{"response":{"docs":[{"id":"vrc_pec_35913","title":"Robert Russa Moton Museum, Farmville, Va., 50th anniversary of the student strike, Sam Wilson and Hunter Watson, 2001","collection_id":"vrc_pec","collection_title":"Edward H. Peeples Prince Edward County (Va.) Public Schools","dcterms_contributor":["Peeples, Edward H. (Edward Harden), 1935-","James Branch Cabell Library. Special Collections and Archives","VCU Libraries"],"dcterms_spatial":["United States, Virginia, Prince Edward County, 37.2243, -78.44108","United States, Virginia, Prince Edward County, Farmville, 37.3021, -78.39194"],"dcterms_creator":null,"dc_date":["2001-04-23"],"dcterms_description":["Sam Wilson and Hunter Watson, Chair Prince Edward County Board of Supervisors, speaking at the Robert Russa Moton Museum, Farmville, Va., on April 23, 2001 on the 50th Anniversary of the Prince Edward County African American student strike at Robert R. Moton High School.","37.2651527","-78.3991619","http://maps.google.com/maps?q=37.2912633,%20-78.3977735","Robert Russa Moton Museum"],"dc_format":["image/tiff"],"dcterms_identifier":null,"dcterms_language":["eng"],"dcterms_publisher":null,"dc_relation":null,"dc_right":["http://rightsstatements.org/vocab/InC/1.0/"],"dcterms_is_part_of":["Edward H. Peeples Prince Edward County (Va.) Public Schools"],"dcterms_subject":["Anniversaries","Robert Russa Moton Museum (Farmville, Va.)--Anniversaries, etc.","R. R. Moton High School (Farmville, Va.)--Student strike, 1951--Anniversaries, etc."],"dcterms_title":["Robert Russa Moton Museum, Farmville, Va., 50th anniversary of the student strike, Sam Wilson and Hunter Watson, 2001"],"dcterms_type":["StillImage"],"dcterms_provenance":["James Branch Cabell Library. Special Collections and Archives"],"edm_is_shown_by":null,"edm_is_shown_at":["https://digital.library.vcu.edu/islandora/object/vcu%3A35913"],"dcterms_temporal":null,"dcterms_rights_holder":null,"dcterms_bibliographic_citation":null,"dlg_local_right":["In Copyright - Non-Commercial Use Permitted","This material is protected by copyright, and copyright is held by VCU. You are permitted to use this material in any way that is permitted by copyright. In addition, this material is licensed under a Creative Commons Attribution-Noncommercial-Share Alike 4.0 International license (CC BY-NC-SA 4.0) (https://creativecommons.org/licenses/by-nc-sa/4.0/). Acknowledgment of Virginia Commonwealth University Libraries as a source is required."],"dcterms_medium":["color negatives"],"dcterms_extent":["6 x 9 cm."],"dlg_subject_personal":["Wilson, Sam","Watson, Hunter"],"dcterms_subject_fast":null,"fulltext":null},{"id":"vrc_pec_35889","title":"Robert Russa Moton Museum, Farmville, Va., 50th anniversary of the student strike, sister of Barbara Johns, 2001","collection_id":"vrc_pec","collection_title":"Edward H. Peeples Prince Edward County (Va.) Public Schools","dcterms_contributor":["Peeples, Edward H. (Edward Harden), 1935-","James Branch Cabell Library. Special Collections and Archives","VCU Libraries"],"dcterms_spatial":["United States, Virginia, Prince Edward County, 37.2243, -78.44108","United States, Virginia, Prince Edward County, Farmville, 37.3021, -78.39194"],"dcterms_creator":null,"dc_date":["2001-04-23"],"dcterms_description":["Joan Johns Cobbs, sister of Barbara Johns, at the Robert Russa Moton Museum, Farmville, Va., on April 23, 2001 on the 50th Anniversary of the Prince Edward County African American student strike at Robert R. Moton High School.","37.2651527","-78.3991619","http://maps.google.com/maps?q=37.2912633,%20-78.3977735","Robert Russa Moton Museum"],"dc_format":["image/tiff"],"dcterms_identifier":null,"dcterms_language":["eng"],"dcterms_publisher":null,"dc_relation":null,"dc_right":["http://rightsstatements.org/vocab/InC/1.0/"],"dcterms_is_part_of":["Edward H. Peeples Prince Edward County (Va.) Public Schools"],"dcterms_subject":["Anniversaries","Robert Russa Moton Museum (Farmville, Va.)--Anniversaries, etc.","R. R. Moton High School (Farmville, Va.)--Student strike, 1951--Anniversaries, etc."],"dcterms_title":["Robert Russa Moton Museum, Farmville, Va., 50th anniversary of the student strike, sister of Barbara Johns, 2001"],"dcterms_type":["StillImage"],"dcterms_provenance":["James Branch Cabell Library. Special Collections and Archives"],"edm_is_shown_by":null,"edm_is_shown_at":["https://digital.library.vcu.edu/islandora/object/vcu%3A35889"],"dcterms_temporal":null,"dcterms_rights_holder":null,"dcterms_bibliographic_citation":null,"dlg_local_right":["In Copyright - Non-Commercial Use Permitted","This material is protected by copyright, and copyright is held by VCU. You are permitted to use this material in any way that is permitted by copyright. In addition, this material is licensed under a Creative Commons Attribution-Noncommercial-Share Alike 4.0 International license (CC BY-NC-SA 4.0) (https://creativecommons.org/licenses/by-nc-sa/4.0/). Acknowledgment of Virginia Commonwealth University Libraries as a source is required."],"dcterms_medium":["color negatives"],"dcterms_extent":["6 x 9 cm."],"dlg_subject_personal":["Johns, Barbara, 1935-1991","Cobbs, Joan Johns"],"dcterms_subject_fast":null,"fulltext":null},{"id":"vrc_pec_35890","title":"Robert Russa Moton Museum, Farmville, Va., 50th anniversary of the student strike, sister of Barbara Johns, 2001","collection_id":"vrc_pec","collection_title":"Edward H. Peeples Prince Edward County (Va.) Public Schools","dcterms_contributor":["Peeples, Edward H. (Edward Harden), 1935-","James Branch Cabell Library. Special Collections and Archives","VCU Libraries"],"dcterms_spatial":["United States, Virginia, Prince Edward County, 37.2243, -78.44108","United States, Virginia, Prince Edward County, Farmville, 37.3021, -78.39194"],"dcterms_creator":null,"dc_date":["2001-04-23"],"dcterms_description":["Joan Johns Cobbs, sister of Barbara Johns, at the Robert Russa Moton Museum, Farmville, Va., on April 23, 2001 on the 50th Anniversary of the Prince Edward County African American student strike at Robert R. Moton High School.","37.2651527","-78.3991619","http://maps.google.com/maps?q=37.2912633,%20-78.3977735","Robert Russa Moton Museum"],"dc_format":["image/tiff"],"dcterms_identifier":null,"dcterms_language":["eng"],"dcterms_publisher":null,"dc_relation":null,"dc_right":["http://rightsstatements.org/vocab/InC/1.0/"],"dcterms_is_part_of":["Edward H. Peeples Prince Edward County (Va.) Public Schools"],"dcterms_subject":["Anniversaries","Robert Russa Moton Museum (Farmville, Va.)--Anniversaries, etc.","R. R. Moton High School (Farmville, Va.)--Student strike, 1951--Anniversaries, etc."],"dcterms_title":["Robert Russa Moton Museum, Farmville, Va., 50th anniversary of the student strike, sister of Barbara Johns, 2001"],"dcterms_type":["StillImage"],"dcterms_provenance":["James Branch Cabell Library. Special Collections and Archives"],"edm_is_shown_by":null,"edm_is_shown_at":["https://digital.library.vcu.edu/islandora/object/vcu%3A35890"],"dcterms_temporal":null,"dcterms_rights_holder":null,"dcterms_bibliographic_citation":null,"dlg_local_right":["In Copyright - Non-Commercial Use Permitted","This material is protected by copyright, and copyright is held by VCU. You are permitted to use this material in any way that is permitted by copyright. In addition, this material is licensed under a Creative Commons Attribution-Noncommercial-Share Alike 4.0 International license (CC BY-NC-SA 4.0) (https://creativecommons.org/licenses/by-nc-sa/4.0/). Acknowledgment of Virginia Commonwealth University Libraries as a source is required."],"dcterms_medium":["color negatives"],"dcterms_extent":["6 x 9 cm."],"dlg_subject_personal":["Johns, Barbara, 1935-1991","Cobbs, Joan Johns"],"dcterms_subject_fast":null,"fulltext":null},{"id":"vrc_pec_35888","title":"Robert Russa Moton Museum, Farmville, Va., 50th anniversary of the student strike, sister of Barbara Johns, 2001","collection_id":"vrc_pec","collection_title":"Edward H. Peeples Prince Edward County (Va.) Public Schools","dcterms_contributor":["Peeples, Edward H. (Edward Harden), 1935-","James Branch Cabell Library. Special Collections and Archives","VCU Libraries"],"dcterms_spatial":["United States, Virginia, Prince Edward County, 37.2243, -78.44108","United States, Virginia, Prince Edward County, Farmville, 37.3021, -78.39194"],"dcterms_creator":null,"dc_date":["2001-04-23"],"dcterms_description":["Joan Johns Cobbs, sister of Barbara Johns, at the Robert Russa Moton Museum, Farmville, Va., on April 23, 2001 on the 50th Anniversary of the Prince Edward County African American student strike at Robert R. Moton High School.","37.2651527","-78.3991619","http://maps.google.com/maps?q=37.2912633,%20-78.3977735","Robert Russa Moton Museum"],"dc_format":["image/tiff"],"dcterms_identifier":null,"dcterms_language":["eng"],"dcterms_publisher":null,"dc_relation":null,"dc_right":["http://rightsstatements.org/vocab/InC/1.0/"],"dcterms_is_part_of":["Edward H. Peeples Prince Edward County (Va.) Public Schools"],"dcterms_subject":["Anniversaries","Robert Russa Moton Museum (Farmville, Va.)--Anniversaries, etc.","R. R. Moton High School (Farmville, Va.)--Student strike, 1951--Anniversaries, etc."],"dcterms_title":["Robert Russa Moton Museum, Farmville, Va., 50th anniversary of the student strike, sister of Barbara Johns, 2001"],"dcterms_type":["StillImage"],"dcterms_provenance":["James Branch Cabell Library. Special Collections and Archives"],"edm_is_shown_by":null,"edm_is_shown_at":["https://digital.library.vcu.edu/islandora/object/vcu%3A35888"],"dcterms_temporal":null,"dcterms_rights_holder":null,"dcterms_bibliographic_citation":null,"dlg_local_right":["In Copyright - Non-Commercial Use Permitted","This material is protected by copyright, and copyright is held by VCU. You are permitted to use this material in any way that is permitted by copyright. In addition, this material is licensed under a Creative Commons Attribution-Noncommercial-Share Alike 4.0 International license (CC BY-NC-SA 4.0) (https://creativecommons.org/licenses/by-nc-sa/4.0/). Acknowledgment of Virginia Commonwealth University Libraries as a source is required."],"dcterms_medium":["color negatives"],"dcterms_extent":["6 x 9 cm."],"dlg_subject_personal":["Johns, Barbara, 1935-1991","Cobbs, Joan Johns"],"dcterms_subject_fast":null,"fulltext":null},{"id":"vrc_pec_35906","title":"Robert Russa Moton Museum, Farmville, Va., 50th anniversary of the student strike, Thomas Mayfield, 2001","collection_id":"vrc_pec","collection_title":"Edward H. Peeples Prince Edward County (Va.) Public Schools","dcterms_contributor":["Peeples, Edward H. (Edward Harden), 1935-","James Branch Cabell Library. Special Collections and Archives","VCU Libraries"],"dcterms_spatial":["United States, Virginia, Prince Edward County, 37.2243, -78.44108","United States, Virginia, Prince Edward County, Farmville, 37.3021, -78.39194"],"dcterms_creator":null,"dc_date":["2001-04-23"],"dcterms_description":["Thomas Mayfield speaking at the Robert Russa Moton Museum, Farmville, Va., on April 23, 2001 on the 50th Anniversary of the Prince Edward County African American student strike at Robert R. Moton High School.","37.2651527","-78.3991619","http://maps.google.com/maps?q=37.2912633,%20-78.3977735","Robert Russa Moton Museum"],"dc_format":["image/tiff"],"dcterms_identifier":null,"dcterms_language":["eng"],"dcterms_publisher":null,"dc_relation":null,"dc_right":["http://rightsstatements.org/vocab/InC/1.0/"],"dcterms_is_part_of":["Edward H. Peeples Prince Edward County (Va.) Public Schools"],"dcterms_subject":["Anniversaries","Robert Russa Moton Museum (Farmville, Va.)--Anniversaries, etc.","R. R. Moton High School (Farmville, Va.)--Student strike, 1951--Anniversaries, etc."],"dcterms_title":["Robert Russa Moton Museum, Farmville, Va., 50th anniversary of the student strike, Thomas Mayfield, 2001"],"dcterms_type":["StillImage"],"dcterms_provenance":["James Branch Cabell Library. Special Collections and Archives"],"edm_is_shown_by":null,"edm_is_shown_at":["https://digital.library.vcu.edu/islandora/object/vcu%3A35906"],"dcterms_temporal":null,"dcterms_rights_holder":null,"dcterms_bibliographic_citation":null,"dlg_local_right":["In Copyright - Non-Commercial Use Permitted","This material is protected by copyright, and copyright is held by VCU. You are permitted to use this material in any way that is permitted by copyright. In addition, this material is licensed under a Creative Commons Attribution-Noncommercial-Share Alike 4.0 International license (CC BY-NC-SA 4.0) (https://creativecommons.org/licenses/by-nc-sa/4.0/). Acknowledgment of Virginia Commonwealth University Libraries as a source is required."],"dcterms_medium":["color negatives"],"dcterms_extent":["6 x 9 cm."],"dlg_subject_personal":["Mayfield, Thomas"],"dcterms_subject_fast":null,"fulltext":null},{"id":"vrc_pec_35905","title":"Robert Russa Moton Museum, Farmville, Va., 50th anniversary of the student strike, Vera Allen, 2001","collection_id":"vrc_pec","collection_title":"Edward H. Peeples Prince Edward County (Va.) Public Schools","dcterms_contributor":["Peeples, Edward H. (Edward Harden), 1935-","James Branch Cabell Library. Special Collections and Archives","VCU Libraries"],"dcterms_spatial":["United States, Virginia, Prince Edward County, 37.2243, -78.44108","United States, Virginia, Prince Edward County, Farmville, 37.3021, -78.39194"],"dcterms_creator":null,"dc_date":["2001-04-23"],"dcterms_description":["Vera Allen speaking at the Robert Russa Moton Museum, Farmville, Va., on April 23, 2001 on the 50th Anniversary of the Prince Edward County African American student strike at Robert R. Moton High School.","37.2651527","-78.3991619","http://maps.google.com/maps?q=37.2912633,%20-78.3977735","Robert Russa Moton Museum"],"dc_format":["image/tiff"],"dcterms_identifier":null,"dcterms_language":["eng"],"dcterms_publisher":null,"dc_relation":null,"dc_right":["http://rightsstatements.org/vocab/InC/1.0/"],"dcterms_is_part_of":["Edward H. Peeples Prince Edward County (Va.) Public Schools"],"dcterms_subject":["Anniversaries","Robert Russa Moton Museum (Farmville, Va.)--Anniversaries, etc.","R. R. Moton High School (Farmville, Va.)--Student strike, 1951--Anniversaries, etc."],"dcterms_title":["Robert Russa Moton Museum, Farmville, Va., 50th anniversary of the student strike, Vera Allen, 2001"],"dcterms_type":["StillImage"],"dcterms_provenance":["James Branch Cabell Library. Special Collections and Archives"],"edm_is_shown_by":null,"edm_is_shown_at":["https://digital.library.vcu.edu/islandora/object/vcu%3A35905"],"dcterms_temporal":null,"dcterms_rights_holder":null,"dcterms_bibliographic_citation":null,"dlg_local_right":["In Copyright - Non-Commercial Use Permitted","This material is protected by copyright, and copyright is held by VCU. You are permitted to use this material in any way that is permitted by copyright. In addition, this material is licensed under a Creative Commons Attribution-Noncommercial-Share Alike 4.0 International license (CC BY-NC-SA 4.0) (https://creativecommons.org/licenses/by-nc-sa/4.0/). Acknowledgment of Virginia Commonwealth University Libraries as a source is required."],"dcterms_medium":["color negatives"],"dcterms_extent":["6 x 9 cm."],"dlg_subject_personal":["Allen, Vera"],"dcterms_subject_fast":null,"fulltext":null},{"id":"vrc_pec_35916","title":"Robert Russa Moton Museum, Farmville, Va., 50th anniversary of the student strike, view of audience, 2001","collection_id":"vrc_pec","collection_title":"Edward H. Peeples Prince Edward County (Va.) Public Schools","dcterms_contributor":["Peeples, Edward H. (Edward Harden), 1935-","James Branch Cabell Library. Special Collections and Archives","VCU Libraries"],"dcterms_spatial":["United States, Virginia, Prince Edward County, 37.2243, -78.44108","United States, Virginia, Prince Edward County, Farmville, 37.3021, -78.39194"],"dcterms_creator":null,"dc_date":["2001-04-23"],"dcterms_description":["View of audience at the Robert Russa Moton Museum, Farmville, Va., on April 23, 2001 on the 50th Anniversary of the Prince Edward County African American student strike at Robert R. Moton High School.","37.2651527","-78.3991619","http://maps.google.com/maps?q=37.2912633,%20-78.3977735","Robert Russa Moton Museum"],"dc_format":["image/tiff"],"dcterms_identifier":null,"dcterms_language":["eng"],"dcterms_publisher":null,"dc_relation":null,"dc_right":["http://rightsstatements.org/vocab/InC/1.0/"],"dcterms_is_part_of":["Edward H. Peeples Prince Edward County (Va.) Public Schools"],"dcterms_subject":["Anniversaries","Robert Russa Moton Museum (Farmville, Va.)--Anniversaries, etc.","R. R. Moton High School (Farmville, Va.)--Student strike, 1951--Anniversaries, etc."],"dcterms_title":["Robert Russa Moton Museum, Farmville, Va., 50th anniversary of the student strike, view of audience, 2001"],"dcterms_type":["StillImage"],"dcterms_provenance":["James Branch Cabell Library. Special Collections and Archives"],"edm_is_shown_by":null,"edm_is_shown_at":["https://digital.library.vcu.edu/islandora/object/vcu%3A35916"],"dcterms_temporal":null,"dcterms_rights_holder":null,"dcterms_bibliographic_citation":null,"dlg_local_right":["In Copyright - Non-Commercial Use Permitted","This material is protected by copyright, and copyright is held by VCU. You are permitted to use this material in any way that is permitted by copyright. In addition, this material is licensed under a Creative Commons Attribution-Noncommercial-Share Alike 4.0 International license (CC BY-NC-SA 4.0) (https://creativecommons.org/licenses/by-nc-sa/4.0/). Acknowledgment of Virginia Commonwealth University Libraries as a source is required."],"dcterms_medium":["color negatives"],"dcterms_extent":["6 x 9 cm."],"dlg_subject_personal":null,"dcterms_subject_fast":null,"fulltext":null},{"id":"vrc_pec_35917","title":"Robert Russa Moton Museum, Farmville, Va., 50th anniversary of the student strike, view of tent, 2001","collection_id":"vrc_pec","collection_title":"Edward H. Peeples Prince Edward County (Va.) Public Schools","dcterms_contributor":["Peeples, Edward H. (Edward Harden), 1935-","James Branch Cabell Library. Special Collections and Archives","VCU Libraries"],"dcterms_spatial":["United States, Virginia, Prince Edward County, 37.2243, -78.44108","United States, Virginia, Prince Edward County, Farmville, 37.3021, -78.39194"],"dcterms_creator":null,"dc_date":["2001-04-23"],"dcterms_description":["View of tent at the Robert Russa Moton Museum, Farmville, Va., on April 23, 2001 on the 50th Anniversary of the Prince Edward County African American student strike at Robert R. Moton High School.","37.2651527","-78.3991619","http://maps.google.com/maps?q=37.2912633,%20-78.3977735","Robert Russa Moton Museum"],"dc_format":["image/tiff"],"dcterms_identifier":null,"dcterms_language":["eng"],"dcterms_publisher":null,"dc_relation":null,"dc_right":["http://rightsstatements.org/vocab/InC/1.0/"],"dcterms_is_part_of":["Edward H. Peeples Prince Edward County (Va.) Public Schools"],"dcterms_subject":["Anniversaries","Robert Russa Moton Museum (Farmville, Va.)--Anniversaries, etc.","R. R. Moton High School (Farmville, Va.)--Student strike, 1951--Anniversaries, etc."],"dcterms_title":["Robert Russa Moton Museum, Farmville, Va., 50th anniversary of the student strike, view of tent, 2001"],"dcterms_type":["StillImage"],"dcterms_provenance":["James Branch Cabell Library. Special Collections and Archives"],"edm_is_shown_by":null,"edm_is_shown_at":["https://digital.library.vcu.edu/islandora/object/vcu%3A35917"],"dcterms_temporal":null,"dcterms_rights_holder":null,"dcterms_bibliographic_citation":null,"dlg_local_right":["In Copyright - Non-Commercial Use Permitted","This material is protected by copyright, and copyright is held by VCU. You are permitted to use this material in any way that is permitted by copyright. In addition, this material is licensed under a Creative Commons Attribution-Noncommercial-Share Alike 4.0 International license (CC BY-NC-SA 4.0) (https://creativecommons.org/licenses/by-nc-sa/4.0/). Acknowledgment of Virginia Commonwealth University Libraries as a source is required."],"dcterms_medium":["color negatives"],"dcterms_extent":["6 x 9 cm."],"dlg_subject_personal":null,"dcterms_subject_fast":null,"fulltext":null},{"id":"vrc_pec_35918","title":"Robert Russa Moton Museum, Farmville, Va., 50th anniversary of the student strike, view of tent, 2001","collection_id":"vrc_pec","collection_title":"Edward H. Peeples Prince Edward County (Va.) Public Schools","dcterms_contributor":["Peeples, Edward H. (Edward Harden), 1935-","James Branch Cabell Library. Special Collections and Archives","VCU Libraries"],"dcterms_spatial":["United States, Virginia, Prince Edward County, 37.2243, -78.44108","United States, Virginia, Prince Edward County, Farmville, 37.3021, -78.39194"],"dcterms_creator":null,"dc_date":["2001-04-23"],"dcterms_description":["View of audience and tent at the Robert Russa Moton Museum, Farmville, Va., on April 23, 2001 on the 50th Anniversary of the Prince Edward County African American student strike at Robert R. Moton High School.","37.2651527","-78.3991619","http://maps.google.com/maps?q=37.2912633,%20-78.3977735","Robert Russa Moton Museum"],"dc_format":["image/tiff"],"dcterms_identifier":null,"dcterms_language":["eng"],"dcterms_publisher":null,"dc_relation":null,"dc_right":["http://rightsstatements.org/vocab/InC/1.0/"],"dcterms_is_part_of":["Edward H. Peeples Prince Edward County (Va.) Public Schools"],"dcterms_subject":["Anniversaries","Robert Russa Moton Museum (Farmville, Va.)--Anniversaries, etc.","R. R. Moton High School (Farmville, Va.)--Student strike, 1951--Anniversaries, etc."],"dcterms_title":["Robert Russa Moton Museum, Farmville, Va., 50th anniversary of the student strike, view of tent, 2001"],"dcterms_type":["StillImage"],"dcterms_provenance":["James Branch Cabell Library. Special Collections and Archives"],"edm_is_shown_by":null,"edm_is_shown_at":["https://digital.library.vcu.edu/islandora/object/vcu%3A35918"],"dcterms_temporal":null,"dcterms_rights_holder":null,"dcterms_bibliographic_citation":null,"dlg_local_right":["In Copyright - Non-Commercial Use Permitted","This material is protected by copyright, and copyright is held by VCU. You are permitted to use this material in any way that is permitted by copyright. In addition, this material is licensed under a Creative Commons Attribution-Noncommercial-Share Alike 4.0 International license (CC BY-NC-SA 4.0) (https://creativecommons.org/licenses/by-nc-sa/4.0/). Acknowledgment of Virginia Commonwealth University Libraries as a source is required."],"dcterms_medium":["color negatives"],"dcterms_extent":["6 x 9 cm."],"dlg_subject_personal":null,"dcterms_subject_fast":null,"fulltext":null},{"id":"bcas_bcmss0837_1456","title":"\"2000-01 Enrollment and Racial Balance in the Little Rock School District and Pulaski County Special School District,\" Office of Desegregation and Monitoring","collection_id":"bcas_bcmss0837","collection_title":"Office of Desegregation Management","dcterms_contributor":null,"dcterms_spatial":["United States, 39.76, -98.5","United States, Arkansas, 34.75037, -92.50044","United States, Arkansas, Pulaski County, 34.76993, -92.3118","United States, Arkansas, Pulaski County, Little Rock, 34.74648, -92.28959"],"dcterms_creator":["Office of Desegregation Monitoring (Little Rock, Ark.)"],"dc_date":["2001-04-11"],"dcterms_description":null,"dc_format":["application/pdf"],"dcterms_identifier":null,"dcterms_language":["eng"],"dcterms_publisher":["Little Rock, Ark. : Butler Center for Arkansas Studies. Central Arkansas Library System."],"dc_relation":null,"dc_right":["http://rightsstatements.org/vocab/InC-EDU/1.0/"],"dcterms_is_part_of":["Office of Desegregation Monitoring records (BC.MSS.08.37)","History of Segregation and Integration of Arkansas's Educational System"],"dcterms_subject":["Little Rock (Ark.)--History--21st Century","Little Rock School District","School districts--Arkansas--Pulaski County","Office of Desegregation Monitoring (Little Rock, Ark.)","Education--Arkansas","Education--Evaluation","Educational law and legislation","Educational statistics","School enrollment","School improvement programs","School integration","School management and organization","Magnet schools"],"dcterms_title":["\"2000-01 Enrollment and Racial Balance in the Little Rock School District and Pulaski County Special School District,\" Office of Desegregation and Monitoring"],"dcterms_type":["Text"],"dcterms_provenance":["Butler Center for Arkansas Studies"],"edm_is_shown_by":null,"edm_is_shown_at":["http://arstudies.contentdm.oclc.org/cdm/ref/collection/bcmss0837/id/1456"],"dcterms_temporal":null,"dcterms_rights_holder":null,"dcterms_bibliographic_citation":null,"dlg_local_right":["Available for use in research, teaching, and private study. Any other use requires permission from the Butler Center."],"dcterms_medium":["reports"],"dcterms_extent":["50 pages"],"dlg_subject_personal":null,"dcterms_subject_fast":null,"fulltext":null},{"id":"bcas_bcmss0837_27","title":"Arkansas Department of Education's (ADE's) Project Management Tool","collection_id":"bcas_bcmss0837","collection_title":"Office of Desegregation Management","dcterms_contributor":null,"dcterms_spatial":["United States, 39.76, -98.5","United States, Arkansas, 34.75037, -92.50044","United States, Arkansas, Pulaski County, 34.76993, -92.3118"],"dcterms_creator":["Arkansas. Department of Education"],"dc_date":["2001-04","2001-05","2001-06"],"dcterms_description":null,"dc_format":["application/pdf"],"dcterms_identifier":null,"dcterms_language":["eng"],"dcterms_publisher":["Little Rock, Ark. : Butler Center for Arkansas Studies. Central Arkansas Library System."],"dc_relation":null,"dc_right":["http://rightsstatements.org/vocab/InC-EDU/1.0/"],"dcterms_is_part_of":["Office of Desegregation Monitoring records (BC.MSS.08.37)","History of Segregation and Integration of Arkansas's Educational System"],"dcterms_subject":["Education--Arkansas","Little Rock (Ark.). Office of Desegregation Monitoring","School integration--Arkansas","Arkansas. Department of Education","Project managers--Implements"],"dcterms_title":["Arkansas Department of Education's (ADE's) Project Management Tool"],"dcterms_type":["Text"],"dcterms_provenance":["Butler Center for Arkansas Studies"],"edm_is_shown_by":null,"edm_is_shown_at":["http://arstudies.contentdm.oclc.org/cdm/ref/collection/bcmss0837/id/27"],"dcterms_temporal":null,"dcterms_rights_holder":null,"dcterms_bibliographic_citation":null,"dlg_local_right":null,"dcterms_medium":["documents (object genre)"],"dcterms_extent":null,"dlg_subject_personal":null,"dcterms_subject_fast":null,"fulltext":"\n \n\n\n\n\n\n\n\n  \n\n\n   \n\n   \n\n\n   \n\n\n   \n\n\n\n\n   \n\n\n\n\n   \n\n\n\n\n\n\n\n\n   \n\n   \n\n \n\n\n   \n\n   \n\n  \n\n\n   \n\n  \n\n \n\n\n   \n\n  \n\n \n\n\n   \n\n  \n\n  \n\nLittle Rock School District, plaintiff vs. Pulaski County Special School District, defendant.\nIN THE UNITED STATES DISTRICT COURT \\ EASTERN DISTRICT OF ARKANSAS ~ WESTERN DMSION ! RECEIVED \\t.\\~1 4 - 100\\ Qff\\ttOf lllfll6'1\\0ll tAQll{roR\\tlQ LITTLE ROCK SCHOOL DISTRICT PLAINTIFF v. No. LR-C-82-866 PULASKI COUNTY SPECIAL SCHOOL DISTRICT NO. 1, et al. DEFENDANTS NOTICE OF FILING In accordance with the Court's Order of December 10, 1993, the Arkansas Department of Education hereby gives notice of the filing of ADE's Project Management Tool for April, 2001. Respectfully Submitted, MARK PRYOR Attorney General ~~T . HAGEMEIER # 127 Assistant Attorney =a1 323 Center Street, Suite 200 Little Rock, Arkansas 72201 (501) 682-3643 Attorney for Arkansas Department of Education CERTIFICATE OF SERVICE I, Mark A Hagemeier, certify that on April 26, 2001, I caused a copy of the foregoing document to be served by U.S. mail, postage prepaid, on the following person(s) at the address(es) indicated: M. Samuel Jones, III Wright, Lindsey \u0026amp; Jennings 2000 ationsBank Bldg. 200 W. Capitol Little Rock, AR 72201 John W. Walker John Walker, P.A. 1723 Broadway Little Rock, AR 72201 Richard Roachell P.O. Box 17388 Little Rock, AR 72222-7388 - Timothy G. Gauger Mitchell, Williams, Selig, Gates \u0026amp; Woodyard 425 West Capitol Ave. Suite 1800 Little Rock, AR 72201-3525 Christopher Heller Friday, Eldredge \u0026amp; Clark 2000 Regions Center 400 W. Capitol Little Rock, AR 72201-3493 Stephen W. Jones Jack, Lyon \u0026amp; Jones 3400 TCBY Tower 425 W. Capitol Little Rock, AR 72201 Ann Brown 201 E. Markham, Ste. 510 Little Rock, AR 72201 INTHE UNITED STATES DISTRICT COURT EASTERN DISTRICT OF ARKANSAS WESTERN DIVISION LITTLE ROCK SCHOOL DISTRICT, ET AL PLAINTIFFS V. NO. LR-C-82-866 PULASKI COUNTY SPECIAL SCHOOL DISTRICT, ET AL DEFENDANTS MRS. LORENE JOSHUA, ET AL INTERVENORS KATHERINE W. KNIGHT, ET AL INTERVENORS ADE'S PROJECT MANAGEMENT TOOL In compliance with the Court's Order of December 10, 1993, the Arkansas Department of Education (ADE) submits the following Project Management Tool to the parties and the Court. This document describes the progress the ADE has made since March 15, 1994, in complying with provisions of the Implementation Plan and itemizes the ADE's progress against timelines presented in the Plan. - IMPLEMENTATION PHASE ACTIVITY I. FINANCIAL OBLIGATIONS A. Use the previous year's three quarter average daily membership to calculate MFPA (State Equalization) for the current school year. 1. Projected Ending Date Last day of each month, August - June. 2. Actual as of April 30, 2001 Based on the information available.at March 31, 2001, the ADE calculated the Equalization Funding for FY 00/01, subject to periodic adjustments. B. Include all Magnet students in the resident District's average daily membership for calculation. 1. Projected Ending Date Last day of each month, August - June. I. FINANCIAL OBLIGATIONS (Continued) B. Include all Magnet students in the resident District's average daily membership for calculation. (Continued) 2. Actual as of April 30, 2001 Based on the information available at March 31, 2001, the ADE calculated for FY 00/01, subject to periodic adjustments. C. Process and distribute State MFPA. 1. Projected Ending Date Last day of each month, August - June. 2. Actual as of April 30, 2001 On March 31, 2001 , clistributions of State Equalization Funding for FY 00/01 were as follows: LRSD - $38,391,330 NLRSD - $20,491,872 PCSSD - $41,159,823 The allotments of State Equalization Funding calculated for FY 00/01 at March 31 , 2001, subject to periodic adjustments, were as follows: LRSD - $52,788,081 NLRSD - $28,176,324 PCSSD - $56,594,757 D. Determine the number of Magnet students residing in each District and attending a Magnet School. 1. Projected Ending Date Last day of each month, August - June. 2. Actual as of April 30, 2001 Based on the information available, the ADE calculated at March 31, 2001 for FY 00/01, subject to periodic adjustments. E. Desegregation Staff Attorney reports the Magnet Operational Charge to the Fiscal Services Office. 1. Projected Ending Date Ongoing, as ordered by the Court. 2 I. FINANCIAL OBLIGATIONS (Continued) E. Desegregation Staff Attorney reports the Magnet Operational Charge to the Fiscal Services Office. (Continued) 2. Actual as of April 30, 2001 Basea on the information availa6Ie, the ADE calculated at March 31, 2001 for FY 00/01, subject to Rerioaic adjustments. It should be noted that currently the Magnet Review Committee is reporting this information instead of the staff attorney as indicated in the Implementation Plan. F. Calculate state aid due the LRSD based upon the Magnet Operational Charge. 1. Projected Ending Date Last day of each month, August - June. 2. Actual as of April 30, 2001 Based on the information available, the ADE calculated at March 31, 2001 for FY 00/01, subject to periodic adjustments. G. Process and distribute state aid for Magnet Operational Charge. 1. Projected Ending Date Last day of each month, August - June. 2. Actual as of April 30, 2001 Distributions for FY 00/01 at March 31, 2001, totaled $7,753,631. Allotment calculated for FY 00/01 was $10,763,339 subject to periodic adjustments. H. Calculate the amount of M-to-M incentive money to which each school district is entitled. 1. Projected Ending Date Last day of each month, August - June. 2. Actual as of April 30, 2001 Calculated for FY 00/01, subject to periodic adjustments. I. Process and distribute M-to-M incentive checks. 1. Projected Ending Date Last day of each month, September - June. 3 I. FINANCIAL OBLIGATIONS (Continued) I. Process and distribute M-to-M incentive checks. (Continued) 2. Actual as of April 30, 2001 Distributions for FY 00701 at Marcli 31, 2001 were: LRSD - $2,620,338 NLRSD - $1,486,323 PCSSD -$5,190,668 Tfie allotments calculated for FY 00/01 at March 31, 2001, subject to periodic adjustments, were: LRSD - $3,816,614 NLRSD - $2,092,977 PCSSD - $7,301,748 J. Districts submit an estimated Magnet and M-to-M transportation budget to ADE. 1. Projected Ending Date 2. Ongoing, December of each year. Actual as of April 30, 2001 In September 2000, the Magnet and M-to-M transportation budgets for FY 00/01 were submitted to the ADE by the Districts. K. The Coordinator of School Transportation notifies General Finance to pay districts for the Districts' proposed budget. 1. Projected Ending Date Ongoing, annually. 2. Actual as of April 30, 2001 In January 2001, General Finance was notified to pay the second one-third payment for FY 00/01 to the Districts. It should be noted that the Transportation Coordinator is currently performing this function instead of Reginald Wilson as indicated in the Implementation Plan. L. ADE pays districts three equal installments of their proposed budget. 1. Projected Ending Date Ongoing, annually. 4 I. FINANCIAL OBLIGATIONS (Continued) L. ADE pays districts three equal installments of their proposed budget. (Continued) 2. Actual as of April 30, 2001 In January 2001, General Finance made the second one-third payment to the Districts for their FY 00/01 transportation budget. The budget is now paid out in three equal installments. At February 28, 2001, the following had been paid for FY 00/01 : LRSD- $2,197,201.00 NLRSD - $437,233.34 PCSSD -$1,184,784.28 M. ADE verifies actual expenditures submitted by Districts and reviews each bill with each District's transportation coordinator. 1. Projected Ending Date Ongoing, annually. 2. Actual as of April 30, 2001 In August 1997, the ADE transportation coordinator reviewed each district's Magnet and M-to-M transportation costs for FY 96/97. In July 1998, each district was asked to submit an estimated budget for the 98/99 school year. In September 1998, paperwork was generated for the first payment in the 98/99 school year for the Magnet and M-to-M transportation program. School districts should receive payment by October 1, 1998 In July 1999, each district submitted an estimated budget for the 99/00 school year. In September 1999, paperwork was generated for the first payment in the 99/00 school year for the Magnet and M-to-M transportation program. In September 2000, paperwork was generated for the first payment in the 00/01 school year for the Magnet and M-to-M transportation program. 5 I. FINANCIAL OBLIGATIONS (Continued) N. Purchase buses for the Districts to replace existing Magnet and M-to-M fleets and to provide a larger fleet for the Districts' Magnet and M-to-M Transportation needs. 1. Projected Ending Date Ongoing, as stated in Exhibit A of the Implementation Plan. 2. Actual as of April 30, 2001 In FY 94/95, the State purchased 52 buses at a cost of $1,799,431 which were added to or replaced existing Magnet and M-to-M buses in the Districts. The buses were distributed to the Districts as follows: LRSD - 32\nNLRSD - 6\nand PCSSD -14. The ADE purchased 64 Magnet and M-to-M buses at a cost of $2,334,800 in FY 95/96. The buses were distributed accordingly: LRSD - 45\nNLRSD - 7\nand PCSSD -12. In May 1997, the ADE purchased 16 Magnet and M-to-M buses at a cost of $646,400. In July 1997, the ADE purchased 16 Magnet and M-to-M buses at a cost of $624,879. In July 1998, the ADE purchased 16 new Magnet and M-to-M buses at a cost of $695,235. The buses were distributed accordingly: LRSD - 8\nNLRSD - 2\nand PCSSD- 6. Specifications for 16 school buses have been forwarded to state purchasing for bidding in January, 1999 for delivery in July, 1999. The ADE accepted a bid on 16 buses for the Magnet and M/M transportation program. The buses will be delivered after July 1, 1999 and before August 1, 1999. The buses will be distributed accordingly: LRSD - 8\nNLRSD - 2\nPCSSD - 6. In July 1999, the ADE purchased 16 new Magnet and M-to-M buses at a cost of $718,355. The buses were distributed accordingly: LRSD - 8\nNLRSD - 2\nand PCSSD - 6. In July 2000, the ADE purchased 16 new Magnet and M-to-M buses at a cost of $724,165. The buses were distributed accordingly: LRSD - 8\nNLRSD - 2\nand PCSSD-6. 6 I. FINANCIAL OBLIGATIONS (Continued) N. Purchase buses for the Districts to replace existing Magnet and M-to-M fleets and to provide a larger fleet for the Districts' Magnet and M-to-M Transportation needs. (Continued) 2. Actual as of April 30, 2001 The bid for 16 new Magnet and M-to-M buses was let by State Purchasing on February 22, 2001 . The contract was awarded to Ward Transportation Services, Inc. The buses to be purchased include two type C 47 passenger buses and fourteen type C 65 passenger buses. Prices on these units are $43,426.00 each on the 47 passenger buses, and $44,289.00 each on the 65 passenger buses. The buses will be distributed accordingly: LRSD - 8 of the 65 passenger\nNLRSD - 2 of the 65 passenger\nPCSSD - 2 of the 47 passenger and 4 of the 65 passenger buses. 0 . Process and distribute compensatory education payments to LRSD as required by page 23 of the Settlement Agreement. 1. Projected Ending Date 2. July 1 and January 1, of each school year through January 1, 1999. Actual as of April 30, 2001 Obligation fulfilled in FY 96/97. P. Process and distribute additional payments in lieu of formula to LRSD as required by page 24 of the Settlement Agreement. 1. Projected Ending Date Payment due date and ending July 1, 1995. 2. Actual as of April 30, 2001 Obligation fulfilled in FY 95/96. Q. Process and distribute payments to PCSSD as required by Page 28 of the Settlement Agreement. 1. Projected Ending Date Payment due date and ending July 1, 1994. 2. Actual as of April 30, 2001 Final payment was distributed July 1994. 7 I. FINANCIAL OBLIGATIONS (Continued) R. Upon loan request by LRSD accompanied by a promissory note, the ADE makes loans to LRSD. 1. Projected Ending Date Ongoing through July 1, 1999. See Settlement Agreement page 24. 2. Actual as of April 30, 2001 The LRSD received $3,000,000 on September 10, 1998. As of this reporting date, the LRSD has received $20,000,000 in loan proceeds. S. Process and distribute payments in lieu of formula to PCSSD required by page 29 of the Settlement Agreement. T. 1. Projected Ending Date Payment due date and ending July 1, 1995. 2. Actual as of April 30, 2001 Obligation fulfilled in FY 95/96. Process and distribute compensatory education payments to NLRSD as required by page 31 of the Settlement Agreement. 1. Projected Ending Date July 1 of each school year through June 30, 1996. 2. Actual as of April 30, 2001 Obligation fulfilled in FY 95/96. U. Process and distribute check to Magnet Review Committee. 1. Projected Ending Date Payment due date and ending July 1, 1995. 2. Actual as of April 30, 2001 Distribution in July 1997 for FY 97/98 was $75,000. This was the total amount due to the Magnet Review Committee for FY 97 /98. Distribution in July 1998 for FY 98/99 was $75,000. This was the total amount due to the Magnet Review Committee for FY 98/99. 8 I. FINANCIAL OBLIGATIONS (Continued) U. Process and distribute check to Magnet Review Committee. (Continued) 2. Actual as of April 30, 2001 (Continued) Distribution in July 1999 for FY 99/00 was $92,500. This was the total amount due to the Magnet Review Committee for FY 99/00. Distribution in July 2000 for FY 00/01 was $92,500. This was the total amount due to the Magnet Review Committee for FY 00/01 . V. Process and distribute payments for Office of Desegregation Monitoring . 1. Projected Ending Date Not applicable. 2. Actual as of April 30, 2001 Distribution in July 1997 for FY 97/98 was $200,000. This was the total amount due to the ODM for FY 97/98. Distribution in July 1998 for FY 98/99 was $200,000. This was the total amount due to the ODM for FY 98/99. Distribution in July 1999 for FY 99/00 was $200,000. This was the total amount due to the ODM for FY 99/00. Distribution in July 2000 for FY 00/01 was $200,000. This was the total amount due to the ODM for FY 00/01 . 9 II. MONITORING COMPENSATORY EDUCATION A. Begin testing and evaluating the monitoring instrument and monitoring system to assure that data is appropriate and useful in monitoring the impacts of compensatory education programs on disparities in academic achievement for black students and white students. 1. Projected Ending Date January 15, 1995 2. Actual as of April 30, 2001 In May 1995, monitors completed the unannounced visits of schools in Pulaski County. The monitoring process involved a qualitative process of document reviews, interviews, and observations. The monitoring focused on progress made since the announced monitoring visits. In June 1995, monitoring data from unannounced visits was included in the July Semiannual Report. Twenty-five per cent of all classrooms were visited, and all of the schools in Pulaski County were monitored. All principals were interviewed to determine any additional progress since the announced visits. The July 1995 Monitoring Report was reviewed by the ADE administrative team, the Arkansas State Board of Education, and the Districts and filed with the Court. The report was formatted in accordance with the Allen Letter. In October 1995, a common terminology was developed by principals from the Districts and the Lead Planning and Desegregation staff to facilitate the monitoring process. The announced monitoring visits began on November 14, 1995 and were completed on January 26, 1996. Copies of the preliminary Semiannual Monitoring Report and its executive summary were provided to the ADE administrative team and the State Board of Education in January 1996. A report on the current status of the Cycle 5 schools in the ECOE process and their school improvement plans was filed with the Court on February 1, 1996. The unannounced monitoring visits began in February 1996 and ended on May 10, 1996. In June 1996, all announced and unannounced monitoring visits were completed, and the data was analyzed using descriptive statistics. The Districts provided data on enrollment in compensatory education programs. The Districts and the ADE Desegregation Monitoring staff developed a definition for instructional programs. 10 II. MONITORING COMPENSATORY EDUCATION (Continued) A. Begin testing and evaluating the monitoring instrument and monitoring system to assure that data is appropriate and useful in monitoring the impacts of compensatory education programs on disparities in academic achievement for black students and white students. (Continued) 2. Actual as of April 30, 2001 (Continued) The Semiannual Monitoring Report was completed and filed with the Court on July 15, 1996 with copies distributed to the parties. Announced monitoring visits of the Cycle 1 schools began on October 28, 1996 and concluded in December 1996. In January 1997, presentations were made to the State Board of Education, the Desegregation Litigation Oversight Subcommittee, and the parties to review the draft Semiannual Monitoring Report. The monitoring instrument and process were evaluated for their usefulness in monitoring the impacts of compensatory education programs on achievement disparities. In February 1997, the Semiannual Monitoring Report was filed. Unannounced monitoring visits began on February 3, 1997 and concluded in May 1997. In March 1997, letters were sent to the Districts regarding data requirements for the July 1997 Semiannual Monitoring Report and the additional discipline data element that was requested by the Desegregation Litigation Oversight Subcommittee. Desegregation data collection workshops were conducted in the Districts from March 28, 1997 to April 7, 1997. A meeting was conducted on April 3, 1997 to finalize plans for the July 15, 1997 Semiannual Monitoring Report. Onsite visits were made to Cycle 1 schools who did not submit accurate and timely data on discipline, M-to-M transfers, and policy. The July 15, 1997 Semiannual Monitoring Report and its executive summary were finalized in June 1997. In July 1997, the Semiannual Monitoring Report and its executive summary were filed with the court, and the ADE sponsored a School Improvement Conference. On July 10, 1997, copies of the Semiannual Monitoring Report and its executive summary were made available to the Districts for their review prior to filing it with the Court. In August 1997, procedures and schedules were organized for the monitoring of the Cycle 2 schools in FY 97 /98. 11 II. MONITORING COMPENSATORY EDUCATION (Continued) A. Begin testing and evaluating the monitoring instrument and monitoring system to assure that data is appropriate and useful in monitoring the impacts of compensatory education programs on disparities in academic achievement for black students and white students. (Continued) 2. Actual as of April 30, 2001 (Continued) A Desegregation Monitoring and School Improvement Workshop for the Districts was held on September 10, 1997 to discuss monitoring expectations, instruments, data collection and school improvement visits. On October 9, 1997, a planning meeting was held with the desegregation monitoring staff to discuss deadlines, responsibilities, and strategic planning issues regarding the Semiannual Monitoring Report. Reminder letters were sent to the Cycle 2 principals outlining the data collection deadlines and availability of technical assistance. In October and November 1997, technical assistance visits were conducted, and announced monitoring visits of the Cycle 2 schools were completed. In December 1997 and January 1998, technical assistance visits were conducted regarding team visits, technical review recommendations, and consensus building. Copies of the infusion document and perceptual surveys were provided to schools in the ECOE process. The February 1998 Semiannual Monitoring Report was submitted for review and approval to the State Board of Education, the Director, the Administrative Team, the Attorney General's Office, and the Desegregation Litigation Oversight Subcommittee. Unannounced monitoring visits began in February 1998, and technical assistance was provided on the school improvement process, external team visits and finalizing school improvement plans. On February 18, 1998, the representatives of all parties met to discuss possible revisions to the ADE's monitoring plan and monitoring reports. Additional meetings will be scheduled. Unannounced monitoring visits were conducted in March 1998, and technical assistance was provided on the school improvement process and external team visits. In April 1998, unannounced monitoring visits were conducted, and technical assistance was provided on the school improvement process. 12 II. MONITORING COMPENSATORY EDUCATION (Continued) A. Begin testing and evaluating the monitoring instrument and monitoring system to assure that data is appropriate and useful in monitoring the impacts of compensatory education programs on disparities in academic achievement for black students and white students. (Continued) 2. Actual as of April 30, 2001 (Continued) In May 1998, unannounced monitoring visits were completed, and technical assistance was provided on the school improvement process. On May 18, 1998, the Court granted the ADE relief from its obligation to file the July 1998 Semiannual Monitoring Report to develop proposed modifications to ADE's monitoring and reporting obligations. In June 1998, monitoring information previously submitted by the districts in the Spring of 1998 was reviewed and prepared for historical files and presentation to the Arkansas State Board. Also, in June the following occurred: a) The Extended COE Team Visit Reports were completed, b) the Semiannual Monitoring COE Data Report was completed, c) progress reports were submitted from previous cycles, and d.) staff development on assessment (SAT-9) and curriculum alignment was conducted with three supervisors. In July, the Lead Planner provided the Desegregation Litigation Oversight Committee with (1) a review of the court Order relieving ADE of its obligation to file a July Semiannual Monitoring Report, and (2) an update of ADE's progress toward work with the parties and ODM to develop proposed revisions to ADE's monitoring and reporting obligations. The Committee encouraged ODM, the parties and the ADE to continue to work toward revision of the monitoring and reporting process. In August 1998, the ADE Implementation Phase Working group met to review the Implementation Phase activities for the previous quarter. The Assistant Attorney General, the Assistant Director for Accountability and the Education Lead Planner updated the group on all relevant desegregation legal issues and proposed revisions to monitoring and reporting activities during the quarter. In September 1998, tentative monitoring dates were established and they will be finalized once proposed revisions to the Desegregation Monitoring Plan are finalized and approved. In September/October 1998, progress was being made on the proposed revisions to the monitoring process by committee representatives of all the Parties in the Pulaski County Settlement Agreement. While the revised monitoring plan is finalized and approved, the ADE monitoring staff will continue to provide technical assistance to schools upon request. In December 1998, requests were received from schools in PCSSD regarding test score analysis and staff Development. Oak Grove is scheduled for January 21, 1999 and Lawson Elementary is also tentatively scheduled in January. 13 II. MONITORING COMPENSATORY EDUCATION (Continued) A. Begin testing and evaluating the monitoring instrument and monitoring system to assure that data is appropriate and useful in monitoring the impacts of compensatory education programs on disparities in academic achievement for black students and white students. (Continued) 2. Actual as of April 30, 2001 (Continued) Staff development regarding test score analysis for Oak Grove and Lawson Elementary in the PCSSD has been rescheduled for April 2000. Staff development regarding test score analysis for Oak Grove and Lawson Elementary in the PCSSD was conducted on May 5, 2000 and May 9, 2000 respectively. Staff development regarding classroom management was provided to the Franklin Elementary School in LRSD on November 8, 2000. Staff development regarding ways to improve academic achievement was presented to College Station Elementary in PCSSD on November 22, 2000. On November 1, 2000, the ADE Implementation Phase Working group met to review the Implementation Phase activities for the previous quarter. The Assistant Director for Accountability updated the group on all relevant desegregation legal issues and discussed revisions to monitoring and reporting activities during the quarter. The next Implementation Phase Working Group Meeting is scheduled for February 27, 2001 in room 201-A at the ADE. The Implementation Phase Working Group meeting that was scheduled for February 27 had to be postponed. It will be rescheduled as soon as possible. 14 Ill. A PETITION FOR ELECTION FOR LRSD WILL BE SUPPORTED SHOULD A MILLAGE BE REQUIRED A. Monitor court pleadings to determine if LRSD has petitioned the Court for a special election. 1. Projected Ending Date Ongoing. 2. Actual as of April 30, 2001 Ongoing. All Court pleadings are monitored monthly. B. Draft and file appropriate pleadings if LRSD petitions the Court for a special election. 1. Projected Ending Date Ongoing 2. Actual as of April 30, 2001 To date, no action has been taken by the LRSD. 15 IV. REPEAL STATUTES AND REGULATIONS THAT IMPEDE DESEGREGATION A. Using a collaborative approach, immediately identify those laws and regulations that appear to impede desegregation. 1. Projected Ending Date December, 1994 2. Actual as of April 30, 2001 The information for this item is detailed under Section IV. E. of this report. B. Conduct a review within ADE of existing legislation and regulations that appear to impede desegregation. C. 1. Projected Ending Date November, 1994 2. Actual as of April 30, 2001 The information for this item is detailed under Section IV.E. of this report. Request of the other parties to the Settlement Agreement that they identify laws and regulations that appear to impede desegregation. 1. Projected Ending Date November, 1994 2. Actual as of April 30, 2001 The information for this item is detailed under Section IV.E. of this report. D. Submit proposals to the State Board of Education for repeal of those regulations that are confirmed to be impediments to desegregation. 1. Projected Ending Date Ongoing 2. Actual as of April 30, 2001 The information for this item is detailed under Section IV.E. of this report. 16 IV. REPEAL STATUTES AND REGULATIONS THAT IMPEDE DESEGREGATION (Continued) E. Submit proposals to the Legislature for repeal of those laws that appear to be impediments to desegregation. 2. Actual as of April 30, 2001 A committee within the ADE was formed in May 1995 to review and collect data on existing legislation and regulations identified by the parties as impediments to desegregation. The committee researched the Districts' concerns to determine if any of the rules, regulations, or legislation cited impede desegregation. The legislation cited by the Districts regarding loss funding and worker's compensation were not reviewed because they had already been litigated. In September 1995, the committee reviewed the following statutes, acts, and regulations: Act 113 of 1993\nADE Director's Communication 93-205\nAct 145 of 1989\nADE Director's Memo 91-67\nADE Program Standards Eligibility Criteria for Special Education\nArkansas Codes 6-18-206, 6-20-307, 6-20-319, and 6-17- 1506. In October 1995, the individual reports prepared by committee members in their areas of expertise and the data used to support their conclusions were submitted to the ADE administrative team for their review. A report was prepared and submitted to the State Board of Education in July 1996. The report concluded that none of the items reviewed impeded desegregation. As of February 3, 1997, no laws or regulations have been determined to impede desegregation efforts. Any new education laws enacted during the Arkansas 81 st Legislative Session will be reviewed at the close of the legislative session to ensure that they do not impede desegregation. In April 1997, copies of all laws passed during the 1997 Regular Session of the 81 st General Assembly were requested from the office of the ADE Liaison to the Legislature for distribution to the Districts for their input and review of possible impediments to their desegregation efforts. In August 1997, a meeting to review the statutes passed in the prior legislative session was scheduled for September 9, 1997. On September 9, 1997, a meeting was held to discuss the review of the statutes passed in the prior legislative session and new ADE regulations. The Districts will be contacted in writing for their input regarding any new laws or regulations that they feel may impede desegregation. Additionally, the Districts will be asked to review their regulations to ensure that they do not impede their desegregation efforts. The committee will convene on December 1, 1997 to review their findings and finalize their report to the Administrative Team and the State Board of Education. 17 IV. REPEAL STATUTES AND REGULATIONS THAT IMPEDE DESEGREGATION (Continued) E. Submit proposals to the Legislature for repeal of those laws that appear to be impediments to desegregation. (Continued) 2. Actual as of April 30, 2001 (Continued) In October 1997, the Districts were asked to review new regulations and statutes for impediments to their desegregation efforts, and advise the ADE, in writing, if they feel a regulation or statute may impede their desegregation efforts. In October 1997, the Districts were requested to advise the ADE, in writing, no later than November 1, 1997 of any new law that might impede their desegregation efforts. As of November 12, 1997, no written responses were received from the Districts. The ADE concludes that the Districts do not feel that any new law negatively impacts their desegregation efforts. The committee met on December 1, 1997 to discuss their findings regarding statutes and regulations that may impede the desegregation efforts of the Districts. The committee concluded that there were no laws or regulations that impede the desegregation efforts of the Districts. It was decided that the committee chair would prepare a report of the committee's findings for the Administrative Team and the State Board of Education. The committee to review statutes and regulations that impede desegregation is now reviewing proposed bills and regulations, as well as laws that are being signed in, for the current 1999 legislative session. They will continue to do so until the session is over. The committee to review statutes and regulations that impede desegregation will meet on April 26, 1999 at the ADE. The committee met on April 26, 1999 at the ADE. The purpose of the meeting was to identify rules and regulations that might impede desegregation, and review within the existing legislation any regulations that might result in an impediment to desegregation. This is a standing committee that is ongoing and a report will be submitted to the State Board of Education once the process is completed. The committee met on May 24, 1999 at the ADE. The committee was asked to review within the existing legislation any regulations that might result in an impediment to desegregation. The committee determined that Mr. Ray Lumpkin would contact the Pulaski County districts to request written response to any rules, regulations or laws that might impede desegregation. The committee would also collect information and data to prepare a report for the State Board. This will be a standing committee. This data gathering will be ongoing until the final report is given to the State Board. On July 26, 1999, the committee met at the ADE. The committee did not report any laws or regulations that they currently thought would impede desegregation, and are still waiting for a response from the three districts in Pulaski County. 18 IV. REPEAL STATUTES AND REGULATIONS THAT IMPEDE DESEGREGATION (Continued) E. Submit proposals to the Legislature for repeal of those laws that appear to be impediments to desegregation. (Continued) 2. Actual as of April 30, 2001 (Continued) The committee met on August 30, 1999 at the ADE to review rules and regulations that might impede desegregation. At that time, there were no laws under review that appeared to impede desegregation. In November, the three districts sent letters to the ADE stating that they have reviewed the laws passed by the 82nd legislative session as well as current rules \u0026amp; regulations and district policies to ensure that they have no ill effect on desegregation efforts. There was some concern from PCSSD concerning a charter school proposal in the Maumelle area. The work of the committee is on-going each month depending on the information that comes before the committee. Any rules, laws or regulations that would impede desegregation will be discussed and reported to the State Board of Education. On October 4, 2000, the ADE presented staff development for assistant superintendents in LRSD, NLRSD and PCSSD regarding school laws of Arkansas. The ADE is in the process of forming a committee to review all Rules and Regulations from the ADE and State Laws that might impede desegregation. The ADE Committee on Statutes and Regulations will review all new laws that might impede desegregation once the 83rd General Assembly has completed this session. 19 V. COMMITMENT TO PRINCIPLES A. Through a preamble to the Implementation Plan, the Board of Education will reaffirm its commitment to the principles of the Settlement Agreement and outcomes of programs intended to apply those principles. 1. Projected Ending Date Ongoing 2. Actual as of April 30, 2001 The preamble was contained in the Implementation Plan filed with the Court on March 15, 1994. B. Through execution of the Implementation Plan, the Board of Education will continue to reaffirm its commitment to the principles of the Settlement Agreement and outcomes of programs intended to apply those principles. 1. Projected Ending Date Ongoing 2. Actual as of April 30, 2001 Ongoing C. Through execution of the Implementation Plan, the Board of Education will continue to reaffirm its commitment to the principles of the Settlement Agreement by actions taken by ADE in response to monitoring results. 1. Projected Ending Date Ongoing 2. Actual as of April 30, 2001 Ongoing D. Through regular oversight of the Implementation Phase's Project Management Tool, and scrutiny of results of ADE's actions, the Board of Education will act on its commitment to the principles of the Settlement Agreement. 1. Projected Ending Date Ongoing 20 V. COMMITMENT TO PRINCIPLES (Continued) D. Through regular oversight of the Implementation Phase's Project Management Tool, and scrutiny of results of ADE's actions, the Board of Education will act on its commitment to the principles of the Settlement Agreement. (Continued) 2. Actual as of April 30, 2001 At each regular monthly meeting of the State Board of Education, the Board is provided copies of the most recent Project Management Tool (PMT) and an executive summary of the PMT for their review and approval. Only activities that are in addition to the Board's monthly review of the PMT are detailed below. In May 1995, the State Board of Education was informed of the total number of schools visited during the monitoring phase and the data collection process. Suggestions were presented to the State Board of Education on how recommendations could be presented in the monitoring reports. In June 1995, an update on the status of the pending Semiannual Monitoring Report was provided to the State Board of Education. In July 1995, the July Semiannual Monitoring Report was reviewed by the State Board of Education. On August 14, 1995, the State Board of Education was informed of the need to increase minority participation in the teacher scholarship program and provided tentative monitoring dates to facilitate reporting requests by the ADE administrative team and the Desegregation Litigation Oversight Subcommittee. In September 1995, the State Board of Education was advised of a change in the PMT from a table format to a narrative format. The Board was also briefed about a meeting with the Office of Desegregation Monitoring regarding the PMT. In October 1995, the State Board of Education was updated on monitoring timelines. The Board was also informed of a meeting with the parties regarding a review of the Semiannual Monitoring Report and the monitoring process, and the progress of the test validation study. In November 1995, a report was made to the State Board of Education regarding the monitoring schedule and a meeting with the parties concerning the development of a common terminology for monitoring purposes. In December 1995, the State Board of Education was updated regarding announced monitoring visits. In January 1996, copies of the draft February Semiannual Monitoring Report and its executive summary were provided to the State Board of Education. 21 V. COMMITMENT TO PRINCIPLES (Continued) D. Through regular oversight of the Implementation Phase's Project Management Tool, and scrutiny of results of ADE's actions, the Board of Education will act on its commitment to the principles of the Settlement Agreement. (Continued) 2. Actual as of April 30, 2001 (Continued) During the months of February 1996 through May 1996, the PMT report was the only item on the agenda regarding the status of the implementation of the Monitoring Plan. In June 1996, the State Board of Education was updated on the status of the bias review study. In July 1996, the Semiannual Monitoring Report was provided to the Court, the parties, ODM, the State Board of Education, and the Desegregation Litigation Oversight Subcommittee. In August 1996, the State Board of Education and the ADE administrative team were provided with copies of the test validation study prepared by Dr. Paul Williams. During the months of September 1996 through December 1996, the PMT was the only item on the agenda regarding the status of the implementation of the Monitoring Plan. On January 13, 1997, a presentation was made to the State Board of Education regarding the February 1997 Semiannual Monitoring Report, and copies of the report and its executive summary were distributed to all Board members. The Project Management Tool and its executive summary were addressed at the February 10, 1997 State Board of Education meeting regarding the ADE's progress in fulfilling their obligations as set forth in the Implementation Plan. In March 1997, the State Board of Education was notified that historical information in the PMT had been summarized at the direction of the Assistant Attorney General in order to reduce the size and increase the clarity of the report. The Board was updated on the Pulaski County Desegregation Case and reviewed the Memorandum Opinion and Order issued by the Court on February 18, 1997 in response to the Districts' motion for summary judgment on the issue of state funding for teacher retirement matching contributions. During the months of April 1997 through June 1997, the PMT was the only item on the agenda regarding the status of the implementation of the Monitoring Plan. The State Board of Education received copies of the July 15, 1997 Semiannual Monitoring Report and executive summary at the July Board meeting. 22 V. COMMITMENT TO PRINCIPLES (Continued) D. Through regular oversight of the Implementation Phase's Project Management Tool, and scrutiny of results of ADE's actions, the Board of Education will act on its commitment to the principles of the Settlement Agreement. (Continued) 2. Actual as of April 30, 2001 (Continued) The Implementation Phase Working Group held its quarterly meeting on August 4, 1997 to discuss the progress made in attaining the goals set forth in the Implementation Plan and the critical areas for the current quarter. A special report regarding a historical review of the Pulaski County Settlement Agreement and the ADE's role and monitoring obligations were presented to the State Board of Education on September 8, 1997. Additionally, the July 15, 1997 Semiannual Monitoring Report was presented to the Board for their review. In October 1997, a special draft report regarding disparity in achievement was submitted to the State Board Chairman and the Desegregation Litigation Oversight Subcommittee. In November 1997, the State Board of Education was provided copies of the monthly PMT and its executive summary. The Implementation Phase Working Group held its quarterly meeting on November 3, 1997 to discuss the progress made in attaining the goals set forth in the Implementation Plan and the critical areas for the current quarter. In December 1997, the State Board of Education was provided copies of the monthly PMT and its executive summary. In January 1998, the State Board of Education reviewed and discussed ODM's report on the ADE's monitoring activities and instructed the Director to meet with the parties to discuss revisions to the ADE's monitoring plan and monitoring reports. In February 1998, the State Board of Education reviewed and approved the PMT and discussed the February 1998 Semiannual Monitoring Report. In March 1998, the State Board of Education reviewed and approved the PMT and its executive summary and was provided an update regarding proposed revisions to the monitoring process. In April 1998, the State Board of Education reviewed and approved the PMT and its executive summary. In May 1998, the State Board of Education reviewed and approved the PMT and its executive summary. 23 V. COMMITMENT TO PRINCIPLES (Continued) D. Through regular oversight of the Implementation Phase's Project Management Tool, and scrutiny of results of ADE's actions, the Board of Education will act on its commitment to the principles of the Settlement Agreement. (Continued) 2. Actual as of April 30, 2001 (Continued) In June 1998, the State Board of Education reviewed and approved the PMT and its executive summary. The State Board of Education also reviewed how the ADE would report progress in the PMT concerning revisions in ADE's Monitoring Plan. In July 1998, the State Board of Education reviewed and approved the PMT and its executive summary. The State Board of Education also received an update on Test Validation, the Desegregation Litigation Oversight Committee Meeting, and revisions in ADE's Monitoring Plan. In August 1998, the State Board of Education reviewed and approved the PMT and its executive summary. The Board also received an update on the five discussion points regarding the proposed revisions to the monitoring and reporting process. The Board also reviewed the basic goal of the Minority Recruitment Committee. In September 1998, the State Board of Education reviewed the proposed modifications to the Monitoring plans by reviewing the common core of written response received from the districts. The primary commonalities were (1) Staff Development, (2) Achievement Disparity and (3) Disciplinary Disparity. A meeting of the parties is scheduled to be conducted on Thursday, September 17, 1998. The Board encouraged the Department to identify a deadline for Standardized Test Validation and Test Selection. In October 1998, the Board received the progress report on Proposed Revisions to the Desegregation Monitoring and Reporting Process (see XVIII). The Board also reviewed and approved the PMT and its executive summary. In November, the Arkansas State Board of Education reviewed the PMT and its executive summary. The Board also received an update on the proposed revisions in the Desegregation monitoring Process and the update on Test validation and Test Selection provisions of the Settlement Agreement. The Board was also notified that the Implementation Plan Working Committee held its quarterly meeting to review progress and identify quarterly priorities. In December, the State Board of Education reviewed the PMT and its executive summary. The Board also received an update on the joint motion by the ADE, the LRSD, NLRSD, and the PCSSD, to relieve the Department of its obligation to file a February Semiannual Monitoring Report. The Board was also notified that the Joshua lntervenors filed a motion opposing the joint motion. The Board was informed that the ADE was waiting on a response from Court. 24 V. COMMITMENT TO PRINCIPLES (Continued) D. Through regular oversight of the Implementation Phase's Project Management Tool, and scrutiny of results of ADE's actions, the Board of Education will act on its commitment to the principles of the Settlement Agreement. (Continued) 2. Actual as of April 30, 2001 (Continued) In January, the Arkansas State Board of Education reviewed the PMT and its executive summary. The Board also received an update on the joint motion of the ADE, LRSD, PCSSD, and NLRSD for an order relieving the ADE of filing a February 1999 Monitoring Report. The motion was granted subject to the following three conditions: (1) notify the Joshua intervenors of all meetings between the parties to discuss proposed changes, (2) file with the Court on or before February 1, 1999, a report detailing the progress made in developing proposed changes and (3) identify ways in which ADE might assist districts in their efforts to improve academic achievement. In February, the Arkansas State Board of Education reviewed the PMT and its executive summary. The Board was informed that the three conditions: (1) notify the Joshua lntervenors of all meetings between the parties to discuss proposed changes, (2) file with the Court on or before February 1, 1999, a report detailing the progress made in developing proposed changes and (3) identify ways in which ADE might assist districts in their efforts to improve academic achievement had been satisfied. The Joshua lntervenors were invited again to attend the meeting of the parties and they attended on January 13, and January 28, 1999. They are also scheduled to attend on February 17, 1998. The report of progress, a collaborative effort from all parties was presented to court on February 1, 1999. The Board was also informed that additional items were received for inclusion in the revised report, after the deadline for the submission of the progress report and the ADE would: (1) check them for feasibility, and fiscal impact if any, and (2) include the items in future drafts of the report. In March, the Arkansas State Board of Education reviewed the PMT and its executive summary. The Board also received and reviewed the Desegregation Monitoring and Assistance Progress Report submitted to Court on February 1, 1999. On April 12, and May 10, 1999, the Arkansas State Board of Education reviewed the PMT and its executive summary. The Board also was notified that once the financial section of the proposed plan was completed, the revised plan would be submitted to the board for approval. On June 14, 1999, the Arkansas State Board of Education reviewed the PMT and its executive summary. The Board also was notified that once the financial section of the proposed plan was completed, the revised plan would be submitted to the board for approval. 25 V. COMMITMENT TO PRINCIPLES (Continued) D. Through regular oversight of the Implementation Phase's Project Management Tool, and scrutiny of results of ADE's actions, the Board of Education will act on its commitment to the principles of the Settlement Agreement. (Continued) 2. Actual as of April 30, 2001 (Continued) On July 12, 1999, the Arkansas State Board of Education reviewed the PMT and its executive summary. The Board also was notified that once the financial section of the proposed plan was completed, the revised plan would be submitted to the board for approval. On August 9, 1999, the Arkansas State Board of Education reviewed the PMT and its executive summary. The Board was also notified that the new Desegregation Monitoring and Assistance Plan would be ready to submit to the Board for their review \u0026amp; approval as soon as plans were finalized. On September 13, 1999, the Arkansas State Board of Education reviewed the PMT and its executive summary. The Board was also notified that the new Desegregation Monitoring and Assistance Plan would be ready to submit to the Board for their review \u0026amp; approval as soon as plans were finalized. On October 12, 1999, the Arkansas State Board of Education reviewed the PMT and its executive summary. The Board was notified that on September 21 , 1999 that the Office of Education Lead Planning and Desegregation Monitoring meet before the Desegregation Litigation Oversight Subcommittee and presented them with the draft version of the new Desegregation Monitoring and Assistance Plan. The State Board was notified that the plan would be submitted for Board review and approval when finalized. On November 8, 1999, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of October. On December 13, 1999, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of November. On January 10, 2000, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of December. On February 14, 2000, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of January. On March 13, 2000, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of February. On April 10, 2000, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of March. 26 V. COMMITMENT TO PRINCIPLES (Continued) D. Through regular oversight of the Implementation Phase's Project Management Tool, and scrutiny of results of ADE's actions, the Board of Education will act on its commitment to the principles of the Settlement Agreement. (Continued) 2. Actual as of April 30, 2001 (Continued) On May 8, 2000, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of April. On June 12, 2000, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of May. On July 10, 2000, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of June. On August 14, 2000, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of July. On September 11, 2000, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of August. On October 9, 2000, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of September. On November 13, 2000, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of October. On December 11, 2000, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of November. On January 8, 2001 , the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of December. On February 12, 2001, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of January. On March 12, 2001 , the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of February. On April 9, 2001 , the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of March. 27 VI. REMEDIATION A. Through the Extended COE process, the needs for technical assistance by District, by School, and by desegregation compensatory education programs will be identified. 1. Projected Ending Date Ongoing 2. Actual as of April 30, 2001 During May 1995, team visits to Cycle 4 schools were conducted, and plans were developed for reviewing the Cycle 5 schools. In June 1995, the current Extended COE packet was reviewed, and enhancements to the Extended COE packet were prepared. In July 1995, year end reports were finalized by the Pulaski County field service specialists, and plans were finalized for reviewing the draft improvement plans of the Cycle 5 schools. In August 1995, Phase I - Cycle 5 school improvement plans were reviewed. Plans were developed for meeting with the Districts to discuss plans for Phase II - Cycle 1 schools of Extended COE, and a school improvement conference was conducted in Hot Springs. The technical review visits for the FY 95/96 year and the documentation process were also discussed. In October 1995, two computer programs, the Effective Schools Planner and the Effective Schools Research Assistant, were ordered for review, and the first draft of a monitoring checklist for Extended COE was developed. Through the Extended COE process, the field service representatives provided technical assistance based on the needs identified within the Districts from the data gathered. In November 1995, ADE personnel discussed and planned for the FY 95/96 monitoring, and onsite visits were conducted to prepare schools for the FY 95/96 team visits. Technical review visits continued in the Districts. In December 1995, announced monitoring and technical assistance visits were conducted in the Districts. At December 31 , 1995, approximately 59% of the schools in the Districts had been monitored. Technical review visits were conducted during January 1996. In February 1996, announced monitoring visits and midyear monitoring reports were completed, and the field service specialists prepared for the spring NCA/COE peer team visits. 28 VI. REMEDIATION (Continued) A. Through the Extended COE process, the needs for technical assistance by District, by School, and by desegregation compensatory education programs will be identified. (Continued) 2. Actual as of April 30, 2001 (Continued) In March 1996, unannounced monitoring visits of Cycle 5 schools commenced, and two-day peer team visits of Cycle 5 schools were conducted. Two-day team visit materials, team lists and reports were prepared. Technical assistance was provided to schools in final preparation for team visits and to schools needing any school improvement information. In April and May 1996, the unannounced monitoring visits were completed. The unannounced monitoring forms were reviewed and included in the July monitoring report. The two-day peer team visits were completed, and annual COE monitoring reports were prepared. In June 1996, all announced and unannounced monitoring visits of the Cycle 5 schools were completed, and the data was analyzed. The Districts identified enrollment in compensatory education programs. The Semiannual Monitoring Report was completed and filed with the Court on July 15, 1996, and copies were distributed to the parties. During August 1996, meetings were held with the Districts to discuss the monitoring requirements. Technical assistance meetings with Cycle 1 schools were planned for 96/97. The Districts were requested to record discipline data in accordance with the Allen Letter. In September 1996, recommendations regarding the ADE monitoring schedule for Cycle 1 schools and content layouts of the semiannual report were submitted to the ADE administrative team for their review. Training materials were developed and schedules outlined for Cycle 1 schools. In October 1996, technical assistance needs were identified and addressed to prepare each school for their team visits. Announced monitoring visits of the Cycle 1 schools began on October 28, 1996. In December 1996, the announced monitoring visits of the Cycle 1 schools were completed, and technical assistance needs were identified from school site visits. In January 1997, the ECOE monitoring section identified technical assistance needs of the Cycle 1 schools, and the data was reviewed when the draft February Semiannual Monitoring Report was presented to the Desegregation Litigation Oversight Subcommittee, the State Board of Education, and the parties. 29 VI. REMEDIATION (Continued) A. Through the Extended COE process, the needs for technical assistance by District, by School, and by desegregation compensatory education programs will be identified. (Continued) 2. Actual as of April 30, 2001 (Continued) In February 1997, field service specialists prepared for the peer team visits of the Cycle 1 schools. NCA accreditation reports were presented to the NCA Committee, and NCA reports were prepared for presentation at the April NCA meeting in Chicago. From March to May 1997, 111 visits were made to schools or central offices to work with principals, ECOE steering committees, and designated district personnel concerning school improvement planning. A workshop was conducted on Learning Styles for Geyer Springs Elementary School. A School Improvement Conference was held in Hot Springs on July 15-17, 1997. The conference included information on the process of continuous school improvement, results of the first five years of COE, connecting the mission with the school improvement plan, and improving academic performance. Technical assistance needs were evaluated for the FY 97 /98 school year in August 1997. From October 1997 to February 1998, technical reviews of the ECOE process were conducted by the field service representatives. Technical assistance was provided to the Districts through meetings with the ECOE steering committees, assistance in analyzing perceptual surveys, and by providing samples of school improvement plans, Gold File catalogs, and web site addresses to schools visited. Additional technical assistance was provided to the Districts through discussions with the ECOE committees and chairs about the process. In November 1997, technical reviews of the ECOE process were conducted by the field service representatives in conjunction with the announced monitoring visits. Workshops on brainstorming and consensus building and asking strategic questions were held in January and February 1998. In March 1998, the field service representatives conducted ECOE team visits and prepared materials for the NCA workshop. Technical assistance was provided in workshops on the ECOE process and team visits. In April 1998, technical assistance was provided on the ECOE process and academically distressed schools. In May 1998, technical assistance was provided on the ECOE process, and team visits were conducted. 30 VI. REMEDIATION (Continued) A. Through the Extended COE process, the needs for technical assistance by District, by School, and by desegregation compensatory education programs will be identified. (Continued) 2. Actual as of April 30, 2001 (Continued) In June 1998, the Extended COE Team Visit Reports were completed. A School Improvement Conference was held in Hot Springs on July 13-15, 1998. Major conference topics included information on the process of continuous school improvement, curriculum alignment, \"Smart Start,\" Distance Learning, using data to improve academic performance, educational technology, and multicultural education. All school districts in Arkansas were invited and representatives from Pulaski County attended. In September 1998, requests for technical assistance were received, visitation schedules were established, and assistance teams began visiting the Districts. Assistance was provided by telephone and on-site visits. The ADE provided inservice training on \"Using Data to Sharpen the Focus on Student Achievement\" at Gibbs Magnet Elementary school on October 5, 1998 at their request. The staff was taught how to increase test scores through data disaggregation, analysis, alignment, longitudinal achievement review, and use of individualized test data by student, teacher, class and content area. Information was also provided regarding the \"Smart Start\" and the \"Academic Distress\" initiatives. On October 20, 1998, ECOE technical assistance was provided to Southwest Jr. High School. B. Identify available resources for providing technical assistance for the specific condition, or circumstances of need, considering resources within ADE and the Districts, and also resources available from outside sources and experts. 1. Projected Ending Date Ongoing 2. Actual as of April 30, 2001 The information for this item is detailed under Section VI.F. of this report. C. Through the ERIC system, conduct a literature search for research evaluating compensatory education programs. 1. Projected Ending Date Ongoing 31 VI. REMEDIATION (Continued) C. D. Through the ERIC system, conduct a literature search for research evaluating compensatory education programs. (Continued) 2. Actual as of April 30, 2001 An updated ERIC Search was conducted on May 15, 1995 to locate research on evaluating compensatory education programs. The ADE received the updated ERIC disc that covered material through March 1995. An ERIC search was conducted in September 30, 1996 to identify current research dealing with the evaluation of compensatory education programs, and the articles were reviewed. An ERIC search was conducted in April 1997 to identify current research on compensatory education programs and sent to the Cycle 1 principals and the field service specialists for their use. An Eric search was conducted in October 1998 on the topic of Compensatory Education and related descriptors. The search included articles with publication dates from 1997 through July 1998. Identify and research technical resources available to ADE and the Districts through programs and organizations such as the Desegregation Assistance Center in San Antonio, Texas. 1. Projected Ending Date Summer 1994 2. Actual as of April 30, 2001 The information for this item is detailed under Section VI.F. of this report. E. Solicit, obtain, and use available resources for technical assistance. 1. Projected Ending Date Ongoing 2. Actual as of April 30, 2001 The information for this item is detailed under Section VI.F. of this report. F. Evaluate the impact of the use of resources for technical assistance. 1. Projected Ending Date Ongoing 32 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of April 30, 2001 From March 1995 through July 1995, technical assistance and resources were obtained from the following sources: the Southwest Regional Cooperative\nUALR regarding training for monitors\nODM on a project management software\nADHE regarding data review and display\nand Phi Delta Kappa, the Desegregation Assistance Center and the Dawson Cooperative regarding perceptual surveys. Technical assistance was received on the Microsoft Project software in November 1995, and a draft of the PMT report using the new software package was presented to the ADE administrative team for review. In December 1995, a data manager was hired permanently to provide technical assistance with computer software and hardware. In October 1996, the field service specialists conducted workshops in the Districts to address their technical assistance needs and provided assistance for upcoming team visits. In November and December 1996, the field service specialists addressed technical assistance needs of the schools in the Districts as they were identified and continued to provide technical assistance for the upcoming team visits. In January 1997, a draft of the February 1997 Semiannual Monitoring Report was presented to the State Board of Education, the Desegregation Litigation Oversight Subcommittee, and the parties. The ECOE monitoring section of the report included information that identified technical assistance needs and resources available to the Cycle 1 schools. Technical assistance was provided during the January 29-31 , 1997 Title I MidWinter Conference. The conference emphasized creating a learning community by building capacity schools to better serve all children and empowering parents to acquire additional skills and knowledge to better support the education of their children. In February 1997, three ADE employees attended the Southeast Regional Conference on Educating Black Children. Participants received training from national experts who outlined specific steps that promote and improve the education of black children. On March 6-9, 1997, three members of the ADE's Technical Assistance Section attended the National Committee for School Desegregation Conference. The participants received training in strategies for Excellence and Equity: Empowerment and Training for the Future. Specific information was received regarding the current status of court-ordered desegregation, unitary status, and resegregation and distributed to the Districts and ADE personnel. 33 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of April 30, 2001 (Continued) The field service specialists attended workshops in March on ACT testing and school improvement to identify technical assistance resources available to the Districts and the ADE that will facilitate desegregation efforts. ADE personnel attended the Eighth Annual Conference on Middle Level Education in Arkansas presented by the Arkansas Association of Middle Level Education on April 6-8, 1997. The theme of the conference was Sailing Toward New Horizons. In May 1997, the field service specialists attended the NCA annual conference and an inservice session with Mutiu Fagbayi. An Implementation Oversight Committee member participated in the Consolidated COE Plan inservice training. In June and July 1997, field service staff attended an SAT-9 testing workshop and participated in the three-day School Improvement Conference held in Hot Springs. The conference provided the Districts with information on the COE school improvement process, technical assistance on monitoring and assessing achievement, availability of technology for the classroom teacher, and teaching strategies for successful student achievement. In August 1997, field service personnel attended the ASCD Statewide Conference and the AAEA Administrators Conference. On August 18, 1997, the bi-monthly Team V meeting was held and presentations were made on the Early Literacy Learning in Arkansas (ELLA) program and the Schools of the 21st Century program. In September 1997, technical assistance was provided to the Cycle 2 principals on data collection for onsite and offsite monitoring. ADE personnel attended the Region VI Desegregation Conference in October 1997. Current desegregation and educational equity cases and unitary status issues were the primary focus of the conference. On October 14, 1997, the bi-monthly Team V meeting was held in Paragould to enable members to observe a 21st Century school and a school that incorporates traditional and multi-age classes in its curriculum. In November 1997, the field service representatives attended the Governor's Partnership Workshop to discuss how to tie the committee's activities with the ECOE process. 34 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of April 30, 2001 (Continued) In March 1998, the field service representatives attended a school improvement conference and conducted workshops on team building and ECOE team visits. Staff development seminars on Using Data to Sharpen the Focus on Student Achievement are scheduled for March 23, 1998 and March 27, 1998 for the Districts. In April 1998, the Districts participated in an ADE seminar to aid them in evaluating and improving student achievement. In August 1998, the Field Service Staff attended inservice to provide further assistance to schools, i.e., Title I Summer Planning Session, ADE session on Smart Start, and the School Improvement Workshops. All schools and districts in Pulaski County were invited to attend the \"Smart Start\" Summit November 9, 10, and 11 to learn more about strategies to increase student performance. \"Smart Start\" is a standards-driven educational initiative which emphasizes the articulation of clear standards for student achievement and accurate measures of progress against those standards through assessments, staff development and individual school accountability. The Smart Start Initiative focused on improving reading and mathematics achievement for all students in Grades K-4. Representatives from all three districts attended. On January 21 , 1998, the ADE provided staff development for the staff at Oak Grove Elementary School designed to assist them with their efforts to improve student achievement. Using achievement data from Oak Grove, educators reviewed trends in achievement data, identified areas of greatest need, and reviewed seven steps for improving student performance. On February 24, 1999, the ADE provided staff development for the administrative staff at Clinton Elementary School regarding analysis of achievement data. On February 15, 1999, staff development was rescheduled for Lawson Elementary School. The staff development program was designed to assist them with their efforts to improve student achievement using achievement data from Lawson, educators reviewed the components of the Arkansas Smart Initiative, trends in achievement data, identified areas of greatest need, and reviewed seven steps for improving student performance. Student Achievement Workshops were rescheduled for Southwest Jr. High in the Little Rock School District, and the Oak Grove Elementary School in the Pulaski County School District. 35 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of April 30, 2001 (Continued) On April 30, 1999, a Student Achievement Workshop was conducted for Oak Grove Elementary School in PCSSD. The Student Achievement Workshop for Southwest Jr. High in LRSD has been rescheduled. On June 8, 1999, a workshop was presented to representatives from each of the Arkansas Education Service Cooperatives and representatives from each of the three districts in Pulaski County. The workshop detailed the Arkansas Comprehensive Testing, Assessment and Accountability Program (ACTAAP). On June 18, 1999, a workshop was presented to administrators of the NLRSD. The workshop detailed the Arkansas Comprehensive Testing, Assessment and Accountability Program (ACTAAP) . On August 16, 1999, professional development on ways to increase student achievement and the components of the new ACTAAP program was presented during the preschool staff development activities for teaching assistant in the LRSD. On August 20, 1999, professional development on ways to increase student achievement and the components of the new ACTAAP program was presented during the preschool staff development activities for the Accelerated Learning Center in the LRSD. On September 13, 1999, professional development on ways to increase student achievement and the components of the new ACTAAP program were presented to the staff at Booker T. Washington Magnet Elementary School. On September 27, 1999, professional development on ways to increase student achievement was presented to the Middle and High School staffs of the NLRSD. The workshop also covered the components of the new ACTAAP program, and ACT 999 of 1999. On October 26, 1999, professional development on ways to increase student achievement was presented to LRSD personnel through a staff development training class. The workshop also covered the components of the new ACT AAP program, and ACT 999 of 1999. On December 7, 1999, professional development on ways to increase student achievement was scheduled for Southwest Middle School in the LRSD. The workshop was also set to cover the components of the new ACTAAP program, and ACT 999 of 1999. However, Southwest Middle School administrators had a need to reschedule, therefore the workshop will be rescheduled. On January 10, 2000, professional development on ways to increase student achievement was conducted for both Dr. Martin Luther King Magnet Elementary School \u0026amp; Little Rock Central High School. The workshops also covered the components of the new ACT AAP program, and ACT 999 of 1999. 36 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of April 30, 2001 (Continued) On March 1, 2000, professional development on ways to increase student achievement was conducted for all principals and district level administrators in the PCSSD. The workshop also covered the components of the new ACTAAP program, and ACT 999 of 1999. On April 12, 2000, professional development on ways to increase student achievement was conducted for the LRSD. The workshop also covered the components of the new ACT AAP program, and ACT 999 of 1999. Targeted staffs from the middle and junior high schools in the three districts in Pulaski County attended the Smart Step Summit on May 1 and May 2. Training was provided regarding the overview of the \"Smart Step\" initiative, \"Standard and Accountability in Action,\" and \"Creating Learning Environments Through Leadership Teams.\" The ADE provided training on the development of alternative assessment September 12-13, 2000. Information was provided regarding the assessment of Special Education and LEP students. Representatives from each district were provided the opportunity to select a team of educators from each school within the district to participate in professional development regarding Integrating Curriculum and Assessment K-12. The professional development activity was directed by the national consultant, Dr. Heidi Hays Jacobs, on September 14 and 15, 2000. The ADE provided professional development workshops from October 2 through October 13, 2000 regarding, \"The Write Stuff: Curriculum Frameworks, Content Standards and Item Development.\" Experts from the Data Recognition Corporation provided the training. Representatives from each district were provided the opportunity to select a team of educators from each school within the district to participate. The ADE provided training on Alternative Assessment Portfolio Systems by video conference for Special Education and LEP Teachers on November 17, 2000. Also, Alternative Assessment Portfolio System Training was provided for testing coor.dinators through teleconference broadcast on November 27, 2000. On December 12, 2000, the ADE provided training for Test Coordinators on end of course assessments in Geometry and Algebra I Pilot examination. Experts from the Data Recognition Corporation conducted the professional development at the Arkansas Teacher Retirement Building. 37 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of April 30, 2001 (Continued) The ADE presented a one-day training session with Dr. Cecil Reynolds on the Behavior Assessment for Children (BASC). This took place on December 7, 2000 at the NLRSD Administrative Annex. Dr. Reynolds is a practicing clinical psychologist. He is also a professor at Texas A \u0026amp; M University and a nationally known author. In the training, Dr. Reynolds addressed the following: 1) how to use and interpret information obtained on the direct observation form, 2) how to use this information for programming, 3) when to use the BASC, 4) when to refer for more or additional testing or evaluation, 5) who should complete the forms and when, (i.e., parents, teachers, students), 6) how to correctly interpret scores. This training was intended to especially benefit School Psychology Specialists, psychologists, psychological examiners, educational examiners and counselors. During January 22-26, 2001 the ADE presented the ACT AAP Intermediate (Grade 6) Benchmark Professional Development Workshop on Item Writing. Experts from the Data Recognition Corporation provided the training. Representatives from each district were invited to attend. On January 12, 2001 the ADE presented test administrators training for mid-year End of Course (Pilot) Algebra I and Geometry exams. This was provided for schools with block scheduling. On January 13, 2001 the ADE presented SmartScience Lessons and worked with teachers to produce curriculum. This was shared with eight Master Teachers. The SmartScience Lessons were developed by the Arkansas Science Teachers Association in conjunction with the Wilbur Mills Educational Cooperative under an Eisenhower grant provided by the ADE. The purpose of SmartScience is to provide K-6 teachers with activity-oriented science lessons that incorporate reading, writing, and mathematics skills. The following training has been provided for educators in the three districts in Pulaski County by the Division of Special Education at the ADE since January 2000: On January 6, 2000, training was conducted for the Shannon Hills Pre-school Program, entitled \"Things you can do at home to support your child's learning.\" This was presented by Don Boyd - ASERC and Shelley Weir. The school's director and seven parents attended. On March 8, 2000, training was conducted for the Southwest Middle School in Little Rock, on ADD. Six people attended the training . There was follow-up training on Learning and Reading Styles on March 26. This was presented by Don Boyd - ASERC and Shelley Weir. 38 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of April 30, 2001 (Continued) On September 7, 2000, Autism and Classroom Accommodations for the LRSD at Chicot Elementary School was presented. Bryan Ayres and Shelley Weir were presenters. The participants were: Karen Sabo, Kindergarten Teacher\nMelissa Gleason, Paraprofessional\nCurtis Mayfield, P.E. Teacher\nLisa Poteet, Speech Language Pathologist\nJane Harkey, Principal\nKathy Penn-Norman, Special Education Coordinator\nAlice Phillips, Occupational Therapist. On September 15, 2000, the Governor's Developmental Disability Coalition Conference presented Assistive Technology Devices \u0026amp; Services. This was held at the Arlington Hotel in Hot Springs. Bryan Ayres was the presenter. On September 19, 2000, Autism and Classroom Accommodations for the LRSD at Jefferson Elementary School was presented. Bryan Ayres and Shelley Weir were presenters. The participants were: Melissa Chaney, Special Education Teacher\nBarbara Barnes, Special Education Coordinator\na Principal, a Counselor, a Librarian, and a Paraprofessional. On October 6, 2000, Integrating Assistive Technology Into Curriculum was presented at a conference in the Hot Springs Convention Center. Presenters were: Bryan Ayers and Aleecia Starkey. Speech Language Pathologists from LRSD and NLRSD attended. On October 24, 2000, Consideration and Assessment of Assistive Technology was presented through Compressed Video-Teleconference at the ADE facility in West Little Rock. Bryan Ayres was the presenter. On October 25 and 26, 2000, Alternate Assessment for Students with Severe Disabilities for the LRSD at J. A. Fair High School was presented. Bryan Ayres was the presenter. The participants were: Susan Chapman, Special Education Coordinator\nMary Steele, Special Education Teacher\nDenise Nesbit, Speech Language Pathologist\nand three Paraprofessionals. On November 14, 2000, Consideration and Assessment of Assistive Technology was presented through Compressed Video-Teleconference at the ADE facility in West Little Rock. Bryan Ayres was the presenter. On November 17, 2000, training was conducted on Autism for the LRSD at the Instructional Resource Center. Bryan Ayres and Shelley Weir were presenters. On December 5, 2000, Access to the Curriculum Via the use of Assistive Technology Computer Lab was presented. Bryan Ayres was the presenter of this teleconference. The participants were: Tim Fisk, Speech Language Pathologist from Arch Ford Education Service Cooperative at Plumerville and Patsy Lewis, Special Education Teacher from Mabelvale Middle School in the LRSD. 3 9 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of April 30, 2001 (Continued) On January 9, 2001, Consideration and Assessment of Assistive Technology was presented through Compressed Video-Teleconference at the ADE facility in West Little Rock. Bryan Ayres was the presenter. Kathy Brown, a vision consultant from the LRSD, was a participant. On January 23, 2001, Autism and Classroom Modifications for the LRSD at Brady Elementary School was presented. Bryan Ayres and Shelley Weir were presenters. The participants were: Beverly Cook, Special Education Teacher\nAmy Littrell, Speech Language Pathologist\nJan Feurig, Occupational Therapist\nCarolyn James, Paraprofessional\nCindy Kackly, Paraprofessional\nand Rita Deloney, Paraprofessional. The ADE provided training on Alternative Assessment Portfolio Systems for Special Education and Limited English Proficient students through teleconference broadcast on February 5, 2001. Presenters were: Charlotte Marvel, ADE\nDr. Gayle Potter, ADE\nMarcia Harding, ADE\nLynn Springfield, ASERC\nMary Steele, J. A. Fair High School, LRSD\nBryan Ayres, Easter Seals Outreach. This was provided for Special Education teachers and supervisors in the morning, and Limited English Proficient teachers and supervisors in the afternoon. The Special Education session was attended by 29 teachers/administrators and provided answers to specific questions about the alternate assessment portfolio system and the scoring rubric and points on the rubric to be used to score the portfolios. The LEP session was attended by 16 teachers/administrators and disseminated the common tasks to be included in the portfolios: one each in mathematics, writing and reading. On February 12-23, 2001, the ADE and Data Recognition Corporation personnel trained Test Coordinators in the administration of the spring Criterion-Referenced Test. This was provided in 20 sessions at 10 regional sites. Testing protocol, released items, and other testing materials were presented and discussed. The sessions provided training for Primary, Intermediate, and Middle Level Benchmark Exams as well as End of Course Literacy, Algebra and Geometry Pilot Tests. The LRSD had 2 in attendance for the End of Course session and 2 for the Benchmark session. The NLRSD had 1 in attendance for the End of Course session and 1 for the Benchmark session. The PCSSD had 1 in attendance for the End of Course session and 1 for the Benchmark session. 40 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of April 30, 2001 (Continued) On March 15, 2001 , there was a meeting at the ADE to plan professional development for staff who work with Limited English Proficiency (LEP) students. A $30,000 grant has been created to provide LEP training at Chicot Elementary for a year, starting in April 2001 . A $40,000 grant was created to provide a Summer English as Second Language (ESL) Academy for the LRSD from June 18 through 29, 2001. Andre Guerrero from the ADE Accountability section met with Karen Broadnax, ESL Coordinator at LRSD, Pat Price, Early Childhood Curriculum Supervisor at LRSD, and Jane Harkey, Principal of Chicot Elementary. On March 1-2 and 8-29, 2001 , ADE staff performed the following activities: processed registration for April 2 and 3 Alternate Portfolio Assessment video conference quarterly meeting\nanswered questions about Individualized Educational Plan (IEP) and LEP Alternate Portfolio Assessment by phone from schools and Education Service Cooperatives\nand signed up students for alternate portfolio assessment from school districts. On March 6, 2001, ADE staff attended a Smart Step Technology Leadership Conference at the State House Convention Center. On March 7, 2001 , ADE staff attended a National Assessment of Educational Progress (NAEP) Regional Math Framework Meeting about the Consensus Project 2004. On March 8, 2001 , there was a one-on-one conference with Carole Villarreal from Pulaski County at the ADE about the LEP students with portfolios. She was given pertinent data, including all the materials that have been given out at the video conferences. The conference lasted for at least an hour. On March 14, 2001, a Test Administrator's Training Session was presented SP.ecifically to LRSD Test Coordinators and Principals. About 60 LRSD personnel attended. The following meetings have 15een conducted with educators in the three districts in Pulaski County sinye July 2000. On July 10-13, 2000 the ADE provided Smart Step training. The sessions covered Standards-based classroom practices. 41 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of April 30, 2001 (Continued) On July 19-21, 2000 me ADE fiela tne Math/Science Leadership Conference al UCA. This provided services for Arkansas math and science teachers to SUPROrt s~stemic retorm in matfi/scierice ana training for 8th grade Benchmark. There were 200 teachers from across the state in attendance. On August 14-31, 2000 the ADE presented Science Smart Start Lessons and workea with teachers to produce curriculum. This will provide K-6 teachers with activity-oriented science lessons that incorporate reading, writing, and mathematics skills. On Septemoer 5, 2000 the ADE held an Eisenhower Informational meeting with Teacher Center Coordinators. The purgose of the Eisenhower Professional Development Program is to prepare teachers, school staff, and administra1ors to help all students meet challenging standards in the core academic subjects. A summary of the program was presented at the meeting. On November 2-3, 2000 the ADE held the Arkansas Conference on Teaching. This presented curriculum and activity workshops. More than 1200 attended the conference. On November 6, 2000 there was a review of Science Benchmarks and sample model curriculum. A committee of 6 reviewed and revised a drafted document. The committee was made up of ADE and K-8 teachers. On November 7-10, 2000 the ADE held a meeting of the Benchmark and End of Course Mathematics Content Area Committee. Classroom teachers reviewed items for grades 4, 6, 8 and EOC mathematics assessment. There were 60 participants. On December 4-8, 2000 the ADE conducted grades 4 and 8 Benchmark Scoring for Writing Assessment. This professional development was attended by approximately 750 teachers. On December 8, 2000 the ADE conducted Rubric development for Special Education Portfolio scoring. This was a meeting with special education supervisors to revise rubric and plan for scoring in June. On December 8, 2000 the ADE presented the Transition Mathematics Pilot Training Workshop. This provided follow-up training and activities for fourth-year mathematics professional development. On December 12, 2000 the ADE presented test administrators training for midyear End of Course (Pilot) Algebra I and Geometry exams. This was provided for schools with block scheduling. 42 VII. TEST VALIDATION A. 8. Using a collaborative approach, the ADE will select and contract with an independent bias review service or expert to evaluate the Stanford 8, or other monitoring instruments used to measure disparities in academic achievement between black students and white students. 1. Projected Ending Date March, 1995 2. Actual as of April 30, 2001 On March 29, 1995, letters were sent to four national experts about conducting a test bias validation of the Stanford Achievement Test, Eighth Edition, Form K (SAT-8). Dr. Paul Williams, Deputy Director of Educational Testing Service (ETS), contacted the ADE in April of 1995 concerning the proposal for validating the SAT- 8 test. The ADE requested that Dr. Williams conduct a validity study of test items used in the SAT-8. Dr. Williams submitted a final proposal for his services. The ADE Bias Review Test Committee met Friday, July 7, 1995, and approved Dr. William's contract proposal. The final contract was forwarded to Dr. Williams for his signature. The contract was signed in August 1995, thereby, completing this goal. By April 1994, establish a bias review committee to oversee the bias review process, and invite representatives of the Districts and parties to meet with the bias review committee. 1. Projected Ending Date Ongoing 2. Actual as of April 30, 2001 Complete. ADE established a Bias Review Committee in April 1994. In accordance with the Implementation Plan, representatives from the Districts and the parties were invited to attend and participate in this and all meetings of the Bias Review Committee. C. Upon completion of test validation procedures by the bias review service or expert, the ADE will adopt and use a validated test as a monitoring instrument. 1. Projected Ending Date March 1995 and ongoing 43 VII. TEST VALIDATION (Continued) C. Upon completion of test validation procedures by the bias review service or expert, the ADE will adopt and use a validated test as a monitoring instrument. (Continued) 2. Actual as of April 30, 2001 Dr. Paul Williams met with the staff of the Psychological Corporation to review their methods and procedures. In August 1995, he met with the staff at Georgia State University to review the statistical methods that would be used in the analysis. Dr. Williams reported difficulty with the bias-review study in receiving the names of the bias panel and the complete SAT-8 data set from the Psychological Corporation. Dr. Williams submitted an invoice totaling $8,961 for Task I activities of the SAT-8 validity study for partial fulfillment of the test validation study. On December 6, 1995, a contract extension for Dr. Williams was reviewed by the Legislative Council. In January 1996, he indicated that he was in the final stages of the test validation, and the ADE was presented a draft report in March 1996. In May 1996, Dr. Williams stated that the wrong data sets were sent to him by the Psychological Corporation resulting in Task 3 having to be redone. A new draft of the final report was received by the ADE in July 1996. In August 1996, copies of the test validation report were provided to the State Board of Education and the ADE administrative team for their review. On September 10, 1996, the LRSD notified the ADE that they had reviewed the test validation report and would like to meet with the ADE to discuss the report. The ADE Director indicated that he would schedule a meeting with the LRSD to discuss the report. In October 1996, historical files and data were provided to the ADE Director, the ADE Assistant Director for Technical Services, and the ADE Assistant Director for Planning and Curriculum for their review in preparation for a meeting with the LRSD regarding the validity study. Test validation procedures by the expert have been completed. A recommendation was drafted proposing the use of the SAT-8 by the ADE as the validated test for monitoring. The ADE is presently working to arrange a meeting with the Administration of the LRSD to discuss the test validation study. Effective September 22, 1997, the State Board of Education hired a new Director of the General Education Division, which should allow the ADE to move forward in this matter. 44 VII. TEST VALIDATION (Continued) C. Upon completion of test validation procedures by the bias review service or expert, the ADE will adopt and use a validated test as a monitoring instrument. (Continued) 2. Actual as of April 30, 2001 (Continued) In October 1997, the GED Director was updated on the history of the test validation process to provide the Director with background information in preparation for a meeting with the LRSD. In February 1998, ADE staff met with senior staff members to discuss the test validation and appropriate test scores for consideration by the LRSD. The ADE Director met with the Superintendent of the LRSD to discuss test validation issues. In June 1998, the ADE Director directed the Assistant Director for Accountability to recommend staff to discuss how the ADE would measure LRSD's progress toward meeting the loan forgiveness thresholds of the Settlement Agreement. Plans were made to meet with the staff Tuesday, June 30, 1998. The Test Validation Committee met on June 30, 1998, and discussed the following: 1. The appropriateness of the use of scaled scores on the SAT-8 test as the metric for assessing LRSD compliance with the loan forgiveness provisions of the Settlement Agreement\nand 2. The need for an independent analysis of LRSD students' test scores to determine compliance or noncompliance with loan forgiveness standard, and who would bear the cost of such an independent analysis. The Test Validation Committee met on September 10, 1998, to review recent correspondence from LRSD and to further discuss issues related to the loan forgiveness provisions of the Settlement Agreement. A follow-up administrative meeting was held on October 13, 1998, to discuss issues related to the test validation process. Participants included Tim Gauger, Assistant Attorney General, Dr. Charity Smith, Lead Planner for Desegregation, and Frank Anthony, Assistant Director for Accountability. A meeting was scheduled with Dr. Les Carnine, LRSD Superintendent and Mr. Ray Simon, ADE Director, regarding Test Validation and loan forgiveness provisions of the Settlement Agreement on May 12, 1999. 45 VII. TEST VALIDATION (Continued) C. Upon completion of test validation procedures by the bias review service or expert, the ADE will adopt and use a validated test as a monitoring instrument. (Continued) 2. Actual as of April 30, 2001 (Continued) On June 14, 1999, the State Board of Education was briefed on the status of LRSD's refusal to make principal and interest payments into escrow as required by the loan provisions of the Settlement Agreement and related documents. The Board requested that a draft motion to enforce the Settlement Agreement be prepared and submitted to the Board for review and discussion at the Board's next regularly scheduled meeting. On July 12, 1999, the State Board of Education authorized the filing of a motion to compel LRSD to make interest and principal payments into escrow pursuant to the loan provisions of the Settlement Agreement. The State Board of Education instructed the Attorney General's Office to file a motion by March 1, 2000 if a determination is made that the LRSD is not in compliance with Section 6 B of the Pulaski County Settlement Agreement regarding the establishment and funding of the escrow account in the loan provision section. On May 8, 2000, the Assistant Director of Accountability was directed by the Director of Education to contact Harcourt Brace Educational Measurement Company about the possibility of conducting a research study on the standardized test composite scores from 1990 through 1999 of LRSD (excluding special education students). The Test Selection Committee met on May 23, 2000, at the ADE and discussed ways to measure LRSD's progress toward meeting the loan forgiveness threshold of the Pulaski County Settlement Agreement. An update on the progress with Harcourt Brace was made at that time. Harcourt Brace has been contacted about conducting an initial research report on LRSD's progress toward meeting the loan forgiveness threshold of the settlement agreement. This report will review all composite scores since 1990 of LRSD's black and white students (excluding special education students). The purpose of the report is to determine if at any time from Spring 1990 to Fall 1999 did the composite scores of LRSD's black students (excluding special education students) reach 90% or greater of the composite scores of LRSD's white students (excluding special education students) on the State mandated norm-referenced test. Company representatives will advise the ADE of the cost and feasibility of producing the report by May 31, 2000. If the report indicates that LRSD has not meet the loan forgiveness requirements of the Pulaski County Settlement Agreement, an additional analysis of the Fall 2000 standardized tests results will be made. 46 VII. TEST VALIDATION (Continued) C. Upon completion of test validation procedures by the bias review service or expert, the ADE will adopt and use a validated test as a monitoring instrument. (Continued) 2. Actual as of April 30, 2001 (Continued) Harcourt Brace indicated that they would be able to provide the data, but indicated that analysis of the data should be done by an independent consultant. The search for an independent consultant has been undertaken. On February 12, 2001, the ADE Director provided the State Board of Education with a special update on desegregation activities. 47 VIII. IN-SERVICE TRAINING A. Through an interactive process with representatives of desegregating districts, identify in-service training needs. 1. Projected Ending Date Ongoing 2. Actual as of April 30, 2001 The information for this item is detailed under Section VIII.D. of this report. B. Develop in-service training programs to address in-service training needs of desegregating districts. C. 1. Projected Ending Date Ongoing 2. Actual as of April 30, 2001 The information for this item is detailed under Section VIII.D. of this report. Implement in-service training programs to address in-service training needs of desegregating districts. 1. Projected Ending Date Ongoing 2. Actual as of April 30, 2001 The information for this item is detailed under Section VIII.D. of this report. D. Evaluate in-service training programs developed and executed to address in-service training needs of desegregating districts. 1. Projected Ending Date Ongoing 2. Actual as of April 30, 2001 In April 1995, the Tri-District Staff Development Committee were provided an overview of the Scott Alternative Learning Center's operation and met with students and staff. In May 1995, the Districts were in the process of self-assessment and planning for fall staff development. 48 VIII. IN-SERVICE TRAINING (Continued) D. Evaluate in-service training programs developed and executed to address in-service training needs of desegregating districts. (Continued) 2. Actual as of April 30, 2001 (Continued) The Districts worked on staff development to be incorporated into their fall 95/96 preschool calendars. The uniqueness of each district's needs and their schools was considered in the planning by utilizing the results of needs assessment instruments. The Tri-District Staff Development Committee met on September 13, 1995 to plan for an ADE administered Classroom Management grant. The Tri-District Staff Development Committee met on September 19, 1995 to finalize the Classroom Management grant proposal. The Tri-District Staff Development Committee met on October 24, 1995 to discuss program and staff development evaluation models that might be available to the Districts. On November 15, 1995, the ADE met with an ODM representative to discuss the progress the ADE had made in attaining the objectives outlined in the Implementation Plan with regard to inservice training. The Tri-District Staff Development Committee met on November 21 , 1995 to discuss upcoming training events and various NLR programs that focus on non-academic needs. A new program consisting of placing a graduate student of social work, a field supervisor, and a OHS worker in the district at no cost to the district was discussed. Additionally, NLR provided an overview of their program for credit deficient students. The Tri-District Staff Development Committee met on December 19, 1995 to discuss information dealing with ways to broaden the perspective of multicultural education. The Tri-District Staff Development Committee met on January 17, 1996 to discuss proposed changes in the standards regarding media centers and NLRSD's staff development strategic planning committee. The committee reviewed a video on diversity produced by the Arkansas Elementary Principals Association. The Tri-District Staff Development Committee met on February 21, 1996 to discuss the implications of budget cuts on staff development programs and PCSSD's request for unitary status for their staff development program . They also discussed the need for computer literacy, technology training, and acquisition of hardware and software by the Districts. 49 VIII. IN-SERVICE TRAINING (Continued) D. Evaluate in-service training programs developed and executed to address in-service training needs of desegregating districts. (Continued) 2. Actual as of April 30, 2001 (Continued) The Tri-District Staff Development Committee met on March 27, 1996 to discuss available resources concerning sexual harassment. ADE regulations in relation to staff members attending professional association conferences as well as the district staff development and potential sites for training seminars were also discussed. The Tri-District Staff Development Committee met on April 30, 1996 to discuss the reconfiguring of Jacksonville Junior High, PCSSD professional development schedules, and APSCN on-line time lines. A tour of the Washington Magnet school was also conducted. The Tri-District Staff Development Committee received a demonstration of UALR's Baum Decision Support Center's capabilities regarding consensus and planning on May 29, 1996. The Tri-District Staff Development Committee did not meet during September, October, and November 1996 because of scheduling conflicts and the extended medical leave of the ADE liaison. On December 18, 1996, the Tri-District Staff Development Committee met to discuss the linkage between the Implementation Plan, staff development, and student achievement. On January 21 , 1997, the Tri-District Staff Development Committee met and discussed sharing middle school strategies and the Districts' training catalogs. The Tri-District Staff Development Committee met on February 25, 1997 to discuss their current staff development programs and an overview of the relationship of their current programs with their desegregation plans. The Tri-District Staff Development Committee met on March 26, 1997 to observe the Great Expectations Program. The principal and mentor teachers provided information on the components and philosophy of the program, and students demonstrated selected components. The PCSSD may adopt the program for selected schools in their district. The committee was provided with an update of pertinent information on resources available to the Districts. The committee decided that the ADE liaison to the committee would gather documentation of completed staff development directly from the Districts, instead of the Districts providing this information at the committee meetings. 50 VIII. IN-SERVICE TRAINING (Continued) D. Evaluate in-service training programs developed and executed to address in-service training needs of desegregating districts. (Continued) 2. Actual as of April 30, 2001 (Continued) New information on teacher licensure and rules and regulations was shared with the Tri-District Staff Development Committee at their April 1997 meeting. A report was presented to the committee on information from the Arkansas Council for Social Studies about an October 1997 meeting on integrated curriculum. The Districts will provide principal retreats this summer as a part of their staff development. The PCSSD will sponsor a renowned speaker on strategies to serve at risk youth in August 1997 in which the committee is invited to attend. The LRSD shared survey results from a pilot administration to four teachers in each district. The survey found the sample to be strong in content but lacking in context and process. Plans to address these needs will be developed. In another survey to certified and non-certified LRSD staff, stress management was the major concern. The Tri-District Staff Development Committee met on May 14, 1997 to participate in a teleconference with the five 1996 awardees of the National Awards Program for Model for Professional Development. The PCSSD shared their summer and fall staff development catalog with the members. The committee will reconvene in the fall of the 97/98 school year. The Tri-District Staff Development Committee is scheduled to meet on September 30, 1997 to discuss collaborative actions for FY 97/98. The Tri-District Staff Development Committee met on September 30, 1997 to discuss their staff development for the 1997 /1998 school year. The PCSSD had a pre-school in-service for the faculty, and the LRSD conducted a Principals Academy with an expert on the math and science initiative which lasted several days. The NLRSD is provid ing staff development by satellite. The Tri-District Staff Development Committee met on October 28, 1997. The LRSD and NLRSD shared some of their staff development course offerings with the committee, and the PCSSD discussed ways of optimizing opportunities for staff development with specific emphasis on the junior high school conflict resolution training. In November 1997, the Lead Planner provided technical assistance to Central High School staff regarding data disaggregation, test score analysis and ways to improve student achievement. 51 VIII. IN-SERVICE TRAINING (Continued) D. Evaluate in-service training programs developed and executed to address in-service training needs of desegregating districts. (Continued) 2. Actual as of April 30, 2001 (Continued) The Tri-District Staff Development Committee met on November 25, 1997 to discuss the Standards for Staff Development. The LRSD will begin providing technology training to their employees in January by utilizing business teachers. Additionally, they discussed a collaborative venture of the Districts involving a workshop from Chicago on a program called \"Great Expectations.\" The Tri-District Staff Development Committee met on December 16, 1997 to discuss technology plans, strategies for obtaining information currently being provided to the education cooperatives, scheduling of Arkansas history, and the development of a comprehensive list of locations available for staff development. Members agreed to bring information on available locations to the January meeting and have set a tentative completion date for the project of May 1998. The Tri-District Staff Development Committee met on January 27, 1998 to share information for developing a comprehensive list of locations available for staff development. The Tri-District Staff Development Committee met on February 24, 1998 to work on the development of the list of locations available for staff development. The committee also discussed the meeting on student achievement sponsored by the ADE for the Districts, principals' staff development in the Districts and emphasis on improving achievement as reflected on the SAT-9. The Tri-District Staff Development Committee met on March 19, 1998 to discuss the math and science grant received by the LRSD, the Districts' inservice calendars for August, TESA and Student-Team Learning trainers, and team building for staff. The ADE Deputy Director is scheduled to discuss ways the committee can strengthen their relationship with the regional cooperatives at their May meeting. The Tri-District Staff Development Committee met on April 27, 1998 to discuss their proposal for involvement with the regional cooperatives. The ADE Deputy Director is scheduled to discuss committee's concerns regarding their relationship with the regional cooperatives at their next meeting. 52 VIII. IN-SERVICE TRAINING (Continued) D. Evaluate in-service training programs developed and executed to address in-service training needs of desegregating districts. (Continued) 2. Actual as of April 30, 2001 (Continued) The Tri-District Staff Development Committee met Thursday, May 21 , 1998, in the Instructional Resources Center at Little Rock School District. Dr. Woodrow Cummins, ADE Deputy Director, joined the group to discuss ways to develop a closer connection with the Education Service Cooperatives. He also discussed other issues concerning Tri-District Staff Development. Tentative plans were made to meet with the Teacher Center Coordinators at their next regular meeting. The next Central Office meeting will be at 9:00 a.m., Thursday, September 29, 1998, in the PCSSD. The Tri-District Staff Development Committee will attend the Educational Cooperative Teacher Center Coordinators' meeting September 1, 1998, in the ADE auditorium. The next regular meeting of the committee is tentatively set for 9:00 a.m., Thursday, September 29, 1998, in the PCS SD Central Office. The Tri-County Staff Development Committee met Monday, August 24, 1998, at PCSSD central office with four members present: Marion Woods, LRSD\nDoug Ask and Mary McClendon, PCSSD\nand Betty Gale Davis, ADE. Topics of discussion included the September 1 meeting scheduled with the regional cooperatives' teacher center coordinators\nthe staff development task force on which Marion Woods is serving\nthe property tax issue\nand various mathematics and reading programs being used in the districts. The committee met Tuesday, September 1, 1998, with the Teacher Center Coordinators, at which time Dr. Woody Cummins presented. Six Tri-District Staff Development Committee members were present: Marion Woods, LRSD\nDoug Ask and Mary Mcclendon, PCSSD\nDana Chadwick and Estelle Crawford, NLRSD\nBetty Gale Davis, ADE. The next committee meeting will be 9:00 a.m., Thursday, September 24, 1998, at the Little Rock District Instructional Resources Center. The Tri-District Staff Development Committee met Thursday, September 24, 1998, at the Instructional Resources Center, Little Rock, with five present: Marion Woods and Dr. Bonnie Lesley, LRSD\nDoug Ask, PCSSD\nDana Chadwick, NLRSD\nand Dr. Betty Gale Davis, ADE. Topics of discussion included the meeting with the regional cooperatives' teacher center coordinators\nthe staff development task force on which Marion Woods is serving and the NSCI training\ntraining provided by the Federal Emergency Management Agency (FEMA)\ntraining provided by Casio\nand the proposal of a Principals Academy. 53 VIII. IN-SERVICE TRAINING (Continued) D. Evaluate in-service training programs developed and executed to address in-service training needs of desegregating districts. (Continued) 2. Actual as of April 30, 2001 (Continued) Doug Ask will serve as representative to the October 6, 1998 meeting of the Teacher Center Coordinators. He will submit to Donna Harris, president of the group, a request for one other member of the Tri-County Committee (Dana Chadwick) to attend the meeting. Representatives for future meetings (second Tuesday of each month) will be: Marion Woods, November\nMary McClendon, December\nDana Chadwick, January. The next committee meeting will be 9:00 a.m., Tuesday, October 13, 1998, at the North Little Rock School District Central Office. The Tri-District Staff Development Committee met on Tuesday, October 13, 1998, in the NLRSD Administration Building. Doug Ask represented the committee at the Teacher Center Coordinators' meeting in Fayetteville, October 6. He shared with the Tri-District Committee information regarding the upcoming NSCI/Smart Start Training. James Smith spoke with the group about Amendment 4. Members of the Tri-District Staff Development Committee also met with the Teacher Center Coordinators, Wednesday, October 28. Doug Ask, Marion Woods, and Esther Crawford were trained as facilitators, October 29, for the initial Smart Start Summit to be held November 9-12, 1998. Marion Woods will represent the committee at the next regular Teacher Center Coordinators' meeting, Tuesday, November 3, 10:00 a.m. at the ADE. The next Tri-District Committee meeting will be at 9:00 a.m., November 10, in the PCSSD Administration Building. Members of the Tri-District Staff Development Committee met several times with the Teacher Center Coordinators in preparation for the Smart Start Summit. During the Smart Start Summit, they served as facilitators. The meeting planned for November 10 was postponed due to the conflict with the Summit. Doug Ask, Marion Woods, and Esther Crawford met with the Teacher Center Coordinators on Tuesday, December 1, 1998, for the regular monthly meeting. Principal topics discussed were the Smart Start Initiative and Principals' Institute. The next meeting of the Teacher Center Coordinators is scheduled for January 6, 1999, 9:00 a.m., in the ADE Auditorium. The Tri-District Staff Development Committee will meet at 9:00 a.m., Tuesday, December 8, 1998, at the Little Rock School District Instructional Resources Center. 54 VIII. IN-SERVICE TRAINING (Continued) D. Evaluate in-service training programs developed and executed to address in-service training needs of desegregating districts. (Continued) 2. Actual as of April 30, 2001 (Continued) Doug Ask, PCSSD\nMarion Woods, LRSD\nand Esther Crawford, NLRSD, met with the Teacher Center Coordinators on Tuesday, December 1, 1998, for the regular monthly meeting. Principal topics discussed were the Smart Start Initiative and Principals' Institute. The Teacher Center Coordinators held their monthly meeting on January 6, 1999, 9:00 a.m., in the ADE Auditorium, with Doug Ask, Marion Woods, and Esther Crawford in attendance. At the January meeting, the primary focus was on the Smart Start Initiative. Dates for the future committee meetings have been tentatively scheduled to coincide with meetings with the Teacher Center Coordinators. Due to the Tri-District Committee's involvement with the Smart Start Initiative, no formal meeting of the committee was held in January. Members of the TriDistrict Staff Development Committee met with Teacher Center Coordinators, January 6 and 25, 1999, preparing for and facilitating Smart Start activities. Dates for future meetings have been tentatively scheduled to coincide with meetings of Teacher Center Coordinators. The Tri-District Staff Development Committee met Wednesday, February 17, 1999, at the Best Western lnntowne with four members in attendance. Most of the discussion centered on Smart Start and Character Centered Teaching. A March meeting date was not determined. Members of the Tri-District Staff Development Committee met with the Teacher Center Coordinators at their regular monthly meeting, April 6, 1999, at the ADE. Much of the meeting centered on the Smart Start Initiative and the Getting Smarter Summer Conference to be held in Hot Springs, July 28-31, 1999. The next meeting of the Tri-District Staff Development Committee will be May 11, 1999, at the Northeast Arkansas Educational Cooperative, Walnut Ridge. Members of the Tri-District Staff Development Committee met with the Teacher Center Coordinators at their regular monthly meeting, Tuesday, May 11, 1999, at the Northeast Arkansas Educational Cooperative, Walnut Ridge, with Mary McClendon, PCSSD, Marion Woods, LRSD, Esther Crawford, NLRSD, and Janinne Riggs, ADE, attending. Much of the meeting centered on the Smart Start Initiative. The next meeting was scheduled as a retreat, June 7-9, 1999, at Hot Springs. Members of the Tri-District Staff Development Committee met with the Teacher Center Coordinators for their annual retreat, June 7-9, 1999, at Hot Springs. The next regular meeting will be in September, the date and place to be announced later. Summer activities will include the Getting Smarter Conference. 55 VIII. IN-SERVICE TR!\\INING (Continued) D. Evaluate in-service training programs developed and executed to address in-service training needs of desegregating districts. (Continued) 2. Actual as of April 30, 2001 (Continued) Members of the Tri-District Staff Development Committee met during the Getting Smarter Conference, July 28-31 , 1999, at Hot Springs. In collaboration with the Teacher Center Coordinators, those participating in the conference as facilitators were: Doug Ask, PCSSD\nEsther Crawford, NLRSD\nand Marion Woods, LRSD. The next regular meeting will be in September, the date and place to be announced later. Target, Teach, and Test for Student Success, a workshop aimed at improving interpretation of test data and applying that knowledge toward more effective lesson planning, was adapted for presentation in conjunction with the Multicultural Institute. Members of the Standards Assurance Unit (Dee Cox, Betty Gale Davis, Bob Maddox, and Lonzo Gatlin) presented an all-day workshop (Target, Teach, and Test for Student Success) for Pulaski County Special School District in connection with the Multicultural Institute, July 27, 1999. Members of the Tri-District Staff Development Committee met Tuesday, September 7, 1999, at the ADE, with five members in attendance: Doug Ask and Mary McClendon, PCSSD\nEsther Crawford, NLRSD\nMaron Woods, LRSD\nand Betty Gale Davis, ADE. Discussion included Smart Start activities and performance assessment. Following the meeting, the committee met with the Teacher Center Coordinators at their regular monthly meeting. The next meeting will be Tuesday, October 5, 1999, at the ADE. Members of the Tri-District Staff Development Committee met Tuesday, October 5, 1999 at the ADE. Discussion included middle level training (LRSD), inservice for administrators in retreat (PCSSD), and Smart Start activities. Following the meeting, the committee met with the Teacher Center Coordinators at their regular monthly meeting. The next meeting will be November 2, 1999 at the ADE. Members of the Tri-District Staff Development Committee met Tuesday, November 2, 1999 at the ADE. Following the meeting, the committee met with the Teacher Center Coordinators at their regular monthly meeting. The next meeting will be December 7, at the ADE. The December meeting was canceled due to conflicts in scheduling. The TriDistrict Staff Development Committee will hold its next meeting January 3, 2000 at the ADE. The Committee continues to work in cooperation with the Teacher Center Coordinators in the Smart Start Initiative. 56 VIII. IN-SERVICE TRAINING (Continued) D. Evaluate in-service training programs developed and executed to address in-service training needs of desegregating districts. (Continued) 2. Actual as of April 30, 2001 (Continued) The Tri-District Staff Development Committee met January 4, 2000 at the ADE. Major discussion included the upcoming three day meeting with Teacher Center Coordinators (January 4-6, 2000), benchmarks training (NLRSD), balance literacy training (PCSSD), alternative learning training (LRSD), and activities of the Smart Start Initiative. The next meeting will be February 3, 2000 at the ADE. The Tri-District Staff Development Committee met Monday and Tuesday, February 7-8, 2000, at Ferncliff, with four members present: Doug Ask and Mary McClendon, PCSSD\nEsther Crawford, NLRSD\nand Marion Woods, LRSD. The meeting was held in conjunction with the Teacher Center Coordinators' retreat. Several presenters shared information on various topics, and the Getting Smarter summer conference was discussed. Plans were tentatively made to conduct the April meeting via distance learning. The Tri-District Staff Development Committee met March 7, 2000, at the ADE. Following the meeting, the committee met with the Teacher Center Coordinators at their regular monthly meeting. Items discussed were: documentation of clock hours for professional development, Middle School training, and the use of staff development days. The Tri-District Staff Development Committee met by Distance Learning through the Sherwood School Site with the Teacher Center Coordinators for its April meeting. The Tri-District Staff Development Committee met with the Teacher Center Coordinators, in conjunction with the Smart Step Summit, May 1-2, 2000, at the Convention Center. Three members participated: Doug Ask and Mary Mcclendon, PCSSD\nand Marion Woods, LRSD. A June meeting date has not been set. The Tri-District Staff Development Committee met with the Teacher Center Coordinators at their annual summer conference in Hot Springs, June 5-7, 2000. Among the discussions were the formation of a chapter of the National Staff Development Council, the Pathwise Mentor program grant, Smart Start, and Smart Step. In lieu of a regular monthly meeting, the Tri-District Staff Development Committee met and worked with the Teacher Center Coordinators during the Smart Start/Smart Step conferences, July 10-13, 2000, at the Little Rock Convention Center. The next meeting date has not yet been set. 57 VIII. IN-SERVICE TRAINING (Continued) D. Evaluate in-service training programs developed and executed to address in-service training needs of desegregating districts. (Continued) 2. Actual as of April 30, 2001 (Continued) The Tri-District Staff Development Committee will reconvene in September, with no meeting during August. LRSD, NLRSD, and PCSSD applied for the Arkansas Pathwise Mentoring Pilot Model as a collaborative effort and were awarded $445,875 for the new teachers for the 2000-2001 school year - one of many collaborative successful ventures for the districts. The Tri-District Staff Development Committee has been working with Smart Start and Smart Step Initiatives in collaboration with the Teacher Center Coordinators throughout the month of August. No regular meeting is scheduled for September. The Tri-District Staff Development Committee met Tuesday, October 3, 2000, at the Arkansas Department of Education, Room 3058, with three members present: Marion Woods, LRSD\nEsther Crawford, NLRSD\nand Dr. Betty Gale Davis, ADE. The procedures for dissemination of information within the respective districts were discussed. Members of cabinet level administrators from LRSD and PCSSD will be included in future meetings. Other topics of discussion were the Arkansas Pathwise Mentoring Program and topics of presentations for LRSD administrators. The next meeting will be Tuesday, November 7, 2000, in Room 3038, ADE. The Tri-District Staff Development Committee met Tuesday, November 7, 2000, at the ADE, Room 3038, with seven members present: Doug Ask, John Mccraney, and Dr. Ruth Simmons Herts, PCSSD\nEsther Crawford, NLRSD\nDr. Bonnie Lesley and Marion Woods, LRSD\nand Dr. Betty Gale Davis, ADE. Dr. Herts and Dr. Lesley have been added to the committee in response to each district's request to include a member of the cabinet. Many of the recent staff development activities in each of the districts have been related to Smart Start and Smart Step. Other topics discussed included: the upcoming National Staff Development Council conference and the availability of math specialists and literacy specialists. The next meeting will be at 9:00 a.m., Tuesday, December 5, 2000, in Room 3038, ADE. The Tri-District Staff Development Committee met Tuesday, December 5, 2000, at the ADE, Room 3038, with three members present: Esther Crawford, NLRSD\nSue Walls, LRSD\nand Dr. Betty Gale Davis, ADE. Many of the recent staff development activities in each of the districts have been related to Smart Start and Smart Step. Other topics discussed included: the ongoing Pathwise training of mentors, the writing training provided by the ADE, and the ongoing collaborative work with the Teacher Center Coordinators. The next meeting has not been scheduled. 58 VIII. IN-SERVICE TRAINING (Continued) D. Evaluate in-service training programs developed and executed to address in-service training needs of desegregating districts. (Continued) 2. Actual as of April 30, 2001 (Continued) The Tri-District Staff Development Committee did not hold its monthly meeting in January. The next meeting will be Tuesday morning, February 6, at 8:30 a.m., in the ADE third floor conference room. The Tri-District Staff Development Committee, rather than meeting separately from the Teacher Center Coordinators in February, chose to meet during the regular monthly meeting of Teacher Coordinators, at Ferndale, on February 6. The staff development topics were Smart Start and Smart Step. John Mccraney from PCSSD and Esther Crawford from NLRSD attended. The next meeting will be on March 6, 2001 , at 8:30 a.m ., in the ADE third floor conference room. The Tri-District Staff Development Committee did not formally meet during the month of March. The connection and work with Teacher Center Coordinators continued through meeting informally at the conferences, i.e. , \"Smart Steps to Technology Leadership\", March 5-6, 2001 . Committee members Esther Crawford from NLRSD, and Doug Ask from PCSSD attended. The April meeting date has not been determined. The Tri-District Staff Development Committee met April 3, 2001 , at the Amerisuites Hotel in Little Rock. Committee members attending were: Marion Woods, LRSD\nDoug Ask, PCSSD\nand Esther Crawford, NLRSD. The committee met with Teacher Center Coordinators at first, then separately. The discussion included Gates training , Pathwise and Middle School training. The Arkansas Association of Middle Level Education (AAMLE) and the ADE presented the Twelfth Annual Middle Level Education Conference \"AAMLE: In Step With Smart Step\" at the Hot Springs Convention Center on April 8-10, 2001 . Dr. Neila Connors gave practical tips on improving school climate and communication skills for teachers, principals, and administrators. Dr. Charles Beaman gave dynamic strategies for coping with at-risk and marginal learners within the school and classroom setting . Dr. Howard Johnson proposed a model and action plan for refocusing middle level schools on achievement. Lucinda Johnston outlined a systematic, humane and effective school-wide productive behavior model and plan with meaningful rewards for productive behavior, and effective r\nThis project was supported in part by a Digitizing Hidden Special Collections and Archives project grant from The Andrew W. Mellon Foundation and Council on Library and Information Resoources.\n   \n\n   \n\n  \n\n\n   \n\n  \n\n \n\n\n   \n\n   \n\n \n\n\n   \n\n  \n\n \n\n\u003cdcterms_creator\u003eArkansas. Department of Education\u003c/dcterms_creator\u003e\n   \n\n \n\n  \n\n\n   \n\n \n\n  \n\n\n\n   \n\n  \n\n  \n\n\n\n\n   \n\n   \n\n  \n\n \n\n \n\n\n   \n\n  \n\n \n\n\n\n\n\n\n\n\n   \n\n \n\n\n\n  \n\n\n   \n\n\n\n  \n\n\n\n "},{"id":"bcas_bcmss0837_1728","title":"Court filings concerning NLRSD July 1998 - June 1999 status report, ODM report, ''2000-01 Enrollment and Racial Balance in the Little Rock School District (LRSD) and Pulaski County Special School District (PCSSD)'', motion of the PCSSD to approve middle school construction modification, and PCSSD motion to approve middle schools and revamped high schools","collection_id":"bcas_bcmss0837","collection_title":"Office of Desegregation Management","dcterms_contributor":null,"dcterms_spatial":["United States, 39.76, -98.5","United States, Arkansas, 34.75037, -92.50044","United States, Arkansas, Pulaski County, 34.76993, -92.3118","United States, Arkansas, Pulaski County, Little Rock, 34.74648, -92.28959"],"dcterms_creator":["United States. District Court (Arkansas: Eastern District)"],"dc_date":["2001-04"],"dcterms_description":null,"dc_format":["application/pdf"],"dcterms_identifier":null,"dcterms_language":["eng"],"dcterms_publisher":["Little Rock, Ark. : Butler Center for Arkansas Studies. Central Arkansas Library System"],"dc_relation":null,"dc_right":["http://rightsstatements.org/vocab/InC-EDU/1.0/"],"dcterms_is_part_of":["Office of Desegregation Monitoring records (BC.MSS.08.37)","History of Segregation and Integration of Arkansas's Educational System"],"dcterms_subject":["Little Rock (Ark.)--History--21st Century","Little Rock School District","School districts--Arkansas--North Little Rock","Office of Desegregation Monitoring (Little Rock, Ark.)","Special districts--Arkansas--Pulaski County","Arkansas. Department of Education","Education--Arkansas","Education--Evaluation","Education--Finance","Educational planning","Educational law and legislation","School buildings","School facilities","School improvement programs","School management and organization"],"dcterms_title":["Court filings concerning NLRSD July 1998 - June 1999 status report, ODM report, ''2000-01 Enrollment and Racial Balance in the Little Rock School District (LRSD) and Pulaski County Special School District (PCSSD)'', motion of the PCSSD to approve middle school construction modification, and PCSSD motion to approve middle schools and revamped high schools"],"dcterms_type":["Text"],"dcterms_provenance":["Butler Center for Arkansas Studies"],"edm_is_shown_by":null,"edm_is_shown_at":["http://arstudies.contentdm.oclc.org/cdm/ref/collection/bcmss0837/id/1728"],"dcterms_temporal":null,"dcterms_rights_holder":null,"dcterms_bibliographic_citation":null,"dlg_local_right":["Available for use in research, teaching, and private study. Any other use requires permission from the Butler Center."],"dcterms_medium":["judicial records"],"dcterms_extent":["84 pages"],"dlg_subject_personal":null,"dcterms_subject_fast":null,"fulltext":"District Court, order; District Court, motion for extension of time to respond to Little Rock School District's (LRSD's) notice of filing and request for scheduling order; District Court, notice of filing, North Little Rock School District (NLRSD) July 1998 - June 1999 status report; District Court, notice of filing, Office of Desegregation Management report, ''2000-01 Enrollment and Racial Balance in the Little Rock School District (LRSD) and Pulaski County Special School District (PCSSD)''; District Court, separate motion of the Pulaski County Special School District (PCSSD) to approve middle school construction modification; District Court, supplement to separate motion of the Pulaski County Special School District (PCSSD) to approve middle school construction modification; District Court, supplement to Pulaski County Special School District (PCSSD) motion to approve middle schools and revamped high schools; District Court, supplemental memorandum in support of Pulaski County Special School District (PCSSD) motion to approve middle schools and revamped high schools; District Court, notice of filing, Arkansas Department of Education (ADE) project managment tool  The transcript for this item was created using Optical Character Recognition (OCR) and may contain some errors.  - RECEIVED APR 'J 2001 OfftCEOF 111116ATIONMONITORIN6 FILED U.S. DISTRICT COURT EASTERN DISTRICT ARKANSAS IN THE UNITED STATES DISTRICT COURT EASTERN DISTRICT OF ARKANSAS WESTERN DIVISION APR 0 4 2001 JA~~sw. M~cc MACK, CLiRK .By. '5J- I ~k, ~ /\\f\\ 1!A DEPCLERK\"\" LITTLE ROCK SCHOOL DISTRICT * * Plaintiff, * * * VS. * No. 4:82CV00866 SWW * * PULASKI COUNTY SPECIAL SCHOOL * DISTRICT NO. 1, ET AL. * * Defendants, * * MRS. LORENE JOSHUA, ET AL. * * Intervenors, * * KATHERINE W. KNIGHT, ET AL. * * Intervenors. * ORDER On March 15, 2001, the Little Rock School District (\"LRSD\") filed a Compliance Report and asked the Court to issue a Scheduling Order setting a date by which the parties must file any objections or challenges to the report.1 The LRSD suggests that the parties be given no more than twenty days within which to file their challenges and, in the event any party files a timely challenge, that the Court schedule a hearing before June 30, 2001. The Court has heard informally from one of the parties, who contends he needs more time to review the report and file challenges. See Attachment A 1See docket entry 3410. Having reviewed the Compliance Report, and considering the informal request for additional time, the Court finds that the parties need more than twenty days to review the many details set forth in the Report and prepar~ any challenges. After having consulted the Court's own calendar, the Court hereby establishes the following deadlines and hearing dates~ Any challenges to the LRSD's Compliance Report must be filed on or before May 18, 2001. If challenges to the report are filed, a hearing will be held on July 5 and July 6, 2001, beginning at 9:00 a.m. If necessary, the hearing will continue on August 1 and August 2, 2001. If the parties desire the Court to examine any documents pertaining to this hearing, those documents shall be submitted to the Court no later than June 29, 2001. Also before the Court is the motion of Tim C. Humphries to withdraw his appearance as counsel for separate defendant Arkansas Department of Education. The motion [ docket entry 3411] is granted.2 The Clerk is directed to remove Mr. Humphries as counsel for the Arkansas Department of Education. SO ORDERED this ~11\\.__day of April 2001. a;z_\u0026,,~ CHIEF JUDGE ' UNITED STATES DISTRICT COURT THIS DOCUMENT ENTERED ON . DOCKET SHEET IN COMPLIANCE 0~1~~8 A~~/m::a) FRCP 2On February 21, 2001, Sammye L. Taylor and Mark Hagemeier entered their appearances as counsel for the Arkansas Department of Education. See docket entries 3405 \u0026 3406. 2 JOHN W. WALKER SHAWN CHILDS JOHN W. WALKER, P.A. ATIORNEY AT LAW 1723 BROADWAY LlTILE ROCK, .ARKANSAS 72206 TELEPHONE (501) 374-3758 FAX (501) 374-418~ Via Facsimile March 26, 2001 Honorable Judge Susan Webber Wright Chief Judge United States District Court 600 West Capitol Avenue Little Rock, AR 72201 Re: LRSD v PCSSD Dear Judge Wright: OF COUNSEL ROBERT McHENRY, P.A. DONNAJ. McHENRY 8210 HENDERSON ROAD Li'ITLE RocK, ARKANSAS 72210 PHONE: (501) 372-3425  FAX (501) 372-3428 EMAIL: mchenryd@swbell.net Due to the fact that I was in trial before the Honorable George Howard Jr. in Pine Bluff, Arkansas from March 19-22, 2001 and in intense preparation for the days preceding the 191\\ I am just getting in position to address the Little Rock filing, Notice of Filing Compliance Report and Request for Scheduling Order. I further note that Little Rock has indicated that it wishes to limit our time for filing challenges to twenty (20) days. This letter is being written to request that the Court set a time for a conference before addressing the issue of a scheduling order so that all parties, as well as the Office of Desegregation Monitoring, would have an opportunity to address the propriety of the scheduling order request. The compliance report is extensive. It appears to be more than two hundred (200) pages in length, is very detail oriented and it makes many claims which are unfamiliar to us and probably to the ODM as well. I am writing the Court this letter, rather than filing a motion, because Mr. Heller, who I am advised is away until Wednesday, expressed an interest in having some dialogue regarding this matter, and the State settlement as well, before this matter becomes, if it ever does, a public dispute which the Court must resolve. ! I understand that the Court .intends to schedule a hearing in the near future regarding the middle s~hool issues raised by the PCS SD. May I suggest that the matter of the hearing of the : scheduling order be set for the same day inasmuch as all parties-are expected to be in court for the PCSSD matter. Although I have been unable to speak with Mr. Heller and I have not attempted to reach his co-counsel, Mr. Clay Fendley who I intend to try and reach immediately, I have informed Ms. Ann Marshall regarding my concerns herein and will be having further conversations with the parties until such time I receive the Court's reply to this letter. With due respect to the court, I remain, JWW:js cc: Mr. Chris Heller Ms. Ann Brown Mr. Sam Jones  Y...r. Steve Jones Mr. Richard Roachell Mr. Timothy Gauger Sincerely yours, ) i APR 12 2001 r:11 Glf.GEif u.!.o1s~fD EASTERN DISTAi r OURT l'Bn!atll!! C AFlKAMc:~c: lllillPII~ A PR O 4 2 IN THE UNITED STATES DISTRICT CO_MRT OOl EASTERN DISTRICT OF ARK.ANSAp)i~S W ..eggRMACK, CLERK WESTERN DIVISION  I \" ' ....   DFP.'TJt[Af LITTLE ROCK SCHOOL DISTRICT PLAINTIFF VS. CASE NO. 4:82CV00866 SWW PULASKI COUNTY SPECIAL SCHOOL DISTRICT, ET AL MOTION FOR EXTENSION OF Tll.VIE TO RESPON~ TO LRSD'S NOTICE OF FILING AND REQUEST FOR SCHEDULING ORDER DEFENDANTS Come now the Joshua Intervenors, through undersigned counsel, for their Motion for - Extension of Time to Respond to LRSD Notice of Filing Compliance Report and Request for Scheduling Order, state: 1. Due to undersigned counsel's trial schedule and other obligations, additional time is needed to review LRSD's Compliance Report. 2. In addition, undersigned adopts, by reference, his letter to the Court dated March 26, 2001. A copy is attached hereto as Exhibit 1. 3. This request is not for purposes of delay. WHEREFORE, for the reasons stated above, plaintiffs respectfully move the Court for an Order extending the time in which to file their Response LRSD's Notice of Filing Compliance Report and.Request for Scheduling Order for an additional thirty days including and up to May 4, 2001 Respectfully submitted, John W Walker, PA. 1723 Broadway Little Rock, AR 72206 501-374-3758 501-3 74-4187 (fax) CERTIFICATE O.F SERVICE I do hereby state that a copy of the foregoing motion has been sent to all counsel of record. \u003c)L JI/ ~~ / ~ ,JOHN W. WALKER SHAWN CHlLDS JOHN W. WALKER, P.A. ATTORNEY AT LAW 1723 BROADWAY LITTLE ROCK, AR1\u003c.,\\.\\S..\\S 72206 T ELEPHONE (501) 374-3758 FAX (501) 374-4187 Via Facsimile March 26, 200 I Honorable Judge Susan Webber Wright Chief Judge United States District Court 600 West Capitol Avenue Little Rock, AR 7220 l Re: LR.SD v PCSSD Dear Judge Wright : OF cou:--:SEL ROBERT McHENRY. P.A. DONNA .J. McHENRY 82 10 Ht::sOF.RSO~ ROAD LITTLE ROCK. :\\.JlK,\\:SS,IS i22 l 0 PHO:sf.: (501) 3i2-3-l25  F.-\\X (50l) 3i2-3-128 E~l\\lL: mchenryd'!!-swbell.nct Due to the fact that I was in trial before the Honorable George Howard Jr. in Pine Bluff, Arkansas from March l 9-22, 2001 and in intense preparation for the days preceding the 191\\ I am. just getting in position to address the Little Rock filing, Notice of Filing Compliance Report and Request for Scheduling Order. I further note that Little Rock has indicated that it wishes to limit our time for filing challenges to twenty (20) days. This letter is being written to request that the Court set a time for a conference before addressing the issue of a scheduling order so that all parties, as well as the Office of Desegregation Monitoring, would have an opportunity to address the propriety of the scheduling order request. The compliance report is extensive. It appears to be more t_han two hundred (200) pages in lengJh, is very detail oriented and it makes many claims which are unfamiliar to us and probably to the ODM as well. I am writing the Court this letter, rather than filing a motion, because Mr. Heller, who I am advised is away until Wednesday, expressed an interest in having some dialogue regarding this matter, and the State settlement as well, before this matter becomes, if it ever does, a public dispute which the Court must resolve. I understand that the Court intends to schedule a hearing in the near future regarding the middle school issues raised by the PCS SD. May I suggest that the matter of the hearing of the scheduling order be set for the same day inasmuch as all parties are expected to be in court for the PCSSD matter. Although I have been unable to speak with Mr. Heller and I have not attempted to reach his co-counsel, Mr. Clay Fendley who T intend to try and reach immediately, I have informed Ms. Ann Marshall regarding my concerns herein and will be having further conversations with the parties until such time I receive the Court's reply to this letter. ,../ I -r-, ---I With due res pect to the court, 1 remain, JWW:js cc: Mr. Chris Heller Ms. Ann Brown Mr. Sam Jones Mr. Steve Jones Mr. Richard Roachell Mr. Timothy Gauger 1 Sincerely yo~urs, . ' , ~~? r.. / 1 tA'r;Jf!-(!,c v fo'hn w. Walker l JACK, LYON \u0026 JONES, P.A. ATTORNEYS AT LAW .. Nashville Office #11 Music Circle South Suite 202 Nashville, Tennessee 37203 (615) 259-4664 Telecop;er (615) 259-4668 3400 TCBY TOWER REce,,,EDrk ~:;:~i~~:mplex 425WESTCAPITOLAVENUE Cf~, 400SalemRd .. Suite3 LITTLE ROCK, ARKANSAS 7220 1-3472 Conway,Arkansas72032 (501) 375-1 122 (501) 329-1133 TELECOPIER (50 1) 375- 1.027 ! APR 5 Telecopier (501) 336-9089 April 5, 2001 200/ VIA HAND DELIVERY OffiCE Of Christopher J. Heller, Esq. fBIREsAnoN MONITliRINS FRIDAY, ELDREDGE \u0026 CLARK 2000 Regions Bldg. 400 West Capitol Little Rock, Arkansas 72201 M. Samuel Jones, Ill, Esq. WRIGHT, LINDSEY \u0026 JENNINGS 200 West Capitol Avenue 2200 Bank of America Bldg. Little Rock, Arkansas 72201 John W. Walker, Esquire JOHN W. WALKER, P.A. 1723 Broadway Little Rock, Arkansas 72206 Sammye Taylor, Esq. Mark Hagemeier, Esq. Arkansas Attorney General's Office 323 Center Street, Suite 200 Little Rock, Arkansas 72201 Ann Brown OFFICE OF DESEGREGATION MONITORING 201 East Markham, Suite 510 Heritage West Building Little Rock, Arkansas 72201 Richard W. Roachell, Esq. Roachell Law Firm 401 W. Capitol Avenue, Suite 504 Little Rock, Arkansas 72201 Tim Gauger, Esq. Mitchell, Williams, Selig, Gates \u0026 Woodyard 425 W. Capitol, Suite 1800 Little Rock, Arkansas 72201-3525 RE: NLRSD Status Report/July 1998 - June 1999 Dear Ms. Brown and Counsel: Enclosed please find a copy of the above referenced Status Report. If you have any questions, please do not hesitate to contact me. SWJ:tl Enclosures yours, IN THE UNITED STA TES DISTRICT COURT EASTERN DISTRICT OF ARKANSAS WESTERN DIVISION NORTH LITTLE ROCK SCHOOL DISTRICT V. LR-C-82-866 PULASKI COUNTY SPECIAL SCHOOL DEFENDANTS DISTRICT NO. 1, ET AL MRS. LORENE JOSHUA, ET AL INTERVENORS KATHERINE KNIGHT, ET AL INTERVENORS RECEIVED APR 5 2001 OFFICE OF DESEGREGATION MONITORING NOTICE OF FILING PLAINTIFF North Little Rock School District hereby gives notice of the filing of the following document: 1. North Little Rock School District's July 1998 - June 1999 Status Report. Respectfully Submitted, JACK, LYON \u0026 JONES, P.A. 3400 TCBY Tower 425 West Capitol Avenue Little Rock, Arkansas 72201 (50 75-1122 CERTIFICATE OF SERVICE I, Stephen W. Jones, hereby certify that I have this 5th day of April, 2001, sent one copy of the foregoing via Hand Deliv~i;y, to the following: Christopher J. Heller, Esq. FRIDAY, ELDREDGE \u0026 CLARK 2000 Regions Center 400 West Capitol Little Rock, Arkansas 72201 M. Samuel Jones, Ill, Esq. WRIGHT, LINDSEY \u0026 JENNINGS 200 West Capitol Avenue 2200 Bank of America Bldg. Little Rock, Arkansas 72201 John W. Walker, Esquire JOHN W. WALKER, P.A. 172;3 Broadway Little Rock, Arkansas 72206 Sammye Taylor, Esq. Mark Hagemeier, Esq. Arkansas Attorney General's Office 323 Center Street, Suite 200 Little Rock, Arkansas 72201 Ann Brown OFFIC.E OF DESEGREGATION MONITORING 201 East Markham, Suite 51 O Heritage West Building Little Rock, Arkansas 72201 Richard W. Roachell, Esq. Roachell Law Firm 401 W. Capitol Avenue, Suite 504 Little Roak, Arkansas 72201  Tim Gauger, Esq. Mitchell, Williams, Selig, Gates \u0026 Woodyard 425 W. Capitol, Suite 1800 Little Rock, Arkansas 72201-3525 1. I I I I I I I 1e I I I I I I ~ I I tT  FILED 2000-01 ENROLLMENT AND RACIAL BALANCE IN 'Ufflt r/~;1i;:.~g9..i~~sAs LITTLE ROCK SCHOOL DISTRICT AND PULASKI COUNTY SPECIAL SCHOOL DISTRICT APR 1 1 2001 Melissa R. Guldin Associate Monitor April 11, 2001 Office of Desegregation Monitoring United States District Court Little Rock, Arkansas Ann S. Marshall Federal Monitor  JAMES W. McCORMACK, CLERK .By: DEP CLERK Polly Ramer Office Manager !'.I I, IN THE UNITED STATES DISTRICT COURT EASTERN DISTRICT OF ARKANSAS WESTERN DIVISION LITTLE ROCK SCHOOL DISTRICT V. NO. LR-C-82-866 PULASKI COUNTY SPECIAL SCHOOL DISTRICT NO. 1, ET AL. MRS. LORENE JOSHUA, ET AL. KATHERINE KNIGHT, ET AL. SEPARATE MOTION OF THE PCSSD TO APPROVE MIDDLE SCHOOL CONSTRUCTION MODIFICATION The PCSSD for its separate motion states: RECEIVED APR J 4 200:li illfflCEQf 1lESl!HfEGATION1MONITORINW PLAINTIFF DEFENDANTS INTERVENORS INTERVENORS 1. The PCSSD Board of Directors approved a conversion to middle schools on May 9, 2000. 2. On September 27, 2000 PCSSD submitted to this court, the ODM and the other parties its comprehensive Business Case which explains and justifies the overall middle school conversion. 3. On February 16, 2001 PCSSD filed its motion to approve middle schools and revamped high schools. A copy of the business case referred to in paragraph two was appended to that motion as was a comprehensive bound set of materials explaining the work and preparation that the District had done since May of 2000 to implement the middle school conversion. 4. As part of the conversion, physical modifications to Robinson High School and Mills University Studies High School were deemed necessary and were explained 248200-v1 - in the Business Case. The details of the modifications are set forth at page 57 of the booklet of materials filed February 16, 2001. For the convenience of the court and the parties, this page is re-appended to this motion as Exhibit\"!('. 5. The renovations referred to Exhibit'~' are already in progress. Because of the general oversight which this court has pursuant to the PCSSD, the PCSSD requests that this court formally approve the renovations described in Exhibit'!A!'. WHEREFORE, the PCSSD respectfully requests an order of this court approving the renovation activities described in Exhibit'~' and for all proper relief. Respectfully submitted, WRIGHT, LINDSEY \u0026 JENNINGS LLP 200 West Capitol Avenue, Suite 2200 Little Rock, Arkansas 72201-3699 (501) 371-0808 FAX: (501) 376-9442 By ____ ,.-a-+-----~1-'-\"'------ M. Ill (76060 Att ski Coun ial Sch On April 13, 2001, a copy of the foregoing was served via U.S. mail on each of the following: Mr. John W. Walker John W. Walker, P.A. 1723 Broadway Little Rock, Arkansas 72201 Mr. Christopher Heller Friday, Eldredge \u0026 Clark 2000 First Commercial Building Little Rock, Arkansas 72201 248200-v1 2 Ms. Ann Brown ODM One Union National Plaza 124 West Capitol, Suite 1895 Little Rock, AR 72201 Mr. Richard W. Roachell Roachell and Street First Federal Plaza 401 West Capitol, Suite 504 Little Rock, Arkansas 72201 Mr. Brian Brooks Assistant Attorney General 323 Center Street, Suite 200 Little Rock, Arkansas 72201 Mr. Stephen W. Jones 3400 TCBY Tower 425 West Capitol Avenue Little Rock, Arkansas 72201 248200-v1 ~ ~ 3 EXHIBIT I A FACILITY NEEDS TO IMPLEMENT MIDDLE SCHOOL~OGRAM Robinson Hi'3h Item Amount  Construct new 2 classroom addition ... ... . ..... .. .... . $160,000  Convert Ex. CR 11 into 2 classrooms . . . . . . . . . . . . . . . . . . . . . . $5,000  Convert Ex. CR 12 into 2 art labs . . . . . . . . . . . . . . . . . . . . . . . . . $5,000  Renovate Ex. Rm. 29 into a classroom . . . . . . . . . . . . . . . . . . . . $5,000  Renovate Ex. Rm. 30 into a classroom . . . . . . . . . . . . . . . . . . . . $5,000  Convert Ex. CR 27 ( choir room )into 2 classrooms . . . . . . . . $20.,.000 Sub-total . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $200,000 Contingency, 10% ( +/-) . . .... . .... . ... '. . . . . . . . . . . . . . . . . . $10,000 Sub-total . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $210,000 Architect fee, Misc. tests, etc., 8% ( +/-) ..... . ... . : . .... . . $15,000 Total ........ . . : . .. .. . ..... . ... .'. - : -: . . .. ... ..... .. .. $225,000 Mills University Studies High  Convert existing Media Center into additional Cafeteria Space and teacher Amount work room ..... . ... . .. . . . ............. . ..... . . ....... . $85,000  Construct new Media Center  . . ..... . ... .. ... . ..... .. .. $637,500 Sub-total .... . . . . . ...... . . .. ... . ... . .. .. .. . .... . ... . $722,500 Contingency, 10% ( +/-) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $72,300 Total . . ....... . ........ . . . .... . .... .. ... . .. _. ...... .. $794,800 .Total of Robinson High and Mills High .... . .......... . .... . ... .. ... $1,019,800 057  . . ' IN THE UNITED STATES DISTRICT COURT EASTERN DISTRICT OF ARKANSAS WESTERN DIVISION R!C!JVa, APR 1 9 ZOOt ~~~OF --.vlll.1MIIUJJ IIJIJro- LITTLE ROCK SCHOOL DISTRICT PLAI NTI FF V. NO. LR-C-82-866 PULASKI COUNTY SPECIAL SCHOOL DISTRICT NO. 1, ET AL. DEFENDANTS INTERVENORS I NTERVENORS MRS. LORENE JOSHUA, ET AL. KATHERINE KNIGHT, ET AL. SUPPLEMENT TO SEPARATE MOTION OF THE PCSSD TO APPROVE MIDDLE SCHOOL CONSTRUCTION MODIFICATION For its supplement to its renovation motion, the PCSSD states: 1. Attached as Exhibit \"A\" is a business case in support of the renovation motion which the PCSSD respectfully requests this Court to consider as part of its submissions in this matter. 249171-v1 Respectfully submitted, WRIGHT, LINDSEY \u0026 JENNINGS LLP 200 West Capitol Avenue, Suite 2200 Little Rock, Arkansas 72201-3699 (501) 371-0808 FAX: (501) 376-9442 B -~,..::;...~----:-:-:-::::'='\"::-:~-..;;;:....---Jones Ill (76 r Pulaski C Special rict CERTIFICATE OF SERVICE On April [1, 2001, a copy of the foregoing was served via U.S. mail on each of the following: Mr. John W. Walker John W. Walker, P.A. 1723 Broadway Little Rock, Arkansas 72201 Mr. Christopher Heller Friday, Eldredge \u0026 Clark 2000 First Commercial Building Little Rock, Arkansas 72201 Ms. Ann Brown ODM One Union National Plaza 124 West Capitol, Suite 1895 Little Rock, AR 72201 Mr. Richard W. Roachell Roachell and Street First Federal Plaza 401 West Capitol, Suite 504 Little Rock, Arkansas 72201 Ms. Sammye L. Taylor Mr. Mark A. Hagemeier Arkansas Attorney General's Office 323 Center Street, Suite 200 Little Rock, Arkansas 72201 Mr. Stephen W. Jones 3400 TCBY Tower 425 West Capitol Avenue Little Rock, Arkansas 72201 249171-v1 2 Executive Summary: Implementation of Middle Schools Construction Pulaski County Special School District April 2001 The Pulaski County Special School District (District) currently has 24 elementary schools, each encompassing grades kindergarten through six; one existing middle school, Jacksonville Middle School; and six junior high schools, each encompassing grades seven through nine. The six senior high schools currently contain students in grades ten through twelve. After discussions, workshops, and community meetings, the District's Board of Directors voted at its May 9, 2000, meeting to approve a district-wide conversion to middle schools, effective for the 2001-2002 school year. This decision to pursue middle school conversion included construction for the Mills University Studies High School campus and the Robinson High School campus. Staff estimated that costs for facility remodeling would total $983,734.00. Background: The implementation of the middle school concept will not change student assignments, only the configuration of the existing junior and senior high schools. Oak Grove Junior/Senior High School, Jacksonville Middle School, Jacksonville Junior High School and Jacksonville High School will be the exceptions to the proposed conversion. Toward this end, the District contracted a general evaluation of all of its schools. The facilities study provided the Board with a blueprint of construction needs. At this time, the District anticipates that the conversion to middle schools can be accomplished by converting the existing junior high facilities to middle school campuses and s ending ninth grade students to the senior high school facilities. Existing facilities have been examined for this movement of students. Two sites would need renovation to accomplish the conversion: Robinson High School will require classroom space conversion and renovation. Mills University Studies High School will need additional cafeteria space and a new media center. Problem Statement: Increasing the capacity at the Robinson and Mills sites is recommended for a successful conversion to 9-12 grade high schools. Without the proposed construction, student capacity would be severely limited. Recruitment within and to those areas would also be hampered. Failure to increase the student capacity at these two campuses would result in overcrowding, discipline problems and displacement of students. In turn, this would result in increased student displacement, busing and negative school-community relations. EXHIBIT 249145-v1 J II I I I I I I I I I Alternatives: The alternative to this recommendation for construction would be to keep the campuses in their current configurations. This would cripple the ability to make the complete middle school conversion and conversion to 9-12 grade high schools. Action Recommended: By its vote on May 9, 2000, the Board of Directors approved a district-wide conversion to middle schools, to become effective for the 2001-2002 school year. The Board chose to delay the conversion of Oak Grove Junior/Senior High School to the middle school concept at this time. On March 13, 2001, the Board decided to delay the conversion of Jacksonville Middle School, Jacksonville Junior High School, and Jacksonville High School as well. Once the Board authorized the middle school concept, an examination of all secondary school facilities was conducted for student capacity. As a result of this examination, it was determined that addition construction would be needed at Mills and at Robinson High Schools. At Mills University Studies High School, a new media center is being built and the old media center would be converted into addition cafeteria space. These renovations will increase the capacity of the school media center and cafeteria. At Robinson High School, two additional classrooms will be constructed, the choir room would be divided and two dressing rooms will be converted into classroom space. This construction would increase the student capacity at Robinson High School by at least 250 students, both to accommodate the addition of the 9th grade and to provide for future desegregated growth. Objectives: The implementation of middle schools works to support the District's overall goals which includes the District's commitments to desegregation. Foremost, the creation of effective learning environments for all students support the District's goal of raising student achievement and successfully raising expectations. Students in sixth grade will have intensive use of technology and more opportunities to participate in co-curricular activities than is available in elementary schools. Ninth graders will enjoy increased opportunities for advanced academic pursuits and extra-curricular activities. Impact: Increased capacity will help to improve discipline, enhance recruitment efforts, and assist in maintaining racial balance at these campuses. It will also enhance student achievement and increase the opportunity for success of these students. Ninth grade students will benefit from the challenge of high school classes, increased curriculum opportunities and extra-curricular activities. 249145-v1 2 Student population at Mills for the current school year is 587 students for grades 10 through 12. Of that total, 343 students are white and 244 students are black. Present student capacity at Mills is 780. The projected student enrollment for 2001- 2002 school year, in grades 9 through 12, is 900. Of that projection, 483 students would be white, 417 students would be black. Student population at Robinson High School for the current school year is 435 students for grades 10 through 12. Of that total, 320 students are white and 115 students are black. Present student capacity at Robinson High School is 506. Robinson's projected enrollment for the 2001-2002 school year, in grades 9 through 12, is 638. Of that projection, 458 students would be white and 180 students would be black. Resources: The conversion to middle schools can be accomplished with few facility changes. Robinson High School and Mills University Studies High School have been identified as the only buildings needing immediate renovations. These costs are estimated to be $983,734. The construction at Mills will cost $766,680. Additional renovation at Robinson will cost $217,054 and will increase student capacity by about 250 students. Plan for Implementation: The Pulaski County Special School District will make the facility renovations required to accommodate a middle school conversion. At both Mills University Studies High School and Robinson High School construction started January 30, 2001. Estimated completion of construction is August 1, 2001. 249145-v1 3 EDWARD L. WRIGHT (1903-1977) ROBERT S. LINDSEY (1913-1991) ISAAC A. SCOTT, JR. JOHN G. LILE WRIGHT, LINDSEY \u0026 JENNINGS LLP ATTORNEYS AT LAW JUDY SIMMONS HENRY KIMBERLY WOOD TUCKER RAY F. COX, JR. TROY A. PRICE GORDON S. RATHER, JR. TERRY L. MATHEWS DAVID M. POWELL ROGER A. GLASGOW C. DOUGLAS BUFORD, JR. PATRICK J. GOSS ALSTON JENNINGS, JR. JOHN R. TISDALE KATHLYN GRAVES M. SAMUEL JONES Ill JOHN WILLIAM SPIVEY Ill LEE J . MULDROW N.M. NORTON CHARLES C. PRICE CHARLES T. COLEMAN JAMES J, GLOVER EDWIN L. LOWTHER, JR. CHARLES L. SCHLUMBERGER WALTER E. MAY GREGORY T. JONES H. KEITH MORRISON BETTINA E. BROWNSTEIN WALTER McSPADDEN ROGER D. ROWE JOHN D. DAVIS Mr. John Walker John Walker, P.A. 1723 Broadway Little Rock, Arkansas 72206 Ms. Ann Brown Marshall ODM One Union National Plaza 124 West Capitol, Suite 1895 Little Rock, Arkansas 72201 Mr. Richard Roachell Roachell Law Firm P.O. Box 17388 Little Rock, Arkansas 72222-7388 RE: PCSSD Dear Counsel and Ms. Marshall: 200 WEST CAPITOL AVENUE SUITE 2200 LITTLE ROCK, ARKANSAS 72201-3699 (501) 371-0808 FAX (501) 376-9442 www.wlj .com OF COUNSEL ALSTON JENNINGS RONALD A. MAY M. TODD WOOD Writer's Direct Dial No. 501-212-1273 mjonesCwlJ.com April 27, 2001 Mr. Christopher Heller Friday, Eldredge \u0026 Clark 400 W. Capitol, Suite 2200 Little Rock, Arkansas 72201 Mr. Stephen W. Jones Jack, Lyon \u0026 Jones 3400 TCBY Tower PATRICIA SIEVERS HARRIS JAMES M. MOODY, JR. KATHRYN A. PRYOR J . MARK DAVIS CLAIRE SHOWS HANCOCK KEVIN W. KENNEDY JERRY J. SALLINGS WILLIAM STUART JACKSON MICHAEL D. BARNES STEPHEN R. LANCASTER JUDY ROBINSON WILBER BETSY MEACHAM KYLE R. WILSON JENNlfER S. BROWN C. TAD BOHANNON MICHELE SIMMONS ALLGOOD KRISTI M. MOODY J. CHARLES DOUGHERTY\" M. SUN HATCH PHYLLIS M. McKENZIE ELISA MASTERSON WHITE JANE W. DUKE ROBERT W. GEORGE J . ANDREW VINES JUSTIN T. ALLEN CHRISTINE J. DAUGHERTY, Ph,O. LJcensad to practlca be/'orB the Unled Sla'9s Patent and Trademarl\u003c Office RECEJ.\\fED 425 West Capitol Avenue Little Rock, Arkansas 72201 APR 3 0 zom CIIIE81f -lllllQfflRIIS Ms. Sammye L. Taylor Assistant Attorney General 323 Center Street, Suite 200 Little Rock, Arkansas 72201 Enclosed are copies of supplement to PCSSD motion to approve middle schools and revamped high schools and supplemental memorandum in support which are being filed today. MSJ/ao Encls. 251317-v1 Cordially, WRIGHT, LINDSEY \u0026 JENNINGS LLP ~~ M. S muues, Ill IN THE UNITED STATES DISTRICT COURT EASTERN DISTRICT OF ARKANSAS WESTERN DIVISION APR 3 0 20m Gffll(lf De~IIJIIDJRlli LITTLE ROCK SCHOOL DISTRICT PLAINTIFF V. NO. 4:82CV00866SWW PULASKI COUNTY SPECIAL SCHOOL DISTRICT NO. 1, ET AL. DEFENDANTS INTERVENORS INTERVENORS MRS. LORENE JOSHUA, ET AL. KA THERINE KNIGHT, ET AL. SUPPLEMENT TO PCSSD MOTION TO APPROVE MIDDLE SCHOOLS AND REVAMPED HIGH SCHOOLS PCSSD, for its supplement to motion, states: 1. Contemporaneously with this supplement, the PCSSD is submitting for filing additional documents numbered 17 4 through 232 for the Court's review and consideration. 2. The numbering of this submission begins with the next number of the documents submitted February 16, 2001. In large measure, the documents are sequenced chronologically and several of them are discussed in the accompanying memorandum. 251097-v1 Respectfully submitted, WRIGHT, LINDSEY \u0026 JENNINGS LLP 200 West Capitol Avenue, Suite 2200 Little Rock, Arkansas 72201-3699 (501) 371-0808 FAX: (501) 376-9442 '---  \"'  (7~ B ~ ---,, \\:::  ones Ill (76Q60) Pulaski'eounty Special ct CERTIFICATE OF SERVICE On April,ZJ, 2001, a copy of the foregoing was served via U.S. mail on each of the following: Mr. John W. Walker John W. Walker, P.A. 1723 Broadway Little Rock, Arkansas 72201 Mr. Christopher Heller Friday, Eldredge \u0026 Clark 2000 First Commercial Building Little Rock, Arkansas 72201 Ms. Ann Brown Marshall ODM One Union National Plaza 124 West Capitol, Suite 1895 Little Rock, AR 72201 Mr. Richard Roachell Roachell Law Firm P.O. Box 17388 Little Rock, Arkansas 72222-7388 Ms. Sammye L. Taylor Mr. Mark A. Hagemeier Arkansas Attorney General's Office 323 Center Street, Suite 200 Little Rock, Arkansas 72201 Mr. Stephen W. Jones 3400 TCBY Tower 425 West Capitol Avenue Little Rock, Arkansas 72201 251097-v1 M. S~el Jo~es Ill ,.  ) ~ u 2 IN THE UNITED STATES DISTRICT COURT EASTERN DISTRICT OF ARKANSAS WESTERN DIVISION LITTLE ROCK SCHOOL DISTRICT V. NO. 4:82CV00866SWW PULASKI COUNTY SPECIAL SCHOOL DISTRICT NO. 1, ET AL. MRS. LORENE JOSHUA, ET AL. KATHERINE KNIGHT, ET AL. SUPPLEMENTAL MEMORANDUM IN SUPPORT PLAINTIFF DEFENDANTS INTERVENOR$ INTERVENORS OF PCSSD MOTION TO APPROVE MIDDLE SCHOOLS AND REVAMPED HIGH SCHOOLS Work on the implementation of middle schools has continued since the District's - original filing dated February 16, 2001. The supplemental document submission covers both documents generated since the first filing as well as supplies a handful of documents that were not available to counsel in February. Documents 174. and 175 represent the memorandum of understanding between PACT and PCSSD dealing with the placement of teachers in middle schools. Documents 176 through 181 represent a presentation made by Dr. Gloria Rousseau to administrators at the PCSSD which contains useful information concerning the process since January 2001. Documents 183 through 193 represent various committee reports and activities as do Documents 195 through 196. Documents 197 through 200 explain the formal Board policies which have been adopted and Documents 201 through 204 contain information regarding the middle school curri "}],"pages":{"current_page":368,"next_page":369,"prev_page":367,"total_pages":6797,"limit_value":12,"offset_value":4404,"total_count":81557,"first_page?":false,"last_page?":false},"facets":[{"name":"educator_resource_mediums_sms","items":[{"value":"lesson plans","hits":319},{"value":"teaching guides","hits":53},{"value":"timelines (chronologies)","hits":43},{"value":"online exhibitions","hits":38},{"value":"bibliographies","hits":15},{"value":"study guides","hits":11},{"value":"annotated bibliographies","hits":9},{"value":"learning modules","hits":6},{"value":"worksheets","hits":6},{"value":"slide shows","hits":4},{"value":"quizzes","hits":1}],"options":{"sort":"count","limit":16,"offset":0,"prefix":null}},{"name":"type_facet","items":[{"value":"Text","hits":40428},{"value":"StillImage","hits":35298},{"value":"MovingImage","hits":4529},{"value":"Sound","hits":3226},{"value":"Collection","hits":41},{"value":"InteractiveResource","hits":25}],"options":{"sort":"count","limit":16,"offset":0,"prefix":null}},{"name":"creator_facet","items":[{"value":"Peppler, Jim","hits":4965},{"value":"Phay, John E.","hits":4712},{"value":"University of Mississippi. Bureau of Educational Research","hits":4707},{"value":"Baldowski, Clifford H., 1917-1999","hits":2599},{"value":"Mississippi State Sovereignty Commission","hits":2255},{"value":"Thurmond, Strom, 1902-2003","hits":2077},{"value":"WSB-TV (Television station : Atlanta, Ga.)","hits":1475},{"value":"Newman, I. DeQuincey (Isaiah DeQuincey), 1911-1985","hits":1003},{"value":"The State Media Company (Columbia, S.C.)","hits":926},{"value":"Atlanta Journal-Constitution","hits":844},{"value":"Herrera, John J.","hits":778}],"options":{"sort":"count","limit":11,"offset":0,"prefix":null}},{"name":"subject_facet","items":[{"value":"African Americans--Civil rights","hits":9445},{"value":"Civil rights","hits":8328},{"value":"African Americans","hits":5912},{"value":"Mississippi--Race relations","hits":5750},{"value":"Race relations","hits":5604},{"value":"Education, Secondary","hits":5083},{"value":"Education, Elementary","hits":4729},{"value":"Segregation in education--Mississippi","hits":4727},{"value":"Education--Pictorial works","hits":4707},{"value":"Civil rights demonstrations","hits":4440},{"value":"Civil rights workers","hits":3536}],"options":{"sort":"count","limit":11,"offset":0,"prefix":null}},{"name":"subject_personal_facet","items":[{"value":"Smith, Lillian (Lillian Eugenia), 1897-1966--Correspondence","hits":1888},{"value":"King, Martin Luther, Jr., 1929-1968","hits":1815},{"value":"Meredith, James, 1933-","hits":1709},{"value":"Baker, Augusta, 1911-1998","hits":1495},{"value":"Herrera, John J.","hits":1312},{"value":"Parks, Rosa, 1913-2005","hits":1071},{"value":"Jordan, Barbara, 1936-1996","hits":858},{"value":"Young, Andrew, 1932-","hits":814},{"value":"Smith, Lillian (Lillian Eugenia), 1897-1966","hits":719},{"value":"Mizell, M. Hayes","hits":674},{"value":"Silver, James W. (James Wesley), 1907-1988","hits":626}],"options":{"sort":"count","limit":11,"offset":0,"prefix":null}},{"name":"name_authoritative_sms","items":[{"value":"Smith, Lillian (Lillian Eugenia), 1897-1966","hits":2598},{"value":"King, Martin Luther, Jr., 1929-1968","hits":1915},{"value":"Meredith, James, 1933-","hits":1704},{"value":"Herrera, John J.","hits":1331},{"value":"Parks, Rosa, 1913-2005","hits":1070},{"value":"Jordan, Barbara, 1936-1996","hits":856},{"value":"Young, Andrew, 1932-","hits":806},{"value":"Silver, James W. (James Wesley), 1907-1988","hits":625},{"value":"Connor, Eugene, 1897-1973","hits":605},{"value":"Snelling, Paula","hits":580},{"value":"Williams, Hosea, 1926-2000","hits":440}],"options":{"sort":"count","limit":11,"offset":0,"prefix":null}},{"name":"event_title_sms","items":[{"value":"Martin Luther King, Jr.'s Nobel Prize","hits":1769},{"value":"Ole Miss Integration","hits":1670},{"value":"Housing Act of 1961","hits":969},{"value":"Little Rock Central High School Integration","hits":853},{"value":"Memphis Sanitation Workers Strike","hits":366},{"value":"Selma-Montgomery March","hits":337},{"value":"Freedom Summer","hits":306},{"value":"Freedom Rides","hits":214},{"value":"Poor People's Campaign","hits":180},{"value":"University of Georgia Integration","hits":173},{"value":"University of Alabama Integration","hits":140}],"options":{"sort":"count","limit":11,"offset":0,"prefix":null}},{"name":"location_facet","items":[{"value":"United States, 39.76, -98.5","hits":17987},{"value":"United States, Georgia, Fulton County, Atlanta, 33.749, -84.38798","hits":5437},{"value":"United States, Alabama, Montgomery County, Montgomery, 32.36681, -86.29997","hits":5151},{"value":"United States, Georgia, 32.75042, -83.50018","hits":4847},{"value":"United States, South Carolina, 34.00043, -81.00009","hits":4599},{"value":"United States, Arkansas, 34.75037, -92.50044","hits":4328},{"value":"United States, Alabama, 32.75041, -86.75026","hits":3948},{"value":"United States, Mississippi, 32.75041, -89.75036","hits":2910},{"value":"United States, Arkansas, Pulaski County, 34.76993, -92.3118","hits":2580},{"value":"United States, Tennessee, Shelby County, Memphis, 35.14953, -90.04898","hits":2580},{"value":"United States, Arkansas, Pulaski County, Little Rock, 34.74648, -92.28959","hits":2536}],"options":{"sort":"count","limit":11,"offset":0,"prefix":null}},{"name":"us_states_facet","items":[{"value":"Georgia","hits":12823},{"value":"Alabama","hits":11313},{"value":"Mississippi","hits":10220},{"value":"South Carolina","hits":8493},{"value":"Arkansas","hits":4733},{"value":"Texas","hits":4399},{"value":"Tennessee","hits":3786},{"value":"Florida","hits":2602},{"value":"Ohio","hits":2403},{"value":"North Carolina","hits":1875},{"value":"New York","hits":1840}],"options":{"sort":"count","limit":11,"offset":0,"prefix":null}},{"name":"year_facet","items":[{"value":"1966","hits":10632},{"value":"1963","hits":10287},{"value":"1965","hits":10218},{"value":"1956","hits":9840},{"value":"1955","hits":9619},{"value":"1964","hits":9365},{"value":"1968","hits":9345},{"value":"1962","hits":9247},{"value":"1967","hits":8897},{"value":"1957","hits":8523},{"value":"1961","hits":8282},{"value":"1958","hits":8259},{"value":"1959","hits":8061},{"value":"1960","hits":7948},{"value":"1969","hits":7348},{"value":"1954","hits":7240},{"value":"1950","hits":7118},{"value":"1953","hits":6969},{"value":"1970","hits":6835},{"value":"1971","hits":6425},{"value":"1977","hits":6367},{"value":"1972","hits":6254},{"value":"1952","hits":6162},{"value":"1951","hits":6046},{"value":"1975","hits":5894},{"value":"1976","hits":5863},{"value":"1974","hits":5849},{"value":"1973","hits":5689},{"value":"1979","hits":5416},{"value":"1978","hits":5405},{"value":"1980","hits":5366},{"value":"1995","hits":4885},{"value":"1981","hits":4811},{"value":"1994","hits":4704},{"value":"1948","hits":4597},{"value":"1949","hits":4573},{"value":"1996","hits":4542},{"value":"1982","hits":4417},{"value":"1947","hits":4317},{"value":"1985","hits":4313},{"value":"1998","hits":4281},{"value":"1983","hits":4261},{"value":"1997","hits":4258},{"value":"1984","hits":4152},{"value":"1999","hits":4074},{"value":"1946","hits":4047},{"value":"1945","hits":4018},{"value":"1986","hits":4006},{"value":"1990","hits":3988},{"value":"1943","hits":3900},{"value":"1944","hits":3896},{"value":"2000","hits":3894},{"value":"2001","hits":3876},{"value":"1942","hits":3868},{"value":"1940","hits":3765},{"value":"1941","hits":3758},{"value":"1987","hits":3744},{"value":"2002","hits":3624},{"value":"1991","hits":3553},{"value":"1936","hits":3507},{"value":"1939","hits":3501},{"value":"1992","hits":3500},{"value":"2003","hits":3489},{"value":"1993","hits":3478},{"value":"1938","hits":3466},{"value":"1937","hits":3450},{"value":"1989","hits":3441},{"value":"1930","hits":3378},{"value":"1988","hits":3355},{"value":"1935","hits":3307},{"value":"1933","hits":3271},{"value":"1934","hits":3271},{"value":"1932","hits":3255},{"value":"1931","hits":3240},{"value":"2005","hits":3143},{"value":"2004","hits":2995},{"value":"2006","hits":2860},{"value":"1929","hits":2790},{"value":"1928","hits":2272},{"value":"1921","hits":2124},{"value":"1925","hits":2040},{"value":"1927","hits":2026},{"value":"1924","hits":2012},{"value":"2016","hits":2011},{"value":"1926","hits":2010},{"value":"1920","hits":1976},{"value":"1923","hits":1955},{"value":"1922","hits":1929},{"value":"2007","hits":1715},{"value":"2008","hits":1664},{"value":"2011","hits":1661},{"value":"2009","hits":1624},{"value":"2019","hits":1623},{"value":"2015","hits":1613},{"value":"2013","hits":1604},{"value":"2010","hits":1601},{"value":"2014","hits":1567},{"value":"2012","hits":1553},{"value":"1919","hits":1533},{"value":"1918","hits":1531}],"options":{"sort":"count","limit":100,"offset":0,"prefix":null},"min":"0193","max":"2035","count":506439,"missing":56},{"name":"medium_facet","items":[{"value":"photographs","hits":10710},{"value":"correspondence","hits":9628},{"value":"black-and-white photographs","hits":7678},{"value":"negatives (photographs)","hits":7513},{"value":"documents (object genre)","hits":4462},{"value":"letters (correspondence)","hits":3623},{"value":"oral histories (literary works)","hits":3607},{"value":"black-and-white negatives","hits":2771},{"value":"editorial cartoons","hits":2620},{"value":"newspapers","hits":1955},{"value":"manuscripts (documents)","hits":1692}],"options":{"sort":"count","limit":11,"offset":0,"prefix":null}},{"name":"rights_facet","items":[{"value":"http://rightsstatements.org/vocab/InC/1.0/","hits":41201},{"value":"http://rightsstatements.org/vocab/InC-EDU/1.0/","hits":17721},{"value":"http://rightsstatements.org/vocab/UND/1.0/","hits":8830},{"value":"http://rightsstatements.org/vocab/CNE/1.0/","hits":7090},{"value":"http://rightsstatements.org/vocab/NoC-US/1.0/","hits":2186},{"value":"http://rightsstatements.org/vocab/InC-NC/1.0/","hits":1778},{"value":"http://rightsstatements.org/vocab/NoC-CR/1.0/","hits":1115},{"value":"https://creativecommons.org/licenses/by-nc-nd/4.0/","hits":145},{"value":"http://rightsstatements.org/vocab/NKC/1.0/","hits":60},{"value":"http://rightsstatements.org/vocab/InC-RUU/1.0/","hits":51},{"value":"https://creativecommons.org/licenses/by-nc-sa/4.0/","hits":27}],"options":{"sort":"count","limit":11,"offset":0,"prefix":null}},{"name":"collection_titles_sms","items":[{"value":"Jim Peppler Southern Courier Photograph Collection","hits":4956},{"value":"John E. Phay Collection ","hits":4706},{"value":"John J. Herrera Papers","hits":3288},{"value":"Baldy Editorial Cartoons, 1946-1982, 1997: Clifford H. Baldowski Editorial Cartoons at the Richard B. Russell Library.","hits":2607},{"value":"Sovereignty Commission Online","hits":2335},{"value":"Strom Thurmond Collection, Mss 100","hits":2068},{"value":"Alabama Media Group Collection","hits":2067},{"value":"Black Trailblazers, Leaders, Activists, and Intellectuals in Cleveland","hits":2033},{"value":"Rosa Parks Papers","hits":1948},{"value":"Isaiah DeQuincey Newman, (1911-1985), Papers, 1929-2003","hits":1904},{"value":"Lillian Eugenia Smith Papers (circa 1920-1980)","hits":1887}],"options":{"sort":"count","limit":11,"offset":0,"prefix":null}},{"name":"provenance_facet","items":[{"value":"John Davis Williams Library. Department of Archives and Special Collections","hits":8885},{"value":"Alabama. Department of Archives and History","hits":8153},{"value":"South Caroliniana Library","hits":4251},{"value":"Atlanta University Center Robert W. Woodruff Library","hits":4102},{"value":"University of North Texas. Libraries","hits":3854},{"value":"University of South Carolina. Libraries","hits":3438},{"value":"Hargrett Library","hits":3292},{"value":"Richard B. Russell Library for Political Research and Studies","hits":2874},{"value":"Mississippi. Department of Archives and History","hits":2825},{"value":"Butler Center for Arkansas Studies","hits":2785},{"value":"Rhodes College","hits":2264}],"options":{"sort":"count","limit":11,"offset":0,"prefix":null}},{"name":"class_name","items":[{"value":"Item","hits":81102},{"value":"Collection","hits":455}],"options":{"sort":"count","limit":100,"offset":0,"prefix":null}},{"name":"educator_resource_b","items":[{"value":"false","hits":81360},{"value":"true","hits":197}],"options":{"sort":"count","limit":100,"offset":0,"prefix":null}}]}}