{"response":{"docs":[{"id":"bcas_bcmss0837_138","title":"Arkansas Department of Education's (ADE's) Project Management Tool","collection_id":"bcas_bcmss0837","collection_title":"Office of Desegregation Management","dcterms_contributor":null,"dcterms_spatial":["United States, 39.76, -98.5","United States, Arkansas, 34.75037, -92.50044","United States, Arkansas, Pulaski County, 34.76993, -92.3118"],"dcterms_creator":["Arkansas. Department of Education"],"dc_date":["2004-03/2004-04"],"dcterms_description":null,"dc_format":["application/pdf"],"dcterms_identifier":null,"dcterms_language":["eng"],"dcterms_publisher":["Little Rock, Ark. : Butler Center for Arkansas Studies. Central Arkansas Library System"],"dc_relation":null,"dc_right":["http://rightsstatements.org/vocab/InC-EDU/1.0/"],"dcterms_is_part_of":["Office of Desegregation Monitoring records (BC.MSS.08.37)","History of Segregation and Integration of Arkansas's Educational System"],"dcterms_subject":["Education--Arkansas","Office of Desegregation Monitoring (Little Rock, Ark.)","School integration--Arkansas","Arkansas. Department of Education","Project management"],"dcterms_title":["Arkansas Department of Education's (ADE's) Project Management Tool"],"dcterms_type":["Text"],"dcterms_provenance":["Butler Center for Arkansas Studies"],"edm_is_shown_by":null,"edm_is_shown_at":["http://arstudies.contentdm.oclc.org/cdm/ref/collection/bcmss0837/id/138"],"dcterms_temporal":null,"dcterms_rights_holder":null,"dcterms_bibliographic_citation":null,"dlg_local_right":["Available for use in research, teaching, and private study. Any other use requires permission from the Butler Center."],"dcterms_medium":["documents (object genre)"],"dcterms_extent":["352 pages"],"dlg_subject_personal":null,"dcterms_subject_fast":null,"fulltext":"\n \n\n\n\n\n\n\n\n  \n\n\n   \n\n   \n\n\n   \n\n\n   \n\n\n\n\n   \n\n\n\n\n   \n\n\n\n\n\n\n\n\n   \n\n   \n\n \n\n\n   \n\n   \n\n  \n\n\n   \n\n  \n\n \n\n\n   \n\n  \n\n \n\n\n   \n\n  \n\n  \n\nLittle Rock School District, plaintiff vs. Pulaski County Special School District, defendant.\nTOM COURTWAY Interim Director State Board of Education JoNell Caldwell, Chair Lillie Rock Shelby Hillman, Vice Chair Carlisle Sherry Burrow Jonesboro Luke Gordy Van Buren Calvin King Marianna -Lawson Bentonville MaryJane Rebick Liule Rock Diane Tatum Pine Bluff Jeanna Westmoreland 4rkadelphia Arkansas Department of Education #4 Capitol Mall, Lutle Rock, AR 72201-1071 501-682-4475 March 31, 2004 Mr. M. Samuel Jones, III Wright, Lindsey \u0026amp; Jennings 200 West Capitol, Suite 2000 Little Rock, AR 72201 Mr. John W. Walker John Walker, P.A. 1723 Broadway Little Rock, AR 72201 Mr. Mark Burnette Mitchell, Blackstock, Barnes, Wagoner, Ivers \u0026amp; Sneddon P. 0. Box 1510 Little Rock, AR 72203-1510 Mr. Christopher Heller Friday, Eldredge \u0026amp; Clark 400 West Capitol, Suite 2000 Little Rock, AR 72201-3493 Mr. Stephen W. Jones Jack, Lyon \u0026amp; Jones 425 West Capitol, Suite 3400 Little Rock, AR 72201 Ms. Ann Marshall One Union National Plaza 124 West Capitol, Suite 1895 Little Rock, AR 72201 http:/ /arkedu.stale.ar.us RECEIVED APR - 1 2004 . OFFICE OF DESEGREGATION MONITORING RE: Little Rock School District v. Pulaski County Special School District, et al. U.S. District Court No. 4:82-CV-866 Dear Gentlemen and Ms. Marshall: Per an agreement with the Attorney General's Office, I am filing the Arkansas Department of Education's Project Management Tool for the month of March 2004 in the above-referenced case. If you have any questions, please feel free to contact me at your convenience. Sincerely, ~4.~ General Counsel Arkansas Department of Education SS:law cc: Mark Hagemeier UNITED STATES DISTRICT COURT EASTERN DISTRICT OF ARKANSAS WESTERN DIVISION RECEIVED APR - 1 200\\ OFFICE OF DESEGREGATION MONITORING LITTLE ROCK SCHOOL DISTRICT PLAINTIFF V. No. LR-C-82-866 PULASKI COUNTY SPECIAL SCHOOL DISTRICT NO. 1, et al DEFENDANTS NOTICE OF FILING In accordance with the Court's Order of December 10, 1993, the Arkansas Department of Education hereby gives notice of the filing of the ADE's Project Management Tool for March 2004. Respectfully Submitted, cottSmith, #92251 Attorney, Arkansas Department of -Education #4 Capitol Mall, Room 404-A Little Rock, AR 72201 501-682-4227 CERTIFICATE OF SERVICE I, Scott Smith, certify that on March 31, 2004, I caused the foregoing document to be served by depositing a copy in the United States mail, postage prepaid, addressed to each of the following: Mr.M. SamuelJones,m Wright, Lindsey \u0026amp; Jennings 200 West Capitol, Suite 2000 Little Rock, AR 72201 Mr. John W. Walker John Walker, P.A. 1723 Broadway Little Rock, AR 72201 Mr. Mark Burnette Mitchell, Blackstock, Barnes Wagoner, Ivers \u0026amp; Sneddon P. 0. Box 1510 Little Rock, AR 72203-1510 Mr. Christopher Heller Friday, Eldredge \u0026amp; Clark 400 West Capitol, Suite 2000 Little Rock, AR 72201-3493 Mr. Stephen W. Jones Jack, Lyon \u0026amp; Jones 425 West Capitol, Suite 3400 Little Rock, AR 72201 Ms. Ann Marshall One Union National Plaza 124 West Capitol, Suite 1895 Little Rock, AR 72201 UNITED STATES DISTRICT COURT EASTERN DISTRICT OF ARKANSAS WESTERN DIVISION LITTLE ROCK SCHOOL DISTRICT PLAINTIFF V. No. LR-C-82-866 PULASKI COUNTY SPECIAL SCHOOL DISTRICT NO. 1, et al DEFENDANTS NOTICE OF FILING In accordance with the Court's Order of December 10, 1993, the Arkansas Department of Education hereby gives notice of the filing of the ADE's Project Management Tool for March 2004. Respectfully Submitted, cottSmith, #92251 Attorney, Arkansas Department of Education #4 Capitol Mall, Room 404-A Little Rock, AR 72201 501-682-4227 CERTIFICATE OF SERVICE I, Scott Smith, certify that on March 31, 2004, I caused the foregoing document to be served by depositing a copy in the United States mail, postage prepaid, addressed to each of the following: Mr. M. Samuel Jones, III Wright, Lindsey \u0026amp; Jennings 200 West Capitol, Suite 2000 Little Rock, AR 72201 Mr. John W. Walker John Walker, P.A. 1723 Broadway Little Rock, AR 72201 Mr. Mark Burnette Mitchell, Blackstock, Barnes Wagoner, Ivers \u0026amp; Sneddon P. 0. Box 1510 Little Rock, AR 72203-1510 Mr. Christopher Heller Friday, Eldredge \u0026amp; Clark 400 West Capitol, Suite 2000 Little Rock, AR 72201-3493 Mr. Stephen W. Jones Jack, Lyon \u0026amp; Jones 425 West Capitol, Suite 3400 Little Rock, AR 72201 Ms. Ann Marshall One Union National Plaza 124 West Capitol, Suite 1895 Little Rock, AR 72201 IN THE UNITED STATES DISTRICT COURT EASTERN DISTRICT OF ARKANSAS WESTERN DIVISION LITTLE ROCK SCHOOL DISTRICT, ET AL PLAINTIFFS V. NO. LR-C-82-866 PULASKI COUNTY SPECIAL SCHOOL DISTRICT, ET AL DEFENDANTS MRS. LORENE JOSHUA, ET AL INTERVENORS KATHERINE W. KNIGHT, ET AL INTERVENORS ADE'S PROJECT MANAGEMENT TOOL In compliance with the Court's Order of December 10, 1993, the Arkansas Department of Education (ADE) submits the following Project Management Tool to the parties and the Court. This document describes the progress the ADE has made since March 15, 1994, in complying with provisions of the Implementation Plan and itemizes the ADE's progress against timelines presented in the Plan. IMPLEMENTATION PHASE ACTIVITY I. FINANCIAL OBLIGATIONS A. Use the previous year's three quarter average daily membership to calculate MFPA (State Equalization) for the current school year. 1. Projected Ending Date Last day of each month, August - June. 2. Actual as of March 31, 2004 Based on the information available at February 29, 2004, the ADE calculated the Equalization Funding for FY 03/04, subject to periodic adjustments. B. Include all Magnet students in the resident District's average daily membership for calculation. 1. Projected Ending Date Last day of each month, August - June. I. FINANCIAL OBLIGATIONS (Continued) B. Include all Magnet students in the resident District's average daily membership for calculation. (Continued) 2. Actual as of March 31, 2004 Based on the information available at February 29, 2004, the ADE calculated for FY 03/04, subject to periodic adjustments. C. Process and distribute State MFPA. 1 . Projected Ending Date Last day of each month, August - June. 2. Actual as of March 31, 2004 On February 29, 2004, distributions of State Equalization Funding for FY 03/04 were as follows: LRSD - $33,871 , 179 NLRSD - $17,865,960 PCSSD - $32,434,059 The allotments of State Equalization FundinQ calculated for FY 03/04 at February 29, 2004, subject to periodic adjustments, were as follows: LRSD - $53,226,139 NLRSD - $28,075,080 PCSSD - $50,967,808 D. Determine the number of Magnet students residing in each District and attending a Magnet School. 1. Projected Ending Date Last day of each month, August - June. 2. Actual as of March 31, 2004 Based on the information available, the ADE calculated at February 29, 2004 for FY 03/04, subject to periodic adjustments. E. Desegregation Staff Attorney reports the Magnet Operational Charge to the Fiscal Services Office. 1. Projected Ending Date Ongoing, as ordered by the Court. 2 I. FINANCIAL OBLIGATIONS (Continued) E. Desegregation Staff Attorney reports the Magnet Operational Charge to the Fiscal Services Office. (Continued) 2. Actual as of March 31, 2004 Based on the information available, the ADE calculated at February 29, 2004 for FY 03/04, subject to periodic adjustments. It should be noted that currently the Magnet Review Committee is reporting this information instead of the staff attorney as indicated in the Implementation Plan. F. Calculate state aid due the LASO based upon the Magnet Operational Charge. 1 . Projected Ending Date Last day of each month, August - June. 2. Actual as of March 31, 2004 Based on the information available, the ADE calculated at February 29, 2004 for FY 03/04, subject to periodic adjustments. G. Process and distribute state aid for Magnet Operational Charge. 1. Projected Ending Date Last day of each month, August - June. 2. Actual as of March 31, 2004 Distributions for FY 03/04 at February 29, 2004, totaled $7,919,519. Allotment calculated for FY 03/04 was $12,459,153 subject to periodic adjustments. H. Calculate the amount of M-to-M incentive money to which each school district is entitled. 1. Projected Ending Date Last day of each month, August - June. 2. Actual as of March 31, 2004 Calculated for FY 02/03, subject to periodic adjustments. I. Process and distribute M-to-M incentive checks. 1. Projected Ending Date Last day of each month, September - June. 3 I. FINANCIAL OBLIGATIONS (Continued) I. Process and distribute M-to-M incentive checks. (Continued) 2. Actual as of March 31, 2004 Distributions for FY 03/04 at February 29, 2004, 2003 were: LRSD - $2,312,167 NLRSD - $1,802,672 PCSSD - $6,094,855 The allotments calculated for FY 03/04 at February 29, 2004, subject to periodic adjustments, were: LRSD - $4, 192,396 NLRSD - $3,832,804 PCSSD - $11,854,856 J. Districts submit an estimated Magnet and M-to-M transportation budget to ADE. 1. Projected Ending Date Ongoing, December of each year. 2. Actual as of March 31, 2004 In September 2002, the Magnet and M-to-M transportation budgets for FY 02/03 were submitted to the ADE by the Districts. K. The Coordinator of School Transportation notifies General Finance to pay districts for the Districts' proposed budget. 1 . Projected Ending Date Ongoing, annually. 2. Actual as of March 31, 2004 In January 2003, General Finance was notified to pay the second one-third payment for FY 02/03 to the Districts. It should be noted that the Transportation Coordinator is currently performing this function instead of Reginald Wilson as indicated in the Implementation Plan. L. ADE pays districts three equal installments of their proposed budget. 1 . Projected Ending Date Ongoing, annually. 4 I. FINANCIAL OBLIGATIONS (Continued) L. ADE pays districts three equal installments of their proposed budget. (Continued) 2. Actual as of March 31, 2004 In September 2003, General Finance made the last one-third payment to the Districts for their FY 02/03 transportation budget. The budget is now paid out in three equal installments. At September 2003, the following had been paid for FY 02/03: LRSD - $3,835,562.00 NLRSD - $742,399.62 PCSSD - $2,252,050.92 In September 2003, General Finance made the first one-third payment to the Districts for their FY 03/04 transportation budget. The budget is now paid out in three equal installments. At September 2003, the following had been paid for FY 03/04: LRSD - $1,243,841.33 NLRSD - $263,000.00 PCSSD - $727,406.63 In February 2004, General Finance made the second one-third payment to the Districts for their FY 03/04 transportation budget. The budget is now paid out in three equal installments. At February 2004, the following had been paid for FY 03/04: LRSD - $2,487,682.66 NLRSD - $526,000.00 PCSSD - $1,454,813.26 M. ADE verifies actual expenditures submitted by Districts and reviews each bill with each District's transportation coordinator. 1. Projected Ending Date Ongoing, annually. 2. Actual as of March 31, 2004 In August 1997, the ADE transportation coordinator reviewed each district's Magnet and M-to-M transportation costs for FY 96/97. In July 1998, each district was asked to submit an estimated budget for the 98/99 school year. 5 I. FINANCIAL OBLIGATIONS (Continued) M. ADE verifies actual expenditures submitted by Districts and reviews each bill with each District's transportation coordinator. (Continued) 2. Actual as of March 31, 2004 (Continued) In September 1998, paperwork was generated for the first payment in the 98/99 school year for the Magnet and M-to-M transportation program. School districts should receive payment by October 1, 1998 In July 1999, each district submitted an estimated budget for the 99/00 school year. In September 1999, paperwork was generated for the first payment in the 99/00 school year for the Magnet and M-to-M transportation program. In September 2000, paperwork was generated for the first payment in the 00/01 school year for the Magnet and M-to-M transportation program. In September 2001, paperwork was generated for the first payment in the 01/02 school year for the Magnet and M-to-M transportation program. In September 2002, paperwork was generated for the first payment in the 02/03 school year for the Magnet and M-to-M transportation program. In September 2003, paperwork was generated for the first payment in the 03/04 school year for the Magnet and M-to-M transportation program. N. Purchase buses for the Districts to replace existing Magnet and M-to-M fleets and to provide a larger fleet for the Districts' Magnet and M-to-M Transportation needs. 1 . Projected Ending Date Ongoing, as stated in Exhibit A of the Implementation Plan. 2. Actual as of March 31, 2004 In FY 94/95, the State purchased 52 buses at a cost of $1,799,431 which were added to or replaced existing Magnet and M-to-M buses in the Districts. The buses were distributed to the Districts as follows: LRSD - 32\nNLRSD - 6\nand PCSSD - 14. The ADE purchased 64 Magnet and M-to-M buses at a cost of $2,334,800 in FY 95/96. The buses were distributed accordingly: LRSD - 45\nNLRSD - 7\nand PCSSD - 12. In May 1997, the ADE purchased 16 Magnet and M-to-M buses at a cost of $646,400. 6 I. FINANCIAL OBLIGATIONS (Continued) N. Purchase buses for the Districts to replace existing Magnet and M-to-M fleets and to provide a larger fleet for the Districts' Magnet and M-to-M Transportation needs. (Continued) 2. Actual as of March 31, 2004 (Continued) In July 1997, the ADE purchased 16 Magnet and M-to-M buses at a cost of $624,879. In July 1998, the ADE purchased 16 new Magnet and M-to-M buses at a cost of $695,235. The buses were distributed accordingly: LRSD - 8\nNLRSD - 2\nand PCSSD - 6. Specifications for 16 school buses have been forwarded to state purchasing for bidding in January, 1999 for delivery in July, 1999. The ADE accepted a bid on 16 buses for the Magnet and M/M transportation program. The buses will be delivered after July 1, 1999 and before August 1, 1999. The buses will be distributed accordingly: LRSD - 8\nNLRSD - 2\nPCSSD - 6. In July 1999, the ADE purchased 16 new Magnet and M-to-M buses at a cost of $718,355. The buses were distributed accordingly: LRSD - 8\nNLRSD - 2\nand PCSSD - 6. In July 2000, the ADE purchased 16 new Magnet and M-to-M buses at a cost of $724,165. The buses were distributed accordingly: LRSD - 8\nNLRSD - 2\nand PCSSD - 6. The bid for 16 new Magnet and M-to-M buses was let by State Purchasing on February 22, 2001. The contract was awarded to Ward Transportation Services, Inc. The buses to be purchased include two type C 47 passenger buses and fourteen type C 65 passenger buses. Prices on these units are $43,426.00 each on the 47 passenger buses, and $44,289.00 each on the 65 passenger buses. The buses will be distributed accordingly: LRSD - 8 of the 65 passenger\nNLRSD - 2 of the 65 passenger\nPCSSD - 2 of the 47 passenger and 4 of the 65 passenger buses. On August 2, 2001, the ADE took possession of 16 new Magnet and M-to-M buses. The total amount paid was $706,898. In June 2002, a bid for 16 new Magnet and M-to-M buses was awarded to Ward Transportation Services, Inc. The buses to be purchased include five 47 passenger buses for $42,155.00 each, ten 65 passenger buses for $43,850.00 each, and one 47 passenger bus with a wheelchair lift for $46,952.00. The total amount was $696,227. In August of 2002, the ADE purchased 16 new Magnet and M-to-M buses. The total amount paid was $696,227. 7 I. FINANCIAL OBLIGATIONS (Continued) N. Purchase buses for the Districts to replace existing Magnet and M-to-M fleets and to provide a larger fleet for the Districts' Magnet and M-to-M Transportation needs. (Continued) 2. Actual as of March 31, 2004 (Continued) Specifications for 16 new Magnet and M-to-M school buses have been forwarded to State Purchasing for bidding. Bids will be opened on May 12, 2003. The buses will have a required delivery date after July 1, 2003 and before August 8, 2003. In June 2003, a bid for 16 new Magnet and M-to-M buses was awarded to Ward Transportation Services, Inc. The buses to be purchased include 5 - 47 passenger buses for $47,052.00 each, and 11 - 65 passenger buses for $48,895.00 each. The total amount was $773,105. The buses will be distributed accordingly: LRSD - 8 of the 65 passenger\nNLRSD - 2 of the 65 passenger\nPCSSD - 5 of the 47 passenger and 1 of the 65 passenger buses. 0. Process and distribute compensatory education payments to LRSD as required by page 23 of the Settlement Agreement. 1. Projected Ending Date 2. July 1 and January 1, of each school year through January 1, 1999. Actual as of March 31, 2004 Obligation fulfilled in FY 96/97. P. Process and distribute additional payments in lieu of formula to LRSD as required by page 24 of the Settlement Agreement. 1. Projected Ending Date Payment due date and ending July 1, 1995. 2. Actual as of March 31, 2004 Obligation fulfilled in FY 95/96. Q. Process and distribute payments to PCSSD as required by Page 28 of the Settlement Agreement. 1. Projected Ending Date Payment due date and ending July 1, 1994. 2. Actual as of March 31, 2004 Final payment was distributed July 1994. 8 I. FINANCIAL OBLIGATIONS (Continued) R. Upon loan request by LRSD accompanied by a promissory note, the ADE makes loans to LRSD. 1. Projected Ending Date Ongoing through July 1, 1999. See Settlement Agreement page 24. 2. Actual as of March 31, 2004 The LRSD received $3,000,000 on September 10, 1998. As of this reporting date, the LRSD has received $20,000,000 in loan proceeds. S. Process and distribute payments in lieu of formula to PCSSD required by page 29 of the Settlement Agreement. T. 1. Projected Ending Date Payment due date and ending July 1, 1995. 2. Actual as of March 31, 2004 Obligation fulfilled in FY 95/96. Process and distribute compensatory education payments to NLRSD as required by page 31 of the Settlement Agreement. 1. Projected Ending Date July 1 of each school year through June 30, 1996. 2. Actual as of March 31, 2004 Obligation fulfilled in FY 95/96. U. Process and distribute check to Magnet Review Committee. 1. Projected Ending Date Payment due date and ending July 1, 1995. 2. Actual as of March 31, 2004 Distribution in July 1997 for FY 97/98 was $75,000. This was the total amount due to the Magnet Review Committee for FY 97/98. Distribution in July 1998 for FY 98/99 was $75,000. This was the total amount due to the Magnet Review Committee for FY 98/99. 9 I. FINANCIAL OBLIGATIONS (Continued) u. Process and distribute check to Magnet Review Committee. (Continued) 2. Actual as of March 31, 2004 (Continued) Distribution in July 1999 for FY 99/00 was $92,500. This was the total amount due to the Magnet Review Committee for FY 99/00. Distribution in July 2000 for FY 00/01 was $92,500. This was the total amount due to the Magnet Review Committee for FY 00/01. Distribution in August 2001 for FY 01/02 was $92,500. This was the total amount due to the Magnet Review Committee for FY 01/02. Distribution in July 2002 for FY 02/03 was $92,500. This was the total amount due to the Magnet Review Committee for FY 02/03. Distribution in July 2003 for FY 03/04 was $92,500. This was the total amount due to the Magnet Review Committee for FY 03/04. V. Process and distribute payments for Office of Desegregation Monitoring. 1. Projected Ending Date Not applicable. 2. Actual as of March 31, 2004 Distribution in July 1997 for FY 97/98 was $200,000. This was the total amount due to the ODM for FY 97/98. Distribution in July 1998 for FY 98/99 was $200,000. This was the total amount due to the ODM for FY 98/99. Distribution in July 1999 for FY 99/00 was $200,000. This was the total amount due to the ODM for FY 99/00. Distribution in July 2000 for FY 00/01 was $200,000. This was the total amount due to the ODM for FY 00/01. Distribution in August 2001 for FY 01 /02 was $200,000. This was the total amount due to the ODM for FY 01/02. Distribution in July 2002 for FY 02/03 was $200,000. This was the total amount due to the ODM for FY 02/03. Distribution in July 2003 for FY 03/04 was $200,000. This was the total amount due to the ODM for FY 03/04. 10 II. MONITORING COMPENSATORY EDUCATION A. Begin testing and evaluating the monitoring instrument and monitoring system to assure that data is appropriate and useful in monitoring the impacts of compensatory education programs on disparities in academic achievement for black students and white students. 1. Projected Ending Date January 15, 1995 2. Actual as of March 31 , 2004 In May 1995, monitors completed the unannounced visits of schools in Pulaski County. The monitoring process involved a qualitative process of document reviews, interviews, and observations. The monitoring focused on progress made since the announced monitoring visits. In June 1995, monitoring data from unannounced visits was included in the July Semiannual Report. Twenty-five per cent of all classrooms were visited, and all of the schools in Pulaski County were monitored. All principals were interviewed to determine any additional progress since the announced visits. The July 1995 Monitoring Report was reviewed by the ADE administrative team, the Arkansas State Board of Education, and the Districts and filed with the Court. The report was formatted in accordance with the Allen Letter. In October 1995, a common terminology was developed by principals from the Districts and the Lead Planning and Desegregation staff to facilitate the monitoring process. The announced monitoring visits began on November 14, 1995 and were completed on January 26, 1996. Copies of the preliminary Semiannual Monitoring Report and its executive summary were provided to the ADE administrative team and the State Board of Education in January 1996. A report on the current status of the Cycle 5 schools in the ECOE process and their school improvement plans was filed with the Court on February 1, 1996. The unannounced monitoring visits began in February 1996 and ended on May 10, 1996. In June 1996, all announced and unannounced monitoring visits were completed, and the data was analyzed using descriptive statistics. The Districts provided data on enrollment in compensatory education programs. The Districts and the ADE Desegregation Monitoring staff developed a definition for instructional programs. 11 II. MONITORING COMPENSATORY EDUCATION (Continued) A. Begin testing and evaluating the monitoring instrument and monitoring system to assure that data is appropriate and useful in monitoring the impacts of compensatory education programs on disparities in academic achievement for black students and white students. (Continued) 2. Actual as of March 31, 2004 (Continued) The Semiannual Monitoring Report was completed and filed with the Court on July 15, 1996 with copies distributed to the parties. Announced monitoring visits of the Cycle 1 schools began on October 28, 1996 and concluded in December 1996. In January 1997, presentations were made to the State Board of Education, the Desegregation Litigation Oversight Subcommittee, and the parties to review the draft Semiannual Monitoring Report. The monitoring instrument and process were evaluated for their usefulness in monitoring the impacts of compensatory education programs on achievement disparities. In February 1997, the Semiannual Monitoring Report was filed. Unannounced monitoring visits began on February 3, 1997 and concluded in May 1997. In March 1997, letters were sent to the Districts regarding data requirements for the July 1997 Semiannual Monitoring Report and the additional discipline data element that was requested by the Desegregation Litigation Oversight Subcommittee. Desegregation data collection workshops were conducted in the Districts from March 28, 1997 to April 7, 1997. A meeting was conducted on April 3, 1997 to finalize plans for the July 15, 1997 Semiannual Monitoring Report. Onsite visits were made to Cycle 1 schools who did not submit accurate and timely data on discipline, M-to-M transfers, and policy. The July 15, 1997 Semiannual Monitoring Report and its executive summary were finalized in June 1997. In July 1997, the Semiannual Monitoring Report and its executive summary were filed with the court, and the ADE sponsored a School Improvement Conference. On July 10, 1997, copies of the Semiannual Monitoring Report and its executive summary were made available to the Districts for their review prior to filing it with the Court. In August 1997, procedures and schedules were organized for the monitoring of the Cycle 2 schools in FY 97/98. 12 II. MONITORING COMPENSATORY EDUCATION (Continued) A. Begin testing and evaluating the monitoring instrument and monitoring system to assure that data is appropriate and useful in monitoring the impacts of compensatory education programs on disparities in academic achievement for black students and white students. (Continued) 2. Actual as of March 31, 2004 (Continued) A Desegregation Monitoring and School Improvement Workshop for the Districts was held on September 10, 1997 to discuss monitoring expectations, instruments, data collection and school improvement visits. On October 9, 1997, a planning meeting was held with the desegregation monitoring staff to discuss deadlines, responsibilities, and strategic planning issues regarding the Semiannual Monitoring Report. Reminder letters were sent to the Cycle 2 principals outlining the data collection deadlines and availability of technical assistance. In October and November 1997, technical assistance visits were conducted, and announced monitoring visits of the Cycle 2 schools were completed. In December 1997 and January 1998, technical assistance visits were conducted regarding team visits, technical review recommendations, and consensus building. Copies of the infusion document and perceptual surveys were provided to schools in the ECOE process. The February 1998 Semiannual Monitoring Report was submitted for review and approval to the State Board of Education, the Director, the Administrative Team, the Attorney General's Office, and the Desegregation Litigation Oversight Subcommittee. Unannounced monitoring visits began in February 1998, and technical assistance was provided on the school improvement process, external team visits and finalizing school improvement plans. On February 18, 1998, the representatives of all parties met to discuss possible revisions to the ADE's monitoring plan and monitoring reports. Additional meetings will be scheduled. Unannounced monitoring visits were conducted in March 1998, and technical assistance was provided on the school improvement process and external team visits. In April 1998, unannounced monitoring visits were conducted, and technical assistance was provided on the school improvement process. 13 II. MONITORING COMPENSATORY EDUCATION (Continued) A. Begin testing and evaluating the monitoring instrument and monitoring system to assure that data is appropriate and useful in monitoring the impacts of compensatory education programs on disparities in academic achievement for black students and white students. (Continued) 2. Actual as of March 31, 2004 (Continued) In May 1998, unannounced monitoring visits were completed, and technical assistance was provided on the school improvement process. On May 18, 1998, the Court granted the ADE relief from its obligation to file the July 1998 Semiannual Monitoring Report to develop proposed modifications to ADE's monitoring and reporting obligations. In June 1998, monitoring information previously submitted by the districts in the Spring of 1998 was reviewed and prepared for historical files and presentation to the Arkansas State Board. Also, in June the following occurred: a) The Extended COE Team Visit Reports were completed, b) the Semiannual Monitoring COE Data Report was completed, c) progress reports were submitted from previous cycles, and d.) staff development on assessment (SAT-9) and curriculum alignment was conducted with three supervisors. In July, the Lead Planner provided the Desegregation Litigation Oversight Committee with (1) a review of the court Order relieving ADE of its obligation to file a July Semiannual Monitoring Report, and (2) an update of ADE's progress toward work with the parties and ODM to develop proposed revisions to ADE's monitoring and reporting obligations. The Committee encouraged ODM, the parties and the ADE to continue to work toward revision of the monitoring and reporting process. In August 1998, the ADE Implementation Phase Working group met to review the Implementation Phase activities for the previous quarter. The Assistant Attorney General, the Assistant Director for Accountability and the Education Lead Planner updated the group on all relevant desegregation legal issues and proposed revisions to monitoring and reporting activities during the quarter. In September 1998, tentative monitoring dates were established and they will be finalized once proposed revisions to the Desegregation Monitoring Plan are finalized and approved. In September/October 1998, progress was being made on the proposed revisions to the monitoring process by committee representatives of all the Parties in the Pulaski County Settlement Agreement. While the revised monitoring plan is finalized and approved, the ADE monitoring staff will continue to provide technical assistance to schools upon request. 14 II. MONITORING COMPENSATORY EDUCATION (Continued) A. Begin testing and evaluating the monitoring instrument and monitoring system to assure that data is appropriate and useful in monitoring the impacts of compensatory education programs on disparities in academic achievement for black students and white students. (Continued) 2. Actual as of March 31, 2004 (Continued) In December 1998, requests were received from schools in PCSSD regarding test score analysis and staff Development. Oak Grove is scheduled for January 21, 1999 and Lawson Elementary is also tentatively scheduled in January. Staff development regarding test score analysis for Oak Grove and Lawson Elementary in the PCSSD has been rescheduled for April 2000. Staff development regarding test score analysis for Oak Grove and Lawson Elementary in the PCSSD was conducted on May 5, 2000 and May 9, 2000 respectively. Staff development regarding classroom management was provided to the Franklin Elementary School in LRSD on November 8, 2000. Staff development regarding ways to improve academic achievement was presented to College Station Elementary in PCSSD on November 22, 2000. On November 1, 2000, the ADE Implementation Phase Working group met to review the Implementation Phase activities for the previous quarter. The Assistant Director for Accountability updated the group on all relevant desegregation legal issues and discussed revisions to monitoring and reporting activities during the quarter. The next Implementation Phase Working Group Meeting is scheduled for February 27, 2001 in room 201-A at the ADE. The Implementation Phase Working Group meeting that was scheduled for February 27 had to be postponed. It will be rescheduled as soon as possible. The quarterly Implementation Phase Working Group meeting is scheduled for June 27, 2001. The quarterly Implementation Phase Working Group meeting was rescheduled from June 27. It will take place on July 26, 2001 in room 201-A at 1 :30 p.m. at the ADE. 15 II. MONITORING COMPENSATORY EDUCATION (Continued) A. Begin testing and evaluating the monitoring instrument and monitoring system to assure that data is appropriate and useful in monitoring the impacts of compensatory education programs on disparities in academic achievement for black students and white students. (Continued) 2. Actual as of March 31, 2004 (Continued) On July 26, 2001, the ADE Implementation Phase Working group met to review the Implementation Phase activities for the previous quarter. Mr. Willie Morris, ADE Lead Planner for Desegregation, updated the group on all relevant desegregation issues. Mr. Mark Hagemeier, Assistant Attorney General, and Mr. Scott Smith, ADE Staff Attorney, discussed the court case involving the LRSD seeking unitary status. The next Implementation Phase Working Group Meeting is scheduled for October 11, 2001 in room 201-A at the ADE. On October 11, 2001, the ADE Implementation Phase Working group met to review the Implementation Phase activities for the previous quarter. Mr. Willie Morris, ADE Lead Planner for Desegregation, updated the group on all relevant desegregation issues. Mr. Scott Smith, ADE Staff Attorney, discussed the ADE's intent to take a proactive role in Desegregation Monitoring. The next Implementation Phase Working Group Meeting is scheduled for January 10, 2002 in room 201-A at the ADE. The Implementation Phase Working Group Meeting that was scheduled for January 10 was postponed. It has been rescheduled for February 14, 2002 in room 201-A at the ADE. On February 12, 2002, the ADE Implementation Phase Working group met to review the Implementation Phase activities for the previous quarter. Mr. Willie Morris, ADE Lead Planner for Desegregation, updated the group on all relevant desegregation issues. Mr. Mark Hagemeier, Assistant Attorney General, discussed the court case involving the LRSD seeking unitary status. The next Implementation Phase Working Group Meeting is scheduled for April 11, 2002 in room 201-A at the ADE. On April 11, 2002, the ADE Implementation Phase Working group met to review the Implementation Phase activities for the previous quarter. Mr. Willie Morris, ADE Lead Planner for Desegregation, updated the group on all relevant desegregation issues. Mr. Mark Hagemeier, Assistant Attorney General, discussed the court case involving the LRSD seeking unitary status. The next Implementation Phase Working Group Meeting is scheduled for July 11, 2002 in room 201-A at the ADE. 16 II. MONITORING COMPENSATORY EDUCATION (Continued) A. Begin testing and evaluating the monitoring instrument and monitoring system to assure that data is appropriate and useful in monitoring the impacts of compensatory education programs on disparities in academic achievement for black students and white students. (Continued) 2. Actual as of March 31, 2004 (Continued) On July 18, 2002, the ADE Implementation Phase Working group met to review the Implementation Phase activities for the previous quarter. Mr. Willie Morris, ADE Lead Planner for Desegregation, updated the group on all relevant desegregation issues. Dr. Charity Smith, Assistant Director for Accountability, talked about section XV in the Project Management Tool (PMT} on Standardized Test Selection to Determine Loan Forgiveness. She said that the goal has been completed, and no additional reporting is required for section XV. Mr. Morris discussed the court case involving the LRSD seeking unitary status. He handed out a Court Order from May 9, 2002, which contained comments from U.S. District Judge Bill Wilson Jr., about hearings on the LRSD request for unitary status. Mr. Morris also handed out a document from the Secretary of Education about the No Child Left Behind Act. There was discussion about how this could have an affect on Desegregation issues. The next Implementation Phase Working Group Meeting is scheduled for October 10, 2002 at 1 :30 p.m. in room 201-A at the ADE. The quarterly Implementation Phase Working Group meeting was rescheduled from October 10. It will take place on October 29, 2002 in room 201-A at 1 :30 p.m. at the ADE. On October 29, 2002, the ADE Implementation Phase Working Group met to review the Implementation Phase activities for the previous quarter. Mr. Willie Morris, ADE Lead Planner for Desegregation, updated the group on all relevant desegregation issues. Meetings with the parties to discuss possible revisions to the AD E's monitoring plan will be postponed by request of the school districts in Pulaski County. Additional meetings could be scheduled after the Desegregation ruling is finalized. The next Implementation Phase Working Group Meeting is scheduled for January 9, 2003 at 1 :30 p.m. in room 201-A at the ADE. On January 9, 2003, the ADE Implementation Phase Working Group met to review the Implementation Phase activities for the previous quarter. Mr. Willie Morris, ADE Lead Planner for Desegregation, updated the group on all relevant desegregation issues. No Child Left Behind and the Desegregation ruling on unitary status for LRSD were discussed. The next Implementation Phase Working Group Meeting is scheduled for April 10, 2003 at 1 :30 p.m. in room 201-A at the ADE. The quarterly Implementation Phase Working Group meeting was rescheduled from April 10. It will take place on April 24, 2003 in room 201-A at 1 :30 p.m. at the ADE. 17 II. MONITORING COMPENSATORY EDUCATION (Continued) A. Begin testing and evaluating the monitoring instrument and monitoring system to assure that data is appropriate and useful in monitoring the impacts of compensatory education programs on disparities in academic achievement for black students and white students. (Continued) 2. Actual as of March 31, 2004 (Continued) On April 24, 2003, the ADE Implementation Phase Working Group met to review the Implementation Phase activities for the previous quarter. Mr. Willie Morris, ADE Lead Planner for Desegregation, updated the group on all relevant desegregation issues. Laws passed by the legislature need to be checked to make sure none of them impede desegregation. Ray Lumpkin was chairman of the last committee to check legislation. Since he left, we will discuss the legislation with Clearence Lovell. The Desegregation ruling on unitary status for LRSD was discussed. The next Implementation Phase Working Group Meeting is scheduled for July 10, 2003 at 1 :30 p.m. in room 201-A at the ADE. On August 28, 2003, the ADE Implementation Phase Working Group met to review the Implementation Phase activities for the previous quarter. Mr. Willie Morris, ADE Lead Planner for Desegregation, updated the group on all relevant desegregation issues. The Desegregation ruling on unitary status for LRSD was discussed. The LRSD has been instructed to submit evidence showing progress in reducing disparities in academic achievement for black students and white students. This is supposed to be done by March of 2004, so that the LRSD can achieve unitary status. The next Implementation Phase Working Group Meeting is scheduled for October 9, 2003 at the ADE. On October 9, 2003, the ADE Implementation Phase Working Group met to review the Implementation Phase activities for the previous quarter. Mr. Willie Morris, ADE Lead Planner for Desegregation, updated the group on all relevant desegregation issues. Mark Hagemeier, Assistant Attorney General, discussed the Desegregation ruling on unitary status for LRSD. The next Implementation Phase Working Group Meeting is scheduled for January 8, 2004 at the ADE. On October 16, 2003, ADE staff met with the Desegregation Litigation Oversight Subcommittee at the State Capitol. Mr. Willie Morris, ADE Lead Planner for Desegregation, and Dr. Charity Smith, Assistant Director for Accountability, presented the Chronology of activity by the ADE in complying with provisions of the Implementation Plan for the Desegregation Settlement Agreement. They also discussed the role of the ADE Desegregation Monitoring Section. Mr. Mark Hagemeier, Assistant Attorney General, and Scott Smith, ADE Staff Attorney, reported on legal issues relating to the Pulaski County Desegregation Case. Ann Marshall shared a history of activities by ODM, and their view of the activity of the school districts in Pulaski County. John Kunkel discussed Desegregation funding by the ADE. 18 Ill. A PETITION FOR ELECTION FOR LRSD WILL BE SUPPORTED SHOULD A MILLAGE BE REQUIRED A. Monitor court pleadings to determine if LRSD has petitioned the Court for a special election. 1 . Projected Ending Date Ongoing. 2. Actual as of March 31, 2004 Ongoing. All Court pleadings are monitored monthly. B. Draft and file appropriate pleadings if LRSD petitions the Court for a special election. 1. Projected Ending Date Ongoing 2. Actual as of March 31, 2004 To date, no action has been taken by the LRSD. 19 IV. REPEAL STATUTES AND REGULATIONS THAT IMPEDE DESEGREGATION A. Using a collaborative approach, immediately identify those laws and regulations that appear to impede desegregation. 1 . Projected Ending Date December, 1994 2. Actual as of March 31, 2004 The information tor this item is detailed under Section IV.E. of this report. B. Conduct a review within ADE of existing legislation and regulations that appear to impede desegregation. 1. Projected Ending Date November, 1994 2. Actual as of March 31, 2004 The information tor this item is detailed under Section IV.E. of this report. C. Request of the other parties to the Settlement Agreement that they identify laws and regulations that appear to impede desegregation. 1 . Projected Ending Date November, 1994 2. Actual as of March 31, 2004 The information tor this item is detailed under Section IV.E. of this report. D. Submit proposals to the State Board of Education tor repeal of those regulations that are confirmed to be impediments to desegregation. 1. Projected Ending Date Ongoing 2. Actual as of March 31, 2004 The information tor this item is detailed under Section IV.E. of this report. 20 IV. REPEAL STATUTES AND REGULATIONS THAT IMPEDE DESEGREGATION (Continued) E. Submit proposals to the Legislature for repeal of those laws that appear to be impediments to desegregation. 2. Actual as of March 31, 2004 A committee within the ADE was formed in May 1995 to review and collect data on existing legislation and regulations identified by the parties as impediments to desegregation. The committee researched the Districts' concerns to determine if any of the rules, regulations, or legislation cited impede desegregation. The legislation cited by the Districts regarding loss funding and worker's compensation were not reviewed because they had already been litigated. In September 1995, the committee reviewed the following statutes, acts, and regulations: Act 113 of 1993\nADE Director's Communication 93-205\nAct 145 of 1989\nADE Director's Memo 91-67\nADE Program Standards Eligibility Criteria for Special Education\nArkansas Codes 6-18-206, 6-20-307, 6-20-319, and 6-17- 1506. In October 1995, the individual reports prepared by committee members in their areas of expertise and the data used to support their conclusions were submitted to the ADE administrative team for their review. A report was prepared and submitted to the State Board of Education in July 1996. The report concluded that none of the items reviewed impeded desegregation. As of February 3, 1997, no laws or regulations have been determined to impede desegregation efforts. Any new education laws enacted during the Arkansas 81 st Legislative Session will be reviewed at the close of the legislative session to ensure that they do not impede desegregation. In April 1997, copies of all laws passed during the 1997 Regular Session of the 81 st General Assembly were requested from the office of the ADE Liaison to the Legislature for distribution to the Districts for their input and review of possible impediments to their desegregation efforts. In August 1997, a meeting to review the statutes passed in the prior legislative session was scheduled for September 9, 1997. 21 IV. REPEAL STATUTES AND REGULATIONS THAT IMPEDE DESEGREGATION (Continued) E. Submit proposals to the Legislature for repeal of those laws that appear to be impediments to desegregation. (Continued) 2. Actual as of March 31, 2004 (Continued) On September 9, 1997, a meeting was held to discuss the review of the statutes passed in the prior legislative session and new ADE regulations. The Districts will be contacted in writing for their input regarding any new laws or regulations that they feel may impede desegregation. Additionally, the Districts will be asked to review their regulations to ensure that they do not impede their desegregation efforts. The committee will convene on December 1, 1997 to review their findings and finalize their report to the Administrative Team and the State Board of Education. In October 1997, the Districts were asked to review new regulations and statutes for impediments to their desegregation efforts, and advise the ADE, in writing, if they feel a regulation or statute may impede their desegregation efforts. In October 1997, the Districts were requested to advise the ADE, in writing, no later than November 1, 1997 of any new law that might impede their desegregation efforts. As of November 12, 1997, no written responses were received from the Districts. The ADE concludes that the Districts do not feel that any new law negatively impacts their desegregation efforts. The committee met on December 1, 1997 to discuss their findings regarding statutes and regulations that may impede the desegregation efforts of the Districts. The committee concluded that there were no laws or regulations that impede the desegregation efforts of the Districts. It was decided that the committee chair would prepare a report of the committee's findings for the Administrative Team and the State Board of Education. The committee to review statutes and regulations that impede desegregation is now reviewing proposed bills and regulations, as well as laws that are being signed in, for the current 1999 legislative session. They will continue to do so until the session is over. The committee to review statutes and regulations that impede desegregation will meet on April 26, 1999 at the ADE. The committee met on April 26, 1999 at the ADE. The purpose of the meeting was to identify rules and regulations that might impede desegregation, and review within the existing legislation any regulations that might result in an impediment to desegregation. This is a standing committee that is ongoing and a report will be submitted to the State Board of Education once the process is completed. 22 IV. REPEAL STATUTES AND REGULATIONS THAT IMPEDE DESEGREGATION (Continued) E. Submit proposals to the Legislature for repeal of those laws that appear to be impediments to desegregation. (Continued) 2. Actual as of March 31, 2004 (Continued) The committee met on May 24, 1999 at the ADE. The committee was asked to review within the existing legislation any regulations that might result in an impediment to desegregation. The committee determined that Mr. Ray Lumpkin would contact the Pulaski County districts to request written response to any rules, regulations or laws that might impede desegregation. The committee would also collect information and data to prepare a report for the State Board. This will be a standing committee. This data gathering will be ongoing until the final report is given to the State Board. On July 26, 1999, the committee met at the ADE. The committee did not report any laws or regulations that they currently thought would impede desegregation, and are still waiting for a response from the three districts in Pulaski County. The committee met on August 30, 1999 at the ADE to review rules and regulations that might impede desegregation. At that time, there were no laws under review that appeared to impede desegregation. In November, the three districts sent letters to the ADE stating that they have reviewed the laws passed by the 82nd legislative session as well as current rules \u0026amp; regulations and district policies to ensure that they have no ill effect on desegregation efforts. There was some concern from PCSSD concerning a charter school proposal in the Maumelle area. The work of the committee is on-going each month depending on the information that comes before the committee. Any rules, laws or regulations that would impede desegregation will be discussed and reported to the State Board of Education. On October 4, 2000, the ADE presented staff development for assistant superintendents in LRSD, NLRSD and PCSSD regarding school laws of Arkansas. The ADE is in the process of forming a committee to review all Rules and Regulations from the ADE and State Laws that might impede desegregation. The ADE Committee on Statutes and Regulations will review all new laws that might impede desegregation once the 83rd General Assembly has completed this session. The ADE Committee on Statutes and Regulations will meet for the first time on June 11, 2001 at 9:00 a.m. in room 204-A at the ADE. The committee will review all new laws that might impede desegregation that were passed during the 2001 Legislative Session. 23 IV. REPEAL STATUTES AND REGULATIONS THAT IMPEDE DESEGREGATION (Continued) E. Submit proposals to the Legislature for repeal of those laws that appear to be impediments to desegregation. (Continued) 2. Actual as of March 31, 2004 (Continued) The ADE Committee on Statutes and Regulations rescheduled the meeting that was planned for June 11, in order to review new regulations proposed to the State Board of Education. The meeting will take place on July 16, 2001 at 9:00 a.m. at the ADE. The ADE Committee to Repeal Statutes and Regulations that Impede Desegregation met on July 16, 2001 at the ADE. The following Items were discussed: (1) Review of 2001 state laws which appear to impede desegregation. (2) Review of existing ADE regulations which appear to impede desegregation. (3) Report any laws or regulations found to impede desegregation to the Arkansas State Legislature, the ADE and the Pulaski County school districts. The next meeting will take place on August 27, 2001 at 9:00 a.m. at the ADE. The ADE Committee to Repeal Statutes and Regulations that Impede Desegregation met on August 27, 2001 at the ADE. The Committee is reviewing all relevant laws or regulations produced by the Arkansas State Legislature, the ADE and the Pulaski County school districts in FY 2000/2001 to determine if they may impede desegregation. The next meeting will take place on September 10, 2001 in Conference Room 204-B at 2:00 p.m. at the ADE. The ADE Committee to Repeal Statutes and Regulations that Impede Desegregation met on September 10, 2001 at the ADE. The Committee is reviewing all relevant laws or regulations produced by the Arkansas State Legislature, the ADE and the Pulaski County school districts in FY 2000/2001 to determine if they may impede desegregation. The next meeting will take place on October 24, 2001 in Conference Room 204-B at 2:00 p.m. at the ADE. The ADE Committee to Repeal Statutes and Regulations that Impede Desegregation met on October 24, 2001 at the ADE. The Committee is reviewing all relevant laws or regulations produced by the Arkansas State Legislature, the ADE and the Pulaski County school districts in FY 2000/2001 to determine if they may impede desegregation. On December 17, 2001, the ADE Committee to Repeal Statutes and Regulations that Impede Desegregation composed letters that will be sent to the school districts in Pulaski County. The letters ask for input regarding any new laws or regulations that may impede desegregation. Laws to review include those of the 83rd General Assembly, ADE regulations, and regulations of the Districts. 24 IV. REPEAL STATUTES AND REGULATIONS THAT IMPEDE DESEGREGATION (Continued) E. Submit proposals to the Legislature for repeal of those laws that appear to be impediments to desegregation. (Continued) 2. Actual as of March 31, 2004 (Continued) On January 10, 2002, the ADE Committee to Repeal Statutes and Regulations that Impede Desegregation sent letters to the school districts in Pulaski County. The letters ask for input regarding any new laws or regulations that may impede desegregation. The districts were asked to respond by March 8, 2002. On March 5, 2002, A letter was sent from the LRSD which mentioned Act 17 48 and Act 1667 passed during the 83rd Legislative Session which may impede desegregation. These laws will be researched to determine if changes need to be made. A letter was sent from the NLRSD on March 19, noting that the district did not find any laws which impede desegregation. On April 26, 2002, A letter was sent for the PCSSD to the ADE, noting that the district did not find any laws which impede desegregation except the \"deannexation\" legislation which the District opposed before the Senate committee. On October 27, 2003, the ADE sent letters to the school districts in Pulaski County asking if there were any new laws or regulations that may impede desegregation. The districts were asked to review laws passed during the 84th Legislative Session, any new ADE rules or regulations, and district policies. 25 V. COMMITMENT TO PRINCIPLES A. Through a preamble to the Implementation Plan, the Board of Education will reaffirm its commitment to the principles of the Settlement Agreement and outcomes of programs intended to apply those principles. 1. Projected Ending Date Ongoing 2. Actual as of March 31, 2004 The preamble was contained in the Implementation Plan filed with the Court on March 15, 1994. B. Through execution of the Implementation Plan, the Board of Education will continue to reaffirm its commitment to the principles of the Settlement Agreement and outcomes of programs intended to apply those principles. 1 . Projected Ending Date Ongoing 2. Actual as of March 31, 2004 Ongoing C. Through execution of the Implementation Plan, the Board of Education will continue to reaffirm its commitment to the principles of the Settlement Agreement by actions taken by ADE in response to monitoring results. 1 . Projected Ending Date Ongoing 2. Actual as of March 31, 2004 Ongoing D. Through regular oversight of the Implementation Phase's Project Management Tool, and scrutiny of results of ADE's actions, the Board of Education will act on its commitment to the principles of the Settlement Agreement. 1. Projected Ending Date Ongoing 26 V. COMMITMENT TO PRINCIPLES (Continued) D. Through regular oversight of the Implementation Phase's Project Management Tool, and scrutiny of results of AD E's actions, the Board of Education will act on its commitment to the principles of the Settlement Agreement. (Continued) 2. Actual as of March 31, 2004 At each regular monthly meeting of the State Board of Education, the Board is provided copies of the most recent Project Management Tool (PMT) and an executive summary of the PMT for their review and approval. Only activities that are in addition to the Board's monthly review of the PMT are detailed below. In May 1995, the State Board of Education was informed of the total number of schools visited during the monitoring phase and the data collection process. Suggestions were presented to the State Board of Education on how recommendations could be presented in the monitoring reports. In June 1995, an update on the status of the pending Semiannual Monitoring Report was provided to the State Board of Education. In July 1995, the July Semiannual Monitoring Report was reviewed by the State Board of Education. On August 14, 1995, the State Board of Education was informed of the need to increase minority participation in the teacher scholarship program and provided tentative monitoring dates to facilitate reporting requests by the ADE administrative team and the Desegregation Litigation Oversight Subcommittee. In September 1995, the State Board of Education was advised of a change in the PMT from a table format to a narrative format. The Board was also briefed about a meeting with the Office of Desegregation Monitoring regarding the PMT. In October 1995, the State Board of Education was updated on monitoring timelines. The Board was also informed of a meeting with the parties regarding a review of the Semiannual Monitoring Report and the monitoring process, and the progress of the test validation study. In November 1995, a report was made to the State Board of Education regarding the monitoring schedule and a meeting with the parties concerning the development of a common terminology for monitoring purposes. In December 1995, the State Board of Education was updated regarding announced monitoring visits. In January 1996, copies of the draft February Semiannual Monitoring Report and its executive summary were provided to the State Board of Education. 27 V. COMMITMENT TO PRINCIPLES (Continued) D. Through regular oversight of the Implementation Phase's Project Management Tool, and scrutiny of results of AD E's actions, the Board of Education will act on its commitment to the principles of the Settlement Agreement. (Continued) 2. Actual as of March 31, 2004 (Continued) During the months of February 1996 through May 1996, the PMT report was the only item on the agenda regarding the status of the implementation of the Monitoring Plan. In June 1996, the State Board of Education was updated on the status of the bias review study. In July 1996, the Semiannual Monitoring Report was provided to the Court, the parties, ODM, the State Board of Education, and the Desegregation Litigation Oversight Subcommittee. In August 1996, the State Board of Education and the ADE administrative team were provided with copies of the test validation study prepared by Dr. Paul Williams. During the months of September 1996 through December 1996, the PMT was the only item on the agenda regarding the status of the implementation of the Monitoring Plan. On January 13, 1997, a presentation was made to the State Board of Education regarding the February 1997 Semiannual Monitoring Report, and copies of the report and its executive summary were distributed to all Board members. The Project Management Tool and its executive summary were addressed at the February 10, 1997 State Board of Education meeting regarding the ADE's progress in fulfilling their obligations as set forth in the Implementation Plan. In March 1997, the State Board of Education was notified that historical information in the PMT had been summarized at the direction of the Assistant Attorney General in order to reduce the size and increase the clarity of the report. The Board was updated on the Pulaski County Desegregation Case and reviewed the Memorandum Opinion and Order issued by the Court on February 18, 1997 in response to the Districts' motion for summary judgment on the issue of state funding for teacher retirement matching contributions. During the months of April 1997 through June 1997, the PMT was the only item on the agenda regarding the status of the implementation of the Monitoring Plan. The State Board of Education received copies of the July 15, 1997 Semiannual Monitoring Report and executive summary at the July Board meeting. 28 V. COMMITMENT TO PRINCIPLES (Continued) D. Through regular oversight of the Implementation Phase's Project Management Tool, and scrutiny of results of AD E's actions, the Board of Education will act on its commitment to the principles of the Settlement Agreement. (Continued) 2. Actual as of March 31, 2004 (Continued) The Implementation Phase Working Group held its quarterly meeting on August 4, 1997 to discuss the progress made in attaining the goals set forth in the Implementation Plan and the critical areas for the current quarter. A special report regarding a historical review of the Pulaski County Settlement Agreement and the ADE's role and monitoring obligations were presented to the State Board of Education on September 8, 1997. Additionally, the July 15, 1997 Semiannual Monitoring Report was presented to the Board for their review. In October 1997, a special draft report regarding disparity in achievement was submitted to the State Board Chairman and the Desegregation Litigation Oversight Subcommittee. In November 1997, the State Board of Education was provided copies of the monthly PMT and its executive summary. The Implementation Phase Working Group held its quarterly meeting on November 3, 1997 to discuss the progress made in attaining the goals set forth in the Implementation Plan and the critical areas for the current quarter. In December 1997, the State Board of Education was provided copies of the monthly PMT and its executive summary. In January 1998, the State Board of Education reviewed and discussed ODM's report on the ADE's monitoring activities and instructed the Director to meet with the parties to discuss revisions to the ADE's monitoring plan and monitoring reports. In February 1998, the State Board of Education reviewed and approved the PMT and discussed the February 1998 Semiannual Monitoring Report. In March 1998, the State Board of Education reviewed and approved the PMT and its executive summary and was provided an update regarding proposed revisions to the monitoring process. In April 1998, the State Board of Education reviewed and approved the PMT and its executive summary. In May 1998, the State Board of Education reviewed and approved the PMT and its executive summary. 29 V. COMMITMENT TO PRINCIPLES (Continued) D. Through regular oversight of the Implementation Phase's Project Management Tool, and scrutiny of results of AD E's actions, the Board of Education will act on its commitment to the principles of the Settlement Agreement. (Continued) 2. Actual as of March 31, 2004 (Continued) In June 1998, the State Board of Education reviewed and approved the PMT and its executive summary. The State Board of Education also reviewed how the ADE would report progress in the PMT concerning revisions in ADE's Monitoring Plan. In July 1998, the State Board of Education reviewed and approved the PMT and its executive summary. The State Board of Education also received an update on Test Validation, the Desegregation Litigation Oversight Committee Meeting, and revisions in ADE's Monitoring Plan. In August 1998, the State Board of Education reviewed and approved the PMT and its executive summary. The Board also received an update on the five discussion points regarding the proposed revisions to the monitoring and reporting process. The Board also reviewed the basic goal of the Minority Recruitment Committee. In September 1998, the State Board of Education reviewed the proposed modifications to the Monitoring plans by reviewing the common core of written response received from the districts. The primary commonalities were (1) Staff Development, (2) Achievement Disparity and (3) Disciplinary Disparity. A meeting of the parties is scheduled to be conducted on Thursday, September 17, 1998. The Board encouraged the Department to identify a deadline for Standardized Test Validation and Test Selection. In October 1998, the Board received the progress report on Proposed Revisions to the Desegregation Monitoring and Reporting Process (see XVIII). The Board also reviewed and approved the PMT and its executive summary. In November, the Arkansas State Board of Education reviewed the PMT and its executive summary. The Board also received an update on the proposed revisions in the Desegregation monitoring Process and the update on Test validation and Test Selection provisions of the Settlement Agreement. The Board was also notified that the Implementation Plan Working Committee held its quarterly meeting to review progress and identify quarterly priorities. In December, the State Board of Education reviewed the PMT and its executive summary. The Board also received an update on the joint motion by the ADE, the LRSD, NLRSD, and the PCSSD, to relieve the Department of its obligation to file a February Semiannual Monitoring Report. The Board was also notified that the Joshua lntervenors filed a motion opposing the joint motion. The Board was informed that the ADE was waiting on a response from Court. 30 V. COMMITMENT TO PRINCIPLES (Continued) D. Through regular oversight of the Implementation Phase's Project Management Tool, and scrutiny of results of AD E's actions, the Board of Education will act on its commitment to the principles of the Settlement Agreement. (Continued) 2. Actual as of March 31, 2004 (Continued) In January, the Arkansas State Board of Education reviewed the PMT and its executive summary. The Board also received an update on the joint motion of the ADE, LRSD, PCSSD, and NLRSD for an order relieving the ADE of filing a February 1999 Monitoring Report. The motion was granted subject to the following three conditions: (1) notify the Joshua intervenors of all meetings between the parties to discuss proposed changes, (2) file with the Court on or before February 1, 1999, a report detailing the progress made in developing proposed changes and (3) identify ways in which ADE might assist districts in their efforts to improve academic achievement. In February, the Arkansas State Board of Education reviewed the PMT and its executive summary. The Board was informed that the three conditions: (1) notify the Joshua lntervenors of all meetings between the parties to discuss proposed changes, (2) file with the Court on or before February 1, 1999, a report detailing the progress made in developing proposed changes and (3) identify ways in which ADE might assist districts in their efforts to improve academic achievement had been satisfied. The Joshua lntervenors were invited again to attend the meeting of the parties and they attended on January 13, and January 28, 1999. They are also scheduled to attend on February 17, 1998. The report of progress, a collaborative effort from all parties was presented to court on February 1, 1999. The Board was also informed that additional items were received for inclusion in the revised report, after the deadline for the submission of the progress report and the ADE would: (1) check them for feasibility, and fiscal impact if any, and (2) include the items in future drafts of the report. In March, the Arkansas State Board of Education reviewed the PMT and its executive summary. The Board also received and reviewed the Desegregation Monitoring and Assistance Progress Report submitted to Court on February 1, 1999. On April 12, and May 10, 1999, the Arkansas State Board of Education reviewed the PMT and its executive summary. The Board also was notified that once the financial section of the proposed plan was completed, the revised plan would be submitted to the board for approval. On June 14, 1999, the Arkansas State Board of Education reviewed the PMT and its executive summary. The Board also was notified that once the financial section of the proposed plan was completed, the revised plan would be submitted to the board for approval. 31 V. COMMITMENT TO PRINCIPLES (Continued) D. Through regular oversight of the Implementation Phase's Project Management Tool, and scrutiny of results of ADE's actions, the Board of Education will act on its commitment to the principles of the Settlement Agreement. (Continued) 2. Actual as of March 31, 2004 (Continued) On July 12, 1999, the Arkansas State Board of Education reviewed the PMT and its executive summary. The Board also was notified that once the financial section of the proposed plan was completed, the revised plan would be submitted to the board for approval. On August 9, 1999, the Arkansas State Board of Education reviewed the PMT and its executive summary. The Board was also notified that the new Desegregation Monitoring and Assistance Plan would be ready to submit to the Board for their review \u0026amp; approval as soon as plans were finalized. On September 13, 1999, the Arkansas State Board of Education reviewed the PMT and its executive summary. The Board was also notified that the new Desegregation Monitoring and Assistance Plan would be ready to submit to the Board for their review \u0026amp; approval as soon as plans were finalized. On October 12, 1999, the Arkansas State Board of Education reviewed the PMT and its executive summary. The Board was notified that on September 21, 1999 that the Office of Education Lead Planning and Desegregation Monitoring meet before the Desegregation Litigation Oversight Subcommittee and presented them with the draft version of the new Desegregation Monitoring and Assistance Plan. The State Board was notified that the plan would be submitted for Board review and approval when finalized. On November 8, 1999, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of October. On December 13, 1999, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of November. On January 10, 2000, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of December. On February 14, 2000, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of January. On March 13, 2000, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of February. On April 10, 2000, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of March. 32 V. COMMITMENT TO PRINCIPLES (Continued) D. Through regular oversight of the Implementation Phase's Project Management Tool, and scrutiny of results of AD E's actions, the Board of Education will act on its commitment to the principles of the Settlement Agreement. (Continued) 2. Actual as of March 31, 2004 (Continued) On May 8, 2000, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of April. On June 12, 2000, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of May. On July 10, 2000, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of June. On August 14, 2000, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of July. On September 11, 2000, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of August. On October 9, 2000, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of September. On November 13, 2000, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of October. On December 11, 2000, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of November. On January 8, 2001, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of December. On February 12, 2001, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of January. On March 12, 2001, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of February. On April 9, 2001, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of March. On May 14, 2001, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of April. On June 11 , 2001, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of May. 33 V. COMMITMENT TO PRINCIPLES (Continued) D. Through regular oversight of the Implementation Phase's Project Management Tool, and scrutiny of results of ADE's actions, the Board of Education will act on its commitment to the principles of the Settlement Agreement. (Continued) 2. Actual as of March 31, 2004 (Continued) On July 9, 2001, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of June. On August 13, 2001, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of July. On September 10, 2001, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of August. On October 8, 2001, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of September. On November 19, 2001, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of October. On December 10, 2001, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of November. On January 14, 2002, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of December. On February 11, 2002, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of January. On March 11 , 2002, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of February. On April 8, 2002, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of March. On May 13, 2002, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of April. On June 10, 2002, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of May. On July 8, 2002, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of June. On August 12, 2002, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of July. 34 V. COMMITMENT TO PRINCIPLES (Continued) D. Through regular oversight of the Implementation Phase's Project ManagementTool, and scrutiny of results of AD E's actions, the Board of Education will act on its commitment to the principles of the Settlement Agreement. (Continued) 2. Actual as of March 31, 2004 (Continued) On September 9, 2002, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of August. On October 14, 2002, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of September. On November 18, 2002, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of October. On December 9, 2002, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of November. On January 13, 2003, the Arkansas State Board of Edcation reviewed and approved the PMT and its executive summary for the month of December. On February 10, 2003, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of January. On March 10, 2003, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of February. On April 14, 2003, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of March. On May 12, 2003, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of April. On June 9, 2003, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of May. On August 11, 2003, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the months of June and July. On September 8, 2003, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of August. On October 13, 2003, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of September. On November 10, 2003, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of October. 35 V. COMMITMENT TO PRINCIPLES (Continued) D. Through regular oversight of the Implementation Phase's Project Management Tool, and scrutiny of results of AD E's actions, the Board of Education will act on its commitment to the principles of the Settlement Agreement. (Continued) 2. Actual as of March 31 , 2004 (Continued) On January 12, 2004, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of December. On February 9, 2004, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of January. On March 8, 2004, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of February. 36 VI. REMEDIATION A. Through the Extended COE process, the needs for technical assistance by District, by School, and by desegregation compensatory education programs will be identified. 1 . Projected Ending Date Ongoing 2. Actual as of March 31, 2004 During May 1995, team visits to Cycle 4 schools were conducted, and plans were developed for reviewing the Cycle 5 schools. In June 1995, the current Extended COE packet was reviewed, and enhancements to the Extended COE packet were prepared. In July 1995, year end reports were finalized by the Pulaski County field service specialists, and plans were finalized for reviewing the draft improvement plans of the Cycle 5 schools. In August 1995, Phase I - Cycle 5 school improvement plans were reviewed. Plans were developed for meeting with the Districts to discuss plans for Phase II - Cycle 1 schools of Extended COE, and a school improvement conference was conducted in Hot Springs. The technical review visits for the FY 95/96 year and the documentation process were also discussed. In October 1995, two computer programs, the Effective Schools Planner and the Effective Schools Research Assistant, were ordered for review, and the first draft of a monitoring checklist for Extended COE was developed. Through the Extended COE process, the field service representatives provided technical assistance based on the needs identified within the Districts from the data gathered. In November 1995, ADE personnel discussed and planned for the FY 95/96 monitoring, and onsite visits were conducted to prepare schools for the FY 95/96 team visits. Technical review visits continued in the Districts. In December 1995, announced monitoring and technical assistance visits were conducted in the Districts. At December 31, 1995, approximately 59% of the schools in the Districts had been monitored. Technical review visits were conducted during January 1996. In February 1996, announced monitoring visits and midyear monitoring reports were completed, and the field service specialists prepared for the spring NCA/COE peer team visits. 37 VI. REMEDIATION (Continued) A. Through the Extended COE process, the needs for technical assistance by District, by School, and by desegregation compensatory education programs will be identified. (Continued) 2. Actual as of March 31, 2004 (Continued) In March 1996, unannounced monitoring visits of Cycle 5 schools commenced, and two-day peer team visits of Cycle 5 schools were conducted. Two-day team visit materials, team lists and reports were prepared. Technical assistance was provided to schools in final preparation for team visits and to schools needing any school improvement information. In April and May 1996, the unannounced monitoring visits were completed. The unannounced monitoring forms were reviewed and included in the July monitoring report. The two-day peer team visits were completed, and annual COE monitoring reports were prepared. In June 1996, all announced and unannounced monitoring visits of the Cycle 5 schools were completed, and the data was analyzed. The Districts identified enrollment in compensatory education programs. The Semiannual Monitoring Report was completed and filed with the Court on July 15, 1996, and copies were distributed to the parties. During August 1996, meetings were held with the Districts to discuss the monitoring requirements. Technical assistance meetings with Cycle 1 schools were planned for 96/97. The Districts were requested to record discipline data in accordance with the Allen Letter. In September 1996, recommendations regarding the ADE monitoring schedule for Cycle 1 schools and content layouts of the semiannual report were submitted to the ADE administrative team for their review. Training materials were developed and schedules outlined for Cycle 1 schools. In October 1996, technical assistance needs were identified and addressed to prepare each school for their team visits. Announced monitoring visits of the Cycle 1 schools began on October 28, 1996. In December 1996, the announced monitoring visits of the Cycle 1 schools were completed, and technical assistance needs were identified from school site visits. In January 1997, the ECOE monitoring section identified technical assistance needs of the Cycle 1 schools, and the data was reviewed when the draft February Semiannual Monitoring Report was presented to the Desegregation Litigation Oversight Subcommittee, the State Board of Education, and the parties. 38 VI. REMEDIATION (Continued) A. Through the Extended COE process, the needs for technical assistance by District, by School, and by desegregation compensatory education programs will be identified. (Continued) 2. Actual as of March 31, 2004 (Continued) In February 1997, field service specialists prepared for the peer team visits of the Cycle 1 schools. NCA accreditation reports were presented to the NCA Committee, and NCA reports were prepared for presentation at the April NCA meeting in Chicago. From March to May 1997, 111 visits were made to schools or central offices to work with principals, ECOE steering committees, and designated district personnel concerning school improvement planning. A workshop was conducted on Learning Styles for Geyer Springs Elementary School. A School Improvement Conference was held in Hot Springs on July 15-17, 1997. The conference included information on the process of continuous school improvement, results of the first five years of COE, connecting the mission with the school improvement plan, and improving academic performance. Technical assistance needs were evaluated for the FY 97/98 school year in August 1997. From October 1997 to February 1998, technical reviews of the ECOE process were conducted by the field service representatives. Technical assistance was provided to the Districts through meetings with the ECOE steering committees, assistance in analyzing perceptual surveys, and by providing samples of school improvement plans, Gold File catalogs, and web site addresses to schools visited. Additional technical assistance was provided to the Districts through discussions with the ECOE committees and chairs about the process. In November 1997, technical reviews of the ECOE process were conducted by the field service representatives in conjunction with the announced monitoring visits. Workshops on brainstorming and consensus building and asking strategic questions were held in January and February 1998. In March 1998, the field service representatives conducted ECOE team visits and prepared materials for the NCA workshop. Technical assistance was provided in workshops on the ECOE process and team visits. In April 1998, technical assistance was provided on the ECOE process and academically distressed schools. In May 1998, technical assistance was provided on the ECOE process, and team visits were conducted. 39 VI. REMEDIATION (Continued) A. Through the Extended COE process, the needs for technical assistance by District, by School, and by desegregation compensatory education programs will be identified. (Continued)  2. Actual as of March 31, 2004 (Continued) In June 1998, the Extended COE Team Visit Reports were completed. A School Improvement Conference was held in Hot Springs on July 13-15, 1998. Major conference topics included information on the process of continuous school improvement, curriculum alignment, \"Smart Start,\" Distance Learning, using data to improve academic performance, educational technology, and multicultural education. All school districts in Arkansas were invited and representatives from Pulaski County attended. In September 1998, requests for technical assistance were received, visitation schedules were established, and assistance teams began visiting the Districts. Assistance was provided by telephone and on-site visits. The ADE provided inseNice training on \"Using Data to Sharpen the Focus on Student Achievement\" at Gibbs Magnet Elementary school on October 5, 1998 at their request. The staff was taught how to increase test scores through data disaggregation, analysis, alignment, longitudinal achievement review, and use of individualized test data by student, teacher, class and content area. Information was also provided regarding the \"Smart Start\" and the \"Academic Distress\" initiatives. On October 20, 1998, ECOE technical assistance was provided to Southwest Jr. High School. B. Identify available resources for providing technical assistance for the specific condition, or circumstances of need, considering resources within ADE and the Districts, and also resources available from outside sources and experts. 1. Projected Ending Date Ongoing 2. Actual as of March 31, 2004 The information for this item is detailed under Section VI.F. of this report. C. Through the ERIC system, conduct a literature search for research evaluating compensatory education programs. 1. Projected Ending Date Ongoing 40 VI. REMEDIATION (Continued) C. Through the ERIC system, conduct a literature search for research evaluating compensatory education programs. (Continued) 2. Actual as of March 31, 2004 An updated ERIC Search was conducted on May 15, 1995 to locate research on evaluating compensatory education programs. The ADE received the updated ERIC disc that covered material through March 1995. An ERIC search was conducted in September 30, 1996 to identify current research dealing with the evaluation of compensatory education programs, and the articles were reviewed. An ERIC search was conducted in April 1997 to identify current research on compensatory education programs and sent to the Cycle 1 principals and the field service specialists for their use. An Eric search was conducted in October 1998 on the topic of Compensatory Education and related descriptors. The search included articles with publication dates from 1997 through July 1998. D. Identify and research technical resources available to ADE and the Districts through programs and organizations such as the Desegregation Assistance Center in San Antonio, Texas. 1. Projected Ending Date Summer 1994 2. Actual as of March 31, 2004 The information for this item is detailed under Section VI.F. of this report. E. Solicit, obtain, and use available resources for technical assistance. 1. Projected Ending Date Ongoing 2. Actual as of March 31, 2004 The information for this item is detailed under Section VI.F. of this report. 41 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. 1 . Projected Ending Date Ongoing 2. Actual as of March 31, 2004 From March 1995 through July 1995, technical assistance and resources were obtained from the following sources: the Southwest Regional Cooperative\nUALR regarding training for monitors\nODM on a project management software\nADHE regarding data review and display\nand Phi Delta Kappa, the Desegregation Assistance Center and the Dawson Cooperative regarding perceptual surveys. Technical assistance was received on the Microsoft Project software in November 1995, and a draft of the PMT report using the new software package was presented to the ADE administrative team for review. In December 1995, a data manager was hired permanently to provide technical assistance with computer software and hardware. In October 1996, the field service specialists conducted workshops in the Districts to address their technical assistance needs and provided assistance for upcoming team visits. In November and December 1996, the field service specialists addressed technical assistance needs of the schools in the Districts as they were identified and continued to provide technical assistance for the upcoming team visits. In January 1997, a draft of the February 1997 Semiannual Monitoring Report was presented to the State Board of Education, the Desegregation Litigation Oversight Subcommittee, and the parties. The ECOE monitoring section of the report included information that identified technical assistance needs and resources available to the Cycle 1 schools. Technical assistance was provided during the January 29-31, 1997 Title I MidWinter Conference. The conference emphasized creating a learning community by building capacity schools to better serve all children and empowering parents to acquire additional skills and knowledge to better support the education of their children. In February 1997, three ADE employees attended the Southeast Regional Conference on Educating Black Children. Participants received training from national experts who outlined specific steps that promote and improve the education of black children. 42 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of March 31, 2004 (Continued) On March 6-9, 1997, three members of the ADE's Technical Assistance Section attended the National Committee for School Desegregation Conference. The participants received training in strategies for Excellence and Equity: Empowerment and Training for the Future. Specific information was received regarding the current status of court-ordered desegregation, unitary status, and resegregation and distributed to the Districts and ADE personnel. The field service specialists attended workshops in March on ACT testing and school improvement to identify technical assistance resources available to the Districts and the ADE that will facilitate desegregation efforts. ADE personnel attended the Eighth Annual Conference on Middle Level Education in Arkansas presented by the Arkansas Association of Middle Level Education on April 6-8, 1997. The theme of the conference was Sailing Toward New Horizons. In May 1997, the field service specialists attended the NCA annual conference and an inservice session with Mutiu Fagbayi. An Implementation Oversight Committee member participated in the Consolidated COE Plan inservice training. In June and July 1997, field service staff attended an SAT-9 testing workshop and participated in the three-day School Improvement Conference held in Hot Springs. The conference provided the Districts with information on the COE school improvement process, technical assistance on monitoring and assessing achievement, availability of technology for the classroom teacher, and teaching strategies for successful student achievement. In August 1997, field service personnel attended the ASCD Statewide Conference and the AAEA Administrators Conference. On August 18, 1997, the bi-monthly Team V meeting was held and presentations were made on the Early Literacy Learning in Arkansas (ELLA) program and the Schools of the 21st Century program. In September 1997, technical assistance was provided to the Cycle 2 principals on data collection for onsite and offsite monitoring. ADE personnel attended the Region VI Desegregation Conference in October 1997. Current desegregation and educational equity cases and unitary status issues were the primary focus of the conference. On October 14, 1997, the bi-monthly Team V meeting was held in Paragould to enable members to observe a 21st Century school and a school that incorporates traditional and multi-age classes in its curriculum. 43 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of March 31, 2004 (Continued) In November 1997, the field service representatives attended the Governor's Partnership Workshop to discuss how to tie the committee's activities with the ECOE process. In March 1998, the field service representatives attended a school improvement conference and conducted workshops on team building and ECOE team visits. Staff development seminars on Using Data to Sharpen the Focus on Student Achievement are scheduled for March 23, 1998 and March 27, 1998 for the Districts. In April 1998, the Districts participated in an ADE seminar to aid them in evaluating and improving student achievement. In August 1998, the Field Service Staff attended inservice to provide further assistance to schools, i.e., Title I Summer Planning Session, ADE session on Smart Start, and the School Improvement Workshops. All schools and districts in Pulaski County were invited to attend the \"Smart Start\" Summit November 9, 10, and 11 to learn more about strategies to increase student performance. \"Smart Start\" is a standards-driven educational initiative which emphasizes the articulation of clear standards for student achievement and accurate measures of progress against those standards through assessments, staff development and individual school accountability. The Smart Start Initiative focused on improving reading and mathematics achievement for all students in Grades K-4. Representatives from all three districts attended. On January 21, 1998, the ADE provided staff development for the staff at Oak Grove Elementary School designed to assist them with their efforts to improve student achievement. Using achievement data from Oak Grove, educators reviewed trends in achievement data, identified areas of greatest need, and reviewed seven steps for improving student performance. On February 24, 1999, the ADE provided staff development for the administrative staff at Clinton Elementary School regarding analysis of achievement data. On February 15, 1999, staff development was rescheduled for Lawson Elementary School. The staff development program was designed to assist them with their efforts to improve student achievement using achievement data from Lawson, educators reviewed the components of the Arkansas Smart Initiative, trends in achievement data, identified areas of greatest need, and reviewed seven steps for improving student performance. Student Achievement Workshops were rescheduled for Southwest Jr. High in the Little Rock School District, and the Oak Grove Elementary School in the Pulaski County School District. 44 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of March 31, 2004 (Continued) On April 30, 1999, a Student Achievement Workshop was conducted for Oak Grove Elementary School in PCSSD. The Student Achievement Workshop for Southwest Jr. High in LRSD has been rescheduled. On June 8, 1999, a workshop was presented to representatives from each of the Arkansas Education Service Cooperatives and representatives from each of the three districts in Pulaski County. The workshop detailed the Arkansas Comprehensive Testing, Assessment and Accountability Program (ACTAAP). On June 18, 1999, a workshop was presented to administrators of the NLRSD. The workshop detailed the Arkansas Comprehensive Testing, Assessment and Accountability Program (ACTAAP). On August 16, 1999, professional development on ways to increase student achievement and the components of the new ACT AAP program was presented during the preschool staff development activities for teaching assistant in the LRSD. On August 20, 1999, professional development on ways to increase student achievement and the components of the new ACTAAP program was presented during the preschool staff development activities for the Accelerated Learning Center in the LRSD. On September 13, 1999, professional development on ways to increase student achievement and the components of the new ACT AAP program were presented to the staff at Booker T. Washington Magnet Elementary School. On September 27, 1999, professional development on ways to increase student achievement was presented to the Middle and High School staffs of the NLRSD. The workshop also covered the components of the new ACTAAP program, and ACT 999 of 1999. On October 26, 1999, professional development on ways to increase student achievement was presented to LRSD personnel through a staff development training class. The workshop also covered the components of the new ACTAAP program, and ACT 999 of 1999. On December 7, 1999, professional development on ways to increase student achievement was scheduled for Southwest Middle School in the LRSD. The workshop was also set to cover the components of the new ACTAAP program, and ACT 999 of 1999. However, Southwest Middle School administrators had a need to reschedule, therefore the workshop will be rescheduled. 45 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of March 31, 2004 (Continued) On January 10, 2000, professional development on ways to increase student achievement was conducted for both Dr. Martin Luther King Magnet Elementary School \u0026amp; Little Rock Central High School. The workshops also covered the components of the new ACTAAP program, and ACT 999 of 1999. On March 1, 2000, professional development on ways to increase student achievement was conducted for all principals and district level administrators in the PCSSD. The workshop also covered the components of the new ACTAAP program, and ACT 999 of 1999. On April 12, 2000, professional development on ways to increase student achievement was conducted for the LRSD. The workshop also covered the components of the new ACTAAP program, and ACT 999 of 1999. Targeted staffs from the middle and junior high schools in the three districts in Pulaski County attended the Smart Step Summit on May 1 and May 2. Training was provided regarding the overview of the \"Smart Step\" initiative, \"Standard and Accountability in Action,\" and \"Creating Learning Environments Through Leadership Teams.\" The ADE provided training on the development of alternative assessment September 12-13, 2000. Information was provided regarding the assessment of Special Education and LEP students. Representatives from each district were provided the opportunity to select a team of educators from each school within the district to participate in professional development regarding Integrating Curriculum and Assessment K-12. The professional development activity was directed by the national consultant, Dr. Heidi Hays Jacobs, on September 14 and 15, 2000. The ADE provided professional development workshops from October 2 through October 13, 2000 regarding, \"The Write Stuff: Curriculum Frameworks, Content Standards and Item Development.\" Experts from the Data Recognition Corporation provided the training. Representatives from each district were provided the opportunity to select a team of educators from each school within the district to participate. The ADE provided training on Alternative Assessment Portfolio Systems by video conference for Special Education and LEP Teachers on November 17, 2000. Also, Alternative Assessment Portfolio System Training was provided for testing coordinators through teleconference broadcast on November 27, 2000. 46 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of March 31, 2004 (Continued) On December 12, 2000, the ADE provided training for Test Coordinators on end of course assessments in Geometry and Algebra I Pilot examination. Experts from the Data Recognition Corporation conducted the professional development at the Arkansas Teacher Retirement Building. The ADE presented a one-day training session with Dr. Cecil Reynolds on the Behavior Assessment for Children (BASC). This took place on December 7, 2000 at the NLRSD Administrative Annex. Dr. Reynolds is a practicing clinical psychologist. He is also a professor at Texas A \u0026amp; M University and a nationally known author. In the training, Dr. Reynolds addressed the following: 1) how to use and interpret information obtained on the direct observation form, 2) how to use this information for programming, 3) when to use the BASC, 4) when to refer for more or additional testing or evaluation, 5) who should complete the forms and when, (i.e., parents, teachers, students), 6) how to correctly interpret scores. This training was intended to especially benefit School Psychology Specialists, psychologists, psychological examiners, educational examiners and counselors. During January 22-26, 2001 the ADE presented the ACTAAP Intermediate (Grade 6) Benchmark Professional Development Workshop on Item Writing. Experts from the Data Recognition Corporation provided the training. Representatives from each district were invited to attend. On January 12, 2001 the ADE presented test administrators training for mid-year End of Course (Pilot) Algebra I and Geometry exams. This was provided for schools with block scheduling. On January 13, 2001 the ADE presented SmartScience Lessons and worked with teachers to produce curriculum. This was shared with eight Master Teachers. The SmartScience Lessons were developed by the Arkansas Science Teachers Association in conjunction with the Wilbur Mills Educational Cooperative under an Eisenhower grant provided by the ADE. The purpose of SmartScience is to provide K-6 teachers with activity-oriented science lessons that incorporate reading, writing, and mathematics skills. The following training has been provided for educators in the three districts in Pulaski County by the Division of Special Education at the ADE since January 2000: On January 6, 2000, training was conducted for the Shannon Hills Pre-school Program, entitled \"Things you can do at home to support your child's learning.\" This was presented by Don Boyd - ASERC and Shelley Weir. The school's director and seven parents attended. 47 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of March 31, 2004 (Continued) On March 8, 2000, training was conducted for the Southwest Middle School in Little Rock, on ADD. Six people attended the training. There was follow-up training on Learning and Reading Styles on March 26. This was presented by Don Boyd - ASERC and Shelley Weir. On September 7, 2000, Autism and Classroom Accommodations for the LRSD at Chicot Elementary School was presented. Bryan Ayres and Shelley Weir were presenters. The participants were: Karen Sabo, Kindergarten Teacher\nMelissa Gleason, Paraprofessional\nCurtis Mayfield, P.E. Teacher\nLisa Poteet, Speech Language Pathologist\nJane Harkey, Principal\nKathy Penn-Norman, Special Education Coordinator\nAlice Phillips, Occupational Therapist. On September 15, 2000, the Governor's Developmental Disability Coalition Conference presented Assistive Technology Devices \u0026amp; SeNices. This was held at the Arlington Hotel in Hot Springs. Bryan Ayres was the presenter. On September 19, 2000, Autism and Classroom Accommodations for the LRSD at Jefferson Elementary School was presented. Bryan Ayres and Shelley Weir were presenters. The participants were: Melissa Chaney, Special Education Teacher\nBarbara Barnes, Special Education Coordinator\na Principal, a Counselor, a Librarian, and a Paraprofessional. On October 6, 2000, Integrating Assistive Technology Into Curriculum was presented at a conference in the Hot Springs Convention Center. Presenters were: Bryan Ayers and Aleecia Starkey. Speech Language Pathologists from LRSD and NLRSD attended. On October 24, 2000, Consideration and Assessment of Assistive Technology was presented through Compressed Video-Teleconference at the ADE facility in West Little Rock. Bryan Ayres was the presenter. On October 25 and 26, 2000, Alternate Assessment for Students with Severe Disabilities for the LRSD at J. A. Fair High School was presented. Bryan Ayres was the presenter. The participants were: Susan Chapman, Special Education Coordinator\nMary Steele, Special Education Teacher\nDenise Nesbit, Speech Language Pathologist\nand three Paraprofessionals. On November 14, 2000, Consideration and Assessment of Assistive Technology was presented through Compressed Video-Teleconference at the ADE facility in West Little Rock. Bryan Ayres was the presenter. On November 17, 2000, training was conducted on Autism for the LRSD at the Instructional Resource Center. Bryan Ayres and Shelley Weir were presenters. 48 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of March 31, 2004 (Continued) On December 5, 2000, Access to the Curriculum Via the use of Assistive Technology Computer Lab was presented. Bryan Ayres was the presenter of this teleconference. The participants were: Tim Fisk, Speech Language Pathologist from Arch Ford Education Service Cooperative at Plumerville and Patsy Lewis, Special Education Teacher from Mabelvale Middle School in the LRSD. On January 9, 2001, Consideration and Assessment of Assistive Technology was presented through Compressed Video-Teleconference at the ADE facility in West Little Rock. Bryan Ayres was the presenter. Kathy Brown, a vision consultant from the LRSD, was a participant. On January 23, 2001, Autism and Classroom Modifications for the LRSD at Brady Elementary School was presented. Bryan Ayres and Shelley Weir were presenters. The participants were: Beverly Cook, Special Education Teacher\nAmy Littrell, Speech Language Pathologist\nJan Feurig, Occupational Therapist\nCarolyn James, Paraprofessional\nCindy Kackly, Paraprofessional\nand Rita Deloney, Paraprofessional. The ADE provided training on Alternative Assessment Portfolio Systems for Special Education and Limited English Proficient students through teleconference broadcast on February 5, 2001. Presenters were: Charlotte Marvel, ADE\nDr. Gayle Potter, ADE\nMarcia Harding, ADE\nLynn Springfield, ASERC\nMary Steele, J. A. Fair High School, LRSD\nBryan Ayres, Easter Seals Outreach. This was provided for Special Education teachers and supervisors in the morning, and Limited English Proficient teachers and supervisors in the afternoon. The Special Education session was attended by 29 teachers/administrators and provided answers to specific questions about the alternate assessment portfolio system and the scoring rubric and points on the rubric to be used to score the portfolios. The LEP session was attended by 16 teachers/administrators and disseminated the common tasks to be included in the portfolios: one each in mathematics, writing and reading. On February 12-23, 2001, the ADE and Data Recognition Corporation personnel trained Test Coordinators in the administration of the spring Criterion-Referenced Test. This was provided in 20 sessions at 10 regional sites. Testing protocol, released items, and other testing materials were presented and discussed. The sessions provided training for Primary, Intermediate, and Middle Level Benchmark Exams as well as End of Course Literacy, Algebra and Geometry PilotTests. The LRSD had 2 in attendance for the End of Course session and 2 for the Benchmark session. The NLRSD had 1 in attendance for the End of Course session and 1 for the Benchmark session. The PCSSD had 1 in attendance for the End of Course session and 1 for the Benchmark session. 49 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of March 31, 2004 (Continued) On March 15, 2001 , there was a meeting at the ADE to plan professional development for staff who work with Limited English Proficiency (LEP) students. A $30,000 grant has been created to provide LEP training at Chicot Elementary for a year, starting in April 2001. A $40,000 grant was created to provide a Summer English as Second Language (ESL) Academy for the LRSD from June 18 through 29, 2001. Andre Guerrero from the ADE Accountability section met with Karen Broadnax, ESL Coordinator at LRSD, Pat Price, Early Childhood Curriculum Supervisor at LRSD, and Jane Harkey, Principal of Chicot Elementary. On March 1-2 and 8-29, 2001, ADE staff performed the following activities: processed registration for April 2 and 3 Alternate Portfolio Assessment video conference quarterly meeting\nanswered questions about Individualized Educational Plan (IEP) and LEP Alternate Portfolio Assessment by phone from schools and Education Service Cooperatives\nand signed up students for alternate portfolio assessment from school districts. On March 6, 2001, ADE staff attended a Smart Step Technology Leadership Conference at the State House Convention Center. On March 7, 2001, ADE staff attended a National Assessment of Educational Progress (NAEP) Regional Math Framework Meeting about the Consensus Project 2004. On March 8, 2001, there was a one-on-one conference with Carole Villarreal from Pulaski County at the ADE about the LEP students with portfolios. She was given pertinent data, including all the materials that have been given out at the video conferences. The conference lasted for at least an hour. On March 14, 2001, a Test Administrator's Training Session was presented specifically to LRSD Test Coordinators and Principals. About 60 LRSD personnel attended. The following meetings have been conducted with educators in the three districts in Pulaski County since July 2000. On July 10-13, 2000 the ADE provided Smart Step training. The sessions covered Standards-based classroom practices. 50 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of March 31, 2004 (Continued) On July 19-21, 2000 the ADE held the Math/Science Leadership Conference at UCA. This provided services for Arkansas math and science teachers to support systemic reform in math/science and training for 8th grade Benchmark. There were 200 teachers from across the state in attendance. On August 14-31, 2000 the ADE presented Science Smart Start Lessons and worked with teachers to produce curriculum. This will provide K-6 teachers with activity-oriented science lessons that incorporate reading, writing, and mathematics skills. On September 5, 2000 the ADE held an Eisenhower Informational meeting with Teacher Center Coordinators. The purpose of the Eisenhower Professional Development Program is to prepare teachers, school staff, and administrators to help all students meet challenging standards in the core academic subjects. A summary of the program was presented at the meeting. On November 2-3, 2000 the ADE held the Arkansas Conference on Teaching. This presented curriculum and activity workshops. More than 1200 attended the conference. On November 6, 2000 there was a review of Science Benchmarks and sample model curriculum. A committee of 6 reviewed and revised a drafted document. The committee was made up of ADE and K-8 teachers. On November 7-10, 2000 the ADE held a meeting of the Benchmark and End of Course Mathematics Content Area Committee. Classroom teachers reviewed items for grades 4, 6, 8 and EOC mathematics assessment. There were 60 participants. On December 4-8, 2000 the ADE conducted grades 4 and 8 Benchmark Scoring for Writing Assessment. This professional development was attended by approximately 750 teachers. On December 8, 2000 the ADE conducted Rubric development for Special Education Portfolio scoring. This was a meeting with special education supervisors to revise rubric and plan for scoring in June. On December 8, 2000 the ADE presented the Transition Mathematics Pilot Training Workshop. This provided follow-up training and activities for fourth-year mathematics professional development. On December 12, 2000 the ADE presented test administrators training for midyear End of Course (Pilot) Algebra I and Geometry exams. This was provided for schools with block scheduling. 51 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of March 31, 2004 (Continued) The ADE provided training on Alternative Assessment Portfolio Systems for Special Education and Limited English Proficient students through teleconference broadcasts on April 2-3, 2001. Administration of the Primary, Intermediate, and Middle Level Benchmark Exams as well as End of Course Literacy took place on April 23-27, 2001. Administration of the End of Course Algebra and Geometry Exams took place on May 2-3, 2001. Over 1,100 Arkansas educators attended the Smart Step Growing Smarter Conference on July 10 and 11, 2001, at the Little Rock Statehouse Convention Center. Smart Step focuses on improving student achievement for Grades 5-8. The Smart Step effort seeks to provide intense professional development for teachers and administrators at the middle school level, as well as additional materials and assistance to the state's middle school teachers. The event began with opening remarks by Ray Simon, Director of the ADE. Carl Boyd, a longtime educator and staff consultant for Learning 24-7, presented the first keynote address on \"The Character-Centered Teacher''. Debra Pickering, an education consultant from Denver, Colorado, presented the second keynote address on \"Characteristics of Middle Level Education\". Throughout the Smart Step conference, educators attended breakout sessions that were grade-specific and curriculum area-specific. Pat Davenport, an education consultant from Houston, Texas, delivered two addresses. She spoke on \"A Blueprint for Raising Student Achievement\". Representatives from all three districts in Pulaski County attended. Over 1,200 Arkansas teachers and administrators attended the Smart Start Conference on July 12, 2001, at the Little Rock Statehouse Convention Center. Smart Start is a standards-driven educational initiative which emphasizes the articulation of clear standards for student achievement and accurate measures of progress against those standards through assessments, staff development and individual school accountability. The Smart Start Initiative focused on improving reading and mathematics achievement for all students in Grades K-4. The event began with opening remarks by Ray Simon, Director of the ADE. Carl Boyd, a longtime educator and staff consultant for Learning 24-7, presented the keynote address. The day featured a series of 15 breakout sessions on best classroom practices. Representatives from all three districts in Pulaski County attended. On July 18-20, 2001, the ADE held the Math/Science Leadership Conference at UCA. This provided seNices for Arkansas math and science teachers to support systemic reform in math/science and training for 8th grade Benchmark. There were approximately 300 teachers from across the state in attendance. 52 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of March 31, 2004 (Continued) The ADE and Harcourt Educational Measurement conducted Stanford 9 test administrator training from August 1-9, 2001. The training was held at Little Rock, Jonesboro, Fort Smith, Forrest City, Springdale, Mountain Home, Prescott, and Monticello. Another session was held at the ADE on August 30, for those who were unable to attend August 1-9. The ADE conducted the Smart Start quarterly meeting by video conference at the Education Service Cooperatives and at the ADE from 9:00 a.m. until 11 :30 a.m. on September 5, 2001. The ADE released the performance of all schools on the Primary and Middle Level Benchmark Exams on September 5, 2001. The ADE conducted Transition Core Teacher In-Service training for Central in the LRSD on September 6, 2001. The ADE conducted Transition Checklist training for Hall in the LRSD on September 7, 2001. The ADE conducted Transition Checklist training for McClellan in the LRSD on September 13, 2001. The ADE conducted Basic Co-teaching training for the LRSD on October 9, 2001. The ADE conducted training on autism spectrum disorder for the PCSSD on October 15, 2001. Professional Development workshops (1 day in length) in scoring End of Course assessments in algebra, geometry and reading were provided for all districts in the state. Each school was invited to send three representatives (one for each of the sessions). LRSD, NLRSD, and PCSSD participated. Information and training materials pertaining to the Alternate Portfolio Assessment were provided to all districts in the state and were supplied as requested to LRSD, PCSSD and David 0. Dodd Elementary. On November 1-2, 2001 the ADE held the Arkansas Conference on Teaching at the Excelsior Hotel \u0026amp; Statehouse Convention Center. This presented sessions, workshops and short courses to promote exceptional teaching and learning. Educators could become involved in integrated math, science, English \u0026amp; language arts and social studies learning. The ADE received from the schools selected to participate in the National Assessment of Educational Progress (NAEP), a list of students who will take the test. 53 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of March 31, 2004 (Continued) On December 3-7, 2001 the ADE conducted grade 6 Benchmark scoring training for reading and math. Each school district was invited to send a math and a reading specialist. The training was held at the Holiday Inn Airport in Little Rock. On December 4 and 6, 2001 the ADE conducted Mid-Year Test Administrator Training for Algebra and Geometry. This was held at the Arkansas Activities Association's conference room in North Little Rock. On January 24, 2002, the ADE conducted the Smart Start quarterly meeting by ADE compressed video with Fred Jones presenting. On January 31, 2002, the ADE conducted the Smart Step quarterly meeting by NSCI satellite with Fred Jones presenting. On February 7, 2002, the ADE Smart Step co-sponsored the AR Association of Middle Level Principal's/ADE curriculum, assessment and instruction workshop with Bena Kallick presenting. On February 11-21, 2002, the ADE provided training for Test Administrators on the Primary, Intermediate, and Middle Level Benchmark Exams as well as End of Course Literacy, Algebra and Geometry Exams. The sessions took place at Forrest City, Jonesboro, Mountain Home, Springdale, Fort Smith, Monticello, Prescott, Arkadelphia and Little Rock. A make-up training broadcast was given at 15 Educational Cooperative Video sites on February 22. During February 2002, the LRSD had two attendees for the Benchmark Exam training and one attendee for the End of Course Exam training. The NLRSD and PCSSD each had one attendee at the Benchmark Exam training and one attendee for the End of Course Exam training. The ADE conducted the Smart Start quarterly meeting by compressed interactive video at the South Central Education Service Cooperative from 9:30 a.m. until 11 :30 a.m. on May 2, 2002. Telecast topics included creating a standards-based classroom and a seven-step implementation plan. The principal's role in the process was explained. The ADE conducted the Smart Step quarterly meeting by compressed interactive video at the South Central Education Service Cooperative from 9:30 a.m. until 11 :30 a.m. on May 9, 2002. Telecast topics included creating a standards-based classroom and a seven-step implementation plan. The principal's role in the process was explained. 54 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of March 31, 2004 (Continued) The Twenty-First Annual Curriculum and Instruction Conference, co-sponsored by the Arkansas Association for Supervision and Curriculum Development and the Arkansas Department of Education, will be held June 24-26, 2002, at the Arlington Hotel in Hot Springs, Arkansas. \"Ignite Your Enthusiasm for Learning\" is the theme for this year's conference, which will feature educational consultant, Dr. Debbie Silver, as well as other very knowledgeable presenters. Additionally, there will be small group sessions on Curriculum Alignment, North Central Accreditation, Section 504, Building Level Assessment, Administrator Standards, Data Disaggregation, and National Board. The Educational Accountability Unit of the ADE hosted a workshop entitled \"Strategies for Increasing Achievement on the ACT AAP Benchmark Examination\" on June 13-14, 2002 at the Agora Center in Conway. The workshop was presented for schools in which 100% of students scored below the proficient level on one or more parts of the most recent Benchmark Examination. The agenda included presentations on 'The Plan-Do-Check-Act Instructional Cycle\" by the nationally known speaker Pat Davenport. ADE personnel provided an explanation of the MPH point program. Presentations were made by Math and Literacy Specialists. Dr. Charity Smith, Assistant Director for Accountability, gave a presentation about ACTAAP. Break out sessions were held, in which school districts with high scores on the MPH point program offered strategies and insights into increasing student achievement. The NLRSD, LRSD, and PCSSD were invited to attend. The NLRSD attended the workshop. The Smart Start Summer Conference took place on July 8-9, 2002, at the Little Rock Statehouse Convention Center and Peabody Hotel. The Smart Start Initiative focuses on improving reading and mathematics achievement for all students in Grades K-4. The event included remarks by Ray Simon, Director of the ADE. After comments by the Director, Bena Kallick presented the keynote address \"Beyond Mapping: Essential Questions, Assessment, Higher Order Thinking\". This was followed by a series of breakout sessions on best classroom practices. On the second day, Vivian Moore gave the keynote address \"Overcoming Obstacles: Avenues for Student Success\". Krista Underwood gave the presentation \"Put Reading First in Arkansas\". This was followed by a series of breakout sessions on best classroom practices. 55 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of March 31, 2004 (Continued) The Smart Step Summer Conference took place on July 10-11, 2002, at the Little Rock Statehouse Convention Center and Peabody Hotel. Smart Step focuses on improving student achievement for Grades 5-8. The event included remarks by Ray Simon, Director of the ADE. After comments by the Director, Vivian Moore presented the keynote address \"Overcoming Obstacles: Avenues for Student Success\". This was followed by a series of breakout sessions on best classroom practices. On the second day, Bena Kallick presented \"Beyond Mapping: Essential Questions, Assessment, Higher Order Thinking\". Ken Stamatis presented \"Smart Steps to Creating a School Culture That Supports Adolescent Comprehension\". This was followed by a series of breakout sessions on best classroom practices. On August 8, 2002, Steven Weber held a workshop at Booker T. Washington Elementary on \"Best Practices in Social Studies\". It was presented to the 4th grade teachers in the Little Rock School District. The workshop focused around the five themes of geography and the social studies (fourth grade) framework/standards. Several Internet web sites were shared with the teachers, and the teachers were shown methods for incorporating writing into fourth grade social studies. One of the topics was using primary source photos and technology to stimulate the students to write about diverse regions. A theme of the workshop included identifying web sites which apply to fourth grade social studies teachers and interactive web sites for fourth grade students. This was a Back-to-School In-service workshop. The teachers were actively involved in the workshop. On August 13 Steven Weber conducted a workshop at Parkview High School in the LRSD. Topics of the workshop included: 1. Incorporating Writing in the Social Studies Classroom 2. Document Based (open-ended) Questioning Techniques 3. How to practice writing on a weekly basis without assigning a lengthy research report 4. Developing Higher Level Thinking Skills in order to produce active citizens, rather than passive, uninformed citizens 5. Using the Social Studies Framework 6. Identifying state and national Web Sites which contain Primary Sources for use in the classroom The 8:30 - 11 :30 session was for the 6 - 8 grade social studies teachers. The 12:30 - 3:00 session was for the 9 - 12 grade social studies teachers. Several handouts were used, also PowerPoint, primary source photos and documents, and Internet web sites (i.e., Library of Congress, Butler Center for Arkansas Studies, National Archives, etc.). This was a Back-to-School In-service workshop. The teachers were actively involved in the workshop. Marie McNeal is the Social Studies Specialist for the Little Rock School District. She invited Steven Weber to present at the workshop, and was in attendance. 56 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of March 31, 2004 (Continued) On September 30 through October 11, 2002, the ADE provided Professional Development for Test Administrators on the End of Course Literacy, Algebra and Geometry Exams. The training was held at the Holiday Inn Airport. All three districts in Pulaski County sent representatives to the training. On October 3, 2002, Charlotte Marvel provided in-service training for LEP teachers in the Little Rock School District. On December 6, 2002, the Community and Parent Empowerment Summit was held for parents of children attending the LRSD. It took place at the Saint Mark Baptist Church in Little Rock. Dr. Charity Smith, Assistant Director for Accountability, presented information on No Child Left Behind, Supplemental Services, after school tutoring\nThis project was supported in part by a Digitizing Hidden Special Collections and Archives project grant from The Andrew W. Mellon Foundation and Council on Library and Information Resoources.\n   \n\n   \n\n  \n\n\n   \n\n  \n\n \n\n\n   \n\n   \n\n \n\n\n   \n\n  \n\n \n\n\u003cdcterms_creator\u003eArkansas. Department of Education\u003c/dcterms_creator\u003e\n   \n\n \n\n  \n\n\n   \n\n \n\n  \n\n\n\n   \n\n  \n\n  \n\n\n\n   \n\n   \n\n  \n\n \n\n \n\n\n   \n\n  \n\n \n\n\n\n\n\n\n\n\n   \n\n \n\n\n\n  \n\n\n   \n\n\n\n  \n\n\n\n "},{"id":"bcas_bcmss0837_18","title":"Arkansas Department of Education's (ADE's) Project Management Tool","collection_id":"bcas_bcmss0837","collection_title":"Office of Desegregation Management","dcterms_contributor":null,"dcterms_spatial":["United States, 39.76, -98.5","United States, Arkansas, 34.75037, -92.50044","United States, Arkansas, Pulaski County, 34.76993, -92.3118"],"dcterms_creator":["Arkansas. Department of Education"],"dc_date":["2004-01/2004-02"],"dcterms_description":null,"dc_format":["application/pdf"],"dcterms_identifier":null,"dcterms_language":["eng"],"dcterms_publisher":["Little Rock, Ark. : Butler Center for Arkansas Studies. Central Arkansas Library System"],"dc_relation":null,"dc_right":["http://rightsstatements.org/vocab/InC-EDU/1.0/"],"dcterms_is_part_of":["Office of Desegregation Monitoring records (BC.MSS.08.37)","History of Segregation and Integration of Arkansas's Educational System"],"dcterms_subject":["Education--Arkansas","Office of Desegregation Monitoring (Little Rock, Ark.)","School integration--Arkansas","Arkansas. Department of Education","Project management"],"dcterms_title":["Arkansas Department of Education's (ADE's) Project Management Tool"],"dcterms_type":["Text"],"dcterms_provenance":["Butler Center for Arkansas Studies"],"edm_is_shown_by":null,"edm_is_shown_at":["http://arstudies.contentdm.oclc.org/cdm/ref/collection/bcmss0837/id/18"],"dcterms_temporal":null,"dcterms_rights_holder":null,"dcterms_bibliographic_citation":null,"dlg_local_right":["Available for use in research, teaching, and private study. Any other use requires permission from the Butler Center."],"dcterms_medium":["documents (object genre)"],"dcterms_extent":["419 pages"],"dlg_subject_personal":null,"dcterms_subject_fast":null,"fulltext":"\n \n\n\n\n\n\n\n\n  \n\n\n   \n\n   \n\n\n   \n\n\n   \n\n\n\n\n   \n\n\n\n\n   \n\n\n\n\n\n\n\n\n   \n\n   \n\n \n\n\n   \n\n   \n\n  \n\n\n   \n\n  \n\n \n\n\n   \n\n  \n\n \n\n\n   \n\n  \n\n  \n\nLittle Rock School District, plaintiff vs. Pulaski County Special School District, defendant.\nTOM COURTWAY Interim Director State Board of Education JoNell Caldwell, Chair Lillie Rock Shelby Hillman, Vice Chair Carlisle Sherry Burrow Jonesboro Luke Gordy Van Buren Calvin King Marianna .,Lawson '92ville MaryJane Rebick Little Rock Diane Tatum Pine Bluff Jeanna Westmoreland Arkadelphia Arkansas Department of Education #4 Capitol Mall, Little Rock, AR 72201-1071 501-682-4475 January 30, 2004 Mr. M. Samuel Jones, III Wright, Lindsey \u0026amp; Jennings 200 West Capitol, Suite 2000 Little Rock, AR 72201 Mr. John W. Walker John Walker, P.A. 1723 Broadway Little Rock, AR 72201 Mr. Mark Burnette Mitchell, Blackstock, Barnes, Wagoner, Ivers \u0026amp; Sneddon P. 0. Box 1510. Little Rock, AR 72203-1510 Mr. Christopher Heller Friday, Eldredge \u0026amp; Clark 400 West Capitol, Suite 2000 Little Rock, AR 72201-3493 Mr. Stephen W. Jones Jack, Lyon \u0026amp; Jones 425 West Capitol, Suite 3400 Little Rock, AR 72201 Ms. Ann Marshall One Union National Plaza 124 West Capitol, Suite 1895 Little Rock, AR 72201 http:/ /arkedu.state.ar.us RECEIVED - ., 2004 OFFICE OF DESEGREGATION MONITORING RE: Little Rock School District v. Pulaski County Special School District, et al. U.S. District Court No. 4:82-CV-866 Dear Gentlemen and Ms. Marshall: Per an agreement with the Attorney General's Office, I am filing the Arkansas Department of Education's Project Management Tool for the month of January 2004 in the above-referenced case. If you have any questions, please feel free to contact me at your convenience. General Counsel Arkansas Department of Education SS:law cc: Mark Hagemeier UNITED STATES DISTRICT COURT EASTERN DISTRICT OF ARKANSAS WESTERN DIVISION LITTLE ROCK SCHOOL DISTRICT PLAINTIFF V. No. LR-C-82-866 PULASKI COUNTY SPECIAL SCHOOL DISTRICT NO. 1, et al DEFENDANTS NOTICE OF FILING In accordance with the Court's Order of December 10, 1993, the Arkansas Department of Education hereby gives notice of the filing of the ADE's Project Management Tool for January 2004. Respectfully Submitted, 'Sc'6tt Smith, #92251 Attorney, Arkansas Department of Education #4 Capitol Mall, Room 404-A Little Rock, AR 72201 501-682-4227 CERTIFICATE OF SERVICE - I, Scott Smith, certify that on January 30, 2004, I caused the foregoing document to be served by depositing a copy in the United States mail, postage prepaid, addressed to each of the following: Mr. M. Samuel Jones, III Wright, Lindsey \u0026amp; Jennings 200 West Capitol, Suite 2000 Little Rock, AR 72201 Mr. John W. Walker John Walker, P.A. 1723 Broadway Little Rock, AR 72201 Mr. Mark Burnette Mitchell, Blackstock, Barnes Wagoner, Ivers \u0026amp; Sneddon P. 0. Box 1510 Little Rock, AR 72203-1510 Mr. Christopher Heller Friday, Eldredge \u0026amp; Clark 400 West Capitol, Suite 2000 Little Rock, AR 72201-3493 Mr. Stephen W. Jones Jack, Lyon \u0026amp; Jones 425 West Capitol, Suite 3400 Little Rock, AR 72201 Ms. Ann Marshall One Union National Plaza 124 West Capitol, Suite 1895 Little Rock, AR 72201 IN THE UNITED STATES DISTRICT COURT EASTERN DISTRICT OF ARKANSAS WESTERN DIVISION LITTLE ROCK SCHOOL DISTRICT, ET AL PLAINTIFFS V. NO. LR-C-82-866 PULASKI COUNTY SPECIAL SCHOOL DISTRICT, ET AL DEFENDANTS MRS. LORENE JOSHUA, ET AL INTERVENORS KATHERINE W. KNIGHT, ET AL INTERVENORS ADE'S PROJECT MANAGEMENT TOOL In compliance with the Court's Order of December 10, 1993, the Arkansas Department of Education (ADE) submits the following Project Management Tool to the parties and the Court. This document describes the progress the ADE has made since March 15, 1994, in complying with provisions of the Implementation Plan and itemizes the ADE's progress against timelines presented in the Plan. - IMPLEMENTATION PHASE ACTIVITY I. FINANCIAL OBLIGATIONS A. Use the previous year's three quarter average daily membership to calculate MFPA (State Equalization) for the current school year. 1. Projected Ending Date Last day of each month, August - June. 2. Actual as of January 31, 2004 Based on the information available at December 31, 2003, the ADE calculated the Equalization Funding for FY 03/04, subject to periodic adjustments. B. Include all Magnet students in the resident District's average daily membership for calculation. 1. Projected Ending Date Last day of each month, August - June. I. FINANCIAL OBLIGATIONS (Continued) B. Include all Magnet students in the resident District's average daily membership for calculation. (Continued) 2. Actual as of January 31, 2004 Based on the information available at December 31, 2003, the ADE calculated for FY 03/04, subject to periodic adjustments. C. Process and distribute State MFPA. 1. Projected Ending Date Last day of each month, August - June. 2. Actual as of January 31, 2004 On December 31, 2003, distributions of State Equalization Funding for FY 03/04 were as follows: LRSD - $24,193,699 NLRSD -$12,761,400 PCSSD -$23,167,185 The allotments of State Equalization FundinQ calculated for FY 03/04 at December 31, 2003, subject to periodic adjustments, were as follows: LRSD - $53,226, 139 NLRSD - $28,075,080 PCSSD - $50,967,808 D. Determine the number of Magnet students residing in each District and attending a Magnet School. 1. Projected Ending Date Last day of each month, August - June. 2. Actual as of January 31, 2004 Based on the information available, the ADE calculated at December 31, 2003 for FY 03/04, subject to periodic adjustments. E. Desegregation Staff Attorney reports the Magnet Operational Charge to the Fiscal Services Office. 1 . Projected Ending Date Ongoing, as ordered by the Court. 2 I. FINANCIAL OBLIGATIONS (Continued) E. Desegregation Staff Attorney reports the Magnet Operational Charge to the Fiscal Services Office. (Continued) 2. Actual as of January 31, 2004 Based on the information available, the ADE calculated at December 31, 2003 for FY 03/04, subject to periodic adjustments. It should be noted that currently the Magnet Review Committee is reporting this information instead of the staff attorney as indicated in the Implementation Plan. F. Calculate state aid due the LRSD based upon the Magnet Operational Charge. 1 . Projected Ending Date Last day of each month, August - June. 2. Actual as of January 31, 2004 Based on the information available, the ADE calculated at December 31, 2003 for FY 03/04, subject to periodic adjustments. G. Process and distribute state aid for Magnet Operational Charge. 1 . Projected Ending Date Last day of each month, August - June. 2. Actual as of January 31, 2004 Distributions for FY 03/04 at December 31, 2003, totaled $5,649,703. Allotment calculated for FY 03/04 was $12,343,806 subject to periodic adjustments. H. Calculate the amount of M-to-M incentive money to which each school district is entitled. 1. Projected Ending Date Last day of each month, August - June. 2. Actual as of January 31, 2004 Calculated for FY 02/03, subject to periodic adjustments. I. Process and distribute M-to-M incentive checks. 1. Projected Ending Date Last day of each month, September - June. 3 I. FINANCIAL OBLIGATIONS (Continued) I. Process and distribute M-to-M incentive checks. (Continued) 2. Actual as of January 31, 2004 Distributions for FY 03/04 at December 31, 2003 were: LRSD - $1,473,688 NLRSD - $1,036,112 PCSSD - $3,723,884 The allotments calculated for FY 03/04 at December 31, 2003, subject to periodic adjustments, were: LRSD - $3,684,217 NLRSD - $2,590,278 PCSSD - $9,309,708 J. Districts submit an estimated Magnet and M-to-M transportation budget to ADE. 1. Projected Ending Date Ongoing, December of each year. 2. Actual as of January 31, 2004 In September 2002, the Magnet and M-to-M transportation budgets for FY 02/03 were submitted to the ADE by the Districts. K. The Coordinator of School Transportation notifies General Finance to pay districts for the Districts' proposed budget. 1 . Projected Ending Date Ongoing, annually. 2. Actual as of January 31, 2004 In January 2003, General Finance was notified to pay the second one-third payment for FY 02/03 to the Districts. It should be noted that the Transportation Coordinator is currently performing this function instead of Reginald Wilson as indicated in the Implementation Plan. L. ADE pays districts three equal installments of their proposed budget. 1 . Projected Ending Date Ongoing, annually. 4 I. FINANCIAL OBLIGATIONS (Continued) L. ADE pays districts three equal installments of their proposed budget. (Continued) 2. Actual as of January 31, 2004 In September 2003, General Finance made the last one-third payment to the Districts for their FY 02/03 transportation budget. The budget is now paid out in three equal installments. At September 2003, the following had been paid for FY 02/03: LRSD - $3,835,562.00 NLRSD - $742,399.62 PCSSD - $2,252,050.92 In September 2003, General Finance made the first one-third payment to the Districts for their FY 03/04 transportation budget. The budget is now paid out in three equal installments. At September 2003, the following had been paid for FY 03/04: LRSD - $1,243,841.33 NLRSD - $263,000.00 PCSSD - $727,406.63 M. ADE verifies actual expenditures submitted by Districts and reviews each bill with each District's transportation coordinator. 1. Projected Ending Date Ongoing, annually. 2. Actual as of January 31, 2004 In August 1997, the ADE transportation coordinator reviewed each district's Magnet and M-to-M transportation costs for FY 96/97. In July 1998, each district was asked to submit an estimated budget for the 98/99 school year. In September 1998, paperwork was generated for the first payment in the 98/99 school year for the Magnet and M-to-M transportation program. School districts should receive payment by October 1, 1998 In July 1999, each district submitted an estimated budget for the 99/00 school year. In September 1999, paperwork was generated for the first payment in the 99/00 school year for the Magnet and M-to-M transportation program. 5 I. FINANCIAL OBLIGATIONS (Continued) M. ADE verifies actual expenditures submitted by Districts and reviews each bill with each District's transportation coordinator. (Continued) 2. Actual as of January 31, 2004 (Continued) In September 2000, paperwork was generated for the first payment in the 00/01 school year for the Magnet and M-to-M transportation program. In September 2001, paperwork was generated for the first payment in the 01/02 school year for the Magnet and M-to-M transportation program. In September 2002, paperwork was generated for the first payment in the 02/03 school year for the Magnet and M-to-M transportation program. In September 2003, paperwork was generated for the first payment in the 03/04 school year for the Magnet and M-to-M transportation program. N. Purchase buses for the Districts to replace existing Magnet and M-to-M fleets and to provide a larger fleet for the Districts' Magnet and M-to-M Transportation needs. 1 . Projected Ending Date Ongoing, as stated in Exhibit A of the Implementation Plan. 2. Actual as of January 31, 2004 In FY 94/95, the State purchased 52 buses at a cost of $1,799,431 which were added to or replaced existing Magnet and M-to-M buses in the Districts. The buses were distributed to the Districts as follows: LRSD - 32\nNLRSD - 6\nand PCSSD - 14. The ADE purchased 64 Magnet and M-to-M buses at a cost of $2,334,800 in FY 95/96. The buses were distributed accordingly: LRSD - 45\nNLRSD - 7\nand PCSSD - 12. In May 1997, the ADE purchased 16 Magnet and M-to-M buses at a cost of $646,400. In July 1997, the ADE purchased 16 Magnet and M-to-M buses at a cost of $624,879. In July 1998, the ADE purchased 16 new Magnet and M-to-M buses at a cost of $695,235. The buses were distributed accordingly: LRSD - 8\nNLRSD - 2\nand PCSSD - 6. Specifications for 16 school buses have been forwarded to state purchasing for bidding in January, 1999 for delivery in July, 1999. 6 I. FINANCIAL OBLIGATIONS (Continued) N. Purchase buses for the Districts to replace existing Magnet and M-to-M fleets and to provide a larger fleet for the Districts' Magnet and M-to-M Transportation needs. (Continued) 2. Actual as of January 31, 2004 (Continued) The ADE accepted a bid on 16 buses for the Magnet and M/M transportation program. The buses will be delivered after July 1, 1999 and before August 1, 1999. The buses will be distributed accordingly: LASO - 8\nNLASD - 2\nPCSSD - 6. In July 1999, the ADE purchased 16 new Magnet and M-to-M buses at a cost of $718,355. The buses were distributed accordingly: LASO - 8\nNLASD - 2\nand PCSSD - 6. In July 2000, the ADE purchased 16 new Magnet and M-to-M buses at a cost of $724,165. The buses were distributed accordingly: LASO - 8\nNLASD - 2\nand PCSSD - 6. The bid for 16 new Magnet and M-to-M buses was let by State Purchasing on February 22, 2001. The contract was awarded to Ward Transportation Services, Inc. The buses to be purchased include two type C 47 passenger buses and fourteen type C 65 passenger buses. Prices on these units are $43,426.00 each on the 47 passenger buses, and $44,289.00 each on the 65 passenger buses. The buses will be distributed accordingly: LASO - 8 of the 65 passenger\nNLASD - 2 of the 65 passenger\nPCSSD - 2 of the 47 passenger and 4 of the 65 passenger buses. On August 2, 2001, the ADE took possession of 16 new Magnet and M-to-M buses. The total amount paid was $706,898. In June 2002, a bid for 16 new Magnet and M-to-M buses was awarded to Ward Transportation Services, Inc. The buses to be purchased include five 47 passenger buses for $42,155.00 each, ten 65 passenger buses for $43,850.00 each, and one 47 passenger bus with a wheelchair lift for $46,952.00. The total amount was $696,227. In August of 2002, the ADE purchased 16 new Magnet and M-to-M buses. The total amount paid was $696,227. Specifications for 16 new Magnet and M-to-M school buses have been forwarded to State Purchasing for bidding. Bids will be opened on May 12, 2003. The buses will have a required delivery date after July 1, 2003 and before August 8, 2003. 7 I. FINANCIAL OBLIGATIONS (Continued) N. Purchase buses for the Districts to replace existing Magnet and M-to-M fleets and to provide a larger fleet for the Districts' Magnet and M-to-M Transportation needs. (Continued) 2. Actual as of January 31, 2004 (Continued) In June 2003, a bid for 16 new Magnet and M-to-M buses was awarded to Ward Transportation Services, Inc. The buses to be purchased include 5 - 47 passenger buses for $47,052.00 each, and 11 - 65 passenger buses for $48,895.00 each. The total amount was $773,105. The buses will be distributed accordingly: LRSD - 8 of the 65 passenger\nNLRSD - 2 of the 65 passenger\nPCSSD - 5 of the 47 passenger and 1 of the 65 passenger buses. 0. Process and distribute compensatory education payments to LRSD as required by page 23 of the Settlement Agreement. 1. Projected Ending Date July 1 and January 1, of each school year through January 1, 1999. 2. Actual as of January 31, 2004 Obligation fulfilled in FY 96/97. P. Process and distribute additional payments in lieu of formula to LRSD as required by page 24 of the Settlement Agreement. 1. Projected Ending Date Payment due date and ending July 1 , 1995. 2. Actual as of January 31, 2004 Obligation fulfilled in FY 95/96. Q. Process and distribute payments to PCSSD as required by Page 28 of the Settlement Agreement. 1. Projected Ending Date Payment due date and ending July 1 , 1994. 2. Actual as of January 31, 2004 Final payment was distributed July 1994. 8 I. FINANCIAL OBLIGATIONS (Continued) R. Upon loan request by LRSD accompanied by a promissory note, the ADE makes loans to LRSD. 1. Projected Ending Date Ongoing through July 1, 1999. See Settlement Agreement page 24. 2. Actual as of January 31, 2004 The LRSD received $3,000,000 on September 10, 1998. As of this reporting date, the LRSD has received $20,000,000 in loan proceeds. S. Process and distribute payments in lieu of formula to PCSSD required by page 29 of the Settlement Agreement. 1. Projected Ending Date Payment due date and ending July 1, 1995. 2. Actual as of January 31, 2004 Obligation fulfilled in FY 95/96. T. Process and distribute compensatory education payments to NLRSD as required by page 31 of the Settlement Agreement. 1. Projected Ending Date July 1 of each school year through June 30, 1996. 2. Actual as of January 31, 2004 Obligation fulfilled in FY 95/96. U. Process and distribute check to Magnet Review Committee. 1. Projected Ending Date Payment due date and ending July 1, 1995. 2. Actual as of January 31, 2004 Distribution in July 1997 for FY 97/98 was $75,000. This was the total amount due to the Magnet Review Committee for FY 97/98. Distribution in July 1998 for FY 98/99 was $75,000. This was the total amount due to the Magnet Review Committee for FY 98/99. 9 I. FINANCIAL OBLIGATIONS (Continued) U. Process and distribute check to Magnet Review Committee. (Continued) 2. Actual as of January 31, 2004 (Continued) Distribution in July 1999 for FY 99/00 was $92,500. This was the total amount due to the Magnet Review Committee for FY 99/00. Distribution in July 2000 for FY 00/01 was $92,500. This was the total amount due to the Magnet Review Committee for FY 00/01. Distribution in August 2001 for FY 01/02 was $92,500. This was the total amount due to the Magnet Review Committee for FY 01/02. Distribution in July 2002 for FY 02/03 was $92,500. This was the total amount due to the Magnet Review Committee for FY 02/03. Distribution in July 2003 for FY 03/04 was $92,500. This was the total amount due to the Magnet Review Committee for FY 03/04. V. Process and distribute payments for Office of Desegregation Monitoring. 1. Projected Ending Date Not applicable. 2. Actual as of January 31, 2004 Distribution in July 1997 for FY 97/98 was $200,000. This was the total amount due to the ODM for FY 97/98. Distribution in July 1998 for FY 98/99 was $200,000. This was the total amount due to the ODM for FY 98/99. Distribution in July 1999 for FY 99/00 was $200,000. This was the total amount due to the ODM for FY 99/00. Distribution in July 2000 for FY 00/01 was $200,000. This was the total amount due to the ODM for FY 00/01. Distribution in August 2001 for FY 01 /02 was $200,000. This was the total amount due to the ODM for FY 01/02. Distribution in July 2002 for FY 02/03 was $200,000. This was the total amount due to the ODM for FY 02/03. Distribution in July 2003 for FY 03/04 was $200,000. This was the total amount due to the ODM for FY 03/04. 10 II. MONITORING COMPENSATORY EDUCATION A. Begin testing and evaluating the monitoring instrument and monitoring system to assure that data is appropriate and useful in monitoring the impacts of compensatory education programs on disparities in academic achievement for black students and white students. 1. Projected Ending Date January 15, 1995 2. Actual as of January 31, 2004 In May 1995, monitors completed the unannounced visits of schools in Pulaski County. The monitoring process involved a qualitative process of document reviews, interviews, and observations. The monitoring focused on progress made since the announced monitoring visits. In June 1995, monitoring data from unannounced visits was included in the July Semiannual Report. Twenty-five per cent of all classrooms were visited, and all of the schools in Pulaski County were monitored. All principals were interviewed to determine any additional progress since the announced visits. The July 1995 Monitoring Report was reviewed by the ADE administrative team, the Arkansas State Board of Education, and the Districts and filed with the Court. The report was formatted in accordance with the Allen Letter. In October 1995, a common terminology was developed by principals from the Districts and the Lead Planning and Desegregation staff to facilitate the monitoring process. The announced monitoring visits began on November 14, 1995 and were completed on January 26, 1996. Copies of the preliminary Semiannual Monitoring Report and its executive summary were provided to the ADE administrative team and the State Board of Education in January 1996. A report on the current status of the Cycle 5 schools in the ECOE process and their school improvement plans was filed with the Court on February 1, 1996. The unannounced monitoring visits began in February 1996 and ended on May 10, 1996. In June 1996, all announced and unannounced monitoring visits were completed, and the data was analyzed using descriptive statistics. The Districts provided data on enrollment in compensatory education programs. The Districts and the ADE Desegregation Monitoring staff developed a definition for instructional programs. 11 II. MONITORING COMPENSATORY EDUCATION (Continued) A. Begin testing and evaluating the monitoring instrument and monitoring system to assure that data is appropriate and useful in monitoring the impacts of compensatory education programs on disparities in academic achievement for black students and white students. (Continued) 2. Actual as of January 31, 2004 (Continued) The Semiannual Monitoring Report was completed and filed with the Court on July 15, 1996 with copies distributed to the parties. Announced monitoring visits of the Cycle 1 schools began on October 28, 1996 and concluded in December 1996. In January 1997, presentations were made to the State Board of Education, the Desegregation Litigation Oversight Subcommittee, and the parties to review the draft Semiannual Monitoring Report. The monitoring instrument and process were evaluated for their usefulness in monitoring the impacts of compensatory education programs on achievement disparities. In February 1997, the Semiannual Monitoring Report was filed. Unannounced monitoring visits began on February 3, 1997 and concluded in May 1997. In March 1997, letters were sent to the Districts regarding data requirements for the July 1997 Semiannual Monitoring Report and the additional discipline data element that was requested by the Desegregation Litigation Oversight Subcommittee. Desegregation data collection workshops were conducted in the Districts from March 28, 1997 to April 7, 1997. A meeting was conducted on April 3, 1997 to finalize plans for the July 15, 1997 Semiannual Monitoring Report. Onsite visits were made to Cycle 1 schools who did not submit accurate and timely data on discipline, M-to-M transfers, and policy. The July 15, 1997 Semiannual Monitoring Report and its executive summary were finalized in June 1997. In July 1997, the Semiannual Monitoring Report and its executive summary were filed with the court, and the ADE sponsored a School Improvement Conference. On July 10, 1997, copies of the Semiannual Monitoring Report and its executive summary were made available to the Districts for their review prior to filing it with the Court. In August 1997, procedures and schedules were organized for the monitoring of the Cycle 2 schools in FY 97/98. 12 II. MONITORING COMPENSATORY EDUCATION (Continued) A. Begin testing and evaluating the monitoring instrument and monitoring system to assure that data is appropriate and useful in monitoring the impacts of compensatory education programs on disparities in academic achievement for black students and white students. (Continued) 2. Actual as of January 31, 2004 (Continued) A Desegregation Monitoring and School Improvement Workshop for the Districts was held on September 10, 1997 to discuss monitoring expectations, instruments, data collection and school improvement visits. On October 9, 1997, a planning meeting was held with the desegregation monitoring staff to discuss deadlines, responsibilities, and strategic planning issues regarding the Semiannual Monitoring Report. Reminder letters were sent to the Cycle 2 principals outlining the data collection deadlines and availability of technical assistance. In October and November 1997, technical assistance visits were conducted, and announced monitoring visits of the Cycle 2 schools were completed. In December 1997 and January 1998, technical assistance visits were conducted regarding team visits, technical review recommendations, and consensus building. Copies of the infusion document and perceptual surveys were provided to schools in the ECOE process. The February 1998 Semiannual Monitoring Report was submitted for review and approval to the State Board of Education, the Director, the Administrative Team, the Attorney General's Office, and the Desegregation Litigation Oversight Subcommittee. Unannounced monitoring visits began in February 1998, and technical assistance was provided on the school improvement process, external team visits and finalizing school improvement plans. On February 18, 1998, the representatives of all parties met to discuss possible revisions to the ADE's monitoring plan and monitoring reports. Additional meetings will be scheduled. Unannounced monitoring visits were conducted in March 1998, and technical assistance was provided on the school improvement process and external team visits. In April 1998, unannounced monitoring visits were conducted, and technical assistance was provided on the school improvement process. 13 II. MONITORING COMPENSATORY EDUCATION (Continued) A. Begin testing and evaluating the monitoring instrument and monitoring system to assure that data is appropriate and useful in monitoring the impacts of compensatory education programs on disparities in academic achievement for black students and white students. (Continued) 2. Actual as of January 31, 2004 (Continued) In May 1998, unannounced monitoring visits were completed, and technical assistance was provided on the school improvement process. On May 18, 1998, the Court granted the ADE relief from its obligation to file the July 1998 Semiannual Monitoring Report to develop proposed modifications to ADE's monitoring and reporting obligations. In June 1998, monitoring information previously submitted by the districts in the Spring of 1998 was reviewed and prepared for historical files and presentation to the Arkansas State Board. Also, in June the following occurred: a) The Extended COE Team Visit Reports were completed, b) the Semiannual Monitoring COE Data Report was completed, c) progress reports were submitted from previous cycles, and d.) staff development on assessment (SAT-9) and curriculum alignment was conducted with three supeNisors. In July, the Lead Planner provided the Desegregation Litigation Oversight Committee with (1) a review of the court Order relieving ADE of its obligation to file a July Semiannual Monitoring Report, and (2) an update of ADE's progress toward work with the parties and ODM to develop proposed revisions to ADE's monitoring and reporting obligations. The Committee encouraged ODM, the parties and the ADE to continue to work toward revision of the monitoring and reporting process. In August 1998, the ADE Implementation Phase Working group met to review the Implementation Phase activities for the previous quarter. The Assistant Attorney General, the Assistant Director for Accountability and the Education Lead Planner updated the group on all relevant desegregation legal issues and proposed revisions to monitoring and reporting activities during the quarter. In September 1998, tentative monitoring dates were established and they will be finalized once proposed revisions to the Desegregation Monitoring Plan are finalized and approved. In September/October 1998, progress was being made on the proposed revisions to the monitoring process by committee representatives of all the Parties in the Pulaski County Settlement Agreement. While the revised monitoring plan is finalized and approved, the ADE monitoring staff will continue to provide technical assistance to schools upon request. 14 II. MONITORING COMPENSATORY EDUCATION (Continued) A. Begin testing and evaluating the monitoring instrument and monitoring system to assure that data is appropriate and useful in monitoring the impacts of compensatory education programs on disparities in academic achievement for black students and white students. (Continued) 2. Actual as of January 31, 2004 (Continued) In December 1998, requests were received from schools in PCSSD regarding test score analysis and staff Development. Oak Grove is scheduled for January 21, 1999 and Lawson Elementary is also tentatively scheduled in January. Staff development regarding test score analysis for Oak Grove and Lawson Elementary in the PCSSD has been rescheduled for April 2000. Staff development regarding test score analysis for Oak Grove and Lawson Elementary in the PCSSD was conducted on May 5, 2000 and May 9, 2000 respectively. Staff development regarding classroom management was provided to the Franklin Elementary School in LRSD on November 8, 2000. Staff development regarding ways to improve academic achievement was presented to College Station Elementary in PCSSD on November 22, 2000. On November 1, 2000, the ADE Implementation Phase Working group met to review the Implementation Phase activities for the previous quarter. The Assistant Director for Accountability updated the group on all relevant desegregation legal issues and discussed revisions to monitoring and reporting activities during the quarter. The next Implementation Phase Working Group Meeting is scheduled for February 27, 2001 in room 201-A at the ADE. The Implementation Phase Working Group meeting that was scheduled for February 27 had to be postponed. It will be rescheduled as soon as possible. The quarterly Implementation Phase Working Group meeting is scheduled for June 27, 2001. The quarterly Implementation Phase Working Group meeting was rescheduled from June 27. It will take place on July 26, 2001 in room 201-A at 1 :30 p.m. at the ADE. 15 II. MONITORING COMPENSATORY EDUCATION (Continued) A. Begin testing and evaluating the monitoring instrument and monitoring system to assure that data is appropriate and useful in monitoring the impacts of compensatory education programs on disparities in academic achievement for black students and white students. (Continued) 2. Actual as of January 31, 2004 (Continued) On July 26, 2001, the ADE Implementation Phase Working group met to review the Implementation Phase activities for the previous quarter. Mr. Willie Morris, ADE Lead Planner for Desegregation, updated the group on all relevant desegregation issues. Mr. Mark Hagemeier, Assistant Attorney General, and Mr. Scott Smith, ADE Staff Attorney, discussed the court case involving the LRSD seeking unitary status. The next Implementation Phase Working Group Meeting is scheduled for October 11, 2001 in room 201-A at the ADE. On October 11, 2001, the ADE Implementation Phase Working group met to review the Implementation Phase activities for the previous quarter. Mr. Willie Morris, ADE Lead Planner for Desegregation, updated the group on all relevant desegregation issues. Mr. Scott Smith, ADE Staff Attorney, discussed the ADE's intent to take a proactive role in Desegregation Monitoring. The next Implementation Phase Working Group Meeting is scheduled for January 10, 2002 in room 201-A at the ADE. The Implementation Phase Working Group Meeting that was scheduled for January 10 was postponed. It has been rescheduled for February 14, 2002 in room 201-A at the ADE. On February 12, 2002, the ADE Implementation Phase Working group met to review the Implementation Phase activities for the previous quarter. Mr. Willie Morris, ADE Lead Planner for Desegregation, updated the group on all relevant desegregation issues. Mr. Mark Hagemeier, Assistant Attorney General, discussed the court case involving the LRSD seeking unitary status. The next Implementation Phase Working Group Meeting is scheduled for April 11, 2002 in room 201-A at the ADE. On April 11, 2002, the ADE Implementation Phase Working group met to review the Implementation Phase activities for the previous quarter. Mr. Willie Morris, ADE Lead Planner for Desegregation, updated the group on all relevant desegregation issues. Mr. Mark Hagemeier, Assistant Attorney General, discussed the court case involving the LRSD seeking unitary status. The next Implementation Phase Working Group Meeting is scheduled for July 11, 2002 in room 201-A at the ADE. 16 II. MONITORING COMPENSATORY EDUCATION (Continued) A. Begin testing and evaluating the monitoring instrument and monitoring system to assure that data is appropriate and useful in monitoring the impacts of compensatory education programs on disparities in academic achievement for black students and white students. (Continued) 2. Actual as of January 31 , 2004 (Continued) On July 18, 2002, the ADE Implementation Phase Working group met to review the Implementation Phase activities for the previous quarter. Mr. Willie Morris, ADE Lead Planner for Desegregation, updated the group on all relevant desegregation issues. Dr. Charity Smith, Assistant Director for Accountability, talked about section XV in the Project Management Tool (PMT) on Standardized Test Selection to Determine Loan Forgiveness. She said that the goal has been completed, and no additional reporting is required for section XV. Mr. Morris discussed the court case involving the LRSD seeking unitary status. He handed out a Court Order from May 9, 2002, which contained comments from U.S. District Judge Bill Wilson Jr., about hearings on the LRSD request for unitary status. Mr. Morris also handed out a document from the Secretary of Education about the No Child Left Behind Act. There was discussion about how this could have an affect on Desegregation issues. The next Implementation Phase Working Group Meeting is scheduled for October 10, 2002 at 1 :30 p.m. in room 201-A at the ADE. The quarterly Implementation Phase Working Group meeting was rescheduled from October 10. It will take place on October 29, 2002 in room 201-A at 1 :30 p.m. at the ADE. On October 29, 2002, the ADE Implementation Phase Working Group met to review the Implementation Phase activities for the previous quarter. Mr. Willie Morris, ADE Lead Planner for Desegregation, updated the group on all relevant desegregation issues. Meetings with the parties to discuss possible revisions to the ADE's monitoring plan will be postponed by request of the school districts in Pulaski County. Additional meetings could be scheduled after the Desegregation ruling is finalized. The next Implementation Phase Working Group Meeting is scheduled for January 9, 2003 at 1 :30 p.m. in room 201-A at the ADE. On January 9, 2003, the ADE Implementation Phase Working Group met to review the Implementation Phase activities for the previous quarter. Mr. Willie Morris, ADE Lead Planner for Desegregation, updated the group on all relevant desegregation issues. No Child Left Behind and the Desegregation ruling on unitary status for LRSD were discussed. The next Implementation Phase Working Group Meeting is scheduled for April 10, 2003 at 1 :30 p.m. in room 201-A at the ADE. The quarterly Implementation Phase Working Group meeting was rescheduled from April 10. It will take place on April 24, 2003 in room 201-A at 1 :30 p.m. at the ADE. 17 II. MONITORING COMPENSATORY EDUCATION (Continued) A. Begin testing and evaluating the monitoring instrument and monitoring system to assure that data is appropriate and useful in monitoring the impacts of compensatory education programs on disparities in academic achievement for black students and white students. (Continued) 2. Actual as of January 31, 2004 (Continued) On April 24, 2003, the ADE Implementation Phase Working Group met to review the Implementation Phase activities for the previous quarter. Mr. Willie Morris, ADE Lead Planner for Desegregation, updated the group on all relevant desegregation issues. Laws passed by the legislature need to be checked to make sure none of them impede desegregation. Ray Lumpkin was chairman of the last committee to check legislation. Since he left, we will discuss the legislation with Clearence Lovell. The Desegregation ruling on unitary status for LRSD was discussed. The next Implementation Phase Working Group Meeting is scheduled for July 10, 2003 at 1 :30 p.m. in room 201-A at the ADE. On August 28, 2003, the ADE Implementation Phase Working Group met to review the Implementation Phase activities for the previous quarter. Mr. Willie Morris, ADE Lead Planner for Desegregation, updated the group on all relevant desegregation issues. The Desegregation ruling on unitary status for LRSD was discussed. The LRSD has been instructed to submit evidence showing progress in reducing disparities in academic achievement for black students and white students. This is supposed to be done by March of 2004, so that the LRSD can achieve unitary status. The next Implementation Phase Working Group Meeting is scheduled for October 9, 2003 at the ADE. On October 9, 2003, the ADE Implementation Phase Working Group met to review the Implementation Phase activities for the previous quarter. Mr. Willie Morris, ADE Lead Planner for Desegregation, updated the group on all relevant desegregation issues. Mark Hagemeier, Assistant Attorney General, discussed the Desegregation ruling on unitary status for LRSD. The next Implementation Phase Working Group Meeting is scheduled for January 8, 2004 at the ADE. On October 16, 2003, ADE staff met with the Desegregation Litigation Oversight Subcommittee at the State Capitol. Mr. Willie Morris, ADE Lead Planner for Desegregation, and Dr. Charity Smith, Assistant Director for Accountability, presented the Chronology of activity by the ADE in complying with provisions of the Implementation Plan for the Desegregation Settlement Agreement. They also discussed the role of the ADE Desegregation Monitoring Section. Mr. Mark Hagemeier, Assistant Attorney General, and Scott Smith, ADE Staff Attorney, reported on legal issues relating to the Pulaski County Desegregation Case. Ann Marshall shared a history of activities by ODM, and their view of the activity of the school districts in Pulaski County. John Kunkel discussed Desegregation funding by the ADE. 18 Ill. A PETITION FOR ELECTION FOR LRSD WILL BE SUPPORTED SHOULD A MILLAGE BE REQUIRED A Monitor court pleadings to determine if LRSD has petitioned the Court for a special election. 1. Projected Ending Date Ongoing. 2. Actual as of January 31, 2004 Ongoing. All Court pleadings are monitored monthly. B. Draft and file appropriate pleadings if LRSD petitions the Court for a special election. 1 . Projected Ending Date Ongoing 2. Actual as of January 31 , 2004 To date, no action has been taken by the LRSD. 19 IV. REPEAL STATUTES AND REGULATIONS THAT IMPEDE DESEGREGATION A. Using a collaborative approach, immediately identify those laws and regulations that appear to impede desegregation. 1 . Projected Ending Date December, 1994 2. Actual as of January 31, 2004 The information for this item is detailed under Section IV.E. of this report. B. Conduct a review within ADE of existing legislation and regulations that appear to impede desegregation. C. 1. Projected Ending Date November, 1994 2. Actual as of January 31, 2004 The information for this item is detailed under Section IV.E. of this report. Request of the other parties to the Settlement Agreement that they identify laws and regulations that appear to impede desegregation. 1 . Projected Ending Date November, 1994 2. Actual as of January 31, 2004 The information for this item is detailed under Section IV.E. of this report. D. Submit proposals to the State Board of Education for repeal of those regulations that are confirmed to be impediments to desegregation. 1. Projected Ending Date Ongoing 2. Actual as of January 31, 2004 The information for this item is detailed under Section IV.E. of this report. 20 IV. REPEAL STATUTES AND REGULATIONS THAT IMPEDE DESEGREGATION (Continued) E. Submit proposals to the Legislature for repeal of those laws that appear to be impediments to desegregation. 2. Actual as of January 31, 2004 A committee within the ADE was formed in May 1995 to review and collect data on existing legislation and regulations identified by the parties as impediments to desegregation. The committee researched the Districts' concerns to determine if any of the rules, regulations, or legislation cited impede desegregation. The legislation cited by the Districts regarding loss funding and worker's compensation were not reviewed because they had already been litigated. In September 1995, the committee reviewed the following statutes, acts, and regulations: Act 113 of 1993\nADE Director's Communication 93-205\nAct 145 of 1989\nADE Director's Memo 91-67\nADE Program Standards Eligibility Criteria for Special Education\nArkansas Codes 6-18-206, 6-20-307, 6-20-319, and 6-17- 1506. In October 1995, the individual reports prepared by committee members in their areas of expertise and the data used to support their conclusions were submitted to the ADE administrative team for their review. A report was prepared and submitted to the State Board of Education in July 1996. The report concluded that none of the items reviewed impeded desegregation. As of February 3, 1997, no laws or regulations have been determined to impede desegregation efforts. Any new education laws enacted during the Arkansas 81 st Legislative Session will be reviewed at the close of the legislative session to ensure that they do not impede desegregation. In April 1997, copies of all laws passed during the 1997 Regular Session of the 81 st General Assembly were requested from the office of the ADE Liaison to the Legislature for distribution to the Districts for their input and review of possible impediments to their desegregation efforts. In August 1997, a meeting to review the statutes passed in the prior legislative session was scheduled for September 9, 1997. 21 IV. REPEAL STATUTES AND REGULATIONS THAT IMPEDE DESEGREGATION (Continued) E. Submit proposals to the Legislature for repeal of those laws that appear to be impediments to desegregation. (Continued) 2. Actual as of January 31, 2004 (Continued) On September 9, 1997, a meeting was held to discuss the review of the statutes passed in the prior legislative session and new ADE regulations. The Districts will be contacted in writing for their input regarding any new laws or regulations that they feel may impede desegregation. Additionally, the Districts will be asked to review their regulations to ensure that they do not impede their desegregation efforts. The committee will convene on December 1, 1997 to review their findings and finalize their report to the Administrative Team and the State Board of Education. In October 1997, the Districts were asked to review new regulations and statutes for impediments to their desegregation efforts, and advise the ADE, in writing, if they feel a regulation or statute may impede their desegregation efforts. In October 1997, the Districts were requested to advise the ADE, in writing, no later than November 1, 1997 of any new law that might impede their desegregation efforts. As of November 12, 1997, no written responses were received from the Districts. The ADE concludes that the Districts do not feel that any new law negatively impacts their desegregation efforts. The committee met on December 1, 1997 to discuss their findings regarding statutes and regulations that may impede the desegregation efforts of the Districts. The committee concluded that there were no laws or regulations that impede the desegregation efforts of the Districts. It was decided that the committee chair would prepare a report of the committee's findings for the Administrative Team and the State Board of Education. The committee to review statutes and regulations that impede desegregation is now reviewing proposed bills and regulations, as well as laws that are being signed in, for the current 1999 legislative session. They will continue to do so until the session is over. The committee to review statutes and regulations that impede desegregation will meet on April 26, 1999 at the ADE. The committee met on April 26, 1999 at the ADE. The purpose of the meeting was to identify rules and regulations that might impede desegregation, and review within the existing legislation any regulations that might result in an impediment to desegregation. This is a standing committee that is ongoing and a report will be submitted to the State Board of Education once the process is completed. 22 IV. REPEAL STATUTES AND REGULATIONS THAT IMPEDE DESEGREGATION (Continued) E. Submit proposals to the Legislature for repeal of those laws that appear to be impediments to desegregation. (Continued) 2. Actual as of January 31, 2004 (Continued) The committee met on May 24, 1999 at the ADE. The committee was asked to review within the existing legislation any regulations that might result in an impediment to desegregation. The committee determined that Mr. Ray Lumpkin would contact the Pulaski County districts to request written response to any rules, regulations or laws that might impede desegregation. The committee would also collect information and data to prepare a report for the State Board. This will be a standing committee. This data gathering will be ongoing until the final report is given to the State Board. On July 26, 1999, the committee met at the ADE. The committee did not report any laws or regulations that they currently thought would impede desegregation, and are still waiting for a response from the three districts in Pulaski County. The committee met on August 30, 1999 at the ADE to review rules and regulations that might impede desegregation. At that time, there were no laws under review that appeared to impede desegregation. In November, the three districts sent letters to the ADE stating that they have reviewed the laws passed by the 82nd legislative session as well as current rules \u0026amp; regulations and district policies to ensure that they have no ill effect on desegregation efforts. There was some concern from PCSSD concerning a charter school proposal in the Maumelle area. The work of the committee is on-going each month depending on the information that comes before the committee. Any rules, laws or regulations that would impede desegregation will be discussed and reported to the State Board of Education. On October 4, 2000, the ADE presented staff development for assistant superintendents in LRSD, NLRSD and PCS SD regarding school laws of Arkansas. The ADE is in the process of forming a committee to review all Rules and Regulations from the ADE and State Laws that might impede desegregation. The ADE Committee on Statutes and Regulations will review all new laws that might impede desegregation once the 83rd General Assembly has completed this session. The ADE Committee on Statutes and Regulations will meet for the first time on June 11, 2001 at 9:00 a.m. in room 204-A at the ADE. The committee will review all new laws that might impede desegregation that were passed during the 2001 Legislative Session. 23 IV. REPEAL STATUTES AND REGULATIONS THAT IMPEDE DESEGREGATION (Continued) E. Submit proposals to the Legislature for repeal of those laws that appear to be impediments to desegregation. (Continued) 2. Actual as of January 31, 2004 (Continued) The ADE Committee on Statutes and Regulations rescheduled the meeting that was planned for June 11, in order to review new regulations proposed to the State Board of Education. The meeting will take place on July 16, 2001 at 9:00 a.m. at the ADE. The ADE Committee to Repeal Statutes and Regulations that Impede Desegregation met on July 16, 2001 at the ADE. The following Items were discussed: (1) Review of 2001 state laws which appear to impede desegregation. (2) Review of existing ADE regulations which appear to impede desegregation. (3) Report any laws or regulations found to impede desegregation to the Arkansas State Legislature, the ADE and the Pulaski County school districts. The next meeting will take place on August 27, 2001 at 9:00 a.m. at the ADE. The ADE Committee to Repeal Statutes and Regulations that Impede Desegregation met on August 27, 2001 at the ADE. The Committee is reviewing all relevant laws or regulations produced by the Arkansas State Legislature, the ADE and the Pulaski County school districts in FY 2000/2001 to determine if they may impede desegregation. The next meeting will take place on September 10, 2001 in Conference Room 204-8 at 2:00 p.m. at the ADE. The ADE Committee to Repeal Statutes and Regulations that Impede Desegregation met on September 10, 2001 at the ADE. The Committee is reviewing all relevant laws or regulations produced by the Arkansas State Legislature, the ADE and the Pulaski County school districts in FY 2000/2001 to determine if they may impede desegregation. The next meeting will take place on October 24, 2001 in Conference Room 204-B at 2:00 p.m. at the ADE. The ADE Committee to Repeal Statutes and Regulations that Impede Desegregation met on October 24, 2001 at the ADE. The Committee is reviewing all relevant laws or regulations produced by the Arkansas State Legislature, the ADE and the Pulaski County school districts in FY 2000/2001 to determine if they may impede desegregation. On December 17, 2001, the ADE Committee to Repeal Statutes and Regulations that Impede Desegregation composed letters that will be sent to the school districts in Pulaski County. The letters ask for input regarding any new laws or regulations that may impede desegregation. Laws to review include those of the 83rd General Assembly, ADE regulations, and regulations of the Districts. 24 IV. REPEAL STATUTES AND REGULATIONS THAT IMPEDE DESEGREGATION (Continued) E. Submit proposals to the Legislature for repeal of those laws that appear to be impediments to desegregation. (Continued) 2. Actual as of January 31, 2004 (Continued) On January 10, 2002, the ADE Committee to Repeal Statutes and Regulations that Impede Desegregation sent letters to the school districts in Pulaski County. The letters ask for input regarding any new laws or regulations that may impede desegregation. The districts were asked to respond by March 8, 2002. On March 5, 2002, A letter was sent from the LRSD which mentioned Act 17 48 and Act 1667 passed during the 83rd Legislative Session which may impede desegregation. These laws will be researched to determine if changes need to be made. A letter was sent from the NLRSD on March 19, noting that the district did not find any laws which impede desegregation. On April 26, 2002, A letter was sent for the PCSSD to the ADE, noting that the district did not find any laws which impede desegregation except the \"deannexation\" legislation which the District opposed before the Senate committee. On October 27, 2003, the ADE sent letters to the school districts in Pulaski County asking if there were any new laws or regulations that may impede desegregation. The districts were asked to review laws passed during the 84th Legislative Session, any new ADE rules or regulations, and district policies. 25 V. COMMITMENT TO PRINCIPLES A. Through a preamble to the Implementation Plan, the Board of Education will reaffirm its commitment to the principles of the Settlement Agreement and outcomes of programs intended to apply those principles. 1. Projected Ending Date Ongoing 2. Actual as of January 31, 2004 The preamble was contained in the Implementation Plan filed with the Court on March 15, 1994. B. Through execution of the Implementation Plan, the Board of Education will continue to reaffirm its commitment to the principles of the Settlement Agreement and outcomes of programs intended to apply those principles. C. 1 . Projected Ending Date Ongoing 2. Actual as of January 31 , 2004 Ongoing Through execution of the Implementation Plan, the Board of Education will continue to reaffirm its commitment to the principles of the Settlement Agreement by actions taken by ADE in response to monitoring results. 1. Projected Ending Date Ongoing 2. Actual as of January 31, 2004 Ongoing D. Through regular oversight of the Implementation Phase's Project Management Tool, and scrutiny of results of AD E's actions, the Board of Education will act on its commitment to the principles of the Settlement Agreement. 1. Projected Ending Date Ongoing 26 V. COMMITMENT TO PRINCIPLES (Continued) D. Through regular oversight of the Implementation Phase's Project Management Tool, and scrutiny of results of ADE's actions, the Board of Education will act on its commitment to the principles of the Settlement Agreement. (Continued) 2. Actual as of January 31, 2004 At each regular monthly meeting of the State Board of Education, the Board is provided copies of the most recent Project Management Tool (PMT) and an executive summary of the PMT for their review and approval. Only activities that are in addition to the Board's monthly review of the PMT are detailed below. In May 1995, the State Board of Education was informed of the total number of schools visited during the monitoring phase and the data collection process. Suggestions were presented to the State Board of Education on how recommendations could be presented in the monitoring reports. In June 1995, an update on the status of the pending Semiannual Monitoring Report was provided to the State Board of Education. In July 1995, the July Semiannual Monitoring Report was reviewed by the State Board of Education. On August 14, 1995, the State Board of Education was informed of the need to increase minority participation in the teacher scholarship program and provided tentative monitoring dates to facilitate reporting requests by the ADE administrative team and the Desegregation Litigation Oversight Subcommittee. In September 1995, the State Board of Education was advised of a change in the PMT from a table format to a narrative format. The Board was also briefed about a meeting with the Office of Desegregation Monitoring regarding the PMT. In October 1995, the State Board of Education was updated on monitoring timelines. The Board was also informed of a meeting with the parties regarding a review of the Semiannual Monitoring Report and the monitoring process, and the progress of the test validation study. In November 1995, a report was made to the State Board of Education regarding the monitoring schedule and a meeting with the parties concerning the development of a common terminology for monitoring purposes. In December 1995, the State Board of Education was updated regarding announced monitoring visits. In January 1996, copies of the draft February Semiannual Monitoring Report and its executive summary were provided to the State Board of Education. 27 V. COMMITMENT TO PRINCIPLES (Continued) D. Through regular oversight of the Implementation Phase's Project Management Tool, and scrutiny of results of ADE's actions, the Board of Education will act on its commitment to the principles of the Settlement Agreement. (Continued) 2. Actual as of January 31, 2004 (Continued) During the months of February 1996 through May 1996, the PMT report was the only item on the agenda regarding the status of the implementation of the Monitoring Plan. In June 1996, the State Board of Education was updated on the status of the bias review study. In July 1996, the Semiannual Monitoring Report was provided to the Court, the parties, ODM, the State Board of Education, and the Desegregation Litigation Oversight Subcommittee. In August 1996, the State Board of Education and the ADE administrative team were provided with copies of the test validation study prepared by Dr. Paul Williams. During the months of September 1996 through December 1996, the PMT was the only item on the agenda regarding the status of the implementation of the Monitoring Plan. On January 13, 1997, a presentation was made to the State Board of Education regarding the February 1997 Semiannual Monitoring Report, and copies of the report and its executive summary were distributed to all Board members. The Project Management Tool and its executive summary were addressed at the February 10, 1997 State Board of Education meeting regarding the AD E's progress in fulfilling their obligations as set forth in the Implementation Plan. In March 1997, the State Board of Education was notified that historical information in the PMT had been summarized at the direction of the Assistant Attorney General in order to reduce the size and increase the clarity of the report. The Board was updated on the Pulaski County Desegregation Case and reviewed the Memorandum Opinion and Order issued by the Court on February 18, 1997 in response to the Districts' motion for summary judgment on the issue of state funding for teacher retirement matching contributions. During the months of April 1997 through June 1997, the PMT was the only item on the agenda regarding the status of the implementation of the Monitoring Plan. The State Board of Education received copies of the July 15, 1997 Semiannual Monitoring Report and executive summary at the July Board meeting. 28 V. COMMITMENT TO PRINCIPLES (Continued) D. Through regular oversight of the Implementation Phase's Project Management Tool, and scrutiny of results of AD E's actions, the Board of Education will act on its commitment to the principles of the Settlement Agreement. (Continued) 2. Actual as of January 31, 2004 (Continued) The Implementation Phase Working Group held its quarterly meeting on August 4, 1997 to discuss the progress made in attaining the goals set forth in the Implementation Plan and the critical areas for the current quarter. A special report regarding a historical review of the Pulaski County Settlement Agreement and the AD E's role and monitoring obligations were presented to the State Board of Education on September 8, 1997. Additionally, the July 15, 1997 Semiannual Monitoring Report was presented to the Board for their review. In October 1997, a special draft report regarding disparity in achievement was submitted to the State Board Chairman and the Desegregation Litigation Oversight Subcommittee. In November 1997, the State Board of Education was provided copies of the monthly PMT and its executive summary. The Implementation Phase Working Group held its quarterly meeting on November 3, 1997 to discuss the progress made in attaining the goals set forth in the Implementation Plan and the critical areas for the current quarter. In December 1997, the State Board of Education was provided copies of the monthly PMT and its executive summary. In January 1998, the State Board of Education reviewed and discussed ODM's report on the ADE's monitoring activities and instructed the Director to meet with the parties to discuss revisions to the ADE's monitoring plan and monitoring reports. In February 1998, the State Board of Education reviewed and approved the PMT and discussed the February 1998 Semiannual Monitoring Report. In March 1998, the State Board of Education reviewed and approved the PMT and its executive summary and was provided an update regarding proposed revisions to the monitoring process. In April 1998, the State Board of Education reviewed and approved the PMT and its executive summary. In May 1998, the State Board of Education reviewed and approved the PMT and its executive summary. 29 V. COMMITMENT TO PRINCIPLES (Continued) D. Through regular oversight of the Implementation Phase's Project Management Tool, and scrutiny of results of ADE's actions, the Board of Education will act on its commitment to the principles of the Settlement Agreement. (Continued) 2. Actual as of January 31, 2004 (Continued) In June 1998, the State Board of Education reviewed and approved the PMT and its executive summary. The State Board of Education also reviewed how the ADE would report progress in the PMT concerning revisions in ADE's Monitoring Plan. In July 1998, the State Board of Education reviewed and approved the PMT and its executive summary. The State Board of Education also received an update on Test Validation, the Desegregation Litigation Oversight Committee Meeting, and revisions in ADE's Monitoring Plan. In August 1998, the State Board of Education reviewed and approved the PMT and its executive summary. The Board also received an update on the five discussion points regarding the proposed revisions to the monitoring and reporting process. The Board also reviewed the basic goal of the Minority Recruitment Committee. In September 1998, the State Board of Education reviewed the proposed modifications to the Monitoring plans by reviewing the common core of written response received from the districts. The primary commonalities were (1) Staff Development, (2) Achievement Disparity and (3) Disciplinary Disparity. A meeting of the parties is scheduled to be conducted on Thursday, September 17, 1998. The Board encouraged the Department to identify a deadline for Standardized Test Validation and Test Selection. In October 1998, the Board received the progress report on Proposed Revisions to the Desegregation Monitoring and Reporting Process (see XVIII). The Board also reviewed and approved the PMT and its executive summary. In November, the Arkansas State Board of Education reviewed the PMT and its executive summary. The Board also received an update on the proposed revisions in the Desegregation monitoring Process and the update on Test validation and Test Selection provisions of the Settlement Agreement. The Board was also notified that the Implementation Plan Working Committee held its quarterly meeting to review progress and identify quarterly priorities. In December, the State Board of Education reviewed the PMT and its executive summary. The Board also received an update on the joint motion by the ADE, the LASO, NLRSD, and the PCSSD, to relieve the Department of its obligation to file a February Semiannual Monitoring Report. The Board was also notified that the Joshua lntervenors filed a motion opposing the joint motion. The Board was informed that the ADE was waiting on a response from Court. 30 V. COMMITMENT TO PRINCIPLES (Continued} D. Through regular oversight of the Implementation Phase's Project Management Tool, and scrutiny of results of ADE's actions, the Board of Education will act on its commitment to the principles of the Settlement Agreement. (Continued} 2. Actual as of January 31, 2004 (Continued) In January, the Arkansas State Board of Education reviewed the PMT and its executive summary. The Board also received an update on the joint motion of the ADE, LRSD, PCSSD, and NLRSD for an order relieving the ADE of filing a February 1999 Monitoring Report. The motion was granted subject to the following three conditions: (1) notify the Joshua intervenors of all meetings between the parties to discuss proposed changes, (2) file with the Court on or before February 1, 1999, a report detailing the progress made in developing proposed changes and (3) identify ways in which ADE might assist districts in their efforts to improve academic achievement. In February, the Arkansas State Board of Education reviewed the PMT and its executive summary. The Board was informed that the three conditions: (1) notify the Joshua lntervenors of all meetings between the parties to discuss proposed changes, (2) file with the Court on or before February 1, 1999, a report detailing the progress made in developing proposed changes and (3) identify ways in which ADE might assist districts in their efforts to improve academic achievement had been satisfied. The Joshua lntervenors were invited again to attend the meeting of the parties and they attended on January 13, and January 28, 1999. They are also scheduled to attend on February 17, 1998. The report of progress, a collaborative effort from all parties was presented to court on February 1, 1999. The Board was also informed that additional items were received for inclusion in the revised report, after the deadline for the submission of the progress report and the ADE would: (1) check them for feasibility, and fiscal impact if any, and (2) include the items in future drafts of the report. In March, the Arkansas State Board of Education reviewed the PMT and its executive summary. The Board also received and reviewed the Desegregation Monitoring and Assistance Progress Report submitted to Court on February 1 , 1999. On April 12, and May 10, 1999, the Arkansas State Board of Education reviewed the PMT and its executive summary. The Board also was notified that once the financial section of the proposed plan was completed, the revised plan would be submitted to the board for approval. On June 14, 1999, the Arkansas State Board of Education reviewed the PMT and its executive summary. The Board also was notified that once the financial section of the proposed plan was completed, the revised plan would be submitted to the board for approval. 31 V. COMMITMENT TO PRINCIPLES (Continued) D. Through regular oversight of the Implementation Phase's Project Management Tool, and scrutiny of results of ADE's actions, the Board of Education will act on its commitment to the principles of the Settlement Agreement. (Continued) 2. Actual as of January 31, 2004 (Continued) On July 12, 1999, the Arkansas State Board of Education reviewed the PMT and its executive summary. The Board also was notified that once the financial section of the proposed plan was completed, the revised plan would be submitted to the board for approval. On August 9, 1999, the Arkansas State Board of Education reviewed the PMT and its executive summary. The Board was also notified that the new Desegregation Monitoring and Assistance Plan would be ready to submit to the Board for their review \u0026amp; approval as soon as plans were finalized. On September 13, 1999, the Arkansas State Board of Education reviewed the PMT and its executive summary. The Board was also notified that the new Desegregation Monitoring and Assistance Plan would be ready to submit to the Board for their review \u0026amp; approval as soon as plans were finalized. On October 12, 1999, the Arkansas State Board of Education reviewed the PMT and its executive summary. The Board was notified that on September 21, 1999 that the Office of Education Lead Planning and Desegregation Monitoring meet before the Desegregation Litigation Oversight Subcommittee and presented them with the draft version of the new Desegregation Monitoring and Assistance Plan. The State Board was notified that the plan would be submitted for Board review and approval when finalized. On November 8, 1999, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of October. On December 13, 1999, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of November. On January 10, 2000, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of December. On February 14, 2000, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of January. On March 13, 2000, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of February. On April 10, 2000, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of March. 32 V. COMMITMENT TO PRINCIPLES (Continued) D. Through regular oversight of the Implementation Phase's Project Management Tool, and scrutiny of results of ADE's actions, the Board of Education will act on its commitment to the principles of the Settlement Agreement. (Continued} 2. Actual as of January 31, 2004 (Continued) On May 8, 2000, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of April. On June 12, 2000, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of May. On July 10, 2000, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of June. On August 14, 2000, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of July. On September 11, 2000, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of August. On October 9, 2000, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of September. On November 13, 2000, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of October. On December 11, 2000, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of November. On January 8, 2001, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of December. On February 12, 2001, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of January. On March 12, 2001, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of February. On April 9, 2001, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of March. On May 14, 2001, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of April. On June 11, 2001, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of May. 33 V. COMMITMENT TO PRINCIPLES (Continued) D. Through regular oversight of the Implementation Phase's Project Management Tool, and scrutiny of results of AD E's actions, the Board of Education will act on its commitment to the principles of the Settlement Agreement. (Continued) 2. Actual as of January 31, 2004 (Continued) On July 9, 2001, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of June. On August 13, 2001, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of July. On September 10, 2001, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of August. On October 8, 2001, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of September. On November 19, 2001, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of October. On December 10, 2001, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of November. On January 14, 2002, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of December. On February 11 , 2002, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of January. On March 11 , 2002, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of February. On April 8, 2002, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of March. On May 13, 2002, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of April. On June 10, 2002, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of May. On July 8, 2002, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of June. ' On August 12, 2002, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of July. 34 V. COMMITMENT TO PRINCIPLES (Continued) D. Through regular oversight of the Implementation Phase's Project Management Tool, and scrutiny of results of ADE's actions, the Board of Education will act on its commitment to the principles of the Settlement Agreement. (Continued) 2. Actual as of January 31, 2004 (Continued) On September 9, 2002, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of August. On October 14, 2002, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of September. On November 18, 2002, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of October. On December 9, 2002, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of November. On January 13, 2003, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of December. On February 10, 2003, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of January. On March 10, 2003, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of February. On April 14, 2003, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of March. On May 12, 2003, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of April. On June 9, 2003, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of May. On August 11, 2003, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the months of June and July. On September 8, 2003, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of August. On October 13, 2003, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of September. On November 10, 2003, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of October. 35 V. COMMITMENT TO PRINCIPLES (Continued) D. Through regular oversight of the Implementation Phase's Project Management Tool, and scrutiny of results of ADE's actions, the Board of Education will act on its commitment to the principles of the Settlement Agreement. (Continued) 2. Actual as of January 31, 2004 (Continued) On January 12, 2004, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of December. 36 VI. REMEDIATION A. Through the Extended COE process, the needs for technical assistance by District, by School, and by desegregation compensatory education programs will be identified. 1 . Projected Ending Date Ongoing 2. Actual as of January 31, 2004 During May 1995, team visits to Cycle 4 schools were conducted, and plans were developed for reviewing the Cycle 5 schools. In June 1995, the current Extended COE packet was reviewed, and enhancements to the Extended COE packet were prepared. In July 1995, year end reports were finalized by the Pulaski County field service specialists, and plans were finalized for reviewing the draft improvement plans of the Cycle 5 schools. In August 1995, Phase I - Cycle 5 school improvement plans were reviewed. Plans were developed for meeting with the Districts to discuss plans for Phase II - Cycle 1 schools of Extended COE, and a school improvement conference was conducted in Hot Springs. The technical review visits for the FY 95/96 year and the documentation process were also discussed. In October 1995, two computer programs, the Effective Schools Planner and the Effective Schools Research Assistant, were ordered for review, and the first draft of a monitoring checklist for Extended COE was developed. Through the Extended COE process, the field service representatives provided technical assistance based on the needs identified within the Districts from the data gathered. In November 1995, ADE personnel discussed and planned for the FY 95/96 monitoring, and onsite visits were conducted to prepare schools for the FY 95/96 team visits. Technical review visits continued in the Districts. In December 1995, announced monitoring and technical assistance visits were conducted in the Districts. At December 31, 1995, approximately 59% of the schools in the Districts had been monitored. Technical review visits were conducted during January 1996. In February 1996, announced monitoring visits and midyear monitoring reports were completed, and the field service specialists prepared for the spring NCA/COE peer team visits. 37 VI. REMEDIATION (Continued) A. Through the Extended COE process, the needs for technical assistance by District, by School, and by desegregation compensatory education programs will be identified. (Continued) 2. Actual as of January 31, 2004 (Continued) In March 1996, unannounced monitoring visits of Cycle 5 schools commenced, and two-day peer team visits of Cycle 5 schools were conducted. Two-day team visit materials, team lists and reports were prepared. Technical assistance was provided to schools in final preparation for team visits and to schools needing any school improvement information. In April and May 1996, the unannounced monitoring visits were completed. The unannounced monitoring forms were reviewed and included in the July monitoring report. The two-day peer team visits were completed, and annual COE monitoring reports were prepared. In June 1996, all announced and unannounced monitoring visits of the Cycle 5 schools were completed, and the data was analyzed. The Districts identified enrollment in compensatory education programs. The Semiannual Monitoring Report was completed and filed with the Court on July 15, 1996, and copies were distributed to the parties. During August 1996, meetings were held with the Districts to discuss the monitoring requirements. Technical assistance meetings with Cycle 1 schools were planned for 96/97. The Districts were requested to record discipline data in accordance with the Allen Letter. In September 1996, recommendations regarding the ADE monitoring schedule for Cycle 1 schools and content layouts of the semiannual report were submitted to the ADE administrative team for their review. Training materials were developed and schedules outlined for Cycle 1 schools. In October 1996, technical assistance needs were identified and addressed to prepare each school for their team visits. Announced monitoring visits of the Cycle 1 schools began on October 28, 1996. In December 1996, the announced monitoring visits of the Cycle 1 schools were completed, and technical assistance needs were identified from school site visits. In January 1997, the ECOE monitoring section identified technical assistance needs of the Cycle 1 schools, and the data was reviewed when the draft February Semiannual Monitoring Report was presented to the Desegregation Litigation Oversight Subcommittee, the State Board of Education, and the parties. 38 VI. REMEDIATION (Continued) A. Through the Extended COE process, the needs for technical assistance by District, by School, and by desegregation compensatory education programs will be identified. (Continued) 2. Actual as of January 31, 2004 (Continued) In February 1997, field service specialists prepared for the peer team visits of the Cycle 1 schools. NCA accreditation reports were presented to the NCA Committee, and NCA reports were prepared for presentation at the April NCA meeting in Chicago. From March to May 1997, 111 visits were made to schools or central offices to work with principals, ECOE steering committees, and designated district personnel concerning school improvement planning. A workshop was conducted on Learning Styles for Geyer Springs Elementary School. A School Improvement Conference was held in Hot Springs on July 15-17, 1997. The conference included information on the process of continuous school improvement, results of the first five years of COE, connecting the mission with the school improvement plan, and improving academic performance. Technical assistance needs were evaluated for the FY 97/98 school year in August 1997. From October 1997 to February 1998, technical reviews of the ECOE process were conducted by the field service representatives. Technical assistance was provided to the Districts through meetings with the ECOE steering committees, assistance in analyzing perceptual surveys, and by providing samples of school improvement plans, Gold File catalogs, and web site addresses to schools visited. Additional technical assistance was provided to the Districts through discussions with the ECOE committees and chairs about the process. In November 1997, technical reviews of the ECOE process were conducted by the field service representatives in conjunction with the announced monitoring visits. Workshops on brainstorming and consensus building and asking strategic questions were held in January and February 1998. In March 1998, the field service representatives conducted ECOE team visits and prepared materials for the NCA workshop. Technical assistance was provided in workshops on the ECOE process and team visits. In April 1998, technical assistance was provided on the ECOE process and academically distressed schools. In May 1998, technical assistance was provided on the ECOE process, and team visits were conducted. 39 VI. REMEDIATION (Continued) A. Through the Extended COE process, the needs for technical assistance by District, by School, and by desegregation compensatory education programs will be identified. (Continued) 2. Actual as of January 31, 2004 (Continued) In June 1998, the Extended COE Team Visit Reports were completed. A School Improvement Conference was held in Hot Springs on July 13-15, 1998. Major conference topics included information on the process of continuous school improvement, curriculum alignment, \"Smart Start,\" Distance Learning, using data to improve academic performance, educational technology, and multicultural education. All school districts in Arkansas were invited and representatives from Pulaski County attended. In September 1998, requests for technical assistance were received, visitation schedules were established, and assistance teams began visiting the Districts. Assistance was provided by telephone and on-site visits. The ADE provided inservice training on \"Using Data to Sharpen the Focus on Student Achievement\" at Gibbs Magnet Elementary school on October 5, 1998 at their request. The staff was taught how to increase test scores through data disaggregation, analysis, alignment, longitudinal achievement review, and use of individualized test data by student, teacher, class and content area. Information was also provided regarding the \"Smart Start\" and the \"Academic Distress\" initiatives. On October 20, 1998, ECOE technical assistance was provided to SouthwestJr. High School. B. Identify available resources for providing technical assistance for the specific condition, or circumstances of need, considering resources within ADE and the Districts, and also resources available from outside sources and experts. 1. Projected Ending Date Ongoing 2. Actual as of January 31, 2004 The information for this item is detailed under Section VI.F. of this report. C. Through the ERIC system, conduct a literature search for research evaluating compensatory education programs. 1. Projected Ending Date Ongoing 40 VI. REMEDIATION (Continued) C. D. Through the ERIC system, conduct a literature search for research evaluating compensatory education programs. (Continued) 2. Actual as of January 31, 2004 An updated ERIC Search was conducted on May 15, 1995 to locate research on evaluating compensatory education programs. The ADE received the updated ERIC disc that covered material through March 1995. An ERIC search was conducted in September 30, 1996 to identify current research dealing with the evaluation of compensatory education programs, and the articles were reviewed. An ERIC search was conducted in April 1997 to identify current research on compensatory education programs and sent to the Cycle 1 principals and the field service specialists for their use. An Eric search was conducted in October 1998 on the topic of Compensatory Education and related descriptors. The search included articles with publication dates from 1997 through July 1998. Identify and research technical resources available to ADE and the Districts through programs and organizations such as the Desegregation Assistance Center in San Antonio, Texas. 1. Projected Ending Date Summer 1994 2. Actual as of January 31, 2004 The information for this item is detailed under Section VI.F. of this report. E. Solicit, obtain, and use available resources for technical assistance. 1. Projected Ending Date Ongoing 2. Actual as of January 31, 2004 The information for this item is detailed under Section VI.F. of this report. 41 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. 1. Projected Ending Date Ongoing 2. Actual as of January 31 , 2004 From March 1995 through July 1995, technical assistance and resources were obtained from the following sources: the Southwest Regional Cooperative\nUALR regarding training for monitors\nODM on a project management software\nADHE regarding data review and display\nand Phi Delta Kappa, the Desegregation Assistance Center and the Dawson Cooperative regarding perceptual surveys. Technical assistance was received on the Microsoft Project software in November 1995, and a draft of the PMT report using the new software package was presented to the ADE administrative team for review. In December 1995, a data manager was hired permanently to provide technical assistance with computer software and hardware. In October 1996, the field service specialists conducted workshops in the Districts to address their technical assistance needs and provided assistance for upcoming team visits. In November and December 1996, the field service specialists addressed technical assistance needs of the schools in the Districts as they were identified and continued to provide technical assistance for the upcoming team visits. In January 1997, a draft of the February 1997 Semiannual Monitoring Report was presented to the State Board of Education, the Desegregation Litigation Oversight Subcommittee, and the parties. The ECOE monitoring section of the report included information that identified technical assistance needs and resources available to the Cycle 1 schools. Technical assistance was provided during the January 29-31, 1997 Title I MidWinter Conference. The conference emphasized creating a learning community by building capacity schools to better serve all children and empowering parents to acquire additional skills and knowledge to better support the education of their children. In February 1997, three ADE employees attended the Southeast Regional Conference on Educating Black Children. Participants received training from national experts who outlined specific steps that promote and improve the education of black children. 42 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of January 31, 2004 (Continued) On March 6-9, 1997, three members of the ADE's Technical Assistance Section attended the National Committee for School Desegregation Conference. The participants received training in strategies for Excellence and Equity: Empowerment and Training for the Future. Specific information was received regarding the current status of court-ordered desegregation, unitary status, and resegregation and distributed to the Districts and ADE personnel. The field service specialists attended workshops in March on ACT testing and school improvement to identify technical assistance resources available to the Districts and the ADE that will facilitate desegregation efforts. ADE personnel attended the Eighth Annual Conference on Middle Level Education in Arkansas presented by the Arkansas Association of Middle Level Education on April 6-8, 1997. The theme of the conference was Sailing Toward New Horizons. In May 1997, the field service specialists attended the NCA annual conference and an inservice session with Mutiu Fagbayi. An Implementation Oversight Committee member participated in the Consolidated COE Plan inservice training. In June and July 1997, field service staff attended an SAT-9 testing workshop and participated in the three-day School Improvement Conference held in Hot Springs. The conference provided the Districts with information on the COE school improvement process, technical assistance on monitoring and assessing achievement, availability of technology for the classroom teacher, and teaching strategies for successful student achievement. In August 1997, field service personnel attended the ASCD Statewide Conference and the AAEA Administrators Conference. On August 18, 1997, the bi-monthly Team V meeting was held and presentations were made on the Early Literacy Learning in Arkansas (ELLA) program and the Schools of the 21st Century program. In September 1997, technical assistance was provided to the Cycle 2 principals on data collection for onsite and offsite monitoring. ADE personnel attended the Region VI Desegregation Conference in October 1997. Current desegregation and educational equity cases and unitary status issues were the primary focus of the conference. On October 14, 1997, the bi-monthly Team V meeting was held in Paragould to enable members to observe a 21st Century school and a school that incorporates traditional and multi-age classes in its curriculum. 43 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of January 31, 2004 (Continued) In November 1997, the field service representatives attended the Governor's Partnership Workshop to discuss how to tie the committee's activities with the ECOE process. In March 1998, the field service representatives attended a school improvement conference and conducted workshops on team building and ECOE team visits. Staff development seminars on Using Data to Sharpen the Focus on Student Achievement are scheduled for March 23, 1998 and March 27, 1998 for the Districts. In April 1998, the Districts participated in an ADE seminar to aid them in evaluating and improving student achievement. In August 1998, the Field Service Staff attended inservice to provide further assistance to schools, i.e., Title I Summer Planning Session, ADE session on Smart Start, and the School Improvement Workshops. All schools and districts in Pulaski County were invited to attend the \"Smart Start\" Summit November 9, 10, and 11 to learn more about strategies to increase student performance. \"Smart Start\" is a standards-driven educational initiative which emphasizes the articulation of clear standards for student achievement and accurate measures of progress against those standards through assessments, staff development and individual school accountability. The Smart Start Initiative focused on improving reading and mathematics achievement for all students in Grades K-4. Representatives from all three districts attended. On January 21, 1998, the ADE provided staff development for the staff at Oak Grove Elementary School designed to assist them with their efforts to improve student achievement. Using achievement data from Oak Grove, educators reviewed trends in achievement data, identified areas of greatest need, and reviewed seven steps for improving student performance. On February 24, 1999, the ADE provided staff development for the administrative staff at Clinton Elementary School regarding analysis of achievement data. On February 15, 1999, staff development was rescheduled for Lawson Elementary School. The staff development program was designed to assist them with their efforts to improve student achievement using achievement data from Lawson, educators reviewed the components of the Arkansas Smart Initiative, trends in achievement data, identified areas of greatest need, and reviewed seven steps for improving student performance. Student Achievement Workshops were rescheduled for Southwest Jr. High in the Little Rock School District, and the Oak Grove Elementary School in the Pulaski County School District. 44 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of January 31, 2004 (Continued} On April 30, 1999, a Student Achievement Workshop was conducted for Oak Grove Elementary School in PCSSD. The Student Achievement Workshop for Southwest Jr. High in LRSD has been rescheduled. On June 8, 1999, a workshop was presented to representatives from each of the Arkansas Education Service Cooperatives and representatives from each of the three districts in Pulaski County. The workshop detailed the Arkansas Comprehensive Testing, Assessment and Accountability Program (ACTAAP). On June 18, 1999, a workshop was presented to administrators of the NLRSD. The workshop detailed the Arkansas Comprehensive Testing, Assessment and Accountability Program (ACTAAP). On August 16, 1999, professional development on ways to increase student achievement and the components of the new ACTAAP program was presented during the preschool staff development activities for teaching assistant in the LRSD. On August 20, 1999, professional development on ways to increase student achievement and the components of the new ACT AAP program was presented during the preschool staff development activities for the Accelerated Learning Center in the LRSD. On September 13, 1999, professional development on ways to increase student achievement and the components of the new ACTAAP program were presented to the staff at Booker T. Washington Magnet Elementary School. On September 27, 1999, professional development on ways to increase student achievement was presented to the Middle and High School staffs of the NLRSD. The workshop also covered the components of the new ACTAAP program, and ACT 999 of 1999. On October 26, 1999, professional development on ways to increase student achievement was presented to LRSD personnel through a staff development training class. The workshop also covered the components of the new ACT AAP program, and ACT 999 of 1999. On December 7, 1999, professional development on ways to increase student achievement was scheduled for Southwest Middle School in the LRSD. The workshop was also set to cover the components of the new ACTAAP program, and ACT 999 of 1999. However, Southwest Middle School administrators had a need to reschedule, therefore the workshop will be rescheduled. 45 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of January 31, 2004 (Continued) On January 10, 2000, professional development on ways to increase student achievement was conducted for both Dr. Martin Luther King Magnet Elementary School \u0026amp; Little Rock Central High School. The workshops also covered the components of the new ACTAAP program, and ACT 999 of 1999. On March 1, 2000, professional development on ways to increase student achievement was conducted for all principals and district level administrators in the PCSSD. The workshop also covered the components of the new ACTAAP program, and ACT 999 of 1999. On April 12, 2000, professional development on ways to increase student achievement was conducted for the LRSD. The workshop also covered the components of the new ACTAAP program, and ACT 999 of 1999. Targeted staffs from the middle and junior high schools in the three districts in Pulaski County attended the Smart Step Summit on May 1 and May 2. Training was provided regarding the overview of the \"Smart Step\" initiative, \"Standard and Accountability in Action,\" and \"Creating Learning Environments Through Leadership Teams.\" The ADE provided training on the development of alternative assessment September 12-13, 2000. Information was provided regarding the assessment of Special Education and LEP students. Representatives from each district were provided the opportunity to select a team of educators from each school within the district to participate in professional development regarding Integrating Curriculum and Assessment K-12. The professional development activity was directed by the national consultant, Dr. Heidi Hays Jacobs, on September 14 and 15, 2000. The ADE provided professional development workshops from October 2 through October 13, 2000 regarding, \"The Write Stuff: Curriculum Frameworks, Content Standards and Item Development.\" Experts from the Data Recognition Corporation provided the training. Representatives from each district were provided the opportunity to select a team of educators from each school within the district to participate. The ADE provided training on Alternative Assessment Portfolio Systems by video conference for Special Education and LEP Teachers on November 17, 2000. Also, Alternative Assessment Portfolio System Training was provided for testing coordinators through teleconference broadcast on November 27, 2000. 46 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of January 31, 2004 (Continued) On December 12, 2000, the ADE provided training for Test Coordinators on end of course assessments in Geometry and Algebra I Pilot examination. Experts from the Data Recognition Corporation conducted the professional development at the Arkansas Teacher Retirement Building. The ADE presented a one-day training session with Dr. Cecil Reynolds on the Behavior Assessment for Children (BASC). This took place on December 7, 2000 at the NLRSD Administrative Annex. Dr. Reynolds is a practicing clinical psychologist. He is also a professor at Texas A \u0026amp; M University and a nationally known author. In the training, Dr. Reynolds addressed the following: 1) how to use and interpret information obtained on the direct observation form, 2) how to use this information for programming, 3) when to use the BASC, 4) when to refer for more or additional testing or evaluation, 5) who should complete the forms and when, (i.e., parents, teachers, students), 6) how to correctly interpret scores. This training was intended to especially benefit School Psychology Specialists, psychologists, psychological examiners, educational examiners and counselors. During January 22-26, 2001 the ADE presented the ACTAAP Intermediate (Grade 6) Benchmark Professional Development Workshop on Item Writing. Experts from the Data Recognition Corporation provided the training. Representatives from each district were invited to attend. On January 12, 2001 the ADE presented test administrators training for mid-year End of Course (Pilot) Algebra I and Geometry exams. This was provided for schools with block scheduling. On January 13, 2001 the ADE presented SmartScience Lessons and worked with teachers to produce curriculum. This was shared with eight Master Teachers. The SmartScience Lessons were developed by the Arkansas Science Teachers Association in conjunction with the Wilbur Mills Educational Cooperative under an Eisenhower grant provided by the ADE. The purpose of SmartScience is to provide K-6 teachers with activity-oriented science lessons that incorporate reading, writing, and mathematics skills. The following training has been provided for educators in the three districts in Pulaski County by the Division of Special Education at the ADE since January 2000: On January 6, 2000, training was conducted for the Shannon Hills Pre-school Program, entitled ''Things you can do at home to support your child's learning.\" This was presented by Don Boyd - ASERC and Shelley Weir. The school's director and seven parents attended. 47 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of January 31, 2004 (Continued) On March 8, 2000, training was conducted for the Southwest Middle School in Little Rock, on ADD. Six people attended the training. There was follow-up training on Learning and Reading Styles on March 26. This was presented by Don Boyd - ASERC and Shelley Weir. On September 7, 2000, Autism and Classroom Accommodations for the LRSD at Chicot Elementary School was presented. Bryan Ayres and Shelley Weir were presenters. The participants were: Karen Sabo, Kindergarten Teacher\nMelissa Gleason, Paraprofessional\nCurtis Mayfield, P.E. Teacher\nLisa Poteet, Speech Language Pathologist\nJane Harkey, Principal\nKathy Penn-Norman, Special Education Coordinator\nAlice Phillips, Occupational Therapist. On September 15, 2000, the Governor's Developmental Disability Coalition Conference presented Assistive Technology Devices \u0026amp; SeNices. This was held at the Arlington Hotel in Hot Springs. Bryan Ayres was the presenter. On September 19, 2000, Autism and Classroom Accommodations for the LRSD at Jefferson Elementary School was presented. Bryan Ayres and Shelley Weir were presenters. The participants were: Melissa Chaney, Special Education Teacher\nBarbara Barnes, Special Education Coordinator\na Principal, a Counselor, a Librarian, and a Paraprofessional. On October 6, 2000, Integrating Assistive Technology Into Curriculum was presented at a conference in the Hot Springs Convention Center. Presenters were: Bryan Ayers and Aleecia Starkey. Speech Language Pathologists from LRSD and NLRSD attended. On October 24, 2000, Consideration and Assessment of Assistive Technology was presented through Compressed Video-Teleconference at the ADE facility in West Little Rock. Bryan Ayres was the presenter. On October 25 and 26, 2000, Alternate Assessment for Students with Severe Disabilities for the LRSD at J. A. Fair High School was presented. Bryan Ayres was the presenter. The participants were: Susan Chapman, Special Education Coordinator\nMary Steele, Special Education Teacher\nDenise Nesbit, Speech Language Pathologist\nand three Paraprofessionals. On November 14, 2000, Consideration and Assessment of Assistive Technology was presented through Compressed Video-Teleconference at the ADE facility in West Little Rock. Bryan Ayres was the presenter. On November 17, 2000, training was conducted on Autism for the LRSD at the Instructional Resource Center. Bryan Ayres and Shelley Weir were presenters. 48 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of January 31, 2004 (Continued) On December 5, 2000, Access to the Curriculum Via the use of Assistive Technology Computer Lab was presented. Bryan Ayres was the presenter of this teleconference. The participants were: Tim Fisk, Speech Language Pathologist from Arch Ford Education Service Cooperative at Plumerville and Patsy Lewis, Special Education Teacher from Mabelvale Middle School in the LRSD. On January 9, 2001, Consideration and Assessment of Assistive Technology was presented through Compressed Video-Teleconference at the ADE facility in West Little Rock. Bryan Ayres was the presenter. Kathy Brown, a vision consultant from the LRSD, was a participant. On January 23, 2001, Autism and Classroom Modifications for the LRSD at Brady Elementary School was presented. Bryan Ayres and Shelley Weir were presenters. The participants were: Beverly Cook, Special Education Teacher\nAmy Littrell, Speech Language Pathologist\nJan Feurig, Occupational Therapist\nCarolyn James, Paraprofessional\nCindy Kackly, Paraprofessional\nand Rita Deloney, Paraprofessional. The ADE provided training on Alternative Assessment Portfolio Systems for Special Education and Limited English Proficient students through teleconference broadcast on February 5, 2001. Presenters were: Charlotte Marvel, ADE\nDr. Gayle Potter, ADE\nMarcia Harding, ADE\nLynn Springfield, ASERC\nMary Steele, J. A. Fair High School, LRSD\nBryan Ayres, Easter Seals Outreach. This was provided for Special Education teachers and supervisors in the morning, and Limited English Proficient teachers and supervisors in the afternoon. The Special Education session was attended by 29 teachers/administrators and provided answers to specific questions about the alternate assessment portfolio system and the scoring rubric and points on the rubric to be used to score the portfolios. The LEP session was attended by 16 teachers/administrators and disseminated the common tasks to be included in the portfolios: one each in mathematics, writing and reading. On February 12-23, 2001, the ADE and Data Recognition Corporation personnel trained Test Coordinators in the administration of the spring Criterion-Referenced Test. This was provided in 20 sessions at 1 O regional sites. Testing protocol, released items, and other testing materials were presented and discussed. The sessions provided training for Primary, Intermediate, and Middle Level Benchmark Exams as well as End of Course Literacy, Algebra and Geometry Pilot Tests. The LRSD had 2 in attendance for the End of Course session and 2 for the Benchmark session. The NLRSD had 1 in attendance for the End of Course session and 1 for the Benchmark session. The PCSSD had 1 in attendance for the End of Course session and 1 for the Benchmark session. 49 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of January 31 , 2004 (Continued) On March 15, 2001, there was a meeting at the ADE to plan professional development for staff who work with Limited English Proficiency (LEP) students. A $30,000 grant has been created to provide LEP training at Chicot Elementary for a year, starting in April 2001. A $40,000 grant was created to provide a Summer English as Second Language (ESL) Academy for the LRSD from June 18 through 29, 2001. Andre Guerrero from the ADE Accountability section met with Karen Broadnax, ESL Coordinator at LRSD, Pat Price, Early Childhood Curriculum Supervisor at LRSD, and Jane Harkey, Principal of Chicot Elementary. On March 1-2 and 8-29, 2001, ADE staff performed the following activities: processed registration for April 2 and 3 Alternate Portfolio Assessment video conference quarterly meeting\nanswered questions about Individualized Educational Plan (IEP) and LEP Alternate Portfolio Assessment by phone from schools and Education Service Cooperatives\nand signed up students for alternate portfolio assessment from school districts. On March 6, 2001, ADE staff attended a Smart Step Technology Leadership Conference at the State House Convention Center. On March 7, 2001 , ADE staff attended a National Assessment of Educational Progress (NAEP) Regional Math Framework Meeting about the Consensus Project 2004. On March 8, 2001, there was a one-on-one conference with Carole Villarreal from Pulaski County at the ADE about the LEP students with portfolios. She was given pertinent data, including all the materials that have been given out at the video conferences. The conference lasted for at least an hour. On March 14, 2001, a Test Administrator's Training Session was presented specifically to LRSD Test Coordinators and Principals. About 60 LRSD personnel attended. The following meetings have been conducted with educators in the three districts in Pulaski County since July 2000. On July 10-13, 2000 the ADE provided Smart Step training. The sessions covered Standards-based classroom practices. 50 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of January 31, 2004 (Continued) On July 19-21, 2000 the ADE held the Math/Science Leadership Conference at UCA. This provided services for Arkansas math and science teachers to support systemic reform in math/science and training for 8th grade Benchmark. There were 200 teachers from across the state in attendance. On August 14-31, 2000 the ADE presented Science Smart Start Lessons and worked with teachers to produce curriculum. This will provide K-6 teachers with activity-oriented science lessons that incorporate reading, writing, and mathematics skills. On September 5, 2000 the ADE held an Eisenhower Informational meeting with Teacher Center Coordinators. The purpose of the Eisenhower Professional Development Program is to prepare teachers, school staff, and administrators to help all students meet challenging standards in the core academic subjects. A summary of the program was presented at the meeting. On November 2-3, 2000 the ADE held the Arkansas Conference on Teaching. This presented curriculum and activity workshops. More than 1200 attended the conference. On November 6, 2000 there was a review of Science Benchmarks and sample model curriculum. A committee of 6 reviewed and revised a drafted document. The committee was made up of ADE and K-8 teachers. On November 7-10, 2000 the ADE held a meeting of the Benchmark and End of Course Mathematics Content Area Committee. Classroom teachers reviewed items for grades 4, 6, 8 and EOC mathematics assessment. There were 60 participants. On December 4-8, 2000 the ADE conducted grades 4 and 8 Benchmark Scoring for Writing Assessment. This professional development was attended by approximately 750 teachers. On December 8, 2000 the ADE conducted Rubric development for Special Education Portfolio scoring. This was a meeting with special education supervisors to revise rubric and plan for scoring in June. On December 8, 2000 the ADE presented the Transition Mathematics Pilot Training Workshop. This provided follow-up training and activities for fourth-year mathematics professional development. On December 12, 2000 the ADE presented test administrators training for midyear End of Course (Pilot) Algebra I and Geometry exams. This was provided for schools with block scheduling. 51 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued} 2. Actual as of January 31, 2004 (Continued} The ADE provided training on Alternative Assessment Portfolio Systems for Special Education and Limited English Proficient students through teleconference broadcasts on April 2-3, 2001. Administration of the Primary, Intermediate, and Middle Level Benchmark Exams as well as End of Course Literacy took place on April 23-27, 2001. Administration of the End of Course Algebra and Geometry Exams took place on May 2-3, 2001. Over 1,100 Arkansas educators attended the Smart Step Growing Smarter Conference on July 10 and 11, 2001, at the Little Rock Statehouse Convention Center. Smart Step focuses on improving student achievement for Grades 5-8. The Smart Step effort seeks to provide intense professional development for teachers and administrators at the middle school level, as well as additional materials and assistance to the state's middle school teachers. The event began with opening remarks by Ray Simon, Director of the ADE. Carl Boyd, a longtime educator and staff consultant for Learning 24-7, presented the first keynote address on \"The Character-Centered Teacher\". Debra Pickering, an education consultant from Denver, Colorado, presented the second keynote address on \"Characteristics of Middle Level Education\". Throughout the Smart Step conference, educators attended breakout sessions that were grade-specific and curriculum area-specific. Pat Davenport, an education consultant from Houston, Texas, delivered two addresses. She spoke on \"A Blueprint for Raising Student Achievement\". Representatives from all three districts in Pulaski County attended. Over 1,200 Arkansas teachers and administrators attended the Smart Start Conference on July 12, 2001, at the Little Rock Statehouse Convention Center. Smart Start is a standards-driven educational initiative which emphasizes the articulation of clear standards for student achievement and accurate measures of progress against those standards through assessments, staff development and individual school accountability. The Smart Start Initiative focused on improving reading and mathematics achievement for all students in Grades K-4. The event began with opening remarks by Ray Simon, Director of the ADE. Carl Boyd, a longtime educator and staff consultant for Learning 24-7, presented the keynote address. The day featured a series of 15 breakout sessions on best classroom practices. Representatives from all three districts in Pulaski County attended. On July 18-20, 2001, the ADE held the Math/Science Leadership Conference at UCA. This provided services for Arkansas math and science teachers to support systemic reform in math/science and training for 8th grade Benchmark. There were approximately 300 teachers from across the state in attendance. 52 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of January 31, 2004 (Continued) The ADE and Harcourt Educational Measurement conducted Stanford 9 test administrator training from August 1-9, 2001. The training was held at Little Rock, Jonesboro, Fort Smith, Forrest City, Springdale, Mountain Home, Prescott, and Monticello. Another session was held at the ADE on August 30, for those who were unable to attend August 1-9. The ADE conducted the Smart Start quarterly meeting by video conference at the Education Service Cooperatives and at the ADE from 9:00 a.m. until 11 :30 a.m. on September 5, 2001. The ADE released the performance of all schools on the Primary and Middle Level Benchmark Exams on September 5, 2001 . The ADE conducted Transition Core Teacher In-Service training for Central in the LRSD on September 6, 2001. The ADE conducted Transition Checklist training for Hall in the LRSD on September 7, 2001. The ADE conducted Transition Checklist training for McClellan in the LRSD on September 13, 2001. The ADE conducted Basic Co-teaching training for the LRSD on October 9, 2001. The ADE conducted training on autism spectrum disorder for the PCSSD on October 15, 2001. Professional Development workshops (1 day in length) in scoring End of Course assessments in algebra, geometry and reading were provided for all districts in the state. Each school was invited to send three representatives (one for each of the sessions). LRSD, NLRSD, and PCSSD participated. Information and training materials pertaining to the Alternate Portfolio Assessment were provided to all districts in the state and were supplied as requested to LRSD, PCSSD and David 0. Dodd Elementary. On November 1-2, 2001 the ADE held the Arkansas Conference on Teaching at the Excelsior Hotel \u0026amp; Statehouse Convention Center. This presented sessions, workshops and short courses to promote exceptional teaching and learning. Educators could become involved in integrated math, science, English \u0026amp; language arts and social studies learning. The ADE received from the schools selected to participate in the National Assessment of Educational Progress (NAEP), a list of students who will take the test. 53 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of January 31, 2004 (Continued) On December 3-7, 2001 the ADE conducted grade 6 Benchmark scoring training for reading and math. Each school district was invited to send a math and a reading specialist. The training was held at the Holiday Inn Airport in Little Rock. On December 4 and 6, 2001 the ADE conducted Mid-Year Test Administrator Training for Algebra and Geometry. This was held at the Arkansas Activities Association's conference room in North Little Rock. On January 24, 2002, the ADE conducted the Smart Start quarterly meeting by ADE compressed video with Fred Jones presenting. On January 31, 2002, the ADE conducted the Smart Step quarterly meeting by NSCI satellite with Fred Jones presenting. On February 7, 2002, the ADE Smart Step co-sponsored the AR Association of Middle Level Principal's/ADE curriculum, assessment and instruction workshop with Bena Kallick presenting. On February 11-21, 2002, the ADE provided training for Test Administrators on the Primary, Intermediate, and Middle Level Benchmark Exams as well as End of Course Literacy, Algebra and Geometry Exams. The sessions took place at Forrest City, Jonesboro, Mountain Home, Springdale, Fort Smith, Monticello, Prescott, Arkadelphia and Little Rock. A make-up training broadcast was given at 15 Educational Cooperative Video sites on February 22. During February 2002, the LRSD had two attendees for the Benchmark Exam training and one attendee for the End of Course Exam training. The NLRSD and PCSSD each had one attendee at the Benchmark Exam training and one attendee for the End of Course Exam training. The ADE conducted the Smart Start quarterly meeting by compressed interactive video at the South Central Education Service Cooperative from 9:30 a.m. until 11 :30 a.m. on May 2, 2002. Telecast topics included creating a standards-based classroom and a seven-step implementation plan. The principal's role in the process was explained. The ADE conducted the Smart Step quarterly meeting by compressed interactive video at the South Central Education Service Cooperative from 9:30 a.m. until 11 :30 a.m. on May 9, 2002. Telecast topics included creating a standards-based classroom and a seven-step implementation plan. The principal's role in the process was explained. 54 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of January 31, 2004 (Continued) The Twenty-First Annual Curriculum and Instruction Conference, co-sponsored by the Arkansas Association for Supervision and Curriculum Development and the Arkansas Department of Education, will be held June 24-26, 2002, at the Arlington Hotel in Hot Springs, Arkansas. \"Ignite Your Enthusiasm for Learning\" is the theme for this year's conference, which will feature educational consultant, Dr. Debbie Silver, as well as other very knowledgeable presenters. Additionally, there will be small group sessions on Curriculum Alignment, North Central Accreditation, Section 504, Building Level Assessment, Administrator Standards, Data Disaggregation, and National Board. The Educational Accountability Unit of the ADE hosted a workshop entitled \"Strategies for Increasing Achievement on the ACTAAP Benchmark Examination\" on June 13-14, 2002 at the Agora Center in Conway. The workshop was presented for schools in which 100% of students scored below the proficient level on one or more parts of the most recent Benchmark Examination. The agenda included presentations on \"The Plan-Do-Check-Act Instructional Cycle\" by the nationally known speaker Pat Davenport. ADE personnel provided an explanation of the MPH point program. Presentations were made by Math and Literacy Specialists. Dr. Charity Smith, Assistant Director for Accountability, gave a presentation about ACTAAP. Break out sessions were held, in which school districts with high scores on the MPH point program offered strategies and insights into increasing student achievement. The NLRSD, LRSD, and PCSSD were invited to attend. The NLRSD attended the workshop. The Smart Start Summer Conference took place on July 8-9, 2002, at the Little Rock Statehouse Convention Center and Peabody Hotel. The Smart Start Initiative focuses on improving reading and mathematics achievement for all students in Grades K-4. The event included remarks by Ray Simon, Director of the ADE. After comments by the Director, Bena Kallick presented the keynote address \"Beyond Mapping: Essential Questions, Assessment, Higher Order Thinking\". This was followed by a series of breakout sessions on best classroom practices. On the second day, Vivian Moore gave the keynote address \"Overcoming Obstacles: Avenues for Student Success\". Krista Underwood gave the presentation \"Put Reading First in Arkansas\". This was followed by a series of breakout sessions on best classroom practices. 55 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of January 31, 2004 (Continued) The Smart Step Summer Conference took place on July 10-11, 2002, at the Little Rock Statehouse Convention Center and Peabody Hotel. Smart Step focuses on improving student achievement for Grades 5-8. The event included remarks by Ray Simon, Director of the ADE. After comments by the Director, Vivian Moore presented the keynote address \"Overcoming Obstacles: Avenues for Student Success\". This was followed by a series of breakout sessions on best classroom practices. On the second day, Bena Kallick presented \"Beyond Mapping: Essential Questions, Assessment, Higher Order Thinking\". Ken Stamatis presented \"Smart Steps to Creating a School Culture That Supports Adolescent Comprehension\". This was followed by a series of breakout sessions on best classroom practices. On August 8, 2002, Steven Weber held a workshop at Booker T. Washington Elementary on \"Best Practices in Social Studies\". It was presented to the 4th grade teachers in the Little Rock School District. The workshop focused around the five themes of geography and the social studies (fourth grade) framework/standards. Several Internet web sites were shared with the teachers, and the teachers were shown methods for incorporating writing into fourth grade social studies. One of the topics was using primary source photos and technology to stimulate the students to write about diverse regions. A theme of the workshop included identifying web sites which apply to fourth grade social studies teachers and interactive web sites for fourth grade students. This was a Back-to-School ln-seNice workshop. The teachers were actively involved in the workshop. On August 13 Steven Weber conducted a workshop at Parkview High School in the LRSD. Topics of the workshop included: 1. Incorporating Writing in the Social Studies Classroom 2. Document Based (open-ended) Questioning Techniques 3. How to practice writing on a weekly basis without assigning a lengthy research report 4. Developing Higher Level Thinking Skills in order to produce active citizens, rather than passive, uninformed citizens 5. Using the Social Studies Framework 6. Identifying state and national Web Sites which contain Primary Sources for use in the classroom The 8:30 - 11 :30 session was for the 6 - 8 grade social studies teachers. The 12:30 - 3:00 session was for the 9 - 12 grade social studies teachers. Several handouts were used, also PowerPoint, primary source photos and documents, and Internet web sites (i.e., Library of Congress, Butler Center for Arkansas Studies, National Archives, etc.). This was a Back-to-School ln-seNice workshop. The teachers were actively involved in the workshop. Marie McNeal is the Social Studies Specialist for the Little Rock School District. She invited Steven Weber to present at the workshop, and was in attendance. 56 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of January 31, 2004 (Continued} On September 30 through October 11, 2002, the ADE provided Professional Development for Test Administrators on the End of Course Literacy, Algebra and Geometry Exams. The training was held at the Holiday Inn Airport. All three districts in Pulaski County sent representatives to the training. On October 3, 2002, Charlotte Marvel provided in-service training for LEP teachers in the Little Rock School District. On December 6, 2002, the Community and Parent Empowerment Summit was held for parents of children attending the LRSD. It took place at the Saint Mark Baptist Church in Little Rock. Dr. Charity Smith, Assistant Director for Accountability, presented information on No Child Left Behind, Supplemental Services, after school tutoring, how parents can help, and the Refrigerator Curriculum. Mr. Reginald Wilson, Senior Coordinator for Accountability, presented information on ACTAAP, including how to find information on the AS-IS Website and what is included in the school report cards. Donna Elam spoke on the topic \"From the School House to the Jail House\". On December 10 - 12, 2002, the Math Workshop \"Investigations in Number, Data and Space\" was held at the Clinton Elementary Magnet School in Sherwood. Training for Kindergarten and First Grade Teachers was held on December 10, and included Making Shapes and Building Blocks, Quilts, Squares and Block Towns. Training for Second and Third Grade Teachers was held on December 11, and included Shapes, Halves, Symmetry and Turtle Paths. Training for Fourth and Fifth Grade Teachers was held on December 12. Fourth grade covered Seeing Solids and Silhouettes. Fifth Grade was about Containers and Cubes. The sessions provided quality time for teachers to discuss the curriculum, reflect on implications, provide mutual support, and continue planning. The ADE provided professional development for all school districts on Alternative Assessment Portfolio Systems on January 7-9, 2003 at the Holiday Inn Airport. The LRSD had two in attendance, NLRSD had one in attendance, and the PCSSD had two in attendance. The ADE conducted the Smart Start Statewide Professional Staff Development Video Conference at the ADE/AETN Studio and at participating Education Service Cooperatives from 9:30 a.m. until 11 :30 a.m. on February 12, 2003. The ADE conducted the Smart Step Statewide Professional Staff Development Video Conference at the ADE/AETN Studio and at participating Education Service Cooperatives from 9:30 a.m. until 11 :30 a.m. on February 13, 2003. 57 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for techn\nThis project was supported in part by a Digitizing Hidden Special Collections and Archives project grant from The Andrew W. Mellon Foundation and Council on Library and Information Resoources.\n   \n\n   \n\n  \n\n\n   \n\n  \n\n \n\n\n   \n\n   \n\n \n\n\n   \n\n  \n\n \n\n\u003cdcterms_creator\u003eArkansas. Department of Education\u003c/dcterms_creator\u003e\n   \n\n \n\n  \n\n\n   \n\n \n\n  \n\n\n\n   \n\n  \n\n  \n\n\n\n   \n\n   \n\n  \n\n \n\n \n\n\n   \n\n  \n\n \n\n\n\n\n\n\n\n\n   \n\n \n\n\n\n  \n\n\n   \n\n\n\n  \n\n\n\n "},{"id":"bcas_bcmss0837_136","title":"Arkansas Department of Education's (ADE's) Project Management Tool","collection_id":"bcas_bcmss0837","collection_title":"Office of Desegregation Management","dcterms_contributor":null,"dcterms_spatial":["United States, 39.76, -98.5","United States, Arkansas, 34.75037, -92.50044","United States, Arkansas, Pulaski County, 34.76993, -92.3118"],"dcterms_creator":["Arkansas. Department of Education"],"dc_date":["2003-12"],"dcterms_description":null,"dc_format":["application/pdf"],"dcterms_identifier":null,"dcterms_language":["eng"],"dcterms_publisher":["Little Rock, Ark. : Butler Center for Arkansas Studies. Central Arkansas Library System"],"dc_relation":null,"dc_right":["http://rightsstatements.org/vocab/InC-EDU/1.0/"],"dcterms_is_part_of":["Office of Desegregation Monitoring records (BC.MSS.08.37)","History of Segregation and Integration of Arkansas's Educational System"],"dcterms_subject":["Education--Arkansas","Office of Desegregation Monitoring (Little Rock, Ark.)","School integration--Arkansas","Arkansas. Department of Education","Project management"],"dcterms_title":["Arkansas Department of Education's (ADE's) Project Management Tool"],"dcterms_type":["Text"],"dcterms_provenance":["Butler Center for Arkansas Studies"],"edm_is_shown_by":null,"edm_is_shown_at":["http://arstudies.contentdm.oclc.org/cdm/ref/collection/bcmss0837/id/136"],"dcterms_temporal":null,"dcterms_rights_holder":null,"dcterms_bibliographic_citation":null,"dlg_local_right":["Available for use in research, teaching, and private study. Any other use requires permission from the Butler Center."],"dcterms_medium":["documents (object genre)"],"dcterms_extent":["384 pages"],"dlg_subject_personal":null,"dcterms_subject_fast":null,"fulltext":"\n \n\n\n\n\n\n\n\n  \n\n\n   \n\n   \n\n\n   \n\n\n   \n\n\n\n\n   \n\n\n\n\n   \n\n\n\n\n\n\n\n\n   \n\n   \n\n \n\n\n   \n\n   \n\n  \n\n\n   \n\n  \n\n \n\n\n   \n\n  \n\n \n\n\n   \n\n  \n\n  \n\nLittle Rock School District, plaintiff vs. Pulaski County Special School District, defendant.\nTOM COURTWAY Interim Director Stale Board of Education JoNell Caldwell, Chair Little Rock Shelby Hillman, Vice Chair Carlisle Sherry Burrow Jonesboro Luke Gordy Van Buren Calvin King Marianna R~awson Be.Ile MaryJane Rebick Pine Bluff Jeanna Westmoreland Arkadelphia Arkansas Department of Education #4 Capitol Mall, Little Rock, AR 72201-1071 501-682-4475 December 30, 2003 Mr. M. Samuel Jones, III Wright, Lindsey \u0026amp; Jennings 200 West Capitol, Suite 2000 Little Rock, AR 72201 Mr. John W. Walker John Walker, P.A. 1723 Broadway Little Rock, AR 72201 Mr. Mark Burnette Mitchell, Blackstock, Barnes, Wagoner, Ivers \u0026amp; Sneddon P. 0. Box 1510 Little Rock, AR 72203-1510 Mr. Christopher Heller Friday, Eldredge \u0026amp; Clark 400 West Capitol, Suite 2000 Little Rock, AR 72201-3493 Mr. Stephen W. Jones Jack, Lyon \u0026amp; Jones 425 West Capitol, Suite 3400 Little Rock, AR 72201 Ms. Ann Marshall One Union National Plaza 124 West Capitol, Suite 1895 Little Rock, AR 72201 http:/ /arktdu.slale.ar.us RECEIVED\ntt\"' J OFFICEOF DESEGREGATION MONITORING RECEIVED JA\n~ 0 2 2004 OFFICE OF DESEGREGATION MONITORING RE: Little Rock School District v. Pulaski County Special School District, et al. U.S. District Court No. 4:82-CV-866 Dear Gentlemen and Ms. Marshall: Per an agreement with the Attorney General's Office, I am filing the Arkansas Department of Education's Project Management Tool for the month of December 2003 in the above-referenced case. If you have any questions, please feel free to contact me at your convenience. Sipely, ~~m..1. ... ~ General Counsel Arkansas Department of Education SS:law cc: Mark Hagemeier UNITED STATES DISTRICT COURT EASTERN DISTRICT OF ARKANSAS WESTERN DIVISION LITTLE ROCK SCHOOL DISTRICT PLAINTIFF V. No. LR-C-82-866 PULASKI COUNTY SPECIAL SCHOOL DISTRICT NO. 1, et al DEFENDANTS NOTICE OF FILING In accordance with the Court's Order of December 10, 1993, the Arkansas Department of Education hereby gives notice of the filing of the AD E's Project Management Tool for December 2003. Respectfully Submitted, ~$~ Scmith, #922 Attorney, Arkansas Department of Education #4 Capitol Mall, Room 404-A Little Rock, AR 72201 501-682-4227 CERTIFICATE OF SERVICE I, Scott Smith, certify that on December 30, 2003, I caused the foregoing document to be served by depositing a copy in the United States mail, postage prepaid, addressed to each of the following: Mr. M. Samuel Jones, III Wright, Lindsey \u0026amp; Jennings 200 West Capitol, Suite 2000 Little Rock, AR 72201 Mr. John W. Walker John Walker, P.A. 1723 Broadway Little Rock, AR 72201 Mr. Mark Burnette Mitchell, Blackstock, Barnes Wagoner, Ivers \u0026amp; Sneddon P. 0. Box 1510 Little Rock, AR 72203-1510 Mr. Christopher Heller Friday, Eldredge \u0026amp; Clark 400 West Capitol, Suite 2000 Little Rock, AR 72201-3493 Mr. Stephen W. Jones Jack, Lyon \u0026amp; Jones 425 West Capitol, Suite 3400 Little Rock, AR 72201 Ms. Ann Marshall One Union National Plaza 124 West Capitol, Suite 1895 Little Rock, 2201 IN THE UNITED STATES DISTRICT COURT EASTERN DISTRICT OF ARKANSAS WESTERN DIVISION LITTLE ROCK SCHOOL DISTRICT, ET AL PLAINTIFFS V. NO. LR-C-82-866 PULASKI COUNTY SPECIAL SCHOOL DISTRICT, ET AL DEFENDANTS MRS. LORENE JOSHUA, ET AL INTERVENOR$ KATHERINE W. KNIGHT, ET AL INTERVENOR$ ADE'S PROJECT MANAGEMENT TOOL In compliance with the Court's Order of December 10, 1993, the Arkansas Department of Education (ADE) submits the following Project Management Tool to the parties and the Court. This document describes the progress the ADE has made since March 15, 1994, in complying with provisions of the Implementation Plan and itemizes the ADE's progress against timelines presented in the Plan. IMPLEMENTATION PHASE ACTIVITY I. FINANCIAL OBLIGATIONS A. Use the previous year's three quarter average daily membership to calculate MFPA (State Equalization) for the current school year. 1. Projected Ending Date Last day of each month, August - June. 2. Actual as of December 31, 2003 Based on the information available at November 30, 2003, the ADE calculated the .Equalization Funding for FY:03/04, s.ubject to periodic adjustments: B. Include all Magnet students in the resident District's average daily membership for calculation. 1. Projected Ending Date Last day of each month, August - June. I. FINANCIAL OBLIGATIONS (Continued) B. Include all Magnet students in the resident District's average daily membership for calculation. (Continued) 2. Actual as of December 31 , 2003 Based on the information available at November 30, 2003, the ADE calculated for FY 03/04, subject to periodic adjustments. C. Process and distribute State MFPA. 1. Projected Ending Date Last day of each month, August - June. 2. Actual as of December 31 , 2003 On November 30, 2003, distributions of State Equalization Funding for FY 03/04 were as follows: LRSD - $19,354,959 NLRSD- $10,209,120 PCSSD-$18,533,748 The allotments of State Equalization Funding calculated for FY 03/04 at November 30, 2003, subject to periodic adjustments, were as follows: LRSD - $53,226, 139 NLRSD - $28,075,080 PCSSD - $50,967,808 D. Determine the number of Magnet students resid ing in each District and attending a Magnet School. 1. Projected Ending Date Last day of each month, August - June. 2. Actual as of December 31 , 2003 Based on the information available, the ADE calculated at November 30, 2003 for FY 03/04, subject to periodic adjustments. E. Desegregation Staff Attorney reports the Magnet Operational Charge to the Fiscal Services Office. 1. Projected Ending Date Ongoing, as ordered by the Court. 2 I. FINANCIAL OBLIGATIONS (Continued) E. Desegregation Staff Attorney reports the Magnet Operational Charge to the Fiscal Services Office. (Continued) 2. Actual as of December 31, 2003 Based on]he 1nforrnatjon available, the ADE calculated at November 30, 26()3 forfY 03704.: s(IbjJt(to perio'cl/c:~djustmerjts\nIt should be noted that currently the Magnet Review Committee is reporting this information instead of the staff attorney as indicated in the Implementation Plan. F. Calculate state aid due the LRSD based upon the Magnet Operational Charge. 1. Projected Ending Date Last day of each month, August - June. 2. Actual as of December 31 , 2003 Based on the inform'ation available, the ADE calculated at November 30, 2003 for FY 03/04, subject to periodic adjustments. G. Process and distribute state aid for Magnet Operational Charge. 1. Projected Ending Date Last day of each month, August - June. 2. Actual as of December 31, 2003 Distributions for FY 03/04 at November 30, 2003, totaled $4,534,018. Allotment calculated for FY 03/04 was $12,343,806 subject to periodic adjustments. H. Calculate the amount of M-to-M incentive money to which each school district is entitled. 1. Projected Ending Date Last day of each month, August - June. 2. Actual as of December 31 , 2003 Calculated for FY 02/03, subject to periodic adjustments. I. Process and distribute M-to-M incentive checks. 1. Projected Ending Date Last day of each month, September - June. 3 I. FINANCIAL OBLIGATIONS (Continued) I. Process and distribute M-to-M incentive checks. (Continued) 2. Actual as of December 31, 2003 Distributions for FY 03/04 at November 30, 2003 were: i.RSD : $1 '.0 105,266 NLRSD - $777,0?4 pcsso - $2,7.92,91~ The allotments calc4iated for FY 03/04 at November 30, 2003, subject to periocfic adjustments, were: LRSD - $3,684,217 NLRSD - $2,590,278 PCSSD - $9,309,708 J. Districts submit an estimated Magnet and M-to-M transportation budget to ADE. 1. Projected Ending Date Ongoing, December of each year. 2. Actual as of December 31 , 2003 In September 2002, the Magnet and M-to-M transportation budgets for FY 02/03 were submitted to the ADE by the Districts. K. The Coordinator of School Transportation notifies General Finance to pay districts for the Districts' proposed budget. 1. Projected Ending Date Ongoing, annually. 2. Actual as of December 31, 2003 In January 2003, General Finance was notified to pay the second one-third payment for FY 02/03 to the Districts. It should be noted that the Transportation Coordinator is currently performing this function instead of Reginald Wilson as indicated in the Implementation Plan. L. ADE pays districts three equal installments of their proposed budget. 1. Projected Ending Date Ongoing, annually. 4 I. FINANCIAL OBLIGATIONS (Continued) L. ADE pays districts three equal installments of their proposed budget. (Continued) 2. Actual as of December 31 , 2003 In September 2003, General Finance made the last one-third payment to the Districts for their FY 02/03 transportation budget. The budget is now paid out in three equal installments. At September 2003, the following had been paid for FY 02/03: LRSD - $3,835,562.00 NLRSD - $742,399.62 PCSSD - $2,252,050.92 In September 2003, General Finance made the first one-third payment to the Districts for their FY 03/04 transportation budget. The budget is now paid out in three equal installments. At September 2003, the following had been paid for FY 03/04: LRSD - $1 ,243,841 .33 NLRSD - $263,000.00 PCSSD - $727,406.63 M. ADE verifies actual expenditures submitted by Districts and reviews each bill with each District's transportation coordinator. 1. Projected Ending Date Ongoing, annually. 2. Actual as of December 31 , 2003 In August 1997, the ADE transportation coordinator reviewed each district's Magnet and M-to-M transportation costs for FY 96/97. In July 1998, each district was asked to submit an estimated budget for the 98/99 school year. In September 1998, paperwork was generated for the first payment in the 98/99 school year for the Magnet and M-to-M transportation program. School districts should receive payment by October 1, 1998 In July 1999, each district submitted an estimated budget for the 99/00 school year. In September 1999, paperwork was generated for the first payment in the 99/00 school year for the Magnet and M-to-M transportation program. 5 I. FINANCIAL OBLIGATIONS (Continued) M. ADE verifies actual expenditures submitted by Districts and reviews each bill with each District's transportation coordinator. (Continued) 2. Actual as of December 31, 2003 (Continued) In September 2000, paperwork was generated for the first payment in the 00/01 school year for the Magnet and M-to-M transportation program. In September 2001 , paperwork was generated for the first payment in the 01/02 school year for the Magnet and M-to-M transportation program. In September 2002, paperwork was generated for the first payment in the 02/03 school year for the Magnet and M-to-M transportation program. In September 2003, paperwork was generated for the first payment in the 03/04 school year for the Magnet and M-to-M transportation program. N. Purchase buses for the Districts to replace existing Magnet and M-to-M fleets and to provide a larger fleet for the Districts' Magnet and M-to-M Transportation needs. 1. Projected Ending Date Ongoing, as stated in Exhibit A of the Implementation Plan. 2. Actual as of December 31, 2003 In FY 94/95, the State purchased 52 buses at a cost of $1 ,799,431 which were added to or replaced existing Magnet and M-to-M buses in the Districts. The buses were distributed to the Districts as follows: LRSD - 32\nNLRSD - 6\nand PCSSD - 14. The ADE purchased 64 Magnet and M-to-M buses at a cost of $2,334,800 in FY 95/96. The buses were distributed accordingly: LRSD - 45\nNLRSD - 7\nand PCSSD - 12. In May 1997, the ADE purchased 16 Magnet and M-to-M buses at a cost of $646,400. In July 1997, the ADE purchased 16 Magnet and M-to-M buses at a cost of $624,879. In July 1998, the ADE purchased 16 new Magnet and M-to-M buses at a cost of $695,235. The buses were distributed accordingly: LRSD - 8\nNLRSD - 2\nand PCSSD- 6. Specifications for 16 school buses have been forwarded to state purchasing for bidding in January, 1999 for delivery in July, 1999. 6 I. FINANCIAL OBLIGATIONS (Continued) N. Purchase buses for the Districts to replace existing Magnet and M-to-M fleets and to provide a larger fleet for the Districts' Magnet and M-to-M Transportation needs. (Continued) 2. Actual as of December 31 , 2003 (Continued) The ADE accepted a bid on 16 buses for the Magnet and M/M transportation program. The buses will be delivered after July 1, 1999 and before August 1, 1999. The buses will be distributed accordingly: LRSD - 8\nNLRSD - 2\nPCSSD - 6. In July 1999, the ADE purchased 16 new Magnet and M-to-M buses at a cost of $718,355. The buses were distributed accordingly: LRSD - 8\nNLRSD - 2\nand PCSSD-6. In July 2000, the ADE purchased 16 new Magnet and M-to-M buses at a cost of $724,165. The buses were distributed accordingly: LRSD - 8\nNLRSD - 2\nand PCSSD- 6. The bid for 16 new Magnet and M-to-M buses was let by State Purchasing on February 22, 2001 . The contract was awarded to Ward Transportation Services, Inc. The buses to be purchased include two type C 47 passenger buses and fourteen type C 65 passenger buses. Prices on these units are $43,426.00 each on the 47 passenger buses, and $44,289.00 each on the 65 passenger buses. The buses will be distributed accordingly: LRSD - 8 of the 65 passenger\nNLRSD - 2 of the 65 passenger\nPCSSD - 2 of the 47 passenger and 4 of the 65 passenger buses. On August 2, 2001 , the ADE took possession of 16 new Magnet and M-to-M buses. The total amount paid was $706,898. In June 2002, a bid for 16 new Magnet and M-to-M buses was awarded to Ward Transportation Services, Inc. The buses to be purchased include five 47 passenger buses for $42,155.00 each, ten 65 passenger buses for $43,850.00 each, and one 47 passenger bus with a wheelchair lift for $46,952.00. The total amount was $696,227. In August of 2002, the ADE purchased 16 new Magnet and M-to-M buses. The total amount paid was $696,227. Specifications for 16 new Magnet and M-to-M school buses have been forwarded to State Purchasing for bidding. Bids will be opened on May 12, 2003. The buses will have a required delivery date after July 1, 2003 and before August 8, 2003. 7 I. FINANCIAL OBLIGATIONS (Continued) N. Purchase buses for the Districts to replace existing Magnet and M-to-M fleets and to provide a larger fleet for the Districts' Magnet and M-to-M Transportation needs. (Continued) 2. Actual as of December 31 , 2003 (Continued) In June 2003, a bid for 16 new Magnet and M-to-M buses was awarded to Ward Transportation Services, Inc. The buses to be purchased include 5 - 47 passenger buses for $47,052.00 each, and 11 - 65 passenger buses for $48,895.00 each. The total amount was $773,105. The buses will be distributed accordingly: LRSD - 8 of the 65 passenger\nNLRSD - 2 of the 65 passenger\nPCSSD - 5 of the 47 passenger and 1 of the 65 passenger buses. 0. Process and distribute compensatory education payments to LRSD as required by page 23 of the Settlement Agreement. P. 1. Projected Ending Date July 1 and January 1, of each school year through January 1, 1999. 2. Actual as of December 31 , 2003 Obligation fulfilled in FY 96/97. Process and distribute additional payments in lieu of formula to LRSD as required by page 24 of the Settlement Agreement. 1. Projected Ending Date Payment due date and ending July 1, 1995. 2. Actual as of December 31, 2003 Obligation fulfilled in FY 95/96. Q. Process and distribute payments to PCSSD as required by Page 28 of the Settlement Agreement. 1. Projected Ending Date Payment due date and ending July 1, 1994. 2. Actual as of December 31, 2003 Final payment was distributed July 1994. 8 I. FINANCIAL OBLIGATIONS (Continued) R. Upon loan request by LRSD accompanied by a promissory note, the ADE makes loans to LRSD. 1. Projected Ending Date Ongoing through July 1, 1999. See Settlement Agreement page 24. 2. Actual as of December 31 , 2003 The LRSD received $3,000,000 on September 10, 1998. As of this reporting date, the LRSD has received $20,000,000 in loan proceeds. S. Process and distribute payments in lieu of formula to PCSSD required by page 29 of the Settlement Agreement. T. 1. Projected Ending Date Payment due date and ending July 1, 1995. 2. Actual as of December 31 , 2003 Obligation fulfilled in FY 95/96. Process and distribute compensatory education payments to NLRSD as required by page 31 of the Settlement Agreement. 1. Projected Ending Date July 1 of each school year through June 30, 1996. 2. Actual as of December 31 , 2003 Obligation fulfilled in FY 95/96. U. Process and distribute check to Magnet Review Committee. 1. Projected Ending Date Payment due date and ending July 1, 1995. 2. Actual as of December 31 , 2003 Distribution in July 1997 for FY 97/98 was $75,000. This was the total amount due to the Magnet Review Committee for FY 97/98. Distribution in July 1998 for FY 98/99 was $75,000. This was the total amount due to the Magnet Review Committee for FY 98/99. 9 I. FINANCIAL OBLIGATIONS (Continued) U. Process and distribute check to Magnet Review Committee. (Continued) 2. Actual as of December 31, 2003 (Continued) Distribution in July 1999 for FY 99/00 was $92,500. This was the total amount due to the Magnet Review Committee for FY 99/00. Distribution in July 2000 for FY 00/01 was $92,500. This was the total amount due to the Magnet Review Committee for FY 00/01 . Distribution in August 2001 for FY 01/02 was $92,500. This was the total amount due to the Magnet Review Committee for FY 01/02. Distribution in July 2002 for FY 02/03 was $92,500. This was the total amount due to the Magnet Review Committee for FY 02/03. Distribution in July 2003 for FY 03/04 was $92,500. This was the total amount due to the Magnet Review Committee for FY 03/04. V. Process and distribute payments for Office of Desegregation Monitoring. 1. 2. Projected Ending Date Not applicable. Actual as of December 31 , 2003 Distribution in July 1997 for FY 97/98 was $200,000. This was the total amount due to the ODM for FY 97/98. Distribution in July 1998 for FY 98/99 was $200,000. This was the total amount due to the ODM for FY 98/99. Distribution in July 1999 for FY 99/00 was $200,000. This was the total amount due to the ODM for FY 99/00. Distribution in July 2000 for FY 00/01 was $200,000. This was the total amount due to the ODM for FY 00/01 . Distribution in August 2001 for FY 01/02 was $200,000. This was the total amount due to the ODM for FY 01/02. Distribution in July 2002 for FY 02/03 was $200,000. This was the total amount due to the ODM for FY 02/03. Distribution in July 2003 for FY 03/04 was $200,000. This was the total amount due to the ODM for FY 03/04. 10 II. MONITORING COMPENSATORY EDUCATION A. Begin testing and evaluating the monitoring instrument and monitoring system to assure that data is appropriate and useful in monitoring the impacts of compensatory education programs on disparities in academic achievement for black students and white students. 1. Projected Ending Date January 15, 1995 2. Actual as of December 31, 2003 In May 1995, monitors completed the unannounced visits of schools in Pulaski County. The monitoring process involved a qualitative process of document reviews, interviews, and observations. The monitoring focused on progress made since the announced monitoring visits. In June 1995, monitoring data from unannounced visits was included in the July Semiannual Report. Twenty-five per cent of all classrooms were visited, and all of the schools in Pulaski County were monitored. All principals were interviewed to determine any additional progress since the announced visits. The July 1995 Monitoring Report was reviewed by the ADE administrative team, the Arkansas State Board of Education, and the Districts and filed with the Court. The report was formatted in accordance with the Allen Letter. In October 1995, a common terminology was developed by principals from the Districts and the Lead Planning and Desegregation staff to facilitate the monitoring process. The announced monitoring visits began on November 14, 1995 and were completed on January 26, 1996. Copies of the preliminary Semiannual Monitoring Report and its executive summary were provided to the ADE administrative team and the State Board of Education in January 1996. A report on the current status of the Cycle 5 schools in the ECOE process and their school improvement plans was filed with the Court on February 1, 1996. The unannounced monitoring visits began in February 1996 and ended on May 10, 1996. In June 1996, all announced and unannounced monitoring visits were completed, and the data was analyzed using descriptive statistics. The Districts provided data on enrollment in compensatory education programs. The Districts and the ADE Desegregation Monitoring staff developed a definition for instructional programs. 11 II. MONITORING COMPENSATORY EDUCATION (Continued) A. Begin testing and evaluating the monitoring instrument and monitoring system to assure that data is appropriate and useful in monitoring the impacts of compensatory education programs on disparities in academic achievement for black students and white students. (Continued) 2. Actual as of December 31 , 2003 (Continued) The Semiannual Monitoring Report was completed and filed with the Court on July 15, 1996 with copies distributed to the parties. Announced monitoring visits of the Cycle 1 schools began on October 28, 1996 and concluded in December 1996. In January 1997, presentations were made to the State Board of Education, the Desegregation Litigation Oversight Subcommittee, and the parties to review the draft Semiannual Monitoring Report. The monitoring instrument and process were evaluated for their usefulness in monitoring the impacts of compensatory education programs on achievement disparities. In February 1997, the Semiannual Monitoring Report was filed . Unannounced monitoring visits began on February 3, 1997 and concluded in May 1997. In March 1997, letters were sent to the Districts regarding data requirements for the July 1997 Semiannual Monitoring Report and the additional discipline data element that was requested by the Desegregation Litigation Oversight Subcommittee. Desegregation data collection workshops were conducted in the Districts from March 28, 1997 to April 7, 1997. A meeting was conducted on April 3, 1997 to finalize plans for the July 15, 1997 Semiannual Monitoring Report. Onsite visits were made to Cycle 1 schools who did not submit accurate and timely data on discipline, M-to-M transfers, and policy. The July 15, 1997 Semiannual Monitoring Report and its executive summary were finalized in June 1997. In July 1997, the Semiannual Monitoring Report and its executive summary were filed with the court, and the ADE sponsored a School Improvement Conference. On July 10, 1997, copies of the Semiannual Monitoring Report and its executive summary were made available to the Districts for their review prior to filing it with the Court. In August 1997, procedures and schedules were organized for the monitoring of the Cycle 2 schools in FY 97 /98. 12 II. MONITORING COMPENSATORY EDUCATION (Continued) A. Begin testing and evaluating the monitoring instrument and monitoring system to assure that data is appropriate and useful in monitoring the impacts of compensatory education programs on disparities in academic achievement for black students and white students. (Continued) 2. Actual as of December 31 , 2003 (Continued) A Desegregation Monitoring and School Improvement Workshop for the Districts was held on September 10, 1997 to discuss monitoring expectations, instruments, data collection and school improvement visits. On October 9, 1997, a planning meeting was held with the desegregation monitoring staff to discuss deadlines, responsibilities, and strategic planning issues regarding the Semiannual Monitoring Report. Reminder letters were sent to the Cycle 2 principals outlining the data collection deadlines and availability of technical assistance. In October and November 1997, technical assistance visits were conducted, and announced monitoring visits of the Cycle 2 schools were completed. In December 1997 and January 1998, technical assistance visits were conducted regarding team visits, technical review recommendations, and consensus building. Copies of the infusion document and perceptual surveys were provided to schools in the ECOE process. The February 1998 Semiannual Monitoring Report was submitted for review and approval to the State Board of Education, the Director, the Administrative Team, the Attorney General's Office, and the Desegregation Litigation Oversight Subcommittee. Unannounced monitoring visits began in February 1998, and technical assistance was provided on the school improvement process, external team visits and finalizing school improvement plans. On February 18, 1998, the representatives of all parties met to discuss possible revisions to the ADE's monitoring plan and monitoring reports. Additional meetings will be scheduled. Unannounced monitoring visits were conducted in March 1998, and technical assistance was provided on the school improvement process and external team visits. In April 1998, unannounced monitoring visits were conducted , and technical assistance was provided on the school improvement process. 13 II. MONITORING COMPENSATORY EDUCATION (Continued) A. Begin testing and evaluating the monitoring instrument and monitoring system to assure that data is appropriate and useful in monitoring the impacts of compensatory education programs on disparities in academic achievement for black students and white students. (Continued) 2. Actual as of December 31 , 2003 (Continued) In May 1998, unannounced monitoring visits were completed, and technical assistance was provided on the school improvement process. On May 18, 1998, the Court granted the ADE relief from its obligation to file the July 1998 Semiannual Monitoring Report to develop proposed modifications to ADE's monitoring and reporting obligations. In June 1998, monitoring information previously submitted by the districts in the Spring of 1998 was reviewed and prepared for historical files and presentation to the Arkansas State Board. Also, in June the following occurred: a) The Extended COE Team Visit Reports were completed, b) the Semiannual Monitoring COE Data Report was completed, c) progress reports were submitted from previous cycles, and d.) staff development on assessment (SAT-9) and curriculum alignment was conducted with three supervisors. In July, the Lead Planner provided the Desegregation Litigation Oversight Committee with (1) a review of the court Order relieving ADE of its obligation to file a July Semiannual Monitoring Report, and (2) an update of ADE's progress toward work with the parties and ODM to develop proposed revisions to ADE's monitoring and reporting obligations. The Committee encouraged ODM, the parties and the ADE to continue to work toward revision of the monitoring and reporting process. In August 1998, the ADE Implementation Phase Working group met to review the Implementation Phase activities for the previous quarter. The Assistant Attorney General, the Assistant Director for Accountability and the Education Lead Planner updated the group on all relevant desegregation legal issues and proposed revisions to monitoring and reporting activities during the quarter. In September 1998, tentative monitoring dates were established and they will be finalized once proposed revisions to the Desegregation Monitoring Plan are finalized and approved. In September/October 1998, progress was being made on the proposed revisions to the monitoring process by committee representatives of all the Parties in the Pulaski County Settlement Agreement. While the revised monitoring plan is finalized and approved, the ADE monitoring staff will continue to provide technical assistance to schools upon request. 14 II. MONITORING COMPENSATORY EDUCATION (Continued) A. Begin testing and evaluating the monitoring instrument and monitoring system to assure that data is appropriate and useful in monitoring the impacts of compensatory education programs on disparities in academic achievement for black students and white students. (Continued) 2. Actual as of December 31 , 2003 (Continued) In December 1998, requests were received from schools in PCSSD regarding test score analysis and staff Development. Oak Grove is scheduled for January 21 , 1999 and Lawson Elementary is also tentatively scheduled in January. Staff development regarding test score analysis for Oak Grove and Lawson Elementary in the PCSSD has been rescheduled for April 2000. Staff development regarding test score analysis for Oak Grove and Lawson Elementary in the PCSSD was conducted on May 5, 2000 and May 9, 2000 respectively. Staff development regarding classroom management was provided to the Franklin Elementary School in LRSD on November 8, 2000. Staff development regarding ways to improve academic achievement was presented to College Station Elementary in PCSSD on November 22, 2000. On November 1, 2000, the ADE Implementation Phase Working group met to review the Implementation Phase activities for the previous quarter. The Assistant Director for Accountability updated the group on all relevant desegregation legal issues and discussed revisions to monitoring and reporting activities during the quarter. The next Implementation Phase Working Group Meeting is scheduled for February 27, 2001 in room 201-A at the ADE. The Implementation Phase Working Group meeting that was scheduled for February 27 had to be postponed. It will be rescheduled as soon as possible. The quarterly Implementation Phase Working Group meeting is scheduled for June 27, 2001 . The quarterly Implementation Phase Working Group meeting was rescheduled from June 27. It will take place on July 26, 2001 in room 201-A at 1 :30 p.m. at the ADE. 15 II. MONITORING COMPENSATORY EDUCATION (Continued) A. Begin testing and evaluating the monitoring instrument and monitoring system to assure that data is appropriate and useful in monitoring the impacts of compensatory education programs on disparities in academic achievement for black students and white students. (Continued) 2. Actual as of December 31 , 2003 (Continued) On July 26, 2001 , the ADE Implementation Phase Working group met to review the Implementation Phase activities for the previous quarter. Mr. Willie Morris, ADE Lead Planner for Desegregation, updated the group on all relevant desegregation issues. Mr. Mark Hagemeier, Assistant Attorney General, and Mr. Scott Smith, ADE Staff Attorney, discussed the court case involving the LRSD seeking unitary status. The next Implementation Phase Working Group Meeting is scheduled for October 11 , 2001 in room 201-A at the ADE. On October 11 , 2001, the ADE Implementation Phase Working group met to review the Implementation Phase activities for the previous quarter. Mr. Willie Morris, ADE Lead Planner for Desegregation, updated the group on all relevant desegregation issues. Mr. Scott Smith, ADE Staff Attorney, discussed the ADE's intent to take a proactive role in Desegregation Monitoring. The next Implementation Phase Working Group Meeting is scheduled for January 10, 2002 in room 201-A at the ADE. The Implementation Phase Working Group Meeting that was scheduled for January 10 was postponed. It has been rescheduled for February 14, 2002 in room 201-A at the ADE. On February 12, 2002, the ADE Implementation Phase Working group met to review the Implementation Phase activities for the previous quarter. Mr. Willie Morris, ADE Lead Planner for Desegregation, updated the group on all relevant desegregation issues. Mr. Mark Hagemeier, Assistant Attorney General, discussed the court case involving the LRSD seeking unitary status. The next Implementation Phase Working Group Meeting is scheduled for April 11 , 2002 in room 201-A at the ADE. On April 11 , 2002, the ADE Implementation Phase Working group met to review the Implementation Phase activities for the previous quarter. Mr. Willie Morris, ADE Lead Planner for Desegregation, updated the group on all relevant desegregation issues. Mr. Mark Hagemeier, Assistant Attorney General, discussed the court case involving the LRSD seeking unitary status. The next Implementation Phase Working Group Meeting is scheduled for July 11 , 2002 in room 201-A at the ADE. 16 II. MONITORING COMPENSATORY EDUCATION (Continued) A. Begin testing and evaluating the monitoring instrument and monitoring system to assure that data is appropriate and useful in monitoring the impacts of compensatory education programs on disparities in academic achievement for black students and white students. (Continued) 2. Actual as of December 31 , 2003 (Continued) On July 18, 2002, the ADE Implementation Phase Working group met to review the Implementation Phase activities for the previous quarter. Mr. Willie Morris, ADE Lead Planner for Desegregation, updated the group on all relevant desegregation issues. Dr. Charity Smith, Assistant Director for Accountability, talked about section XV in the Project Management Tool (PMT) on Standardized Test Selection to Determine Loan Forgiveness. She said that the goal has been completed, and no additional reporting is required for section XV. Mr. Morris discussed the court case involving the LRSD seeking unitary status. He handed out a Court Order from May 9, 2002, which contained comments from U.S. District Judge Bill Wilson Jr., about hearings on the LRSD request for unitary status. Mr. Morris also handed out a document from the Secretary of Education about the No Child Left Behind Act. There was discussion about how this could have an affect on Desegregation issues. The next Implementation Phase Working Group Meeting is scheduled for October 10, 2002 at 1 :30 p.m. in room 201-A at the ADE. The quarterly Implementation Phase Working Group meeting was rescheduled from October 10. It will take place on October 29, 2002 in room 201-A at 1:30 p.m. at the ADE. On October 29, 2002, the ADE Implementation Phase Working Group met to review the Implementation Phase activities for the previous quarter. Mr. Willie Morris, ADE Lead Planner for Desegregation, updated the group on all relevant desegregation issues. Meetings with the parties to discuss possible revisions to the AD E's monitoring plan will be postponed by request of the school districts in Pulaski County. Additional meetings could be scheduled after the Desegregation ruling is finalized. The next Implementation Phase Working Group Meeting is scheduled for January 9, 2003 at 1 :30 p.m. in room 201-A at the ADE. On January 9, 2003, the ADE Implementation Phase Working Group met to review the Implementation Phase activities for the previous quarter. Mr. Willie Morris, ADE Lead Planner for Desegregation, updated the group on all relevant desegregation issues. No Child Left Behind and the Desegregation ruling on unitary status for LRSD were discussed. The next Implementation Phase Working Group Meeting is scheduled for April 10, 2003 at 1 :30 p.m. in room 201- A at the ADE. The quarterly Implementation Phase Working Group meeting was rescheduled from April 10. It will take place on April 24, 2003 in room 201-A at 1 :30 p.m. at the ADE. 17 II. MONITORING COMPENSATORY EDUCATION (Continued) A. Begin testing and evaluating the monitoring instrument and monitoring system to assure that data is appropriate and useful in monitoring the impacts of compensatory education programs on disparities in academic achievement for black students and white students. (Continued) 2. Actual as of December 31, 2003 (Continued) On April 24, 2003, the ADE Implementation Phase Working Group met to review the Implementation Phase activities for the previous quarter. Mr. Willie Morris, ADE Lead Planner for Desegregation, updated the group on all relevant desegregation issues. Laws passed by the legislature need to be checked to make sure none of them impede desegregation. Ray Lumpkin was chairman of the last committee to check legislation. Since he left, we will discuss the legislation with Clearence Lovell. The Desegregation ruling on unitary status for LRSD was discussed. The next Implementation Phase Working Group Meeting is scheduled for July 10, 2003 at 1 :30 p.m. in room 201-A at the ADE. On August 28, 2003, the ADE Implementation Phase Working Group met to review the Implementation Phase activities for the previous quarter. Mr. Willie Morris, ADE Lead Planner for Desegregation, updated the group on all relevant desegregation issues. The Desegregation ruling on unitary status for LRSD was discussed. The LRSD has been instructed to submit evidence showing progress in reducing disparities in academic achievement for black students and white students. This is supposed to be done by March of 2004, so that the LRSD can achieve unitary status. The next Implementation Phase Working Group Meeting is scheduled for October 9, 2003 at the ADE. On October 9, 2003, the ADE Implementation Phase Working Group met to review the Implementation Phase activities for the previous quarter. Mr. Willie Morris, ADE Lead Planner for Desegregation, updated the group on all relevant desegregation issues. Mark Hagemeier, Assistant Attorney General, discussed the Desegregation ruling on unitary status for LRSD. The next Implementation Phase Working Group Meeting is scheduled for January 8, 2004 at the ADE. On October 16, 2003, ADE staff met with the Desegregation Litigation Oversight Subcommittee at the State Capitol. Mr. Willie Morris, ADE Lead Planner for Desegregation, and Dr. Charity Smith, Assistant Director for Accountability, presented the Chronology of activity by the ADE in complying with provisions of the Implementation Plan for the Desegregation Settlement Agreement. They also discussed the role of the ADE Desegregation Monitoring Section. Mr. Mark Hagemeier, Assistant Attorney General, and Scott Smith, ADE Staff Attorney, reported on legal issues relating to the Pulaski County Desegregation Case. Ann Marshall shared a history of activities by ODM, and their view of the activity of the school districts in Pulaski County. John Kunkel discussed Desegregation funding by the ADE. 18 Ill. A PETITION FOR ELECTION FOR LRSD WILL BE SUPPORTED SHOULD A MILLAGE BE REQUIRED A. Monitor court pleadings to determine if LRSD has petitioned the Court for a special election. 1. Projected Ending Date Ongoing. 2. Actual as of December 31, 2003 Ongoing. All Court pleadings are monitored monthly. B. Draft and file appropriate pleadings if LRSD petitions the Court for a special election. 1. Projected Ending Date Ongoing 2. Actual as of December 31 , 2003 To date, no action has been taken by the LRSD. 19 IV. REPEAL STATUTES AND REGULATIONS THAT IMPEDE DESEGREGATION A. Using a collaborative approach, immediately identify those laws and regulations that appear to impede desegregation. 1. Projected Ending Date December, 1994 2. Actual as of December 31, 2003 The information for this item is detailed under Section IV.E. of this report. 8 . Conduct a review within ADE of existing legislation and regulations that appear to impede desegregation. 1. Projected Ending Date November, 1994 2. Actual as of December 31, 2003 The information for this item is detailed under Section IV.E. of this report. C. Request of the other parties to the Settlement Agreement that they identify laws and regulations that appear to impede desegregation. 1. Projected Ending Date November, 1994 2. Actual as of December 31, 2003 The information for this item is detailed under Section IV.E. of this report. D. Submit proposals to the State Board of Education for repeal of those regulations that are confirmed to be impediments to desegregation. 1. Projected Ending Date Ongoing 2. Actual as of December 31, 2003 The information for this item is detailed under Section IV.E. of this report. 20 IV. REPEAL STATUTES AND REGULATIONS THAT IMPEDE DESEGREGATION (Continued) E. Submit proposals to the Legislature for repeal of those laws that appear to be impediments to desegregation. 2. Actual as of December 31, 2003 A committee within the ADE was formed in May 1995 to review and collect data on existing legislation and regulations identified by the parties as impediments to desegregation. The committee researched the Districts' concerns to determine if any of the rules, regulations, or legislation cited impede desegregation. The legislation cited by the Districts regarding loss funding and worker's compensation were not reviewed because they had already been litigated. In September 1995, the committee reviewed the following statutes, acts, and regulations: Act 113 of 1993\nADE Director's Communication 93-205\nAct 145 of 1989\nADE Director's Memo 91-67\nADE Program Standards Eligibility Criteria for Special Education\nArkansas Codes 6-18-206, 6-20-307, 6-20-319, and 6-17- 1506. In October 1995, the individual reports prepared by committee members in their areas of expertise and the data used to support their conclusions were submitted to the ADE administrative team for their review. A report was prepared and submitted to the State Board of Education in July 1996. The report concluded that none of the items reviewed impeded desegregation. As of February 3, 1997, no laws or regulations have been determined to impede desegregation efforts. Any new education laws enacted during the Arkansas 81 st Legislative Session will be reviewed at the close of the legislative session to ensure that they do not impede desegregation. In April 1997, copies of all laws passed during the 1997 Regular Session of the 81 st General Assembly were requested from the office of the ADE Liaison to the Legislature for distribution to the Districts for their input and review of possible impediments to their desegregation efforts. In August 1997, a meeting to review the statutes passed in the prior legislative session was scheduled for September 9, 1997. 21 IV. REPEAL STATUTES AND REGULATIONS THAT IMPEDE DESEGREGATION (Continued) E. Submit proposals to the Legislature for repeal of those laws that appear to be impediments to desegregation. (Continued) 2. Actual as of December 31 , 2003 (Continued) On September 9, 1997, a meeting was held to discuss the review of the statutes passed in the prior legislative session and new ADE regulations. The Districts will be contacted in writing for their input regarding any new laws or regulations that they feel may impede desegregation. Additionally, the Districts will be asked to review their regulations to ensure that they do not impede their desegregation efforts. The committee will convene on December 1, 1997 to review their findings and finalize their report to the Administrative Team and the State Board of Education. In October 1997, the Districts were asked to review new regulations and statutes for impediments to their desegregation efforts, and advise the ADE, in writing, if they feel a regulation or statute may impede their desegregation efforts. In October 1997, the Districts were requested to advise the ADE, in writing, no later than November 1, 1997 of any new law that might impede their desegregation efforts. As of November 12, 1997, no written responses were received from the Districts. The ADE concludes that the Districts do not feel that any new law negatively impacts their desegregation efforts. The committee met on December 1, 1997 to discuss their findings regarding statutes and regulations that may impede the desegregation efforts of the Districts. The committee concluded that there were no laws or regulations that impede the desegregation efforts of the Districts. It was decided that the committee chair would prepare a report of the committee's findings for the Administrative Team and the State Board of Education. The committee to review statutes and regulations that impede desegregation is now reviewing proposed bills and regulations, as well as laws that are being signed in, for the current 1999 legislative session. They will continue to do so until the session is over. The committee to review statutes and regulations that impede desegregation will meet on April 26, 1999 at the ADE. The committee met on April 26, 1999 at the ADE. The purpose of the meeting was to identify rules and regulations that might impede desegregation, and review within the existing legislation any regulations that might result in an impediment to desegregation. This is a standing committee that is ongoing and a report will be submitted to the State Board of Education once the process is completed. 22 IV. REPEAL STATUTES AND REGULATIONS THAT IMPEDE DESEGREGATION (Continued) E. Submit proposals to the Legislature for repeal of those laws that appear to be impediments to desegregation. (Continued) 2. Actual as of December 31 , 2003 (Continued) The committee met on May 24, 1999 at the ADE. The committee was asked to review within the existing legislation any regulations that might result in an impediment to desegregation. The committee determined that Mr. Ray Lumpkin would contact the Pulaski County districts to request written response to any rules, regulations or laws that might impede desegregation. The committee would also collect information and data to prepare a report for the State Board. This will be a standing committee. This data gathering will be ongoing until the final report is given to the State Board. On July 26, 1999, the committee met at the ADE. The committee did not report any laws or regulations that they currently thought would impede desegregation, and are still waiting for a response from the three districts in Pulaski County. The committee met on August 30, 1999 at the ADE to review rules and regulations that might impede desegregation. At that time, there were no laws under review that appeared to impede desegregation. In November, the three districts sent letters to the ADE stating that they have reviewed the laws passed by the 82nd legislative session as well as current rules \u0026amp; regulations and district policies to ensure that they have no ill effect on desegregation efforts. There was some concern from PCSSD concerning a charter school proposal in the Maumelle area. The work of the committee is on-going each month depending on the information that comes before the committee. Any rules, laws or regulations that would impede desegregation will be discussed and reported to the State Board of Education. On October 4, 2000, the ADE presented staff development for assistant superintendents in LRSD, NLRSD and PCSSD regarding school laws of Arkansas. The ADE is in the process of forming a committee to review all Rules and Regulations from the ADE and State Laws that might impede desegregation. The ADE Committee on Statutes and Regulations will review all new laws that might impede desegregation once the 83rd General Assembly has completed this session. The ADE Committee on Statutes and Regulations will meet for the first time on June 11 , 2001 at 9:00 a.m. in room 204-A at the ADE. The committee will review all new laws that might impede desegregation that were passed during the 2001 Legislative Session. 23 IV. REPEAL STATUTES AND REGULATIONS THAT IMPEDE DESEGREGATION (Continued) E. Submit proposals to the Legislature for repeal of those laws that appear to be impediments to desegregation. (Continued) 2. Actual as of December 31 , 2003 (Continued) The ADE Committee on Statutes and Regulations rescheduled the meeting that was planned for June 11 , in order to review new regulations proposed to the State Board of Education. The meeting will take place on July 16, 2001 at 9:00 a.m. at the ADE. The ADE Committee to Repeal Statutes and Regulations that Impede Desegregation met on July 16, 2001 at the ADE. The following Items were discussed: (1) Review of 2001 state laws which appear to impede desegregation. (2) Review of existing ADE regulations which appear to impede desegregation. (3) Report any laws or regulations found to impede desegregation to the Arkansas State Legislature, the ADE and the Pulaski County school districts. The next meeting will take place on August 27, 2001 at 9:00 a.m. at the ADE. The ADE Committee to Repeal Statutes and Regulations that Impede Desegregation met on August 27, 2001 at the ADE. The Committee is reviewing all relevant laws or regulations produced by the Arkansas State Legislature, the ADE and the Pulaski County school districts in FY 2000/2001 to determine if they may impede desegregation. The next meeting will take place on September 10, 2001 in Conference Room 204-B at 2:00 p.m. at the ADE. The ADE Committee to Repeal Statutes and Regulations that Impede Desegregation met on September 10, 2001 at the ADE. The Committee is reviewing all relevant laws or regulations produced by the Arkansas State Legislature, the ADE and the Pulaski County school districts in FY 2000/2001 to determine if they may impede desegregation. The next meeting will take place on October 24, 2001 in Conference Room 204-B at 2:00 p.m. at the ADE. The ADE Committee to Repeal Statutes and Regulations that Impede Desegregation met on October 24, 2001 at the ADE. The Committee is reviewing all relevant laws or regulations produced by the Arkansas State Legislature, the ADE and the Pulaski County school districts in FY 2000/2001 to determine if they may impede desegregation. On December 17, 2001, the ADE Committee to Repeal Statutes and Regulations that Impede Desegregation composed letters that will be sent to the school districts in Pulaski County. The letters ask for input regarding any new laws or regulations that may impede desegregation. Laws to review include those of the 83rd General Assembly, ADE regulations, and regulations of the Districts. 24 IV. REPEAL STATUTES AND REGULATIONS THAT IMPEDE DESEGREGATION (Continued) E. Submit proposals to the Legislature for repeal of those laws that appear to be impediments to desegregation. (Continued) 2. Actual as of December 31 , 2003 (Continued) On January 10, 2002, the ADE Committee to Repeal Statutes and Regulations that Impede Desegregation sent letters to the school districts in Pulaski County. The letters ask for input regarding any new laws or regulations that may impede desegregation. The districts were asked to respond by March 8, 2002. On March 5, 2002, A letter was sent from the LRSD which mentioned Act 17 48 and Act 1667 passed during the 83rd Legislative Session which may impede desegregation. These laws will be researched to determine if changes need to be made. A letter was sent from the NLRSD on March 19, noting that the district did not find any laws which impede desegregation. On April 26, 2002, A letter was sent for the PCSSD to the ADE, noting that the district did not find any laws which impede desegregation except the \"deannexation\" legislation which the District opposed before the Senate committee. On October 27, 2003, the ADE sent letters to the school districts in Pulaski County asking if there were any new laws or regulations that may impede desegregation. The districts were asked to review laws passed during the 84th Legislative Session, any new ADE rules or regulations, and district policies. 25 V. COMMITMENT TO PRINCIPLES A. Through a preamble to the Implementation Plan, the Board of Education will reaffirm its commitment to the principles of the Settlement Agreement and outcomes of programs intended to apply those principles. 1. Projected Ending Date Ongoing 2. Actual as of December 31, 2003 The preamble was contained in the Implementation Plan filed with the Court on March 15, 1994. B. Through execution of the Implementation Plan, the Board of Education will continue to reaffirm its commitment to the principles of the Settlement Agreement and outcomes of programs intended to apply those principles. 1. Projected Ending Date Ongoing 2. Actual as of December 31, 2003 Ongoing C. Through execution of the Implementation Plan, the Board of Education will continue to reaffirm its commitment to the principles of the Settlement Agreement by actions taken by ADE in response to monitoring results. 1. Projected Ending Date Ongoing 2. Actual as of December 31, 2003 Ongoing D. Through regular oversight of the Implementation Phase's Project Management Tool, and scrutiny of results of ADE's actions, the Board of Education will act on its commitment to the principles of the Settlement Agreement. 1. Projected Ending Date Ongoing 26 V. COMMITMENT TO PRINCIPLES (Continued) D. Through regular oversight of the Implementation Phase's Project Management Tool, and scrutiny of results of ADE's actions, the Board of Education will act on its commitment to the principles of the Settlement Agreement. (Continued) 2. Actual as of December 31, 2003 At each regular monthly meeting of the State Board of Education, the Board is provided copies of the most recent Project Management Tool (PMT) and an executive summary of the PMT for their review and approval. Only activities that are in addition to the Board's monthly review of the PMT are detailed below. In May 1995, the State Board of Education was informed of the total number of schools visited during the monitoring phase and the data collection process. Suggestions were presented to the State Board of Education on how recommendations could be presented in the monitoring reports. In June 1995, an update on the status of the pending Semiannual Monitoring Report was provided to the State Board of Education. In July 1995, the July Semiannual Monitoring Report was reviewed by the State Board of Education. On August 14, 1995, the State Board of Education was informed of the need to increase minority participation in the teacher scholarship program and provided tentative monitoring dates to facilitate reporting requests by the ADE administrative team and the Desegregation Litigation Oversight Subcommittee. In September 1995, the State Board of Education was advised of a change in the PMT from a table format to a narrative format. The Board was also briefed about a meeting with the Office of Desegregation Monitoring regarding the PMT. In October 1995, the State Board of Education was updated on monitoring timelines. The Board was also informed of a meeting with the parties regarding a review of the Semiannual Monitoring Report and the monitoring process, and the progress of the test validation study. In November 1995, a report was made to the State Board of Education regarding the monitoring schedule and a meeting with the parties concerning the development of a common terminology for monitoring purposes. In December 1995, the State Board of Education was updated regarding announced monitoring visits. In January 1996, copies of the draft February Semiannual Monitoring Report and its executive summary were provided to the State Board of Education. 27 V. COMMITMENT TO PRINCIPLES (Continued) D. Through regular oversight of the Implementation Phase's Project Management Tool, and scrutiny of results of ADE's actions, the Board of Education will act on its commitment to the principles of the Settlement Agreement. (Continued) 2. Actual as of December 31, 2003 (Continued) During the months of February 1996 through May 1996, the PMT report was the only item on the agenda regarding the status of the implementation of the Monitoring Plan. In June 1996, the State Board of Education was updated on the status of the bias review study. In July 1996, the Semiannual Monitoring Report was provided to the Court, the parties, ODM, the State Board of Education, and the Desegregation Litigation Oversight Subcommittee. In August 1996, the State Board of Education and the ADE administrative team were provided with copies of the test validation study prepared by Dr. Paul Williams. During the months of September 1996 through December 1996, the PMT was the only item on the agenda regarding the status of the implementation of the Monitoring Plan. On January 13, 1997, a presentation was made to the State Board of Education regarding the February 1997 Semiannual Monitoring Report, and copies of the report and its executive summary were distributed to all Board members. The Project Management Tool and its executive summary were addressed at the February 10, 1997 State Board of Education meeting regarding the ADE's progress in fulfilling their obligations as set forth in the Implementation Plan. In March 1997, the State Board of Education was notified that historical information in the PMT had been summarized at the direction of the Assistant Attorney General in order to reduce the size and increase the clarity of the report. The Board was updated on the Pulaski County Desegregation Case and reviewed the Memorandum Opinion and Order issued by the Court on February 18, 1997 in response to the Districts' motion for summary judgment on the issue of state funding for teacher retirement matching contributions. During the months of April 1997 through June 1997, the PMTwas the only item on the agenda regarding the status of the implementation of the Monitoring Plan. The State Board of Education received copies of the July 15, 1997 Semiannual Monitoring Report and executive summary at the July Board meeting. 28 V. COMMITMENT TO PRINCIPLES (Continued) D. Through regular oversight of the Implementation Phase's Project Management Tool, and scrutiny of results of ADE's actions, the Board of Education will act on its commitment to the principles of the Settlement Agreement. (Continued) 2. Actual as of December 31, 2003 (Continued) The Implementation Phase Working Group held its quarterly meeting on August 4, 1997 to discuss the progress made in attaining the goals set forth in the Implementation Plan and the critical areas for the current quarter. A special report regarding a historical review of the Pulaski County Settlement Agreement and the ADE's role and monitoring obligations were presented to the State Board of Education on September 8, 1997. Additionally, the July 15, 1997 Semiannual Monitoring Report was presented to the Board for their review. In October 1997, a special draft report regarding disparity in achievement was submitted to the State Board Chairman and the Desegregation Litigation Oversight Subcommittee. In November 1997, the State Board of Education was provided copies of the monthly PMT and its executive summary. The Implementation Phase Working Group held its quarterly meeting on November 3, 1997 to discuss the progress made in attaining the goals set forth in the Implementation Plan and the critical areas for the current quarter. In December 1997, the State Board of Education was provided copies of the monthly PMT and its executive summary. In January 1998, the State Board of Education reviewed and discussed ODM's report on the ADE's monitoring activities and instructed the Director to meet with the parties to discuss revisions to the ADE's monitoring plan and monitoring reports. In February 1998, the State Board of Education reviewed and approved the PMT and discussed the February 1998 Semiannual Monitoring Report. In March 1998, the State Board of Education reviewed and approved the PMT and its executive summary and was provided an update regarding proposed revisions to the monitoring process. In April 1998, the State Board of Education reviewed and approved the PMT and its executive summary. In May 1998, the State Board of Education reviewed and approved the PMT and its executive summary. 29 V. COMMITMENT TO PRINCIPLES (Continued) D. Through regular oversight of the Implementation Phase's Project Management Tool, and scrutiny of results of ADE's actions, the Board of Education will act on its commitment to the principles of the Settlement Agreement. (Continued) 2. Actual as of December 31 , 2003 (Continued) In June 1998, the State Board of Education reviewed and approved the PMT and its executive summary. The State Board of Education also reviewed how the ADE would report progress in the PMT concerning revisions in ADE's Monitoring Plan. In July 1998, the State Board of Education reviewed and approved the PMT and its executive summary. The State Board of Education also received an update on Test Validation, the Desegregation Litigation Oversight Committee Meeting, and revisions in ADE's Monitoring Plan. In August 1998, the State Board of Education reviewed and approved the PMT and its executive summary. The Board also received an update on the five discussion points regarding the proposed revisions to the monitoring and reporting process. The Board also reviewed the basic goal of the Minority Recruitment Committee. In September 1998, the State Board of Education reviewed the proposed modifications to the Monitoring plans by reviewing the common core of written response received from the districts. The primary commonalities were (1) Staff Development, (2) Achievement Disparity and (3) Disciplinary Disparity. A meeting of the parties is scheduled to be conducted on Thursday, September 17, 1998. The Board encouraged the Department to identify a deadline for Standardized Test Validation and Test Selection. In October 1998, the Board received the progress report on Proposed Revisions to the Desegregation Monitoring and Reporting Process (see XVIII). The Board also reviewed and approved the PMT and its executive summary. In November, the Arkansas State Board of Education reviewed the PMT and its executive summary. The Board also received an update on the proposed revisions in the Desegregation monitoring Process and the update on Test validation and Test Selection provisions of the Settlement Agreement. The Board was also notified that the Implementation Plan Working Committee held its quarterly meeting to review progress and identify quarterly priorities. In December, the State Board of Education reviewed the PMT and its executive summary. The Board also received an update on the joint motion by the ADE, the LRSD, NLRSD, and the PCSSD, to relieve the Department of its obligation to file a February Semiannual Monitoring Report. The Board was also notified that the Joshua lntervenors filed a motion opposing the joint motion. The Board was informed that the ADE was waiting on a response from Court. 30 V. COMMITMENT TO PRINCIPLES (Continued) D. Through regular oversight of the Implementation Phase's Project Management Tool , and scrutiny of results of ADE's actions, the Board of Education will act on its commitment to the principles of the Settlement Agreement. (Continued) 2. Actual as of December 31 , 2003 (Continued) In January, the Arkansas State Board of Education reviewed the PMT and its executive summary. The Board also received an update on the joint motion of the ADE, LRSD, PCSSD, and NLRSD for an order relieving the ADE of filing a February 1999 Monitoring Report. The motion was granted subject to the following three conditions: (1) notify the Joshua intervenors of all meetings between the parties to discuss proposed changes, (2) file with the Court on or before February 1, 1999, a report detailing the progress made in developing proposed changes and (3) identify ways in which ADE might assist districts in their efforts to improve academic achievement. In February, the Arkansas State Board of Education reviewed the PMT and its executive summary. The Board was informed that the three conditions: (1) notify the Joshua lntervenors of all meetings between the parties to discuss proposed changes, (2) file with the Court on or before February 1, 1999, a report detailing the progress made in developing proposed changes and (3) identify ways in which ADE might assist districts in their efforts to improve academic achievement had been satisfied. The Joshua lntervenors were invited again to attend the meeting of the parties and they attended on January 13, and January 28, 1999. They are also scheduled to attend on February 17, 1998. The report of progress, a collaborative effort from all parties was presented to court on February 1, 1999. The Board was also informed that additional items were received for inclusion in  the revised report, after the deadline for the submission of the progress report and the ADE would: (1) check them for feasibility, and fiscal impact if any, and (2) include the items in future drafts of the report. In March, the Arkansas State Board of Education reviewed the PMT and its executive summary. The Board also received and reviewed the Desegregation Monitoring and Assistance Progress Report submitted to Court on February 1, 1999. On April 12, and May 10, 1999, the Arkansas State Board of Education reviewed the PMT and its executive summary. The Board also was notified that once the financial section of the proposed plan was completed, the revised plan would be submitted to the board for approval. On June 14, 1999, the Arkansas State Board of Education reviewed the PMT and its executive summary. The Board also was notified that once the financial section of the proposed plan was completed, the revised plan would be submitted to the board for approval. 31 V. COMMITMENT TO PRINCIPLES (Continued) D. Through regular oversight of the Implementation Phase's Project Management Tool, and scrutiny of results of ADE's actions, the Board of Education will act on its commitment to the principles of the Settlement Agreement. (Continued) 2. Actual as of December 31 , 2003 (Continued) On July 12, 1999, the Arkansas State Board of Education reviewed the PMT and its executive summary. The Board also was notified that once the financial section of the proposed plan was completed, the revised plan would be submitted to the board for approval. On August 9, 1999, the Arkansas State Board of Education reviewed the PMT and its executive summary. The Board was also notified that the new Desegregation Monitoring and Assistance Plan would be ready to submit to the Board for their review \u0026amp; approval as soon as plans were finalized. On September 13, 1999, the Arkansas State Board of Education reviewed the PMT and its executive summary. The Board was also notified that the new Desegregation Monitoring and Assistance Plan would be ready to submit to the Board for their review \u0026amp; approval as soon as plans were finalized. On October 12, 1999, the Arkansas State Board of Education reviewed the PMT and its executive summary. The Board was notified that on September 21 , 1999 that the Office of Education Lead Planning and Desegregation Monitoring meet before the Desegregation Litigation Oversight Subcommittee and presented them with the draft version of the new Desegregation Monitoring and Assistance Plan. The State Board was notified that the plan would be submitted for Board review and approval when finalized. On November 8, 1999, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of October. On December 13, 1999, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of November. On January 10, 2000, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of December. On February 14, 2000, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of January. On March 13, 2000, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of February. On April 10, 2000, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of March. 32 V. COMMITMENT TO PRINCIPLES (Continued) D. Through regular oversight of the Implementation Phase's Project Management Tool, and scrutiny of results of ADE's actions, the Board of Education will act on its commitment to the principles of the Settlement Agreement. (Continued) 2. Actual as of December 31 , 2003 (Continued) On May 8, 2000, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of April. On June 12, 2000, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of May. On July 10, 2000, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of June. On August 14, 2000, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of July. On September 11 , 2000, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of August. On October 9, 2000, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of September. On November 13, 2000, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of October. On December 11 , 2000, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of November. On January 8, 2001, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of December. On February 12, 2001 , the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of January. On March 12, 2001 , the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of February. On April 9, 2001 , the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of March. On May 14, 2001 , the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of April. On June 11, 2001 , the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of May. 33 V. COMMITMENT TO PRINCIPLES (Continued) D. Through regular oversight of the Implementation Phase's Project Management Tool, and scrutiny of results of ADE's actions, the Board of Education will act on its commitment to the principles of the Settlement Agreement. (Continued) 2. Actual as of December 31, 2003 (Continued) On July 9, 2001, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of June. On August 13, 2001, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of July. On September 10, 2001, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of August. On October 8, 2001 , the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of September. On November 19, 2001 , the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of October. On December 10, 2001 , the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of November. On January 14, 2002, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of December. On February 11 , 2002, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of January. On March 11 , 2002, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of February. On April 8, 2002, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of March. On May 13, 2002, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of April. On June 10, 2002, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of May. On July 8, 2002, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of June. On August 12, 2002, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of July. 34 V. COMMITMENT TO PRINCIPLES (Continued) D. Through regular oversight of the Implementation Phase's Project Management Tool, and scrutiny of results of ADE's actions, the Board of Education will act on its commitment to the principles of the Settlement Agreement. (Continued) 2. Actual as of December 31, 2003 (Continued) On September 9, 2002, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of August. On October 14, 2002, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of September. On November 18, 2002, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of October. On December 9, 2002, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of November. On January 13, 2003, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of December. On February 10, 2003, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of January. On March 10, 2003, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of February. On April 14, 2003, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of March. On May 12, 2003, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of April. On June 9, 2003, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of May. On August 11, 2003, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the months of June and July. On September 8, 2003, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of August. On October 13, 2003, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of September. On November 10, 2003, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of October. 35 V. COMMITMENT TO PRINCIPLES (Continued) D. Through regular oversight of the Implementation Phase's Project Management Tool, and scrutiny of results of ADE's actions, the Board of Education will act on its commitment to the principles of the Settlement Agreement. (Continued) 2. Actual as of December 31 , 2003 (Continued) On December 8, 2003, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of November. 36 VI. REMEDIATION A. Through the Extended COE process, the needs for technical assistance by District, by School, and by desegregation compensatory education programs will be identified. 1. Projected Ending Date Ongoing 2. Actual as of December 31 , 2003 During May 1995, team visits to Cycle 4 schools were conducted, and plans were developed for reviewing the Cycle 5 schools. In June 1995, the current Extended COE packet was reviewed , and enhancements to the Extended COE packet were prepared. In July 1995, year end reports were finalized by the Pulaski County field service specialists, and plans were finalized for reviewing the draft improvement plans of the Cycle 5 schools. In August 1995, Phase I - Cycle 5 school improvement plans were reviewed. Plans were developed for meeting with the Districts to discuss plans for Phase 11 - Cycle 1 schools of Extended COE, and a school improvement conference was conducted in Hot Springs. The technical review visits for the FY 95/96 year and the documentation process were also discussed. In October 1995, two computer programs, the Effective Schools Planner and the Effective Schools Research Assistant, were ordered for review, and the first draft of a monitoring checklist for Extended COE was developed. Through the Extended COE process, the field service representatives provided technical assistance based on the needs identified with in the Districts from the data gathered. In November 1995, ADE personnel discussed and planned for the FY 95/96 monitoring, and onsite visits were conducted to prepare schools for the FY 95/96 team visits. Technical review visits continued in the Districts. In December 1995, announced monitoring and technical assistance visits were conducted in the Districts. At December 31 , 1995, approximately 59% of the schools in the Districts had been monitored. Technical review visits were conducted during January 1996. In February 1996, announced monitoring visits and midyear monitoring reports were completed, and the field service specialists prepared for the spring NCA/COE peer team visits. 37 VI. REMEDIATION (Continued) A. Through the Extended COE process, the needs for technical assistance by District, by School, and by desegregation compensatory education programs will be identified. (Continued) 2. Actual as of December 31, 2003 (Continued) In March 1996, unannounced monitoring visits of Cycle 5 schools commenced, and two-day peer team visits of Cycle 5 schools were conducted. Two-day team visit materials, team lists and reports were prepared. Technical assistance was provided to schools in final preparation for team visits and to schools needing any school improvement information. In April and May 1996, the unannounced monitoring visits were completed. The unannounced monitoring forms were reviewed and included in the July monitoring report. The two-day peer team visits were completed, and annual COE monitoring reports were prepared. In June 1996, all announced and unannounced monitoring visits of the Cycle 5 schools were completed, and the data was analyzed. The Districts identified enrollment in compensatory education programs. The Semiannual Monitoring Report was completed and filed with the Court on July 15, 1996, and copies were distributed to the parties. During August 1996, meetings were held with the Districts to discuss the monitoring requirements. Technical assistance meetings with Cycle 1 schools were planned for 96/97. The Districts were requested to record discipline data in accordance with the Allen Letter. In September 1996, recommendations regarding the ADE monitoring schedule for Cycle 1 schools and content layouts of the semiannual report were submitted to the ADE administrative team for their review. Training materials were developed and schedules outlined for Cycle 1 schools. In October 1996, technical assistance needs were identified and addressed to prepare each school for their team visits. Announced monitoring visits of the Cycle 1 schools began on October 28, 1996. In December 1996, the announced monitoring visits of the Cycle 1 schools were completed, and technical assistance needs were identified from school site visits. In January 1997, the ECOE monitoring section identified technical assistance needs of the Cycle 1 schools, and the data was reviewed when the draft February Semiannual Monitoring Report was presented to the Desegregation Litigation Oversight Subcommittee, the State Board of Education, and the parties. 38 VI. REMEDIATION (Continued) A. Through the Extended COE process, the needs for technical assistance by District, by School, and by desegregation compensatory education programs will be identified. (Continued) 2. Actual as of December 31 , 2003 (Continued) In February 1997, field service specialists prepared for the peer team visits of the Cycle 1 schools. NCA accreditation reports were presented to the NCA Committee, and NCA reports were prepared for presentation at the April NCA meeting in Chicago. From March to May 1997, 111 visits were made to schools or central offices to work with principals, ECOE steering committees, and designated district personnel concerning school improvement planning. A workshop was conducted on Learning Styles for Geyer Springs Elementary School. A School Improvement Conference was held in Hot Springs on July 15-17, 1997. The conference included information on the process of continuous school improvement, results of the first five years of COE, connecting the mission with the school improvement plan, and improving academic performance. Technical assistance needs were evaluated for the FY 97/98 school year in August 1997. From October 1997 to February 1998, technical reviews of the ECOE process were conducted by the field service representatives. Technical assistance was provided to the Districts through meetings with the ECOE steering committees, assistance in analyzing perceptual surveys, and by providing samples of school improvement plans, Gold File catalogs, and web site addresses to schools visited. Additional technical assistance was provided to the Districts through discussions with the ECOE committees and chairs about the process. In November 1997, technical reviews of the ECOE process were conducted by the field service representatives in conjunction with the announced monitoring visits. Workshops on brainstorming and consensus building and asking strategic questions were held in January and February 1998. In March 1998, the field service representatives conducted ECOE team visits and prepared materials for the NCA workshop. Technical assistance was provided in workshops on the ECOE process and team visits. In April 1998, technical assistance was provided on the ECOE process and academically distressed schools. In May 1998, technical assistance was provided on the ECOE process, and team visits were conducted. 39 VI. REMEDIATION (Continued) A. Through the Extended COE process, the needs for technical assistance by District, by School, and by desegregation compensatory education programs will be identified. (Continued) 2. Actual as of December 31 , 2003 (Continued) In June 1998, the Extended COE Team Visit Reports were completed. A School Improvement Conference was held in Hot Springs on July 13-15, 1998. Major conference topics included information on the process of continuous school improvement, curriculum alignment, \"Smart Start,\" Distance Learning, using data to improve academic performance, educational technology, and multicultural education. All school districts in Arkansas were invited and representatives from Pulaski County attended. In September 1998, requests for technical assistance were received, visitation schedules were established, and assistance teams began visiting the Districts. Assistance was provided by telephone and on-site visits. The ADE provided inservice training on \"Using Data to Sharpen the Focus on Student Achievement\" at Gibbs Magnet Elementary school on October 5, 1998 at their request. The staff was taught how to increase test scores through data disaggregation, analysis, alignment, longitudinal achievement review, and use of individualized test data by student, teacher, class and content area. Information was also provided regarding the \"Smart Start\" and the \"Academic Distress\" initiatives. On October 20, 1998, ECOE technical assistance was provided to Southwest Jr. High School. B. Identify available resources for providing technical assistance for the specific condition, or circumstances of need, considering resources within ADE and the Districts, and also resources available from outside sources and experts. 1. Projected Ending Date Ongoing 2. Actual as of December 31 , 2003 The information for this item is detailed under Section VI.F. of this report. C. Through the ERIC system, conduct a literature search for research evaluating compensatory education programs. 1. Projected Ending Date Ongoing 40 VI. REMEDIATION (Continued) C. Through the ERIC system, conduct a literature search for research evaluating compensatory education programs. (Continued) 2. Actual as of December 31 , 2003 An updated ERIC Search was conducted on May 15, 1995 to locate research on evaluating compensatory education programs. The ADE received the updated ERIC disc that covered material through March 1995. An ERIC search was conducted in September 30, 1996 to identify current research dealing with the evaluation of compensatory education programs, and the articles were reviewed . An ERIC search was conducted in April 1997 to identify current research on compensatory education programs and sent to the Cycle 1 principals and the field service specialists for their use. An Eric search was conducted in October 1998 on the topic of Compensatory Education and related descriptors. The search included articles with publication dates from 1997 through July 1998. D. Identify and research technical resources available to ADE and the Districts through programs and organizations such as the Desegregation Assistance Center in S.an Antonio, Texas. 1. Projected Ending Date Summer 1994 2. Actual as of December 31 , 2003 The information for this item is detailed under Section VI.F. of this report. E. Solicit, obtain, and use available resources for technical assistance. 1. Projected Ending Date Ongoing 2. Actual as of December 31 , 2003 The information for this item is detailed under Section VI.F. of this report. 41 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. 1. Projected Ending Date Ongoing 2. Actual as of December 31, 2003 From March 1995 through July 1995, technical assistance and resources were obtained from the following sources: the Southwest Regional Cooperative\nUALR regarding training for monitors\nODM on a project management software\nADHE regarding data review and display\nand Phi Delta Kappa, the Desegregation Assistance Center and the Dawson Cooperative regarding perceptual surveys. Technical assistance was received on the Microsoft Project software in November 1995, and a draft of the PMT report using the new software package was presented to the ADE administrative team for review. In December 1995, a data manager was hired permanently to provide technical assistance with computer software and hardware. In October 1996, the field service specialists conducted workshops in the Districts to address their technical assistance needs and provided assistance for upcoming team visits. In November and December 1996, the field service specialists addressed technical assistance needs of the schools in the Districts as they were identified and continued to provide technical assistance for the upcoming team visits. In January 1997, a draft of the February 1997 Semiannual Monitoring Report was presented to the State Board of Education, the Desegregation Litigation Oversight Subcommittee, and the parties. The ECOE monitoring section of the report included information that identified technical assistance needs and resources available to the Cycle 1 schools. Technical assistance was provided during the January 29-31, 1997 Title I MidWinter Conference. The conference emphasized creating a learning community by building capacity schools to better serve all children and empowering parents to acquire additional skills and knowledge to better support the education of their children. In February 1997, three ADE employees attended the Southeast Regional Conference on Educating Black Children. Participants received training from national experts who outlined specific steps that promote and improve the education of black children. 42 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of December 31, 2003 (Continued) On March 6-9, 1997, three members of the ADE's Technical Assistance Section attended the National Committee for School Desegregation Conference. The participants received training in strategies for Excellence and Equity: Empowerment and Training for the Future. Specific information was received regarding the current status of court-ordered desegregation, unitary status, and resegregation and distributed to the Districts and ADE personnel. The field service specialists attended workshops in March on ACT testing and school improvement to identify technical assistance resources available to the Districts and the ADE that will facilitate desegregation efforts. ADE personnel attended the Eighth Annual Conference on Middle Level Education in Arkansas presented by the Arkansas Association of Middle Level Education on April 6-8, 1997. The theme of the conference was Sailing Toward New Horizons. In May 1997, the field service specialists attended the NCA annual conference and an inservice session with Mutiu Fagbayi. An Implementation Oversight Committee member participated in the Consolidated COE Plan in service training. In June and July 1997, field service staff attended an SAT-9 testing workshop and participated in the three-day School Improvement Conference held in Hot Springs. The conference provided the Districts with information on the COE school improvement process, technical assistance on monitoring and assessing achievement, availability of technology for the classroom teacher, and teaching strategies for successful student achievement. In August 1997, field service personnel attended the ASCD Statewide Conference and the AAEA Administrators Conference. On August 18, 1997, the bi-monthly Team V meeting was held and presentations were made on the Early Literacy Learning in Arkansas (ELLA) program and the Schools of the 21st Century program. In September 1997, technical assistance was provided to the Cycle 2 principals on data collection for onsite and offsite monitoring. ADE personnel attended the Region VI Desegregation Conference in October 1997. Current desegregation and educational equity cases and unitary status issues were the primary focus of the conference. On October 14, 1997, the bi-monthly Team V meeting was held in Paragould to enable members to observe a 21st Century school and a school that incorporates traditional and multi-age classes in its curriculum. 43 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of December 31, 2003 (Continued) In November 1997, the field service representatives attended the Governor's Partnership Workshop to discuss how to tie the committee's activities with the ECOE process. In March 1998, the field service representatives attended a school improvement conference and conducted workshops on team building and ECOE team visits. Staff development seminars on Using Data to Sharpen the Focus on Student Achievement are scheduled for March 23, 1998 and March 27, 1998 for the Districts. In April 1998, the Districts participated in an ADE seminar to aid them in evaluating and improving student achievement. In August 1998, the Field Service Staff attended inservice to provide further assistance to schools, i.e., Title I Summer Planning Session, ADE session on Smart Start, and the School Improvement Workshops. All schools and districts in Pulaski County were invited to attend the \"Smart Start\" Summit November 9, 10, and 11 to learn more about strategies to increase student performance. \"Smart Start\" is a standards-driven educational initiative which emphasizes the articulation of clear standards for student achievement and accurate measures of progress against those standards through assessments, staff development and individual school accountability. The Smart Start Initiative focused on improving reading and mathematics achievement for all students in Grades K-4. Representatives from all three districts attended. On January 21 , 1998, the ADE provided staff development for the staff at Oak Grove Elementary School designed to assist them with their efforts to improve student achievement. Using achievement data from Oak Grove, educators reviewed trends in achievement data, identified areas of greatest need, and reviewed seven steps for improving student performance. On February 24, 1999, the ADE provided staff development for the administrative staff at Clinton Elementary School regarding analysis of achievement data. On February 15, 1999, staff development was rescheduled for Lawson Elementary School. The staff development program was designed to assist them with their efforts to improve student achievement using achievement data from Lawson, educators reviewed the components of the Arkansas Smart Initiative, trends in achievement data, identified areas of greatest need, and reviewed seven steps for improving student performance. Student Achievement Workshops were rescheduled for Southwest Jr. High in the Little Rock School District, and the Oak Grove Elementary School in the Pulaski County School District. 44 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of December 31, 2003 (Continued) On April 30, 1999, a Student Achievement Workshop was conducted for Oak Grove Elementary School in PCSSD. The Student Achievement Workshop for Southwest Jr. High in LRSD has been rescheduled. On June 8, 1999, a workshop was presented to representatives from each of the Arkansas Education Service Cooperatives and representatives from each of the three districts in Pulaski County. The workshop detailed the Arkansas Comprehensive Testing, Assessment and Accountability Program (ACTAAP). On June 18, 1999, a workshop was presented to administrators of the NLRSD. The workshop detailed the Arkansas Comprehensive Testing, Assessment and Accountability Program (ACTAAP) . On August 16, 1999, professional development on ways to increase student achievement and the components of the new ACTAAP program was presented during the preschool staff development activities for teaching assistant in the LRSD. On August 20, 1999, professional development on ways to increase student achievement and the components of the new ACTAAP program was presented during the preschool staff development activities for the Accelerated Learning Center in the LRSD. On September 13, 1999, professional development on ways to increase student achievement and the components of the new ACTAAP program were presented to the staff at Booker T. Washington Magnet Elementary School. On September 27, 1999, professional development on ways to increase student achievement was presented to the Middle and High School staffs of the NLRSD. The workshop also covered the components of the new ACTAAP program, and ACT 999 of 1999. On October 26, 1999, professional development on ways to increase student achievement was presented to LRSD personnel through a staff development training class. The workshop also covered the components of the new ACTAAP program, and ACT 999 of 1999. On December 7, 1999, professional development on ways to increase student achievement was scheduled for Southwest Middle School in the LRSD. The workshop was also set to cover the components of the new ACTAAP program, and ACT 999 of 1999. However, Southwest Middle School administrators had a need to reschedule, therefore the workshop will be rescheduled. 45 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of December 31 , 2003 (Continued) On January 10, 2000, professional development on ways to increase student achievement was conducted for both Dr. Martin Luther King Magnet Elementary School \u0026amp; Little Rock Central High School. The workshops also covered the components of the new ACTAAP program, and ACT 999 of 1999. On March 1, 2000, professional development on ways to increase student achievement was conducted for all principals and district level administrators in the PCSSD. The workshop also covered the components of the new ACTAAP program, and ACT 999 of 1999. On April 12, 2000, professional development on ways to increase student achievement was conducted for the LRSD. The workshop also covered the components of the new ACTAAP program, and ACT 999 of 1999. Targeted staffs from the middle and junior high schools in the three districts in Pulaski County attended the Smart Step Summit on May 1 and May 2. Training was provided regarding the overview of the \"Smart Step\" initiative, \"Standard and Accountability in Action ,\" and \"Creating Learning Environments Through Leadership Teams.\" The ADE provided training on the development of alternative assessment September 12-13, 2000. Information was provided regarding the assessment of Special Education and LEP students. Representatives from each district were provided the opportunity to select a team of educators from each school within the district to participate in professional development regarding Integrating Curriculum and Assessment K-12. The professional development activity was directed by the national consultant, Dr. Heidi Hays Jacobs, on September 14 and 15, 2000 The ADE provided professional development workshops from October 2 through October 13, 2000 regarding, \"The Write Stuff: Curriculum Frameworks, Content Standards and Item Development.\" Experts from the Data Recognition Corporation provided the training. Representatives from each district were provided the opportunity to select a team of educators from each school within the district to participate. The ADE provided training on Alternative Assessment Portfolio Systems by video conference for Special Education and LEP Teachers on November 17, 2000. Also, Alternative Assessment Portfolio System Training was provided for testing coordinators through teleconference broadcast on November 27, 2000. 46 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of December 31 , 2003 (Continued) On December 12, 2000, the ADE provided training for Test Coordinators on end of course assessments in Geometry and Algebra I Pilot examination. Experts from the Data Recognition Corporation conducted the professional development at the Arkansas Teacher Retirement Building. The ADE presented a one-day training session with Dr. Cecil Reynolds on the Behavior Assessment for Children (BASC). This took place on December 7, 2000 at the NLRSD Administrative Annex. Dr. Reynolds is a practicing clinical psychologist. He is also a professor at Texas A \u0026amp; M University and a nationally known author. In the training, Dr. Reynolds addressed the following: 1) how to use and interpret information obtained on the direct observation form , 2) how to use this information for programming, 3) when to use the BASC, 4) when to refer for more or additional testing or evaluation, 5) who should complete the forms and when, (i.e. , parents, teachers, students), 6) how to correctly interpret scores. This training was intended to especially benefit School Psychology Specialists, psychologists, psychological examiners, educational examiners and counselors. During January 22-26, 2001 the ADE presented the ACTAAP Intermediate (Grade 6) Benchmark Professional Development Workshop on Item Writing. Experts from the Data Recognition Corporation provided the training. Representatives from each district were invited to attend. On January 12, 2001 the ADE presented test administrators training for mid-year End of Course (Pilot) Algebra I and Geometry exams. This was provided for schools with block scheduling. On January 13, 2001 the ADE presented SmartScience Lessons and worked with teachers to produce curriculum. This was shared with eight Master Teachers. The SmartScience Lessons were developed by the Arkansas Science Teachers Association in conjunction with the Wilbur Mills Educational Cooperative under an Eisenhower grant provided by the ADE. The purpose of SmartScience is to provide K-6 teachers with activity-oriented science lessons that incorporate reading , writing, and mathematics skills. The following training has been provided for educators in the three districts in Pulaski County by the Division of Special Education at the ADE since January 2000: On January 6, 2000, training was conducted for the Shannon Hills Pre-school Program, entitled \"Things you can do at home to support your child's learning.\" This was presented by Don Boyd - ASERC and Shelley Weir. The school's director and seven parents attended . 47 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of December 31 , 2003 (Continued) On March 8, 2000, training was conducted for the Southwest Middle School in Little Rock, on ADD. Six people attended the training. There was follow-up tra ining on Learning and Reading Styles on March 26. This was presented by Don Boyd - ASERC and Shelley Weir. On September 7, 2000, Autism and Classroom Accommodations for the LRSD at Chicot Elementary School was presented. Bryan Ayres and Shelley Weir were presenters. The participants were: Karen Sabo, Kindergarten Teacher\nMelissa Gleason, Paraprofessional\nCurtis Mayfield, P.E. Teacher\nLisa Poteet, Speech Language Pathologist\nJane Harkey, Principal\nKathy Penn-Norman, Special Education Coordinator\nAlice Phillips, Occupational Therapist. On September 15, 2000, the Governor's Developmental Disability Coalition Conference presented Assistive Technology Devices \u0026amp; Services. This was held at the Arlington Hotel in Hot Springs. Bryan Ayres was the presenter. On September 19, 2000, Autism and Classroom Accommodations for the LRSD at Jefferson Elementary School was presented. Bryan Ayres and Shelley Weir were presenters. The participants were: Melissa Chaney, Special Education Teacher\nBarbara Barnes, Special Education Coordinator\na Principal, a Counselor, a Librarian, and a Paraprofessional. On October 6, 2000, Integrating Assistive Technology Into Curriculum was presented at a conference in the Hot Springs Convention Center. Presenters were: Bryan Ayers and Aleecia Starkey. Speech Language Pathologists from LRSD and NLRSD attended. On October 24, 2000, Consideration and Assessment of Assistive Technology was presented through Compressed Video-Teleconference at the ADE facility in West Little Rock. Bryan Ayres was the presenter. On October 25 and 26, 2000, Alternate Assessment for Students with Severe Disabilities for the LRSD at J. A. Fair High School was presented. Bryan Ayres was the presenter. The participants were: Susan Chapman, Special Education Coordinator\nMary Steele, Special Education Teacher\nDenise Nesbit, Speech Language Pathologist\nand three Paraprofessionals. On November 14, 2000, Consideration and Assessment of Assistive Technology was presented through Compressed Video-Teleconference at the ADE facility in West Little Rock. Bryan Ayres was the presenter. On November 17, 2000, training was conducted on Autism for the LRSD at the Instructional Resource Center. Bryan Ayres and Shelley Weir were presenters. 48 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of December 31 , 2003 (Continued) On December 5, 2000, Access to the Curriculum Via the use of Assistive Technology Computer Lab was presented. Bryan Ayres was the presenter of this teleconference. The participants were: Tim Fisk, Speech Language Pathologist from Arch Ford Education Service Cooperative at Plumerville and Patsy Lewis, Special Education Teacher from Mabelvale Middle School in the LRSD. On January 9, 2001 , Consideration and Assessment of Assistive Technology was presented through Compressed Video-Teleconference at the ADE facility in West Little Rock. Bryan Ayres was the presenter. Kathy Brown, a vision consultant from the LRSD, was a participant. On January 23, 2001 , Autism and Classroom Modifications for the LRSD at Brady Elementary School was presented . Bryan Ayres and Shelley Weir were presenters. The participants were: Beverly Cook, Special Education Teacher\nAmy Littrell , Speech Language Pathologist\nJan Feurig, Occupational Therapist\nCarolyn James, Paraprofessional\nCindy Kackly, Paraprofessional\nand Rita Deloney, Paraprofessional. The ADE provided training on Alternative Assessment Portfolio Systems for Special Education and Limited English Proficient students through teleconference broadcast on February 5, 2001 . Presenters were: Charlotte Marvel, ADE\nDr. Gayle Potter, ADE\nMarcia Harding, ADE\nLynn Springfield, ASE RC\nMary Steele, J. A. Fair High School, LRSD\nBryan Ayres, Easter Seals Outreach. This was provided for Special Education teachers and supervisors in the morning, and Limited English Proficient teachers and supervisors in the afternoon. The Special Education session was attended by 29 teachers/administrators and provided answers to specific questions about the alternate assessment portfolio system and the scoring rubric and points on the rubric to be used to score the portfolios. The LEP session was attended by 16 teachers/administrators and disseminated the common tasks to be included in the portfolios: one each in mathematics, writing and reading. On February 12-23, 2001, the ADE and Data Recognition Corporation personnel trained Test Coordinators in the administration of the spring Criterion-Referenced Test. This was provided in 20 sessions at 10 regional sites. Testing protocol, released items, and other testing materials were presented and discussed. The sessions provided training for Primary, Intermediate, and Middle Level Benchmark Exams as well as End of Course Literacy, Algebra and Geometry Pilot Tests. The LRSD had 2 in attendance for the End of Course session and 2 for the Benchmark session. The NLRSD had 1 in attendance for the End of Course session and 1 for the Benchmark session. The PCSSD had 1 in attendance for the End of Course session and 1 for the Benchmark session. 49 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of December 31 , 2003 (Continued) On March 15, 2001 , there was a meeting at the ADE to plan professional development for staff who work with Limited English Proficiency (LEP) students. A $30,000 grant has been created to provide LEP training at Chicot Elementary for a year, starting in April 2001. A $40,000 grant was created to provide a Summer English as Second Language (ESL) Academy for the LRSD from June 18 through 29, 2001 . Andre Guerrero from the ADE Accountability section met with Karen Broadnax, ESL Coordinator at LRSD, Pat Price, Early Childhood Curriculum Supervisor at LRSD, and Jane Harkey, Principal of Chicot Elementary. On March 1-2 and 8-29, 2001 , ADE staff performed the following activities: processed registration for April 2 and 3 Alternate Portfolio Assessment video conference quarterly meeting\nanswered questions about Individualized Educational Plan (IEP) and LEP Alternate Portfolio Assessment by phone from schools and Education Service Cooperatives\nand signed up students for alternate portfolio assessment from school districts. On March 6, 2001, ADE staff attended a Smart Step Technology Leadership Conference at the State House Convention Center. On March 7, 2001 , ADE staff attended a National Assessment of Educational Progress (NAEP) Regional Math Framework Meeting about the Consensus Project 2004. On March 8, 2001 , there was a one-on-one conference with Carole Villarreal from Pulaski County at the ADE about the LEP students with portfolios. She was given pertinent data, including all the materials that have been given out at the video conferences. The conference lasted for at least an hour. On March 14, 2001 , a Test Administrator's Training Session was presented specifically to LRSD Test Coordinators and Principals. About 60 LRSD personnel attended. The following meetings have been conducted with educators in the three districts in Pulaski County since July 2000. On July 10-13, 2000 the ADE provided Smart Step training. The sessions covered Standards-based classroom practices. 50 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of December 31, 2003 (Continued) On July 19-21, 2000 the ADE held the Math/Science Leadership Conference at UCA. This provided services for Arkansas math and science teachers to support systemic reform in math/science and training for 8th grade Benchmark. There were 200 teachers from across the state in attendance. On August 14-31 , 2000 the ADE presented Science Smart Start Lessons and worked with teachers to produce curriculum. This will provide K-6 teachers with activity-oriented science lessons that incorporate reading, writing, and mathematics skills. On September 5, 2000 the ADE held an Eisenhower Informational meeting with Teacher Center Coordinators. The purpose of the Eisenhower Professional Development Program is to prepare teachers, school staff, and administrators to help all students meet challenging standards in the core academic subjects. A summary of the program was presented at the meeting. On November 2-3, 2000 the ADE held the Arkansas Conference on Teaching. This presented curriculum and activity workshops. More than 1200 attended the conference. On November 6, 2000 there was a review of Science Benchmarks and sample model curriculum. A committee of 6 reviewed and revised a drafted document. The committee was made up of ADE and K-8 teachers. On November 7-10, 2000 the ADE held a meeting of the Benchmark and End of Course Mathematics Content Area Committee. Classroom teachers reviewed items for grades 4, 6, 8 and EOC mathematics assessment. There were 60 participants. On December 4-8, 2000 the ADE conducted grades 4 and 8 Benchmark Scoring for Writing Assessment. This professional development was attended by approximately 750 teachers. On December 8, 2000 the ADE conducted Rubric development for Special Education Portfolio scoring. This was a meeting with special education supervisors to revise rubric and plan for scoring in June. On December 8, 2000 the ADE presented the Transition Mathematics Pilot Training Workshop. This provided follow-up training and activities for fourth-year mathematics professional development. On December 12, 2000 the ADE presented test administrators training for midyear End of Course (Pilot) Algebra I and Geometry exams. This was provided for schools with block scheduling. 51 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of December 31 , 2003 (Continued) The ADE provided training on Alternative Assessment Portfolio Systems for Special Education and Limited English Proficient students through teleconference broadcasts on April 2-3, 2001 . Administration of the Primary, Intermediate, and Middle Level Benchmark Exams as well as End of Course Literacy took place on April 23-27, 2001 . Administration of the End of Course Algebra and Geometry Exams took place on May 2-3, 2001 . Over 1,100 Arkansas educators attended the Smart Step Growing Smarter Conference on July 10 and 11 , 2001 , at the Little Rock Statehouse Convention Center. Smart Step focuses on improving student achievement for Grades 5-8. The Smart Step effort seeks to provide intense professional development for teachers and administrators at the middle school level, as well as additional materials and assistance to the state's middle school teachers. The event began with opening remarks by Ray Simon, Director of the ADE. Carl Boyd, a longtime educator and staff consultant for Learning 24-7, presented the first keynote address on \"The Character-Centered Teacher\". Debra Pickering, an education consultant from Denver, Colorado, presented the second keynote address on \"Characteristics of Middle Level Education\". Throughout the Smart Step conference, educators attended breakout sessions that were grade-specific and curriculum area-specific. Pat Davenport, an education consultant from Houston, Texas, delivered two addresses. She spoke on \"A Blueprint for Raising Student Achievement\". Representatives from all three districts in Pulaski County attended. Over 1,200 Arkansas teachers and administrators attended the Smart Start Conference on July 12, 2001 , at the Little Rock Statehouse Convention Center. Smart Start is a standards-driven educational initiative which emphasizes the articulation of clear standards for student achievement and accurate measures of progress against those standards through assessments, staff development and individual school accountability. The Smart Start Initiative focused on improving reading and mathematics achievement for all students in Grades K-4. The event began with opening remarks by Ray Simon, Director of the ADE. Carl Boyd, a longtime educator and staff consultant for Learning 24-7, presented the keynote address. The day featured a series of 15 breakout sessions on best classroom practices. Representatives from all three districts in Pulaski County attended. On July 18-20, 2001 , the ADE held the Math/Science Leadership Conference at UCA. This provided services for Arkansas math and science teachers to support systemic reform in math/science and training for 8th grade Benchmark. There were approximately 300 teachers from across the state in attendance. 52 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of December 31, 2003 (Continued) The ADE and Harcourt Educational Measurement conducted Stanford 9 test administrator training from August 1-9, 2001. The training was held at Little Rock, Jonesboro, Fort Smith, Forrest City, Springdale, Mountain Home, Prescott, and Monticello. Another session was held at the ADE on August 30, for those who were unable to attend August 1-9. The ADE conducted the Smart Start quarterly meeting by video conference at the Education Service Cooperatives and at the ADE from 9:00 a.m. until 11 :30 a.m. on September 5, 2001 . The ADE released the performance of all schools on the Primary and Middle Level Benchmark Exams on September 5, 2001 . The ADE conducted Transition Core Teacher In-Service training for Central in the LRSD on September 6, 2001 . The ADE conducted Transition Checklist training for Hall in the LRSD on September 7, 2001 . The ADE conducted Transition Checklist training for McClellan in the LRSD on September 13, 2001 . The ADE conducted Basic Co-teaching train ing for the LRSD on October 9, 2001 . The ADE conducted training on autism spectrum disorder for the PCSSD on October 15, 2001 . Professional Development workshops (1 day in length) in scoring End of Course assessments in algebra, geometry and reading were provided for all districts in the state. Each school was invited to send three representatives (one for each of the sessions). LRSD, NLRSD, and PCSSD participated. Information and training materials pertaining to the Alternate Portfolio Assessment were provided to all districts in the state and were supplied as requested to LRSD, PCSSD and David 0 . Dodd Elementary. On November 1-2, 2001 the ADE held the Arkansas Conference on Teaching at the Excelsior Hotel \u0026amp; Statehouse Convention Center. This presented sessions, workshops and short courses to promote exceptional teaching and learning. Educators could become involved in integrated math, science, English \u0026amp; language arts and social studies learning. The ADE received from the schools selected to participate in the National Assessment of Educational Progress (NAEP), a list of students who will take the test. 53 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of December 31, 2003 (Continued) On December 3-7, 2001 the ADE conducted grade 6 Benchmark scoring training for reading and math. Each school district was invited to send a math and a reading specialist. The training was held at the Holiday Inn Airport in Little Rock. On December 4 and 6, 2001 the ADE conducted Mid-Year Test Administrator Training for Algebra and Geometry. This was held at the Arkansas Activities Association's conference room in North Little Rock. On January 24, 2002, the ADE conducted the Smart Start quarterly meeting by ADE compressed video with Fred Jones presenting. On January 31, 2002, the ADE conducted the Smart Step quarterly meeting by NSCI satellite with Fred Jones presenting. On February 7, 2002, the ADE Smart Step co-sponsored the AR Association of Middle Level Principal's/ADE curriculum, assessment and instruction workshop with Bena Kallick presenting. On February 11-21, 2002, the ADE provided training for Test Administrators on the Primary, Intermediate, and Middle Level Benchmark Exams as well as End of Course Literacy, Algebra and Geometry Exams. The sessions took place at Forrest City, Jonesboro, Mountain Home, Springdale, Fort Smith, Monticello, Prescott, Arkadelphia and Little Rock. A make-up training broadcast was given at 15 Educational Cooperative Video sites on February 22. During February 2002, the LRSD had two attendees for the Benchmark Exam training and one attendee for the End of Course Exam training. The N LRSD and PCSSD each had one attendee at the Benchmark Exam training and one attendee for the End of Course Exam training. The ADE conducted the Smart Start quarterly meeting by compressed interactive video at the South Central Education Service Cooperative from 9:30 a.m. until 11 :30 a.m. on May 2, 2002. Telecast topics included creating a standards-based classroom and a seven-step implementation plan. The principal's role in the process was explained. The ADE conducted the Smart Step quarterly meeting by compressed interactive video at the South Central Education Service Cooperative from 9:30 a.m. until 11 :30 a.m. on May 9, 2002. Telecast topics included creating a standards-based classroom and a seven-step implementation plan. The principal's role in the process was explained. 54 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of December 31 , 2003 (Continued) The Twenty-First Annual Curriculum and Instruction Conference, cosponsored by the Arkansas Association for Supervision and Curriculum Development and the Arkansas Department of Education, will be held June 24-26, 2002, at the Arlington Hotel in Hot Springs, Arkansas. \"Ignite Your Enthusiasm for Learning\" is the theme for this year's conference, which will feature educational consultant, Dr. Debbie Silver, as well as other very knowledgeable presenters. Additionally, there will be small group sessions on Curriculum Alignment, North Central Accreditation, Section 504, Building Level Assessment, Administrator Standards, Data Disaggregation, and National Board. The Educational Accountability Unit of the ADE hosted a workshop entitled \"Strategies for Increasing Achievement on the ACT AAP Benchmark Examination\" on June 13-14, 2002 at the Agora Center in Conway. The workshop was presented for schools in which 100% of students scored below the proficient level on one or more parts of the most recent Benchmark Examination. The agenda included presentations on \"The Plan-Do-Check-Act Instructional Cycle\" by the nationally known speaker Pat Davenport. ADE personnel provided an explanation of the MPH point program. Presentations were made by Math and Literacy Specialists. Dr. Charity Smith, Assistant Director for Accountability, gave a presentation about ACTAAP. Break out sessions were held, in which school districts with high scores on the MPH point program offered strategies and insights into increasing student achievement. The NLRSD, LRSD, and PCSSD were invited to attend. The NLRSD attended the workshop. The Smart Start Summer Conference took place on July 8-9, 2002, at the Little Rock Statehouse Convention Center and Peabody Hotel. The Smart Start Initiative focuses on improving reading and mathematics achievement for all students in Grades K-4. The event included remarks by Ray Simon, Director of the ADE. After comments by the Director, Bena Kallick presented the keynote address \"Beyond Mapping: Essential Questions, Assessment, Higher Order Thinking\". This was followed by a series of breakout sessions on best classroom practices. On the second day, Vivian Moore gave the keynote address \"Overcoming Obstacles: Avenues for Student Success\". Krista Underwood gave the presentation \"Put Reading First in Arkansas\". This was followed by a series of breakout sessions on best classroom practices. 55 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of December 31 , 2003 (Continued) The Smart Step Summer Conference took place on July 10-11 , 2002, at the Little Rock Statehouse Convention Center and Peabody Hotel. Smart Step focuses on improving student achievement for Grades 5-8. The event included remarks by Ray Simon, Director of the ADE. After comments by the Director, Vivian Moore presented the keynote address \"Overcoming Obstacles: Avenues for Student Success\". This was followed by a series of breakout sessions on best classroom practices. On the second day, Bena Kallick presented \"Beyond Mapping: Essential Questions, Assessment, Higher Order Thinking\". Ken Stamatis presented \"Smart Steps to Creating a School Culture That Supports Adolescent Comprehension\". This was followed by a series of breakout sessions on best classroom practices. On August 8, 2002, Steven Weber held a workshop at Booker T. Washington Elementary on \"Best Practices in Social Studies\". It was presented to the 4th grade teachers in the Little Rock School District. The workshop focused around the five themes of geography and the social studies (fourth grade) framework/standards. Several Internet web sites were shared with the teachers, and the teachers were shown methods for incorporating writing into fourth grade social studies. One of the topics was using primary source photos and technology to stimulate the students to write about diverse regions. A theme of the workshop included identifying web sites which apply to fourth grade social studies teachers and interactive web sites for fourth grade students. This was a Back-to-School In-service workshop. The teachers were actively involved in the workshop. On August 13 Steven Weber conducted a workshop at Parkview High School in the LRSD. Topics of the workshop included: 1. Incorporating Writing in the Social Studies Classroom 2. Document Based (open-ended) Questioning Techniques 3. How to practice writing on a weekly basis without assigning a lengthy research report 4. Developing Higher Level Thinking Skills in order to produce active citizens, rather than passive, uninformed citizens 5. Using the Social Studies Framework 6. Identifying state and national Web Sites which contain Primary Sources for use in the classroom The 8:30 - 11 :30 session was for the 6 - 8 grade social studies teachers. The 12:30 - 3:00 session was for the 9 - 12 grade social studies teachers. Several handouts were used, also PowerPoint, primary source photos and documents, and Internet web sites (i.e., Library of Congress, Butler Center for Arkansas Studies, National Archives, etc.). This was a Back-to-School In-service workshop. The teachers were actively involved in the workshop. Marie McNeal is the Social Studies Specialist for the Little Rock School District. She invited Steven Weber to present at the workshop, and was in attendance. 56 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of December 31 , 2003 (Continued) On September 30 through October 11, 2002, the ADE provided Professional Development for Test Administrators on the End of Course Literacy, Algebra and Geometry Exams. The training was held at the Holiday Inn Airport. All three districts in Pulaski County sent representatives to the training. On October 3, 2002, Charlotte Marvel provided in-service training for LEP teachers in the Little Rock School District. On December 6, 2002, the Community and Parent Empowerment Summit was held for parents of children attending the LRSD. It took place at the Saint Mark Baptist Church in Little Rock. Dr. Charity Smith, Assistant Director for Accountability, presented information on No Child Left Behind, Supplemental Services, after school tutoring, how parents can help, and the Refrigerator Curriculum. Mr. Reginald Wilson, Senior Coordinator for Accountability, presented information on ACTAAP, including how to find information on the AS-IS Website and what is included in the school report cards. Donna Elam spoke on the topic \"From the School House to the Jail House\". On December 10 - 12, 2002, the Math Workshop \"Investigations in Number, Data and Space\" was held at the Clinton Elementary Magnet School in Sherwood. Training for Kindergarten and First Grade Teachers was held on December 10, and included Making Shapes and Building Blocks, Quilts, Squares and Block Towns. Training for Second and Third Grade Teachers was held on December 11 , and included Shapes, Halves, Symmetry and Turtle Paths. Training for Fourth and Fifth Grade Teachers was held on December 12. Fourth grade covered Seeing Solids and Silhouettes. Fifth Grade was about Containers and Cubes. The sessions provided quality time for teachers to discuss the curriculum, reflect on implications, provide mutual support, and continue planning. The ADE provided professional development for all school districts on Alternative Assessment Portfolio Systems on January 7-9, 2003 at the Holiday Inn Airport. The LRSD had two in attendance, NLRSD had one in attendance, and the PCSSD had two in attendance. The ADE conducted the Smart Start Statewide Professional Staff Development Video Conference at the ADE/AETN Studio and at participating Education Service Cooperatives from 9:30 a.m. until 11 :30 a.m. on February 12, 2003. The ADE conducted the Smart Step Statewide Professi\nThis project was supported in part by a Digitizing Hidden Special Collections and Archives project grant from The Andrew W. Mellon Foundation and Council on Library and Information Resoources.\n   \n\n   \n\n  \n\n\n   \n\n  \n\n \n\n\n   \n\n   \n\n \n\n\n   \n\n  \n\n \n\n\u003cdcterms_creator\u003eArkansas. Department of Education\u003c/dcterms_creator\u003e\n   \n\n \n\n  \n\n\n   \n\n \n\n  \n\n\n\n   \n\n  \n\n  \n\n\n   \n\n   \n\n  \n\n \n\n \n\n\n   \n\n  \n\n \n\n\n\n\n\n\n\n\n   \n\n \n\n\n\n  \n\n\n   \n\n\n\n  \n\n\n\n "},{"id":"bcas_bcmss0837_1746","title":"Includes corrected order, notice of filings, brief of appellant and appendix, Pulaski County Special School District's (PCSSD's) motion for enlargement of time to file appellee's brief, ADE project management tool, report by Office of Desegregation Management, and PCSSD motion for two temporary portable buildings at Sylvan Hills School.","collection_id":"bcas_bcmss0837","collection_title":"Office of Desegregation Management","dcterms_contributor":null,"dcterms_spatial":["United States, 39.76, -98.5","United States, Arkansas, 34.75037, -92.50044","United States, Arkansas, Pulaski County, 34.76993, -92.3118","United States, Arkansas, Pulaski County, Little Rock, 34.74648, -92.28959"],"dcterms_creator":["United States. District Court (Arkansas: Eastern District)"],"dc_date":["2003-11/2003-12"],"dcterms_description":null,"dc_format":["application/pdf"],"dcterms_identifier":null,"dcterms_language":["eng"],"dcterms_publisher":["Little Rock, Ark. : Butler Center for Arkansas Studies. Central Arkansas Library System"],"dc_relation":null,"dc_right":["http://rightsstatements.org/vocab/InC-EDU/1.0/"],"dcterms_is_part_of":["Office of Desegregation Monitoring records (BC.MSS.08.37)","History of Segregation and Integration of Arkansas's Educational System"],"dcterms_subject":["Little Rock (Ark.)--History--21st Century","Education--Arkansas","School districts","Pulaski County Special School District","Arkansas. Department of Education","Project management","High schools","Sylvan Hills High School (Little Rock, Ark.)","Magnet schools","Education--Finance","School enrollment","School integration","Office of Desegregation Monitoring (Little Rock, Ark.)"],"dcterms_title":["Includes corrected order, notice of filings, brief of appellant and appendix, Pulaski County Special School District's (PCSSD's) motion for enlargement of time to file appellee's brief, ADE project management tool, report by Office of Desegregation Management, and PCSSD motion for two temporary portable buildings at Sylvan Hills School."],"dcterms_type":["Text"],"dcterms_provenance":["Butler Center for Arkansas Studies"],"edm_is_shown_by":null,"edm_is_shown_at":["http://arstudies.contentdm.oclc.org/cdm/ref/collection/bcmss0837/id/1746"],"dcterms_temporal":null,"dcterms_rights_holder":null,"dcterms_bibliographic_citation":null,"dlg_local_right":["Available for use in research, teaching, and private study. Any other use requires permission from the Butler Center."],"dcterms_medium":["filing"],"dcterms_extent":["176 pages"],"dlg_subject_personal":null,"dcterms_subject_fast":null,"fulltext":"\u003c?xml version=\"1.0\" encoding=\"utf-8\"?\u003e\n\u003citems type=\"array\"\u003e  \u003citem\u003e   \n\n   \n\n   \n\n\n   \n\n   \n\n\n   \n\n\n   \n\n   \n\n\n   \n\n   \n\n\n   \n\n   \n\n\n\n\n\n\n\n\n\n\n\n\n\n   \n\n \n\n \n\n \n\n\n   \n\n   \n\n   \n\n\n   \n\n  \n\n   \n\n\n   \n\n  \n\n   \n\n\n   \n\n \n\n\u003cdcterms_description type=\"array\"\u003e   \n\n\u003cdcterms_description\u003eDistrict Court, corrected order; Court of Appeals, notice of filing, brief of appellant and appendix; District Court, order; Court of Appeals, Pulaski County Special School District (PCSSD) motion for enlargement of time to file appellee's brief; District Court, notice of filing, Arkansas Department of Education (ADE) project management tool; District Court, notice of filing, Office of Desegregation Management report, ''2003-04 Enrollment and Racial Balance in the Pulaski County Special School District (PCSSD)''; District Court, Pulaski County Special School District (PCSSD) motion for two temporary portable buildings at Sylvan Hills School; Court of Appeals, notice of filing, joint brief of appellee/cross-appellant and separate appendix; District Court, notice of filing, Arkansas Department of Education (ADE) project management tool    This transcript was create using Optical Character Recognition (OCR) and may contain some errors.    FILED IN THE UNITED STATES DISTRICT co~rtNg',if~1ifil~~SAS EASTERN DISTRICT OF ARKANSAS LITTLE ROCK DIVISION NOV  3 2003 LITTLE ROCK SCHOOL DISTRICT V. No. 4:82CV00866 WRW/JTR - PULASKI COUNTY SPECIAL SCHOOL  DISTRICT NO. 1, ET AL. MRS. LORENE JOSHUA, ET AL. KATHERINE KNIGHT, ET AL. CORRECTED ORDER JAMES W. McCORMACK, CLERK By:_, ____ -=--~== PLAfN'fml( DEFENDANTS INTERVENORS lNTERVENORS Before the Court is the request of the Magnet Review Committee (\"MRC\") for approval of the interdistrict magnet schools ' final budget for rhe 2002-2003 school year and proposed - budget for the 2003-2004 school year. The MRC communicated the budget to the Court in a letter dated July 31 , 2003 (attached). I have attached a copy of the budget to this order, and if there are any objections, parties must respond withi~ five days; otherwise, the MR.C's final budget for the 2002-2003 school year and proposed 2003-2004 budget will be accepted as presented and become effective immediately. IT IS SO ORDERED this 3rd day ofNovember, 2003. -w1,.... oocu1v1c:.1\" i r::.,'I' c:.,--.c ... ~ ,,;~ I n,;, p  ~'C - E~T 1  -.; COiv1 ... :,-.,~ '- 00CKET SH c:. 1 ' . -  - .NIT~ULE 58 AND/0~- 0NJJ--?j., BY UNITED ST A TES DISTRICT JUDGE WM. R. WILSON, JR. WILL BOND NEIL CHAMBERLIN VIA FEDERAL EXPRESS BOND \u0026amp; CHAMBERLIN TRIAL LAWYERS 602 W. MAIN JACKSONVILLE, ARKANSAS 72076 November 5, 2003 Michael E. Gans, Clerk Eighth Circuit Court of Appeals 24.329 Thomas F . Eagleton U.S. Courthouse lll S. 10~ Street St. Louis, MO 63101 (314) 244-2400 RECEIVED NOV 1 0 2003 OFFICE OF DESEGREGATION MONITORING TELEPHONE: (501 ) 982-9081 FAX: (501 ) 982-9414 RE: United States Court of Appeals for the 8t h Circuit, Little Rock School District v. Pulaski County Special School District No. l, et al. , Mrs. Lorene Joshua, et al., Katherine Knight, et al., Greg Bollen, James Bolden, Martha Whatley and Sue Ann Whisker, Case No. 03-3088 - Brief and Appendix Dear Mr. Gans: Enclosed is an original and eleven copies of Appellants' Brief and an original and three copies of Appellants' Appendix for filing in the above-referenced case. The Addendum on Appellants' Brief is in excess of 15 pages. This is a unique case in which the Judge essentially made his ruling from the bench. I have included the transcript of the Judge's ruling in the Addendum as instructed by your office. After the Brief and Appendix is filed, please forward filemarked copies back to me . I have included a large envelope with postage for your convenience. If you have any questions or concerns , please do not hesitate to contact me. By copy of this letter I have forwarded counsel for all parties involved in the litigation at the lower court copies of the Brief and Appendix. I have also forwarded a copy to the local district judge. Regards, TWB:tt Michael E. Gans November 5, 2003 Page Two cc: Greg Bollen Sam Jones Scott Smith Christopher Heller John W. Walker P.A. Mark Burnette Stephen Jones Ann Marshall Tim Gauger Judge William Wilson I i le I I I I I I I 1 I 1 I I I I le I I RECEIVED IN THE UNITED STATES COURT OF APPEALS FOR THE EIGHTH CIRCUIT NO. 03-3088 GREG BOLLEN, et al. Appellants v. PULASKI COUNTY SPECIAL SCHOOL DISTRICT Appellee . Appeal from the United States District Court for the Western District of Arkansas Honorable William R. Wilson, Jr., District Judge BRIEF OF APPELLANT Will Bond Bond \u0026amp; Chamberlin  602 W. Main Street Jacksonville, AR 72076 (501) 982-9411 AR Bar #95145 Attorney for Appellants NOV 1 O 2003 OFFICE OF DESEGREGATION MONITORING I - I I I -I I 1e I I I I I I -  II RECEIVED NOV 1 0 2003 OFFICE OF IN THE UNITED STATES COURT OF APPEALS DESEGREGATION MONITORING FOR THE EIGHTH CIRCUIT NO. 03-3088 GREG BOLLEN, et al. Appellants V. PULASKI COUNTY SPECIAL SCHOOL DISTRICT Appellee Appeal from the United States District Court for the Western District of Arkansas Honorable William R. Wilson, J.r., District Judge APPENDIX Will Bond Bond \u0026amp; Chamberlin  602 W. Main Street Jacksonville, AR 72076 (501) 982-9411 AR Bar #95145 Attorney for Appellants u.fl~~l?RT EASTEAN CIS'fA!Oi ARKANSAS IN THE UNITED STATES DISTRICT CO1URT NOV 1 0 2003 EASTERN DISTRICT OF ARKANSAS LfITLE ROCK DIVISION JAMES W McCOAMACK, CL.ERK By: -------,=E=P.\"\"\"C..,...,LE\"\"R-K LITTLE ROCK SCHOOL DISTRICT V. No. 4:82CV0086.6 WRW/JTR PULASKI COUNTY SPECIAL SCHOOL DISTRICT NO. 1, ET AL. MRS. LORENE JOSHUA, ET AL. KATHERINE KNIGHT, ET AL. ORDER PLAINTIFF DEFENDANTS INTERVENORS INTERVENORS Pending is Pulaski County Special School District's fee petiti,c\u0026gt;n (Doc. No. 3804). The Arkansas Department of Education has responded (Doc. No. 3814) ai1d the PCS SD has replied (Doc. No. 3816). In its fee petition PCS SD seeks a total fee award of $78,32650, an amount which includes attorney time expended both in this action and a related state court action. Additionally, the attorney time is billed at counsel's standard hourly rate, rather than the lower hourly rate counsel charges its client, the PCSSD; therefore ~e PCSSD's fee petition will be reduced for the following reasons: 1) C.ounsel for PCS SD seeks compensation from the ADE at $215 per hour, his standard hourly rate. However, counsel nonnally bills PCSSD at an hourly rate of $150. Therefore, $150 an hour is the rate which will be used to detennine compensation owed by the ADE in the current action. 2) Total compensation will include only time spent on the federal issues. Time spent on matters related to the state court proceeding is not closely enough related to this award of attorney's fee. 3) Because work performed by counsel in March 2001 and AJpril 2002, were not necessary to present the PCSSD's Motion to Enforce, and was work that would have nonnally been perfoIIDed for PCSSD, counsel is not entitled to compensation from the ADE for those hours. 4) PCS SD requests payment for time spent addressing appellate issues following the August 18, 2003 hearing. This request is premature and will not be i;(lcluded in the total compensation. 5) A total of five hours will be allowed for preparation of PCSSD's fee petition . . With the limitations established above, the award here breaks down as follows: 'lli,te Perfonned May 2003 June 2003 July 2003 August2003 September 2003 Total Total Amoynt 5,715 .00 10,667.50 18,835.50 9,152.50 750.00 $44,820.50 Upon review of both PCSSD's fee petition and the ADE's response, and based on my findings of fact and conclusions of law, counsel for the PCSSD is entitled to compensation from the ADE in the amount of $44,820.50 . .IT IS SO ORDERED this 10th day of November, 2003 u)'! ,~./l.llhA1, f'r UNITED STA TES DISTRICT JUDGE WM. R. WILSON, JR. TO: DATE: FAX COVER SHEET UNITED STATES DISTRICT COURT EASTERN DISTRICT OF ARKANSAS Chris Heller Sam Jones Steve Jones John Walker Timothy Gauger Mark Hagemeier Ann Marshall Mark Burnette //- /O,D3 Telephone: 501-604-5140 Fax Number: 501-604 5149 376-2147 376-9442 375-1027 374-4187 682-2591 682-2591 371-0100 375-1940 There are .3 pages, including this Cover Sheet, being sent by this facsimile transmission. MESSAGE SENT BY: ~ U.S. District Court 600 Wes1 Capitol, Room 423 Little Ro,;k, Arkansas 72201 Matt Morgan, LRSD Law Clerk 501-604-5141 UNITED STATES COURT OF APPEALS FOR THE EIGIITH cmcUIT GREG BOLLEN, JAMES BOLDEN, MARTHA WHATLEY and SUE ANN WHISKER V. CASE NO. 03-3088 CASE NO. 03-3404 PULASKI COUNTY SPECIAL SCHOOL DISTRICT PCSSD MOTION FOR ENLARGEMENT OF TIME TO FILE APPELLEE'S BRIEF RECEIVED DEC -1 2003 OFFICE OF DESEGREGATION MONITORING APPELLANTS APPELLEE Appellant's opening brief was originally due on October 15, 2003 . Appellants obtained an enlargement of time until and including November 6, 2003, to file their opening brief. The PCS SD requests an equivalent period of time until and including December 23, 2003, within which to file its opening Appellee's brief. The PCSSD brief is currently due on or about December 6, 2003. WHEREFORE, the PCSSD prays for an enlargement of time until and including December 23, 2003, within which to file its appellee 's brief. 463029-v1 Respectfully submitted WRIGHT, LINDSEY \u0026amp; JENNINGS LLP 200 West Capitol Avenue, Suite 2300 Little Rock, AR 72201 (501) 371-0808 FAX: (501) 376-9442 CERTIFICATE OF SERVICE On November 26, 2003, a copy of the foregoing was served by U.S. mail on the following : Mr. Will Bond Bond \u0026amp; Chamberlin 602 West Main Street Jacksonville, AR 72076 Mr. Scott Smith State Department of Education #4 Capitol Mall Little Rock, AR 72201 Mr. Christopher Heller Friday, Eldredge \u0026amp; Clark, LLP 2000 Regions Center 400 W. Capitol Little Rock, AR 72201 Ms. Ann Marshall Office of Desegregation Monitoring 1 Union National Plaza 124 W. Capitol, Suite 1895 Little Rock, AR 72201 Mr. Tim Gauger Senior Assistant Attorney General 323 Center Street, Suite 200 Little Rock, AR 72201-2610 442823-v1 2 Mr. John W. Walker John W. Walker P.A. 1723 S. Broadway Little Rock, AR 72206 Mr. Mark Burnette Mitchell, Blackstock, Barnes, Wagoner, Ivers \u0026amp; Sneddon 1010 W. Third Street Little Rock, AR 72201 Mr. Stephen Jones Jack, Lyon \u0026amp; Jones, P.A. 3400 TCBY Tower 425 West Capitol A venue Little Rock, AR 72201 TOM COURTWAY Interim Director State Board of Education JoNell Caldwell, Chair Little Rock Shelby Hillman, Vice Chair Carlisle Sherry Burrow Jonesboro Luke Gordy Van Buren Calvin King Marianna Randy Lawson B- ville MaryJane Rebick Pine Bluff Jeanna Westmoreland Arkadelphia Arkansas Department of Education #4 Capito/Mall, Little Rock, AR 72201-1071 501-682-4475 December 2, 2003 Mr. M. Samuel Jones, III Wright, Lindsey \u0026amp; Jennings 200 West Capitol, Suite 2000 Little Rock, AR 72201 Mr. John W. Walker John Walker, P.A. 1723 Broadway Little Rock, AR 72201 Mr. Mark Burnette Mitchell, Blackstock, Barnes, Wagoner, Ivers \u0026amp; Sneddon P. 0. Box 1510 Little Rock, AR 72203-1510 Mr. Christopher Heller Friday, Eldredge \u0026amp; Clark 400 West Capitol, Suite 2000 Little Rock, AR 72201-3493 Mr. Stephen W. Jones Jack, Lyon \u0026amp; Jones 425 West Capitol, Suite 3400 Little Rock, AR 72201 Ms. Ann Marshall One Union National Plaza 124 West Capitol, Suite 1895 Little Rock, AR 72201 http:/ /arkedu.state.ar.us ~1ECEIVED DEC - :1 2003 OFFICE OF DESEGREGATION MONITORING RE: Little Rock School District v. Pulaski County Special School District, et al. US. District Court No. 4:82-CV-866 Dear Gentlemen and Ms. Marshall: Per an agreement with the Attorney General's Office, I am filing the Arkansas Department of Education's Project Management Tool for the month of November 2003 in the above-referenced case. If you have any questions, please feel free to contact me at your convenience. s~; o.JA ~smt? General Counsel Arkansas Department of Education SS:law cc: Mark Hagemeier UNITED STATES DISTRICT COURT EASTERN DISTRICT OF ARKANSAS WESTERN DIVISION LITTLE ROCK SCHOOL DISTRICT V. No. LR-C-82-866 PLAINTIFF PULASKI COUNTY SPECIAL SCHOOL DISTRICT NO. 1, et al DEFENDANTS NOTICE OF FILING In accordance with the Court's Order of December 10, 1993, the Arkansas Department of Education hereby gives notice of the filing of the ADE's Project Management Tool for November 2003. Respectfully Submitted, cott Smith, # Attorney, Arkansas Department of Education #4 Capitol Mall, Room 404-A Little Rock, AR 72201 501-682-4227 ..... CERTIFICATE OF SERVICE - I, Scott Smith, certify that on December 2, 2003, I caused the foregoing document to be served by depositing a copy in the United States mail, postage prepaid, addressed to each of the following: Mr. M. Samuel Jones, III Wright, Lindsey \u0026amp; Jennings 200 West Capitol, Suite 2000 Little Rock, AR 72201 Mr. John W. Walker John Walker, P.A. 1723 Broadway Little Rock, AR 72201 Mr. Mark Burnette Mitchell, Blackstock, Barnes Wagoner, Ivers \u0026amp; Sneddon P. 0. Box 1510 Little Rock, AR 72203-1510 Mr. Christopher Heller Friday, Eldredge \u0026amp; Clark 400 West Capitol, Suite 2000 Little Rock, AR 72201-3493 Mr. Stephen W. Jones Jack, Lyon \u0026amp; Jones 425 West Capitol, Suite 3400 Little Rock, AR 72201 Ms. Ann Marshall One Union National Plaza 124 West Capitol, Suite 1895 Little Rock, AR 72201 .. IN THE UNITED STATES DISTRICT COURT EASTERN DISTRICT OF ARKANSAS WESTERN DIVISION LITTLE ROCK SCHOOL DISTRICT, ET AL PLAINTIFFS V. NO. LR-C-82-866 PULASKI COUNTY SPECIAL SCHOOL DISTRICT, ET AL DEFENDANTS MRS. LORENEJOSHUA, ETAL INTERVENOR$ KA THERINE W. KNIGHT, ET AL INTERVENOR$ ADE'S PROJECT MANAGEMENT TOOL In compliance with the Court's Order of December 10, 1993, the Arkansas Department of Education (ADE) submits the following Project Management Tool to the parties and the Court. This document describes the progress the ADE has made since March 15, 1994, in complying with provisions of the Implementation Plan and itemizes the ADE's progress against timelines presented in the Plan. - IMPLEMENTATION PHASE ACTIVITY I. FINANCIAL OBLIGATIONS A. Use the previous year's three quarter average daily membership to calculate MFPA (State Equalization) for the current school year. 1. Projected Ending Date Last day of each month, August - June. 2. Actual as of November 30, 2003 Based on the information available at October 31, 2003, the ADE calculated the Equalization Funding for FY 03/04, subject to periodic adjustments. B. Include all Magnet students in the resident District's average daily membership for calculation. 1. Projected Ending Date Last day of each month, August - June. I  II ~ ~ --- -- ' - ' ' I I I r I 01- ..:;;__, 1 G  \"'3 L ,._ ...; 2003-04 ENROLLMENT AND RACIAL BALANdf:~~cc, ,, . ., . ~:-~ cu~::;, ,. PULASKI COUNTY SPECIAL SCHOOL DIST~-~-~ .r. Ann S. Marshall Federal Monitor December 16, 2003 Office of Desegregation Monitoring United States District Court Little Rock, Arkansas Polly Ramer Office Manager L.~ ,-' C.:lL. ~ RECEIVED RECEIVED OEC 2 6 2003 DEC 2 6 2003 OESEGREGr{iW~ ~~1mORIHG IN THE UNITED STATES DISTRICT COURT OFFICE OF EASTERN DISTRICT OF ARKANSAS DESEGREGATION MONITORING WESTERN DIVISION LITTLE ROCK SCHOOL DISTRICT V. NO. 4:82CV00866WRW PULASKI COUNTY SPECIAL SCHOOL DISTRICT NO. 1, ET AL. MRS. LORENE JOSHUA, ET AL. KATHERINE KNIGHT, ET AL. PCSSD MOTION FOR TWO TEMPORARY PORTABLE BUILDINGS AT SYLVAN HILLS SCHOOL PLAINTIFF DEFENDANTS INTERVENORS INTERVENORS 1. On December 16, 2003, the ODM issued its annual report concerning enrollment and racial balance in the PCSSD. At pages 5 and 16 of the report, the ODM concludes that Sylvan Hills High School is currently operating at 103% capacity. It should be noted that this capacity reflects the District's recalculation of building capacities for the 2003-2004 school year. (ODM Report, p. 5). 2. The ODM report simply confirms a problem with which the PCSSD has struggled with thus far during the first semester. It is short at least two classrooms at Sylvan Hills High School. 3. The purpose of this motion is to seek an order of this Court approving the acquisition and use of two portable buildings for the second semester at Sylvan Hills High School. As a practical matter, the PCSSD must seek approval to utilize those _ ___ ,p. ortable buildings for the 2004-2005 schoo ear since it is highly unlikel.J-----\"-'-th...a,,,..._,,,_,_.__ _____ 468157-v1 - informed judgment can be made regarding permanent additions at the Sylvan Hills campus this year. 4. The use of these portable buildings will not have negative racial balance consequences. As the ODM report notes at page 9: \"Sylvan Hills High, which once had an enrollment less than 20% African-American, has been within the target range for the last 14 years.\" 5. The Sylvan Hills High School enrollment over time is depicted at page C-9 of the current ODM report. WHEREFORE, the PCSSD prays for an Order of this Court authorizing it to install and utilize two portable buildings for classroom instruction at Sylvan Hills High School beginning with the second semester and continuing through the 2004-2005 - school year, and for all proper relief. 468157-v1 Respectfully submitted, WRIGHT, LINDSEY \u0026amp; JENNINGS LLP 200 West Capitol Avenue, Suite 2300 Little Rock, Arkansas 72201-3699 (501) 371-0808 FAX: (501) 376-9442 By __ ....::._---l1----......,..-t--::-;__ ______ _ 2 0) nty Special ct CERTIFICATE OF SERVICE On December 23, 2003, a copy of the foregoing was served via facsimile and U.S. mail on each of the following: Mr. John W. Walker John W. Walker, P.A. 1723 Broadway Little Rock, Arkansas 72201 Mr. Christopher Heller Friday, Eldredge \u0026amp; Clark 2000 Regions Center 400 West Capitol Little Rock, Arkansas 72201 Ms. Ann Brown Marshall ODM One Union National Plaza 124 West Capitol, Suite 1895  Little Rock, AR 72201 Judge J. Thomas Ray U.S. District Courthouse 600 West Capitol Avenue, Suite 149 Little Rock, Arkansas 72201 468157-v1 Mr. Mark A. Hagemeier Assistant Attorney General Arkansas Attorney General's Office 323 Center Street, Suite 200 Little Rock, Arkansas 72201 Mr. Stephen W. Jones 3400 TCBY Tower 425 West Capitol Avenue Little Rock, Arkansas 72201 3 Mr. Clayton Blackstock Mr. Mark Burnett 1010 W. Third Street Little Rock, AR 72201 EDWARD L. WRIGHT ( 1903-197'7 ) ROBERT S . LINDSEY ( 191 3- 1991 ) ISAAC A . SCOTT, JR . JOHN G. LILE GORDON S . RATHER , JR. ROGER A. GLASGOW C. DOUGLAS BUFORD . JR . PATRICK J. GOSS ALSTON JENNINGS , JR . JOHN R. TISDALE KATHLYN GRAVES M. SAMUEL JONES Ill JOHN WILLIAM SPIVEY Ill LEE J. MULDROW N.M. NORTON CHARLES C. PRICE CHARLEST . COLEMAN JAMES J. GLOVER EDWIN L. LOWTHER, JR . WALTER E. MAY GREGORY T. JON ES BETTINA E. BROWNSTEIN WALTER McSPAOOEN JOHN D. DAVIS JUDY SIMMONS HENRY \\VRIGHT, LINDSEY \u0026amp; JENNINGS LLP ATTORNEYS AT LAW 200 WEST CAPITOL AVENUE SUITE 2300 LITTLE ROCK, ARKANSAS 72201 -3699 (501) 371 -0808 FAX (501) 376-9442 www . wlj .com OF COUNSEL ALSTON JENNINGS RONALD A. MAY BRUCE R . LINDSEY JAMES R . VAN DOVER Wri ter 's Direct Dial No . 501-212-1273 mjoncs@wlj .com . December 23, 2003 KIMBERLY WOOD TUCKER RAY F. CO X. JR . TROY A. PRICE PATRICIA SIEVERS HARRIS KATHRYN A. PRYOR J. MARK DAVIS CLAIRE SHOWS HANCOCK KEVIN W. KENNEDY JERRY J. SALLINGS WILLIAM STUART JACKSON MICHAEL D. BARNES STEPHEN R. LANCASTER JUDY ROBINSON WILBER KYLE R. WILSON C. TAD BOHANNON KRISTI M. MOODY J. CHARLES DOUGHERTY M. SEAN HATCH J. ANDREW VINES JUSTIN T. ALLEN MICHELLE M. KAEMMERLING SCOTT ANDREW IRBY PATRICK 0 . WILSON REGINA A. SPAULDING MARY ELIZABETH ELDRIDGE BLAKE S. RUTHERFORD PAUL D. MORRIS Lk~ w pnctio:: bdff I Uaitoi Suter PMl1:DI ~nd Tndt:twrk Ollie,: RECEIVED VIA FEDERAL EXPRESS OVERNIGHT DEC 2 R 2003 OFFICE OF DESEGREGATION MONITORlNG Mr. Michael Gans, Clerk of the Court U.S. Court of Appeals for the Eighth Circuit Thomas F. Eagleton Court House Room 24.329 111 S. 10th Street St. Louis, Missouri 63102 RE: 03-3088/03-3404 Greg Bollen, et al. v. Pulaski County Special School District Dear Michael: I have enclosed the original and 11 copies of the Joint Brief of Appellee/Cross-Appellant and Joshua Intervenors together with the original and four copies of Separate.Appendix in this matter. Please file the brief and appendix and return file-stamped copies to me in the enclosed envelope. I have also enclosed a diskette containing the brief in Acrobat format. By copy of this letter, I am serving two copies of the brief and appendix, along with a diskette, on counsel for appellants. If you have questions or comments, please contact me. MSJ:ao Enclosures 459324-vl Cordially yours, WRIGHT, LINDSEY \u0026amp; JENNINGS LLP Cf- WRIGHT , LINDSEY \u0026amp; JENNINGS LLP December 22, 2003 - Page2 cc/w/encls.: Mr. Will Bond (2 copies with diskette) Mr. Scott Smith (1 copy w/o diskette) 459324-vl Mr. Christopher Heller (1 copy w/o diskette) Mr. John W. Walker ( 1 copy w / o diskette) Mr. Mark Burnette (1 copy w/o diskette) Mr. Stephen Jones ( 1 copy w / o diskette) Ms. Ann Marshall (1 copy w/o diskette) Mr. Tim Gauger (1 copy w/o diskette) Honorable Wm. R. Wilson, Jr.(1 copy w/o diskette) NO. 03-3088/03-3404 IN THE UNITED STATES COURT OF APPEALS -, FOR THE EIGHTH CIRCUIT GREG BOLLEN, et al. V, PULASKI COUNTY SPECIAL SCHOOL DISTRICT APPELLANTS APPELLEE/CROSS-APPELLANT On Appeal From The United States District Court for the Eastern District of Arkansas Honorable William R. Wilson, Jr. Presiding Judge JOINT BRIEF OF APPELLEE/CROSS-APPELLANT AND JOSHUAJNTERVENORS John Walker John \\Valker, P.A. 1723 Broadway Little Rock, Arkansas 72206 (501) 374-3758 Attorney for Joshua Intervenors 4593',4 VI M. Samuel Jones, III WRIGHT, LINDSEY \u0026amp; JENNINGS LLP 200 West Capitol A venue, Suite 2300 Little Rock, Arkansas 72201-3699 (501) 371-0808 Attorneys for Pulaski County Special School District -... I I I NO. 03-3088/03-3404 IN THE UNITED STATES COURT OF APPEALS FOR THE EIGHTH CIRCUIT GREG BOLLEN, et al. APPELLANTS I V. I I I  I I I I I I I ' I PULASKI COUNTY SPECIAL SCHOOL DISTRICT APPELLEE/CROSS-APPELLANT John Walker John Walker, P.A. 1723 Broadway On Appeal From The United States District Court for the Eastern District of Arkansas Honorable William R. Wilson, Jr. Presiding Judge SEPARATE APPENDIX OF APPELLEE/CROSS-APPELLANT AND JOSHUAINTERVENORS M. Samuel Jones, III Little Rock, Arkansas 72206 (501) 374-3758 WRIGHT, LINDSEY \u0026amp; JENNINGS LLP 200 West Capitol Avenue, Suite 2300 Little Rock, Arkansas 72201-3699 (501) 371-0808 Attorney for Joshua Intervenors 467883-vl Attorneys for Pulaski County Special SchoolDistrict fOM COURTWAY [nterim Director ;;tale Board of Education loNell Caldwell, Chair ~ittle Rock :ihclby Hillman, Vice Chair '.:arlisle Sherry Burrow Tonesboro Luke Gordy Van Buren '.:alvin King 14arian11a ~andy Lawson 3en ue vfary e Rebick 'ine Bluff eanna Westmoreland lrkadelphia Arkansas Department of Education #4 Capitol Mall, Liitle Rock, AR 72201-1071 501-682-4475 December 30, 2003 Mr.M. SaniuelJones,III Wright, Lindsey \u0026amp; Jennings 200 West Capitol, Suite 2000 Little Rock, AR 72201 Mr. John W. Walker John Walker, P.A. 1723 Broadway Little Rock, AR 72201 Mr. Mark Burnette Mitchell, Blackstock, Barnes, Wagoner, Ivers \u0026amp; Sneddon P. 0. Box 1510 Little Rock, AR 72203-1510 Mr. Christopher Heller Friday, Eldredge \u0026amp; Clark 400 West Capitol, Suite 2000 Little Rock, AR 72201-3493 Mr. Stephen W. Jones Jack, Lyon \u0026amp; Jones 425 West Capitol, Suite 3400 Little Rock, AR 72201 Ms. Ann Marshall One Union National Plaza 124 West Capitol, Suite 1895 Little Rock, AR 72201 http:/ /arkedu.state.ar.us RECEIVED ~ OFFICE OF DESEGREGATION MONITORJNG RECEIVED Jt\\i~ 0 2 2004 OFFICE OF DESEGREGATION MONITORING RE: Little Rock School District v. Pulaski County Special School District, et al. US. District Court No. 4:82-CV-866 Dear Gentlemen and Ms. Marshall: Per an agreement with the Attorney General's Office, I ani filing the Arkansas Department of Education's Project Management Tool for the month of December 2003 in the above-referenced case. If you have any questions, please feel free to contact me at your convenience. -\u0026amp;::~~/.~ ~ Gener:;tl Counsel Arkansas Department of Education SS:law cc: Mark Hagemeier UNITED STATES DISTRICT COURT EASTERN DISTRICT OF ARKANSAS WESTERN DIVISION LITTLE ROCK SCHOOL DISTRICT PLAINTIFF V. No. LR-C-82-866 PULASKI COUNTY SPECIAL SCHOOL DISTRICT NO. 1, et al DEFENDANTS NOTICE OF FILING In accordance with the Court's Order of December 10, 1993, the Arkansas Department of Education hereby gives notice of the filing of the ADE's Project Management Tool for December 2003. Respectfully Submitted, ~A~ sCIIlith, #922 Attorney, Arkansas Department of Education #4 Capitol Mall, Room 404-A Little Rock, AR 72201 501-682-4227 CERTIFICATE OF SERVICE I, Scott Smith, certify that on December 30, 2003, I caused the foregoing document to be served by depositing a copy in the United States mail, postage prepaid, addressed to each of the following: Mr. M. Samuel Jones, III Wright, Lindsey \u0026amp; Jennings 200 West Capitol, Suite 2000 Little Rock, AR 72201 Mr. John W. Walker John Walker, P.A. 1723 Broadway Little Rock, AR 72201 Mr. Mark Burnette Mitchell, Blackstock, Barnes Wagoner, Ivers \u0026amp; Sneddon P. 0. Box 1510 Little Rock, AR 72203-1510 Mr. Christopher Heller Friday, Eldredge \u0026amp; Clark 400 West Capitol, Suite 2000 Little Rock, AR 72201-3493 Mr. Stephen W. Jones Jack, Lyon \u0026amp; Jones 425 West Capitol, Suite 3400 Little Rock, AR 72201 Ms. Ann Marshall One Union National Plaza 124 West Capitol, Suite 1895 Little Rock, 2201 IN THE UNITED STATES DISTRICT COURT EASTERN DISTRICT OF ARKANSAS WESTERN DIVISION LITTLE ROCK SCHOOL DISTRICT, ET AL PLAINTIFFS V. NO. LR-C-82-866 PULASKI COUNTY SPECIAL SCHOOL DISTRICT, ET AL DEFENDANTS MRS. LORENE JOSHUA, ET AL INTERVENORS KATHERINE W. KNIGHT, ET AL INTERVENORS ADE'S PROJECT MANAGEMENT TOOL In compliance with the Court's Order of December 10, 1993, the Arkansas Department of Education (ADE) submits the following Project Management Tool to the parties and the Court. This document describes the progress the ADE has made since March 15, 1994, in complying with provisions of the Implementation Plan and itemizes the AD E's progress against timelines presented in the Plan. - IMPLEMENTATION PHASE ACTIVITY I. FINANCIAL OBLIGATIONS A. Use the previous year's three quarter average daily membership to calculate MFPA (State Equalization) for the current school year. 1. Projected Ending Date Last day of each month, August - June. 2. Actual as of December 31 , 2003 Based on the information available at November 30, 2003, the ADE calculated ihetqualization Funding for FY,03/04,' subject to penodic adjustments: B. Include all Magnet students in the resident District's average daily membership for calculation. 1. Projected Ending Date Last day of each month, August - June.    This project was supported in part by a Digitizing Hidden Special Collections and Archives project grant from The Andrew W. Mellon Foundation and Council on Library and Information Resources.\u003c/dcterms_description\u003e\n   \n\n\u003c/dcterms_description\u003e   \n\n  \n\n\n   \n\n   \n\n   \n\n\n   \n\n   \n\n   \n\n\n   \n\n  \n\n \n\n\n   \n\n   \n\n   \n\n\n   \n\n   \n\n   \n\n\n\n   \n\n   \n\n   \n\n\n   \n\n   \n\n  \n\n  \n\n   \n\n\n   \n\n   \n\n   \n\n\n   \n\n   \n\n   \n\n   \n\n   \n\n   \n\n\n\n\n\n   \n\n   \n\n   \n\n   \n\n\n   \n\n   \n\n   \n\n\n   \n\n   \n\n   \n\n   \n\n\u003c/item\u003e\n\u003c/items\u003e"},{"id":"bcas_bcmss0837_1748","title":"Pulaski County Special School District's (PCSSD's) response to report by the Office of Desegregation Management, PCSSD's motion for an award of attorneys' fees and filing extension, PCSSD's response to court's order dated October 16, 2003, and Arkansas Department of Education (ADE) project management tool.","collection_id":"bcas_bcmss0837","collection_title":"Office of Desegregation Management","dcterms_contributor":null,"dcterms_spatial":["United States, 39.76, -98.5","United States, Arkansas, 34.75037, -92.50044","United States, Arkansas, Pulaski County, 34.76993, -92.3118","United States, Arkansas, Pulaski County, Little Rock, 34.74648, -92.28959"],"dcterms_creator":["United States. District Court (Arkansas: Eastern District)"],"dc_date":["2003-11"],"dcterms_description":null,"dc_format":["application/pdf"],"dcterms_identifier":null,"dcterms_language":["eng"],"dcterms_publisher":["Little Rock, Ark. : Butler Center for Arkansas Studies. Central Arkansas Library System"],"dc_relation":null,"dc_right":["http://rightsstatements.org/vocab/InC-EDU/1.0/"],"dcterms_is_part_of":["Office of Desegregation Monitoring records (BC.MSS.08.37)","History of Segregation and Integration of Arkansas's Educational System"],"dcterms_subject":["Little Rock (Ark.)--History--21st Century","Education--Arkansas","School districts","Arkansas. Department of Education","Project management","Pulaski County Special School District","High schools","Sylvan Hills High School (Little Rock, Ark.)","School enrollment","Office of Desegregation Monitoring (Little Rock, Ark.)","School integration","Education--Finance"],"dcterms_title":["Pulaski County Special School District's (PCSSD's) response to report by the Office of Desegregation Management, PCSSD's motion for an award of attorneys' fees and filing extension, PCSSD's response to court's order dated October 16, 2003, and Arkansas Department of Education (ADE) project management tool."],"dcterms_type":["Text"],"dcterms_provenance":["Butler Center for Arkansas Studies"],"edm_is_shown_by":null,"edm_is_shown_at":["http://arstudies.contentdm.oclc.org/cdm/ref/collection/bcmss0837/id/1748"],"dcterms_temporal":null,"dcterms_rights_holder":null,"dcterms_bibliographic_citation":null,"dlg_local_right":["Available for use in research, teaching, and private study. Any other use requires permission from the Butler Center."],"dcterms_medium":["filing"],"dcterms_extent":["51 pages"],"dlg_subject_personal":null,"dcterms_subject_fast":null,"fulltext":"\u003c?xml version=\"1.0\" encoding=\"utf-8\"?\u003e\n\u003citems type=\"array\"\u003e  \u003citem\u003e   \n\n   \n\n   \n\n\n   \n\n   \n\n\n   \n\n\n   \n\n   \n\n\n   \n\n   \n\n\n   \n\n   \n\n\n\n\n\n\n\n\n\n\n\n\n   \n\n \n\n \n\n \n\n\n   \n\n   \n\n   \n\n\n   \n\n  \n\n   \n\n\n   \n\n  \n\n   \n\n\n   \n\n \n\n\u003cdcterms_description type=\"array\"\u003e   \n\n\u003cdcterms_description\u003eDistrict Court, notice of filing, Pulaski County Special School District (PCSSD) response to report issued by the Office of Desegregation Management on the implementation of Plan 2000; District Court, response to Pulaski County Special School District's (PCSSD's) motion for an award of attorneys' fees; District Court, order; District Court, Pulaski County Special School District's (PCSSD's) brief and reply to response to Pulaski County Special School District's (PCSSD's) motion for an award of attorneys' fees; Court of Appeals, motion for extension of time in which to file their brief and appendix; District Court, order; District Court, Pulaski County Special School District's (PCSSD's) response to the court's order dated October 16, 2003; District Court, notice of filing, Arkansas Department of Education (ADE) project management tool    This transcript was create using Optical Character Recognition (OCR) and may contain some errors.    IN THE UNITED STATES DISTRICT COURT EASTERN DISTRICT OF ARKANSAS WESTERN DIVISION LITTLE ROCK SCHOOL DISTRICT V. NO. 4:82CV00866WRW PULASKI COUNTY SPECIAL SCHOOL DISTRICT NO. 1, ET AL. MRS. LORENE JOSHUA, ET AL. KATHERINE KNIGHT, ET AL. NOTICE OF FILING RECEIVED OCT 2 - 2003 OFFICE OF DESEGREGATION MONITORING PLAINTIFF DEFENDANTS INTERVENORS INTERVENORS The PCSSD hereby gives notice of its filing of its response to Office of Desegregation Monitoring Report dated May 8, 2003. 451168-v1 Respectfully submitted, WRIGHT, LINDSEY \u0026amp; JENNINGS LLP 200 West Capitol Avenue, Suite 2300 Little Rock, Arkansas 72201-3699 (501) 371-0808 FAX: (501) 376-9442 CERTIFICATE OF SERVICE On October 1, 2003, a copy of the foregoing was served via U.S. mail on each of the following: Mr. John W. Walker John W. Walker, P.A. 1723 Broadway Little Rock, Arkansas 72201 Mr. Christopher Heller Friday, Eldredge \u0026amp; Clark 2000 Regions Center 400 West Capitol Little Rock, Arkansas 72201 Ms. Ann Brown Marshall ODM One Union National Plaza 124 West Capitol, Suite 1895 Little Rock, AR 72201 Judge J. Thomas Ray U.S. District Courthouse 600 West Capitol Avenue, Suite 149 Little Rock, Arkansas 72201 451168-v1 Mr. Mark A. Hagemeier Assistant Attorney General Arkansas Attorney General's Office 323 Center Street, Suite 200 Little Rock, Arkansas 72201 Mr. Stephen W. Jones 3400 TCBY Tower 425 West Capitol Avenue Little Rock, Arkansas 72201 2 Mr. Clayton Blackstock Mr. Mark Burnett 1010 W. Third Street Little Rock, AR 72201 PULASKI COUNTY SPECIAL SCHOOL DISTRICT September 29, 2003 Ann Marshall, Federal Monitor Office of Desegregation Monitoring One Union National Plaza 124 West Capitol, Suite 1895 Little Rock, Arkansas 72201 Dear Ann: 925 East Dixon Road/P.O. Box 8601 Little Rock, Arkansas 72216 www.pcssd.org (501) 490-2000 - Enclosed is Pulaski County Special School District's reply to the Office of Desegregation Monitoring Report on the Implementation of Plan 2000, May 8, 2003. Department heads and others with responsibilities to the Plan have submitted responses to the status report in consultation with the Office of Equity and Pupil Services. If you have any questions please feel free to contact us. Sincerely, w~ Karl Brown, Assistant Superintendent for Equity and Pupil Services B /l-1.-....t-  16~)-.a.-o-- Dr. Brenda Bowles, Director of Equity and Multicultural Education C Dr. Don Henderson, Superintendent of Education Sam Jones RESPONSE TO REPORT ISSUED BY THE OFFICE OF DESEGREGATION MONITORING ON THE IMPLEMENTATION OF PLAN 2000 RECEIVED OCT 2 - 2003 OFFICE OF DESEGREGATION MONITORING Dr. Don Henderson Superintendent of Education September 2003 Mark A. Hagemeier Assistant Attorney General M. Samuel Jones, III Wright, Lindsey \u0026amp; Jennings 2000 NationsBank Bldg. 200 W. Capitol Little Rock, AR 72201 John W. Walker John Walker, P.A. 1 723 Broadway Little Rock, AR 72201 Mark Burnette 1010 W. Third Street Little Rock, AR 72201 Mike Wilson 602 W. Main Street Jacksonville, AR 72076 John C. Fendley, Jr. 51 Wingate Drive Little Rock, AR 72205 THE ATTORNEY GENERAL STATE OF ARKANSAS MIKE BEEBE RECEIVED OC1 7 1003 Off\\CE Of DESEGREGAllOK MOtll10ft1KG Direct dial: (501) 682-3643 E-mail: mark.hagemeier@ag.state.ar. us October 6, 2003 Christopher Heller Friday, Eldredge \u0026amp; Clark 2000 Regions Center 400 W. Capitol Little Rock, AR 72201-3493 Stephen W. Jones Jack, Lyon \u0026amp; Jones 3400 TCBY Tower 425 W. Capitol Little Rock, AR 72201 Ann Marshall Office of Desegregation Monitoring 1 Union National Plaza 124 W. Capitol, suite 1895 Little Rock, AR 72201 Will Bond Bond \u0026amp; Chamberlin 602 W. Main Street Jacksonville, AR 72076 Re: Little Rock School District v. Pulaski County Special School District, et al. USDC No. LR-C-82-866 323 Center Street Suite 200  Little Rock, Arkansas 72201 (501) 682-2007  FAX (501) 682-2591 Internet Website http://www.ag.state.ar.us/ Dear Counselors and Ms. Marshall: Please find enclosed the Arkansas Department of Education's Response to PCSSD's Motion for Attorneys ' Fees which has been filed today. MAH Enclosure cc: Mr. Scott Smith Very truly yours, --yri~-~ MARK A. HAGEMEIER Assistant Attorney General / IN THE UNITED STATES DISTRICT COURT EASTERN DISTRICT OF ARKANSAS WESTERN DIVISION LITTLE ROCK SCHOOL DISTRICT v. No. 4:82CV00866 WRW PULASKI COUNTY SPECIAL SCHOOL DISTRICT NO. 1, et al. RECEIVED OCT 7 2003 OFFICEOF DESEGREGATION MONITORING PLAINTIFF DEFENDANTS RESPONSE TO PCSSD'S MOTION FOR AN AW ARD OF ATTORNEYS' FEES Comes now the Defendant Arkansas Department of Education (\"ADE\"), by and through its counsel, Attorney General Mike Beebe and Assistant Attorney General Mark Hagemeier, and for its response to PCSSD's Motion for an Award of Attorneys' Fees (\"Fee Petition\"), states as follows: I. Introduction Legal counsel for PCSSD seeks a total fee award of $78,326.50 for work allegedly associated with its Fourth Motion to Enforce Settlement Agreement and For Allied Relief (\"Motion to Enforce\") filed with this Court on July 25, 2003. On August 18, 2003, this Court conducted a three-hour hearing on issues raised in the Motion to Enforce, and later that same day it issued an order ruling that the State Board of Education's (\"SBE\") action authorizing an election on the issue of detachment of the Jacksonville Area School System from PCS SD violated the 1989 Settlement Agreement. For the reasons stated below, ADE submits the fee petition of PCSSD is unreasonable and should be reduced accordingly. IN THE UNITED STATES DISTRICT COURT EASTERN DISTRICT OF ARKANSAS LITTLE ROCK DIVISION FILED U.S. DISTRICT COURT EASTERN DISTRICT ARKANSAS OCT - 9 2003 JAMES W. McCORMACK, CLERK .By: ______ -=:,-=,-- LITTLE ROCK SCHOOL DISTRICT V. No. 4:82CV00866 WRW/JTR PULASKI COUNTY SPECIAL SCHOOL DISTRICT NO. 1, ET AL. MRS. LORENE JOSHQA, ET AL. KA THERINE KNIGHT, ET AL. RECEIVED () e,t, 1 '1 ?nn~ OFFICE OF DESEGREGATION MONITORING ORDER PLAINTIFF DEFENDANTS INTERVENORS INTERVENORS Pending is Pulaski County Special School District's Renewed and Supplemental Motion - Regarding Sylvan Hills Band Room (Doc. No. 3809), which was amended on September 26, 2003. 1 Also Pending is PCSSD's Motion for Temporary Portable Buildings at Robinson High School (Doc. No. 3810). No parties have responded to the PCSSD's motions, and their time for doing so has now expired.2 Sylvan Hills' Band Room In its motion regarding the Sylvan Hills Band Room, PCSSD requests authorization to lease a portable building to use as the Sylvan Hills band room for the remainder of the 2003-2004 1On September 26, 2003, PCSSD filed an Amended and Supplemental Motion Regarding the Sylvan Hills Band Room (Doc. No. 3811). In this motion, PCCSD revoked its request for permission to build a new permanent band room at Sylvan Hills, which was in the original motion (Doc. No. 3809); accordingly, I will not address the issue of a permanent band room at this time. 2See Local Rule 7.2. oEP CLERK 8 1 5 school year. PCS SD asserts that this portable building is necessary because of recurring water problems with Sylvan Hills' current band room. Robinson High School Portable Buildings According to PCCSD, for a variety ofreasons, the emollment at Robinson High School has significantly increased for the 2003-2004 school year. Because ofthis increase, Robinson -High School is presently conducting classes in the cafeteria, band room, auditorium, and gymnasium. As a temporary remedy to accommodate this increased emollment, while permanent classroom additions are considered, the PCSSD requests permission to lease two portable building for the remainder of the 2003-2004 school year. CONCLUSION The PCSSD's Amended and Supplemental Motion Regarding the Sylvan Hills Band Room (Doc. No. 38011) requesting permission to lease a portable building for the Sylvan Hills band room, for the remainder of the 2003-2004, school year is GRANTED. The PCSSD's motion (Doc. No. 3810) requesting permission to lease two portable buildings, for the remainder of the 2003-2004 school year, to accommodate increased emollment at Robinson High School is GRANTED. IT JS SO ORDERED thi/day of October, 2003. I ;;/J, 0 ~ 4tt UNIJL~J~~ THIS DOCUMENT El\\ffER!::u ui'-J DOCKET SHEET IN COMPLIANCE WIT~1LE...;)8 AN~cr . ON{O ~ 0~ BY S\u0026gt; \u0026amp;- WM. R. WTLSON, JR. 2 __ EDWti:~t,i,ll'.,f1G.HL ______ -4.,.,-R-I6H-T-;-J:;-JN-1:\u0026gt;-S-EY--\u0026amp;-J-E-N-N-I-N6S- J:;-J:;-P------ ~~~BfR2U~~~ TUCKER ROBERTS. LINDSEY TROY A. PRICE (1913 - 1991 ) ATTORNEYS AT LAW PATRICIA SIEVERS HARRIS ISAAC A. SCOTT , JR . KATHRYN A. PRYOR JOHN G. LILE 200 WEST CAPITOL AVENUE J . MARK DAVIS ~g~~~~ -SG~~~~~! JR . SUITE 2300 ~~t:~\\,5,H~:NsN~~~COCK C. DOUGLAS BUFORD , JR . LITTLE ROCK , ARKANSAS 72201-3699 JERRY J. SALLINGS PATRICK l. GOSS WILLIAM STUART JACKSON ALSTON JENNINGS , JR . (501) 371-0808 MICHAEL D. BARNES JOHN R. TISDALE STEPHEN R. LANCASTER ~~~~'..Ytfe~~~~:~ 111 FAX (501) 376-9442 ~uy~1 ~~~~CsooNN WILBER ~i~NJ.W~tilt:1o~IVEY 111 www . wlj .com iRis~~ ~~i::-::o~N N.M . NORTON J. CHARLES DOUGHERTY CHARLES C. PRICE M. SEAN HATCH CHARLES T. COLEMAN l. ANDREW VINES JAMES l. GLOVER OF COUNSEL JUSTIN T, ALLEN ~~~~~i/t:~HER, JR. ALSTON JENNINGS ~~g~;':.L;D~E!A1i_~~ERLING GREGORY T. JONES RONALD A. MA y PATRICK D. WILSON H. KEITH MORRISON BRUCE R. LINDSEY REGINA A. SPAULDING BETTINA E. BROWNSTEIN JAMES R. VAN DOVER MARY ELIZABETH ELDRIDGE WALTER McSPADDEN BLAKES. RUTHERFORD JOHN 0 . DAVIS JUDY SIMMONS HENRY VIA HAND DELIVERY The Honorable Wm. R. Wilson, Jr. U.S. District Courthouse 600 West Capitol Avenue, Suite 423 Little Rock, Arkansas 72201 Wri1cr ' s Dircc1 Di al No . 501 -212-1273 mjoncs@wlj .com October 10, 2003  LioetlJlod,opncticebehretbt: UaitedSUta h1t:111ADIIT111doswtO/lia RECEIVED OCT 1 4 2003 OFFICE OF DESEGREGATION MONITORING Re: Little Rock School District v. Pulaski County Special School District; et al. USDC Docket No.: 4:82CV00866WRW Dear Judge Wilson: Enclosed is a courtesy copy of the PCSSD's brief and reply to response to PCSSD's motion for an Award of attorneys' fees. The reply is accompanied by my supplemental affidavit. We ask the Court to consider both items. Thank you very much. MSJ:ao Encl. cc/w/encl.: 453145-vl Cordially yours, 2:~EY \u0026amp; JENNINGS LLP e_:;mre/ones, m Honorable J. Thomas Ray (via hand delivery) Mr. Timothy Gauger (U.S. Mail) All Counsel of Record (U.S. Mail) RECEIVED ---- .1-------------------------lJOlv-C.\\l--.1i._::,4;__,7u,Dn..,u..3,.'---- IN THE UNITED STATES DISTRICT COURT EASTERN DISTRICT OF ARKANSAS WESTERN DIVISION LITTLE ROCK SCHOOL DISTRICT V. NO. 4:82CV00866WRW PULASKI COUNTY SPECIAL SCHOOL DISTRICT NO. 1, ET AL. MRS. LORENE JOSHUA, ET AL. KATHERINE KNIGHT, ET AL. 0FFICE OF DESEGREGATION MONITORING PLAINTIFF DEFENDANTS INTERVENORS INTERVENORS PCSSD'S BRIEF AND REPLY TO RESPONSE TO PCSSD'S MOTION FOR AN AW ARD OF ATTORNEYS' FEES The PCSSD for its reply, which tracks the format of the State's Response, states: IV. Argument A. An Hourly Rate at $215 Per Hour is Appropriate. While counsel for the PCSSD voluntarily grants the PCSSD a 30 % discount, the State is not entitled to the same discount for violating the 1989 Settlement Agreement. The State's only current financial consequence for violating the 1989 Settlement Agreement is its exposure for attorney's fees. Indeed, if the State could be assured that future violations would warrant no more exposure than the discounted rate given to the PCS SD, then the State would have even less incentive to hew the line and abide by the Settlement Agreement. B. The Number of Hours Expended is Reasonable. Significantly, the State does not directly challenge the total number of hours expended. Rather, it seeks to avoid attorney fee responsibility in some instances by questioning, without citation to authority, the forums before whom the legal efforts were initially made. As we will explain, the relevant cases demonstrate the fallacy of the State's position. 452284-v1 The United States Supreme Court has squarely addressed these issues in Pennsylvania, et al. v. Delaware Valley Citizens Council for Clean Air, et al., 478 U.S. 546 (1986). In 1977 a citizens group, Delaware Valley, filed suit to compel Pennsylvania to implement a vehicle emission inspection program. A consent decree was entered in 1978 calling for the Pennsylvania Department of Transportation to seek legislation instituting the program. Id. @ 549. Thereafter, the Pennsylvania legislature balked at implementing the provisions of the consent decree. In this protracted case, the Supreme Court divided the procedural history after the consent decree thereafter into nine phases. For purposes of this analysis, only the relevant phases will be referred to. Phase IX of the case included work done by Delaware Valley in hearings before the Environmental Protection Agency in which the State unsuccessfully sought the EPA approval of a reduced emissions program. Delaware Valley then filed a motion for attorneys' fees and costs for all work performed after issuance of the consent decree including the work before the administrative agency. Id. @ 553. Among other matters, the Court of Appeals for the Third Circuit had affirmed the District Court's fee award including an award of fees for time spent \"commenting\" on the State's proposed emission regulations promulgated during Phase II. It likewise approved the award of fees for work done at the administrative level citing the Supreme Court case of Webb v. Board of Education of Dyer County, 4 71 U.S. 234 ( 1985), in which the Supreme Court held that time spent on \"optional administrative proceedings\" may be compensable under  1988 if the work was \"both useful and of a type ordinarily necessary to advance the ... litigation\" to the point where the parties succeeded. Id. @ 556. 452284-v1 2 -- - - --- ------------- The Supreme Court rejected challenges from the State that the proceedings involved in Phases II and IX were not judicial in the sense that they did not occur in a courtroom or involved traditional legal work. The Supreme Court reasoned that the work done by counsel in these two phases was as necessary to the attainment of adequate relief for their client as was all of their earlier work in the courtroom which secured Delaware Valley's initial success in obtaining the consent decree. Id. @ 558. It said: Protection of the full scope of relief afforded by the consent decree was thus crucial to safeguard the interests asserted by Delaware Valley; and enforcement of the decree, whether in the courtroom before a judge, or in front of a regulatory agency with power to modify the substance of the program ordered by the court, involved the type of work which is properly compensable as a cost of litigation ... . Id. @ 558. Finally, the Court observed that: Several courts have held that, in the context of the Civil Rights Attorney's Fees Awards Act of 1976, 42 U.S.C.  1988, postjudgment monitoring of a consent decree is a compensable activity for which counsel is entitled to a reasonable fee. Id. @ 559. After engaging in a discussion concerning the similarities between 304 (d) (the Clean Air Act) and 1988 (the Civil Rights Act), the Court noted that: 452284-v1 Given the common purpose of both  304 (d) and  1988 to promote citizen enforcement of important federal policies, we find no reason not to interpret both provisions governing attorney's fees in the same manner. We hold, therefore, that the fact that the work done by counsel in Phases II and IX did not occur in the context of traditional judicial litigation does not preclude an award of reasonable attorney's fees under  304 (d) for the work done during these portions of the present action. Id.@ 560. 3 Many other cases support the position of the PCSSD in these regards. For instance, in Schlimgen v. City of Rapid City, 83 F .Supp.2d 1061 (D.S.D 2000), the plaintiff was fired as a city employee after he opposed a new real estate development. He appealed his termination to the Department of Labor claiming his termination was a violation of his civil and constitutional rights. Id. @ 1065. The Department of Labor agreed. Plaintiff then filed an action in Federal Court seeking damages and attorneys' fees. Rapid City claimed that as a matter of law Schlimgen was not entitled to attorneys' fees related to the earlier Department of Labor hearing. In interpreting 42 U .S.C.  1988, the District Court disagreed. As the District Court explained: The claim must be for specific portions of work product from an earlier administrative proceeding. The work done must be useful and of a type ordinarily necessary to advance the civil rights litigation to the stage it has reached. 42 U.S.C.  1988 awards are not limited to work performed after the complaint is filed . ... fees may be awarded for \"research or investigation done in connection with\" a related proceeding, to the extent it \"proved directly relevant to the successful prosecution of the later civil rights\" action. The District Court also noted that Mr. Schlimgen's DOL action was not one to enforce a specific civil rights statute. Id. @ 1071. Here, however, the efforts of the PCSSD in opposing the detachment were all directed toward preventing the State from violating the 1989 Settlement Agreement, an effort which this Court has previously ruled triggers  1988 including liability for attorneys' fees. (Please see orders cited at pages 2 and 3 of counsel's initial affidavit.) Lambert v. Fulton County, GA, 151 F.Supp.2d 1364 (N.D.Ga. 2000), is to the same effect. Lambert was an employment discrimination case in which the procedural history included an appeal to the Fulton County Personnel Board before the federal court action was 452284-v1 4 I I initiated. Id. @ 1368. The defendant claimed that the time spent on the appeal to the Fulton - County Board was non-compensable. Id. The District Court disagreed. The District Court began its analysis by noting that: The starting point for calculating reasonable attorneys' fees is \"the number of hours reasonably expended on the litigation multiplied by a reasonable hourly rate\" for the attorneys' services. After calculating the lodestar, the court may within its discretion adjust the amount upwards or downwards based on a number of factors, such as the quality of the results obtained and the legal representation provided. Id. @ 1369. In further addressing the lodestar issue, Judge Thrash explained that: As to the work performed, compensable activities include pre-litigation services in preparation of filing the lawsuit, background research and reading in complex cases, productive attorney discussions and strategy sessions, negotiations, routine activities such as making telephone calls and reading mail related to the case, monitoring and enforcing the favorable judgment, and even preparing and litigating the request for attorneys' fees. Id.@ 1369-70. As to the time spent on the administrative proceeding, the Court noted that: A court should award attorneys' fees for time \"spent on administrative proceedings to enforce the civil rights claim prior to the litigation.\" The District Court also noted that: In this case, Plaintiffs' appeal to the Fulton County Personnel Board was not required for them to file this suit ... . Because the proceedings before the Fulton County Personnel Board were not mandatory, time spent on them is not automatically compensable. The Court, however, concludes that time spent on these proceedings should be compensated because they were \"useful and of a type ordinarily necessary to secure the final result obtained from the litigation.\" Here, of course, the PCSSD would have likely committed procedural suicide by not opposing the detachment proceedings initiated by the State Board of Education. Despite that fact, and at a minimum, the State Board proceeding served as a vehicle to conduct discovery through the FOIA, to delineate and brief the myriad legal issues and importantly served as a 452284-v1 5 vehicle whereby the State was presented with an opportunity to avoid its current liability by - comporting its actions with the requirements of the Settlement Agreement. 1. The State Court Case. At least three observations are appropriate here. First, \"but for\" the State's passage and activation of the detachment statute, the State Court case would have never been filed. Second, most of the work involved in the State Court case involved identifying, researching and setting forth the legal issues which were generated by the passage of the statute and its activation by the State. Third, most if not all of the issues could have been brought as part of the Fourth Motion to Enforce Settlement Agreement as matters of pendent jurisdiction. 2. The State Board of Education Proceedings. Had the PCSSD not opposed the detachment process before the State Board of Education, the argument would have undoubtedly been made that it waived its right to seek relief in this Court by not exhausting its administrative remedies. The PCSSD, as a signatory to the 1989 Settlement Agreement, had no choice but to argue to the State Board of Education, among other matters, that the Board's actions were violating the 1989 Settlement Agreement in at least two particulars. Further, the motion and brief ultimately filed before this Court was in substantial measure an adaptation of the written submissions the PCSSD made to the State Board. Thus, most of the submissions made to this Court by the PCSSD were largely researched and documented as part of the process of opposing the detachment before he State Board of Education. Again, but for passage of a statute which violated the 1989 Settlement Agreement, there would have been no appearances before the State Board because the State Board would not have had this process to engage. 452284-v1 6 3-4. The Passage of the Legislation. The Settlement Agreement itself requires the PCSSD to identify, every biennium, those recent legislative acts or regulations which impede desegregation. Here, the PCSSD identified the legislation while it was still pending and, had the legislature heeded the opposition of the PCSSD to the legislation, and refused to pass the detachment statute, the State would have no _pending fee petition to defend against. 5. Appeal Time. The State's observations concerning premature appeal time are probably correct. C. Other Practices. 1. All of the time entries presented in the petition are for work directly associated with the detachment issue. Except for those entries which have been lined through, counsel for the PCSSD had no other issues pending for the PCSSD during the relevant time period. 2. That which the State regards as \"file maintenance\" is actually part of the on-going effort to maintain a \"computer searchable data base\" for the documents, orders, pleadings, etc. generated in this case. This permits a voidance of time-consuming manual searches and assists counsel in locating decades old documents, orders and pleadings through key word searches. 3. The PCSSD believes that the clippings review helped supply a more cogent and refreshed context for many of the events which surrounded the drafting and legislative journey of the 1989 Settlement Agreement. Given Arkansas' singular lack of formal legislative history, the PCSSD believes that the results of these efforts fall within the broad framework of Rule 807 of the Federal Rules of Evidence. 452284-v1 7 4. The docket review was to locate orders, pleadings and Court of Appeals - decisions which bore upon the issue of the 1989 Settlement Agreement and other potential issues. 5. The fee petition contains no \"block billing\" whatsoever. Most if not all of the alleged \"block billings\" are clearly described and invariably relate to a discreet issue or activity. Conclusion. Significantly, the State does not contend that any time was wasted or that excessive time was recorded. The absence of such an argument helps to bring the issue full circle to the core question' of: Was the time reasonably expended toward the end of securing relief from a State created process which both violated the 1989 Settlement Agreement and previous orders of this Court? Having reviewed the State's response, the answer to this question appears to be clearly \"yes\" . But for the State's consideration of, passage of and activation of this detachment statute, there would be no fee petition for this Court to consider. 452284-v1 Respectfully submitted, WRIGHT, LINDSEY \u0026amp; JENNINGS LLP 200 West Capitol Avenue, Suite 2300 Little Rock, Arkansas 72201-3699 (501) 371-0808 FAX: (501) 376-9442 By ______ +--------1,-------- M. Atto cial Sch 8 I I CERTIFICATE OF SERVICE On October 10, 2003, a copy of the foregoing was served via U.S. Mail on the following: Mr. Scott Smith General Counsel Arkansas Department of Education #4 Capitol Mall, Room 404-A Little Rock, AR 72201 Mr. John C. Fendley, Jr. John C. Fendley, Jr., P.A. 51 Wingate Drive Little Rock, AR 72205 Mr. John W. Walker John W. Walker, P.A. 1723 Broadway Little Rock, Arkansas 72201 Mr. Christopher Heller Friday, Eldredge \u0026amp; Clark 2000 Regions Center 400 West Capitol Little Rock, Arkansas 72201 Ms. Ann Brown Marshall ODM One Union National Plaza 124 West Capitol, Suite 1895 Little Rock, AR 72201 452284-v1 Mr. Mike Wilson Mr. Will Bond 602 W. Main Jacksonville, AR 72076 Mr. Timothy Gauger Assistant Attorney General 323 Center Street, Suite 200 Little Rock, AR 72201 Mr. Mark A. Hagemeier Assistant Attorney General Arkansas Attorney General's Office 323 Center Street, Suite 200 Little Rock, Arkansas 72201 Mr. Stephen W. Jones 3400 TCBY Tower 425 West Capitol Avenue Little Rock, Arkansas 72201 Mr. Clayton Blackstock Mr. Mark Burnett 1010 W. Third Street Little Rock, AR 72201 UJonesIII 9 IN THE UNITED STATES DISTRICT COURT EASTERN DISTRICT OF ARKANSAS WESTERN DIVISION LITTLE ROCK SCHOOL DISTRICT V. NO. 4:82CV00866WRW PULASKI COUNTY SPECIAL SCHOOL DISTRICT NO. 1, ET AL. MRS. LORENE JOSHUA, ET AL. KATHERINE KNIGHT, ET AL. SUPPLEMENTAL AFFIDAVIT OF SAM JONES PLAINTIFF DEFENDANTS INTERVENORS INTERVENORS 1. All of the matters contained herein are responsive to positions and statements made by the State as respects the fee petition of the PCSSD. 2. All of the time entries for which the PCSSD seeks reimbursement were directly related to and in furtherance of prevailing on the issue of the Jacksonville detachment effort. 3. The activities which the State characterizes as \"file maintenance\" are actually on-going efforts to maintain a computer searchable database for all of the documents, orders, pleadings and other paper generated in this case to promote efficiency and avoid wasted time in retrieving such documents, particularly documents which are several years old. 4. The clippings review was both necessary as a historical and legal exercise but was particularly time-consuming because it involved, among other matters, an era during which the State still had two statewide newspapers, generated news stories on the \"school 453181-v1 case\" on an almost daily basis, and involved hundreds of newspapers stories for the period of time in 1989 reviewed. 5. The \"document review\" was appropriate to locate those pleadings, orders, etc. which might have significance for the interpretation and implementation of the 1989 Settlement Agreement. 6. The fee petition does not contain any block billing. The time entries are clearly described and all relate to the legal effort to defeat the detachment issue. STATE OF ARKANSAS COUNTY OF PULASKI SUBSCRIBED AND SWORN to before me, a Notary Public, on this 10th day of October, 2003. My Commission Expires: dean\"ie Lacour, Notary Public Pulaski County, Arkansas My Commission Exp. 12,20.2008 453181-v1 Public 2 CERTIFICATE OF SERVICE On October 10, 2003, a copy of the foregoing was served via U.S. Mail on the following: Mr. Scott Smith General Counsel Arkansas Department of Education #4 Capitol Mall, Room 404-A Little Rock, AR 72201 Mr. John C. Fendley, Jr. John C. Fendley, Jr., P.A. 51 Wingate Drive Little Rock, AR 72205 Mr. John W. Walker John W. Walker, P.A. 1723 Broadway Little Rock, Arkansas 72201 Mr. Christopher Heller Friday, Eldredge \u0026amp; Clark 2000 Regions Center 400 West Capitol Little Rock, Arkansas 72201 Ms. Ann Brown Marshall ODM One Union National Plaza 124 West Capitol, Suite 1895 Little Rock, AR 72201 453181-v1 Mr. Mike Wilson Mr. Will Bond 602 W. Main Jacksonville, AR 72076 Mr. Timothy Gauger Assistant Attorney General 323 Center Street, Suite 200 Little Rock, AR 72201 Mr. Mark A. Hagemeier Assistant Attorney General Arkansas Attorney General's Office 323 Center Street, Suite 200 Little Rock, Arkansas 72201 3 Mr. Stephen W. Jones 3400 TCBY Tower 425 West Capitol Avenue Little Rock, Arkansas 72201 Mr. Clayton Blackstock Mr. Mark Burnett 1010 W. Third Street Little Rock, AR 72201 WILL BOND BOND \u0026amp; CHAMBERLIN TRIAL LAWYERS 602 W. MAIN JACKSONVILLE, ARKANSAS 72076 NEIL CHAMBERLIN October 14, 2003 VIA FAX (314)244-2780 Michael E. Gans, Clerk Eighth Circuit Court of Appeals 24.329 Thomas F. Eagleton U.S. Courthouse 111 S. lO ili Street St . Louis, MO 63101 (314) 244-2400 TELEPHONE: (501) 982-9081 FAX: (501 ) 982-9414 RECEIVED OCT l fl 2003 OfflCEOF O~tGRi'GATIOtl M0Nff08Ul6 RE : United States Court of Appeals for the 8th Circuit, Case No. 03-3088 - Motion for Extension Dear Mr. Gans: Attached is a Motion for Extension of Time in Which to File Brief and Appendix in the above - referenced case. Please file and return a file-marked copy to me. Thank you for your attention to this matter. If you have any questions or concerns, please do not hesitate to contact me. TWB:ab Atch(s) cc: Greg Bollen Sam Jones Scott Smith Christopher Heller John W. Walker P.A. Mark Burnette Stephen Jones Ann -Marshall Karla Burnett Tim Gauger l.school district detachment . eighth circuit.appeal \\ clerk. oct.14 . 03 st Regards, UNITED STATES COURT OF APPEALS FOR THE EIGHTH CIRCUIT RECEIVED OCT 1 6 2003 OFFICE OF DESEGREGATION MONITORING LITTLE ROCK SCHOOL DISTRICT PLAINTIFF V. No . 0 3 - 3 0 8 8 PULASKI COUNTY SPECIAL SCHOOL DISTRICT NO. 1, ET AL. _MRS . LORENE JOSHUA, ET AL. KATHERINE KNIGHT, ET AL. GREG BOLLEN, JAMES BOLDEN, MARTHA WHATLEY AND SUE ANN WHISKER DEFENDANTS (APPELLEES) INTERVENORS INTERVENORS INTERVENORS/MOVANTS (APPELLANTS) MOTION FOR EXTENSION OF TIME IN WHICH TO FILE THEIR BRIEF AND APPENDIX Comes the Appellants, the proposed Bollen Intervenors, by and through their attorney, Will Bond, and for thei r Motion for Ex tension of Time in Which to File Their Brief and Appendix, state: 1 . On or about August 20, 2003, Appellants filed an Emergency Motion for Expedited Review Requesting Suspension of the Rules pursuant Rule 2 of the Federal Rules of Appellate Procedure and Motion for Emergency Stay of Judgment o f the District Court. This request came immediately following the decision of the District Court which was adverse to the Appellants. Appellants had received approval from the Arkansas State Board of Education to proceed with an election concerning detachment from Pulaski County Special District. The election was to take place on September 16, 2003. The request for expedited review and the stay was denied by this court. 2. Leading up to the filing of the appeal and the Motion for Expedited Review, Appellants' counsel had spent significant time preparing for and appearing in front of the Arkansas State Board of Education, the Circuit Court of Pulaski County, Arkansas, and the Federal District Court. Appellants' counsel has been and continues to work on the case on a pro bona basis. Appellants' counsel is in a partnership with one other attorney and two staff members. The issue of detachment, and the litigation leading up to the current appeal, has taken a significant amount of office time and attorney time to pursue. Following the denial of the stay, Appellants' counsel essentially had to get back to work on matters which pay the bills. 3. The need for expedited review of the case has become moot. The election date has passed and the next possible election upon which the issue of detachment could appear on the ballot would be a school election occurring in September of 2004 or the general election occurring in November of 2004. 4. An extension of time in which to file Appellants' brief and appendix is necessitated because: (a) Appellants' counsel himself has been \"strapped\" in court appearances and dealing with trial dates and briefing schedules in numerous cases from August 20, 2003 until October 13, 2003. 2 (b) Appellants' counsel's administrative assistant was out numerous days in late September undergoing medical treatment and was on vacation October 6 through October 10. (c) Appellants' counsel has also spent significant time since August 20, 2003 dealing with Legislative issues related to education because of his service as a State _Representative in Arkansas. The Arkansas Legislature is dealing with the impending State Supreme Court deadline dealing with the inequities and inadequacies of the Arkansas Public School System. 5. Appellants request an extension of time until November 6, 2003 in which to file their brief and appendix. A short extension will allow Appellants to properly prepare the appeal. Appellants' counsel does not believe any further extensions will be necessitated short of his death. Respectfully Submitted, Bond \u0026amp; Chamberlin Attorneys for Plaintiff 602 West Main Street Jacksonville, AR 7 76 Telephone (501) 9 -9081 Telefax (501) 9 By: Wil CERTIFICATE OF SERVIC I, Will Bond, do hereby certify that I have served a copy of the foregoing pleading by United States Mail, addressed to such attorney or party with suff/Ft prepaid postage to ensure first-class delivery this day of October, 2003: Mr. Sam Jones Via Fax@ 376-9442 Wright, Lindsey \u0026amp; Jennings, LLP 200 W. Capitol, Ste. 2300 Little Rock, AR 72201-3699 3 Telephone (501)371-0808 Scott Smith State Department of Education #4 Capitol Mall Little Rock, AR 72201 Mr. Christopher Heller Friday, Eldredge \u0026amp; Clark, LLP 2000 Regions Center 400 W. Capitol Little Rock, AR 72201 Telephone 376-2011 John W. Walker P.A. 1723 S. Broadway Little Rock, AR 72206 Telephone (501)374-3758 Via Fax@ 682-4249 Via Fax@ 376-2147 Via Fax @ 374 - 4187 Mr. Mark Burnette Via Fax @ 375 - 1940 Mitchell, Blackstock, Barnes, Wagoner, Ivers \u0026amp; Sneddon 1010 W. Third Street Little Rock, AR 378-7870 Mr. Stephen Jones Jack, Lyon \u0026amp; Jones, P.A. 3400 TCBY Tower 425 West Capitol Avenue Little Rock, AR 72201 Telephone (501)375-1122 Ann Marshall Office of Desegregation Monitoring 1 Union National Plaza 124 W. Capitol, Suite 1895 Little Rock, AR 72201 Ms. Karla Burnett Suite 400, 201 South Broadway Little Rock, AR 72201 Telephone 340-8285 4 Via Fax @ 375-1027 Via Fax@ 371-0100 Via Fax \u0026amp; 340-8282 Tim Gauger Senior Assistant Attorney General 323 Center Street Suite 200 Little Rock, AR 72201-2610 Telephone 682-2586 By: Via Fax \u0026amp; 682-2591 l.school district detachment . eighth circuit.appealmotion tor extension.oct.14 . 03 5 FILED U.S. DISTRICT COURT EASTERN DISTRICT ARKANSAS lNTHE UNITED STATES DISTRICT COURT EASTERN DISTRICT OF ARKANSAS OCT 1 6 2003 UTILE ROCK DIVISION JAMES W. McCORMACK CLERK By: , DEPCLERK LITTLE ROCK SCHOOL DISTRICT PLAINTIFF V. No. 4:82CV00866 WRW/JTR PULASKI COUNTY SPE:CIAL SCHOOL DISTRICT NO. 1, ET Al.. MRS. LORENE JOSHUA, ET AL. KATIIERINE KNIGHT, ET AL. ORDER DEFENDANTS INTERVENORS lNTERVENORS On July 29, 2003, I .received the Office of Desegregation Monitoring's proposed budget for the 2003-2004 fiscal yea.r.1 I have attached a copy of the budget to this order, and ifthere are any objections, parties must respond within five days; otherwise, the ODM's proposed budget will be accepted as presented and become effective immediately. IT IS SO ORDERED this 15th day of October, 2003. THIS DOCUfvic.1'-11 c:NTEH~C, ON JOC!\u0026lt;ET SHEET ,N COMPLIANCE NITH feLE 58 i~N~~mC[ oN_j_O t~/(} 3 BY~ t, t vJ~k~ UNITED STATESD!STIUCDGE W~l. R. WILSON, JR. 1Althou~ the proposed budget was oriJ?inally presented in April, pursuant to an order of this court, action was postponed in consideration of any decisions made by the 8th Circuit while - the case was on appeal. Travel: Expenditures for transportation, meals, hotel, and other expenses associated with traveling or business, such as parking fees. Payments for per diem in lieu of reimbursements for subsistence (room and board) also are charged here. 2002-'13 Budget 2002-03 \u0026amp;pendltures 2003-04 Budget 200.00 184.66 2,459.00 ,~ .. . .. , ., /J,J, last year, the budget includes gUErSt parking and reimbursement to support staff ror the mileage they drive in their own vehicles on official business, an amount bud,eled at $175. The remainder is for travel and lodging associated with the two training events explained above in Due and Fees, one for $1 ,132 and the other for $1,152. amounts that are the average of the previous costs for each of lhelie two events. Insurance: Expenditures for all types of insurance coverage such as property, liability, fidelity, as well as the costs of judgmeints. 2002~1 Budget 2002-03 Ellpendltures 2003-04 Budget 544.00 544.00 712.00 '---------- ... , Our Insurance has increased to the ;amount shown. We were unable to find an underwritel\" at a lower rate. Page 7 Benefits: Benefits are the amounts paid in behalf of employees and not included in the gross salary, but are over and above. Such payments are fringe benefit payments. 2002-03 Budget 2002.03 Expenditur'ff 2003--04 Budget 91,166.00 92,935.16* 80,018.00 ..... ,..,.,,_ .. \"Expenditures exceeded budget Ill; an unforeseen result of provisions In Act 11 of 1999, which govems certain aspecla of the Arkansas Teacher Retirement System and the Teacher Deferred Retirement Option Plan (T-Orop), which Ms. Marshall entered at the conclusion of Iha 2002-03 fiscal year. Below is a breakdown by categoiy of each employee's 2003-04 budgeted fringe benefits. Increases in this category are due in part to recently-enacted legislation that changed retirement contributions. Some decrease resulted from Ms Mar:,hall's entrv into T-Droo. - Name car so,:tat Retire Hospital- Life Dental Hospital Slloct Total Allowance 8ec:1Jrtty meni !Qtlon\" lne. lndemnit.)' Term Benefits Marshall 1.800.00 7,119.82 1,208.22 2,478.43 44.16 250.32 60.96 62.88 13,024.79 Jones 960.00 4.573.78 -0- -0- -0- -0- --0- --0- 5,533.78 Powell 1,200.00 5,451.79 9,281 .48 2,478.43 44.16 250.32 60.96 62.88 18,840.0Z --\"\"'\"\"\"'' ......  .. --- .... _ --.. - --.-- .... ....... , ..... ., ...- -.-~,., ,._. ... .~ . .. -.................... _.. ................ ~_. ... .... ... _._, ______ Smith 1,200.00 5,481 .79 9,281 .48 2.478.43 44.16 250.32 60.96 62.88 18,840.02 Ramer 0.00 4,030.71 6,849.57 2,478.43 44.16 250.32 60.86 62.88 13,7n.03 , Bryant 0.00 2,235.25 3,798.47 2,478.43 27.60 250.32 60.98 62.88 8,913.91 Act 11 of 1999 403.08 684.97 1,088.05 T~I 5,180.00 2!1,286.22 . 31 ,104.19 12,392.15 204.24 '  1,251 .6Q 3Q4.80  314.40. so.011.00 . \"Rates for hospitalization have increased this year, but the exact proportion that will be charged for each employee will not be known until LRSO negotiations have been finalized. F,,r budget preparation, we have estimated the Increase at 10%. Staff Development: Serv:ices petfonned by persons qualified to assist in enhancing the quality of the operation. ---~ -- -03 Budget 2002-03 Expenditures 0.00 0.00 ., ... -  .. -... , ... _..,.,. ..... - - . .... --.... ~--~-- - 2003-04 Budget 0.00 Supplies: Expenditures for all supplies for the operation, including freight and cartage. Amounts paid for material items of atn expendable nature that are consumed, worn out, or deteriorated in use or items that lose their identity through fabrication or incorporation into different or more complex units or substances. 2002-03 Budget 2002..03 Expenditures 2003-04 Budget 6,643.00 4,999.77 6,000.00 - ---------  -- ---Hh - Page6 Repairs and Maintenan1te; Expenditures for repairs and maintenance services which restore equipment to its original :rtate or are a part of a routine preventive maintenance program. This includes service contracts and contractual agreements covering the maintenance and operation of equipment and equipment systems. 2002.()'3 Budget 2002..03 Expenditures 2003-04 Budget 400.00 408.85 400.00 ----- - -- -~- Resource Library: Expenditures for regular or incidental purchases of library books available for general use. 2002--03 Budget 2002-03 Expenditures 2003-04 Budget 0.00 0.00 0.00 ' ----- -- Salaries: Salaries are the :amounts paid to employees who are considered to be in positions of a permanent or temporary nature. 2002~3 Budget 2002-03 Expenditures 2003-04 Budget 110,770.00 422,618.40\" 405,419.00 .. *ExpendilUres exceeded buoget as an unforeseen result of proV1s1ons in Act 11 of 1999, Which governs certain aspects of the Arkansas Teacher Retirement System and the Teacher Deferred Retirement Option Plan (T-Drop), which Ms. Marshall entered at the conclusion of the 2002-03 f1SCal year. Below is a breakdown of each employee's budgeted 2003-04 salary, reflecting a 2% base increase for Ms. Marshall and, for the remaining employees, a 3.29% base increase, which is equal to or less than the annual step increase on the salary scales of the local districts. - -.. -  N\u0026amp;Jine of Employee 2002-03 Salary 2003..CJ4 salary AnriMarshall 116,688.00 119,022.00 Melina Guldin 1 21 ,842.00 0.00 Gene Joneti 2 57,021.00 58,828.00 Margie Powell 67,960.00 70,196.00 Horace Smith 67,960.00 70,196.00 .. --- ----- --..   --'- --- Polly Ramer 51 ,011 .00 52,689.00 Linda Bryant 28,288.00 29,219.00 ..,.,. __. _, ., ... _...,.._..,J,. ,., J_,._,._. ___ _.. . ,. . .. ..........,. .-..~ ....- ---.--\"\"' Act 11 of 1999 s 5,269.00 . Totial 410,770.00 405,419.00 'Melissa Guldin retired on September 30, 2002. 2Gene Jones, who works 4/5 time, 1?1ected to receive payment ror annual insurance premiums in lieu of the insurance benefits; his salary reflects that decision. 3Polly Ramer will complete her 28111 )'8ar under Iha Arkansas Teacher Retirement System on June 30. 2004 and will enter the Teacher Deferred Retirement Option Plan fr-Drop) on that date. Act 11 of 1999 entitles Ms. Ramer to receive the amount noted. which is compensation for unused leave, as she enters TDrop. Pages - Management Services: S,ervices performed by persons qualified to assist management either in the broad policy area or in general operations. This category includes consultants, individually or as a team, to assist the chief executive in conference or through systematic studies. I-~  3 Budget 2002-03 Expenditur9s 2003-04 Budget 5,000.00 0.00 5,000.00 Periodicals: Expenditures for periodicals and newspapers for general use. A periodical is any publication appearing at regular intervals ofless than a year and continuing for an indefinite period. ~ - - 3Budget 2002-03 Expenditures 2003-04 Budget 80.00 79.94 121.00 -- The budget covers the cost of !he 1\\rkan\u0026amp;as Democrat-Gazette, a daily source of current information on events that directly affect the school districts we monitor. Printing and Binding: Expenditures for job printing and bindmg, usually according to specifications. This includes the design and printing of forms as well as printing and binding publications. 2002-03 Budget 2002-03 Expenditures 2003--04 Budget 6,000.00 4,902.74 6,000.00 Professional and Technkal Services: Services which by their nature can be performed only by persons with specialized skills and knowledge. 2002-03 Budget 2002-03 Expenditures 2003-04 Budget 1,700.00 1,700.00 1,700.00 ..-~-- - Rent: Expenditures for lea.sing or renting land and buildings for both temporary and long-range use . .... ~ ....... 2002-03 Budget 2002-03 Expenditures 2003-G4 Budget 47,896.00 47,256.02 48,880.00 Page4 - EXPENDITURES Note: Definitions of expmse categories are from the Arkansas School F'inancial Accounting Manual. Communications: Services provided by persons or businesses to assist in transmitting and receiving messages or infonnation. This category includes telephone services as well as postage machine rental and postag,:. ~ 2002-03 Budget 2002-03 Expenditures 2003-04 Budget 9,700.00 8,416.88 8,000.00 -~ ~ We were able to reduoe this budgeli category by arranging to operate on fewer phone lines. Dues and Fees: Expenditures or assessment for membership in professional or other organizations or associations or payments to a paying agent for services provided. such as conference registration fees. 2002-03 Budget 2002-03 ExpenditurN 2003-414 Budget ..... 439.00 439.00 735.00 The allotment for 200304 includes regis1ration fees for two professional events that are integral to maintaining staff skills that directly serve the mission of ODM. One is the International Association of Facilitatons, a one\u0026amp;-a-year intense training event in which Ms, Marshall hes participated fur a number of years to hone her facmtatlon ekilla by learning and pracliclng new techniques and methodologies fur facilitation, negotiation, promoUng dialogue, team building, problem solving, and conflict resolution among the parties, school perBOnnel, and patmna. The second is the National Counselors' Conference for ODM associate Ms. Powell, who is a nationally board certifl8d counselor. The conference provides professional development pertaining not only to counseling, but to special education, gifted and talentEd education, alternative learning, discipline, and achievement, all areas that she is charged with monitoring. Equipment: Expenditure:; for the initial, additional, and replacement items or equipment, such as furniture and machinery. , ......... dget 2002-03 Expenditures 2003-414 Budget 0.00 0.00 500.00 One of our printers, an old machine, has quit working. The repair service has told us the machine is not salvageable due to Its age. The amount budgeted in lhis categ~ry is to replace the printer, which is indispensable office equipment. Food Services: Ex:pendi1tures for food or preparation and serving of food. which may include catering. 2002-03 Budget 2002-03 Expenditures 2003--04 Budget 0.00 0.00 0.00 ---~--- Page3 ANNOTATED ODM BUDGET FOR2003-04 REVENUE The Court's Interim Order ,'.)f June 27, 1989 required that: ... [T]he amount previously ordered for the Pulaski County Educational Cooperative (Co-op) [$200,000.00] shall be applied toward the budget of the office of the Metropolitan Supervisor .... The balance of the budget will be apportioned among the school districts on a. per pupil basis .... Eighth Circuit Order ofDet:-ember 12, 1990: ... [11he office previ,:msly known as the Office of the Metropolitan Supervisor will be reconstituted as the Office of Desegregation Monitoring .... 10/1/02 %of Total 200~ 2002-03 2003-1)4 Enrollment Enrollment Budget Crull Estimated Allocation (Budget Budget not spent) PaymJlt LRSD 25,430 48.43 177,217 724 176,493 --~ .... NLRSO 8,796 16.75 61,292 250 61,042 PCSSD 18,283 34.82 127,415 520 126,895 - - '\" \"- State of AR NIA NIA 200,000 NIA 200,000 _,_,,,,_ .. Total .52,509 100.00 565,924 1,494  564,430 This chart shows that the 2003-04 Budget Allocation, the 2002-03 Credit and the 2003-04 BudgetPayment are apportioned among the three school dilitricts according lo last year's OCtober 1 enrollment numbers. After the finel 2003-04 enrollment has been tallied, we wiU adjust the figures according~, and notify each district of the exact amount due for its share of ODM's 2003-04 budget Described below is the step-by-step process, reflected in the chart above, that we use to detennine each district's contribution to the ODM budget: 1. The State of Arkansas' contribution ($200,000.00) is subtracted from ODM's total budget. 2. Based on the previous year's October 1 enrollment, the districts are charged their pro rata share ofODM's budget (minus the state's contribution). 3. Each district is credited with its pro rata share ( or estimated share) of ODM' s unspent budget for the previous year. 4. Each district contriibutes that sum to ODM' s budget or, if the credit has been estimated, each district will be notified of the exact amount due for its share of ODM's budget before the close of the cU1Tent fiscal year. . ' OFFICE OF DESEGREGATION MONIT., O. RING. BUD-GET FOR 2003-04 Rf:VENUE 2002-03 2002-03 2003-o4 BUDGET ACTUAL BUDGET State of Arkansa1; 200,000;00 200,000.00 200,000.00 - - - LRSO Budget alloca~,t\u0026gt;n 184,295.00 184,295.00 177,217.00 Minus credit fn:,m previous year ________4_., 4 ___,_7__0__9___.0___0__ _ ........4..4...,.7..0...9....0...0.. . 724.00 ..... .......................... Equals LRSD's share of the budget 139,588.00 139,586.00 176,493.00 NLRSD Budget allocati,:,n 63,740.00 63,740.00 61,292.00 Minus credit frc,m previous year 15,463.00 15,463.00 250.00 ----------------------- uunuon onuu ............. ________________ Equal!! NLRSD's share of the budget 48,277.00 48,277.00 81,042.00 PCSSO Budget allocati,;,n 132,503.00 132,503.00 127,415.00 Minus credit frtrn previous year 32,144.00 32,144.00 520.00 OOOHOO OOOH o  o      n o ............................ Equals PCSSO's share of the budget 100,359.00 100,359.00 126,895.00 - Interest 0.00 5,441 .10 0.00 Total Revenue 580,638.00 585,979:10 565,924.00 Note: The sum of the credits in the chart above is the unspent amount of our previous year's OUdget, including bank interest eaml!d. Every budget cycle, ODM applies this amount toward each school district's budgeted ;illocatlon. Both that allocaUon and the credit are determined for the proposed budget by the previous yea(s October 1 enrollment numbers, then adjusted accordingly when the enro!lment number.; for the current year become available. -  ' EXPENDITURES 2002-03 2002--03 2003-04 BUDGET ACTUAL BUDGET Communications 9,700.00 8,416.88 8,000.00   .- __,-, , .Y  \"-_, Dues and Fees 439.00 439.00 735.00 ,_.., _____ -- Equipment 0.00 0.00 500.00 Food Seivices 0.00 0.00 0.00 Management Seri,icea 5,000.00 0.00 5,000.00 -Pe-riodicals 80.00 79.94 121.00 Printing \u0026amp; Blndln{1 6,000.00 4,902.74 8,000.00 Prof \u0026amp; Tech Services 1,700.00 1,700.00 1,700.00 -- ------- -.. Rent 47,896.00 47,256.02 48,860.00 Repairs \u0026amp; Maintenance 400.00 408.85 400.00 Resource Library 0.00 0.00 0.00 Salaries 410,no.oo 422,618.40 405,419.00 Benefits 91,168.00 92,935.16 80,018.00 -- ------ Staff Developmerlt 0.00 0.00 0.00 Supplies 6,643.00 4,999.77 6,000.00 Tfl!vel 200.00 184.-66 2,459.00 Insurance - 544.00 544.00 712.00 Total El(pendltu~s 580,538.00 584,485;42 565,924.00 Difference (Income minus Expenditures) 0.00 1,493.68 0.00 TO: FAX COVER SHEET UNITED STATES DISTRICT COURT EASTERN DISTRICT OF ARKANSAS Chris Heller Sam Jones Steve Jones John Walker Timothy Gauger Mark Hagemeier Ann Marshall Mark Burnette Telephone: 501-604-5140 Fax Number: 501-604 5149 376-2147 376-9442 375-1027 374-4187 682-2591 682-2591 371-0100 375-1940 There are l pages, including this Cover Sheet, being sent by this facsimile transmission. MESSAGE SENT BY: Office of Judge Wm. R. Wils U.S. District Court 600 West Capitol, Room 423 Little Rock, Arkansas 7220 l Matt Morgan, LRSD Law Clerk 501-604-5141 IN THE UNITED STATES DISTRICT COURT EASTERN DISTRICT OF ARKANSAS WESTERN DIVISION LITTLE ROCK SCHOOL DISTRICT V. NO. 4:82CV00866WRW - PULASKI COUNTY SPECIAL SCHOOL DISTRICT NO. 1, ET AL. MRS. LORENE JOSHUA, ET AL. KA THERINE KNIGHT, E'I'. AL. RECEIVED OCT 2 2 2003 OFACEOF DESEGREGATION MONITORING PCSSD'S RESPONSE TO THE COURT'S ORDER DATED OCTOBER 16, 2003 PLAINTIFF DEFENDANTS INTERVENORS INTERVENORS This responds to the Court's Order dated October 16, 2003, regarding the ODM proposed budget for the 2003-2004 fiscal year. I am authorized to state that so long as the allocations proposed are not changed, the PCSSD has no objection to the proposed budget. 455118-v1 Respectfully submitted, WRIGHT, LINDSEY \u0026amp; JENNINGS LLP 200 West Capitol Avenue, Suite 2300 Little Rock, Arkansas 72201-3699 (501) 371-0808 FAX: (501) 376-9442 0) ounty Special I I I CERTIFICATE OF SERVICE On October}, 2003, a copy of the foregoing was served via U.S. mail on each of the following: Mr. John W. Walker John W. Walker, P.A. 1723 Broadway Little Rock, Arkansas 72201 Mr. Christopher Heller Friday, Eldredge \u0026amp; Clark 2000 Regions Center 400 West Capitol Little Rock, Arkansas 72201 Ms. Ann Brown Marshall ODM  One Union National Plaza 124 West Capitol, Suite 1895 Little Rock, AR 72201 Judge J. Thomas Ray U.S. District Courthouse 600 West Capitol Avenue, Suite 149 Little Rock, Arkansas 72201 455118-v1 Mr. Mark A. Hagemeier Assistant Attorney General Arkansas Attorney General's Office 323 Center Street, Suite 200 Little Rock, Arkansas 72201 Mr. Stephen W. Jones 3400 TCBY Tower . 425 West Capitol A venue Little Rock, Arkansas 72201 Mr. Clayton Blackstock Mr. Mark Burnett 1010 W. Third Street Little Rock, AR 72201 2 Raymond Simon Director State Board of Education JoNell Caldwell, Chair UttleRock Shelby Hillman, Vice Chair Carlisle Luke Gordy Van Buren Robert Hackler Mountain Home Calvin King Marianna Randy Lawson Bentonville A aneRebick - Rock Diane Tatum Pine Bluff Jeanna Westmoreland Arkadelphia Arkansas Department of Education #4 Capitol Mall, Liltle Rock, AR 72201-1071 501-682-4475 October 31, 2003 Mr. M. Samuel Jones, III Wright, Lindsey \u0026amp; Jennings 200 West Capitol, Suite 2000 Little Rock, AR 72201 Mr. John W. Walker John Walker, P.A. 1723 Broadway Little Rock, AR 72201 Mr. Mark Burnette Mitchell, Blackstock, Barnes, Wagoner, Ivers \u0026amp; Sneddon P. 0. Box 1510 Little Rock, AR 72203-1510 Mr. Christopher Heller Friday, Eldredge \u0026amp; Clark 400 West Capitol, Suite 2000 Little Rock, AR 72201-3493 Mr. Stephen W. Jones Jack, Lyon \u0026amp; Jones 425 West Capitol, Suite 3400 Little Rock, AR 72201 Ms. Ann Marshall One Union National Plaza 124 West Capitol, Suite 1895 Little Rock, AR 72201 http:l larkedu.slale.ar.us RECEIVED f\\!OV 3 - 2003 OFFICE OF DESEGREGATION MONITORING RE: Little Rock School District v. Pulaski County Special School District, et al. US. District Court No. 4:82-CV-866 Dear Gentlemen and Ms. Marshall: Per an agreement with the Attorney General's Office, I am filing the Arkansas Department of Education's Project Management Tool for the month of October 2003 in the above-referenced case. If you have any questions, please feel free to contact me at your convenience. Sincerely, 11~~ General Counsel Arkansas Department of Education SS:law cc: Mark Hagemeier UNITED STATES DISTRICT COURT EASTERN DISTRICT OF ARKANSAS WESTERN DIVISION LITTLE ROCK SCHOOL DISTRICT PLAINTIFF V. No. LR-C-82-866 PULASKI COUNTY SPECIAL SCHOOL DISTRICT NO. 1, et al DEFENDANTS NOTICE OF FILING In accordance with the Court's Order of December 10, 1993, the Arkansas Department of Education hereby gives notice of the filing of the ADE's Project Management Tool for October 2003. Respectfully Submitted, Scott Smitn,#92251 Attorney, Arkansas Department of Education #4 Capitol Mall, Room 404-A Little Rock, AR 72201 501-682-4227 CERTIFICATE OF SERVICE - I, Scott Smith, certify that on October \u0026amp;\u0026gt;-rl.\\ , 2003, I caused the foregoing document to be served by depositing a copy in the United States mail, postage prepaid, addressed to each of the following: Mr. M. Samuel Jones, III Wright, Lindsey \u0026amp; Jennings 200 West Capitol, Suite 2000 Little Rock, AR 72201 Mr. John W. Walker John Walker, P.A. 1723 Broadway Little Rock, AR 72201 Mr. Mark Burnette Mitchell, Blackstock, Barnes Wagoner, Ivers \u0026amp; Sneddon P. 0. Box 1510 Little Rock, AR 72203-1510 Mr. Christopher Heller Friday, Eldredge \u0026amp; Clark 400 West Capitol, Suite 2000 Little Rock, AR 72201-3493 Mr. Stephen W. Jones Jack, Lyon \u0026amp; Jones 425 West Capitol, Suite 3400 Little Rock, AR 72201 Ms. Ann Marshall One Union National Plaza 124 West Capitol, Suite 1895 Little Rock, AR 72201 IN THE UNITED STATES DISTRICT COURT EASTERN DISTRICT OF ARKANSAS WESTERN DIVISION LITTLE ROCK SCHOOL DISTRICT, ET AL PLAINTIFFS V. NO. LR-C-82-866 PULASKI COUNTY SPECIAL SCHOOL DISTRICT, ET AL DEFENDANTS MRS. LORENE JOSHUA, ET AL INTERVENORS KATHERINE W. KNIGHT, ET AL INTERVENORS ADE'S PROJECT MANAGEMENT TOOL In compliance with the Court's Order of December 10, 1993, the Arkansas Department of Education (ADE) submits the following Project Management Tool to the parties and the Court. This document describes the progress the ADE has made since March 15, 1994, in complying with provisions of the Implementation Plan and itemizes the ADE's progress against timelines presented in the Plan. IMPLEMENTATION PHASE ACTIVITY I. FINANCIAL OBLIGATIONS A. Use the previous year's three quarter average daily membership to calculate MFPA (State Equalization) for the current school year. 1. Projected Ending Date Last day of each month, August - June. 2. Actual as of October 31, 2003 Bas~d on'th.~ 'iqfor,friatio~'availab!e. at .Septen.,~( 301'2003, the ADE, calcuiated the Equaiizat,oi;iJl:ilridin9tor i=Y63i64;:sob;ecf fo:penoic adjustmerlfa. B. Include all Magnet students in the resident District's average daily membership for calculation. 1. Projected Ending Date Last day of each month, August - June.    This project was supported in part by a Digitizing Hidden Special Collections and Archives project grant from The Andrew W. Mellon Foundation and Council on Library and Information Resources.\u003c/dcterms_description\u003e\n   \n\n\u003c/dcterms_description\u003e   \n\n  \n\n\n   \n\n   \n\n   \n\n\n   \n\n   \n\n   \n\n\n   \n\n  \n\n \n\n\n   \n\n   \n\n   \n\n\n   \n\n   \n\n   \n\n\n\n   \n\n   \n\n   \n\n\n   \n\n   \n\n  \n\n  \n\n   \n\n\n   \n\n   \n\n   \n\n\n   \n\n   \n\n   \n\n   \n\n   \n\n   \n\n\n\n\n\n   \n\n   \n\n   \n\n   \n\n\n   \n\n   \n\n   \n\n\n   \n\n   \n\n   \n\n   \n\n\u003c/item\u003e\n\u003c/items\u003e"},{"id":"bcas_bcmss0837_21","title":"Arkansas Department of Education's (ADE's) Project Management Tool","collection_id":"bcas_bcmss0837","collection_title":"Office of Desegregation Management","dcterms_contributor":null,"dcterms_spatial":["United States, 39.76, -98.5","United States, Arkansas, 34.75037, -92.50044","United States, Arkansas, Pulaski County, 34.76993, -92.3118"],"dcterms_creator":["Arkansas. Department of Education"],"dc_date":["2003-09/2003-11"],"dcterms_description":null,"dc_format":["application/pdf"],"dcterms_identifier":null,"dcterms_language":["eng"],"dcterms_publisher":["Little Rock, Ark. : Butler Center for Arkansas Studies. Central Arkansas Library System"],"dc_relation":null,"dc_right":["http://rightsstatements.org/vocab/InC-EDU/1.0/"],"dcterms_is_part_of":["Office of Desegregation Monitoring records (BC.MSS.08.37)","History of Segregation and Integration of Arkansas's Educational System"],"dcterms_subject":["Education--Arkansas","Office of Desegregation Monitoring (Little Rock, Ark.)","School integration--Arkansas","Arkansas. Department of Education","Project management"],"dcterms_title":["Arkansas Department of Education's (ADE's) Project Management Tool"],"dcterms_type":["Text"],"dcterms_provenance":["Butler Center for Arkansas Studies"],"edm_is_shown_by":null,"edm_is_shown_at":["http://arstudies.contentdm.oclc.org/cdm/ref/collection/bcmss0837/id/21"],"dcterms_temporal":null,"dcterms_rights_holder":null,"dcterms_bibliographic_citation":null,"dlg_local_right":["Available for use in research, teaching, and private study. Any other use requires permission from the Butler Center."],"dcterms_medium":["documents (object genre)"],"dcterms_extent":["309 pages"],"dlg_subject_personal":null,"dcterms_subject_fast":null,"fulltext":"\n \n\n\n\n\n\n\n\n  \n\n\n   \n\n   \n\n\n   \n\n\n   \n\n\n\n\n   \n\n\n\n\n   \n\n\n\n\n\n\n\n\n   \n\n   \n\n \n\n\n   \n\n   \n\n  \n\n\n   \n\n  \n\n \n\n\n   \n\n  \n\n \n\n\n   \n\n  \n\n  \n\nLittle Rock School District, plaintiff vs. Pulaski County Special School District, defendant.\nl 1 j ii Raymond Simon Director State Board of Education 1 JoNell caictwell, Chair 1 UttleRock I Shelby Hillman, Vice Chair i Carlisle j Luke Gordy Van Buren Robert Hackler Mountain Home caMn King Marianna Randy Lawson Bentonville  aneRebid\u0026lt; Rock Diane Tatum Pine Bluff Jeanna Westmoreland Arkadelphia Arkansas Department of Education #4 Capitol Mall, Little Rock, AR 72201-1071 501-682-4475 September 29, 2003 Mr. M. Samuel Jones, III Wright, Lindsey \u0026amp; Jennings 200 West Capitol, Suite 2000 Little Rock, AR 72201 Mr. John W. Walker John Walker, P.A. 1723 Broadway Little Rock, AR 72201 Mr. Mark Burnette Mitchell, Blackstock, Barnes, Wagoner, Ivers \u0026amp; Sneddon P. 0. Box 1510 Little Rock, AR 72203-1510 Mr. Christopher Heller Friday, Eldredge \u0026amp; Clark 400 West Capitol, Suite 2000 Little Rock, AR 72201-3493 Mr. Stephen W. Jones Jack, Lyon \u0026amp; Jones 425 West Capitol, Suite 3400 Little Rock, AR 72201 Ms. Ann Marshall One Union National Plaza 124 West Capitol, Suite 1895 Little Rock, AR 72201 http:/ larudll.stau.ar.,u RECEIVED SEP 3 o 2003 OfF\\CE OF DESEGREG~TION MONITORING RE: Little Rock School District v. Pulaski County Special School District, et al. US. District Court No. 4:82-CV-866 Dear Gentlemen and Ms. Marshall: Per an agreement with the Attorney General's Office, I am filing the Arkansas Department of Education's Project Management Tool for the month of September 2003 in the above-referenced case. If you have any questions, please feel free to contact me at your convenience. General Counsel Arkansas Department of Education SS:law cc: Mark Hagemeier UNITED STATES DISTRICT COURT EASTERN DISTRICT OF ARKANSAS WESTERN DIVISION LITTLE ROCK SCHOOL DISTRICT PLAINTIFF V. No. LR-C-82-866 PULASKI COUNTY SPECIAL SCHOOL DISTRICT NO. 1, et al DEFENDANTS NOTICE OF FILING In accordance with the Court's Order of December 10, 1993, the Arkansas Department of Education hereby gives notice of the filing of the AD E's Project Management Tool for September 2003. Respectfully Submitted, cott Smith, #92251 Attorney, Arkansas Department of Education #4 Capitol Mall, Room 404-A Little Rock, AR 72201 501-682-4227 CERTIFICATE OF SERVICE I, Scott Smith, certify that on September 29, 2003, I caused the foregoing document to be served by depositing a copy in the United States mail, postage prepaid, addressed to each of the following: Mr. M. Samuel Jones, III Wright, Lindsey \u0026amp; Jennings 200 West Capitol, Suite 2000 Little Rock, AR 72201 Mr. John W. Walker John Walker, P.A. 1723 Broadway Little Rock, AR 72201 Mr. Mark Burnette Mitchell, Blackstock, Barnes Wagoner, Ivers \u0026amp; Sneddon P. 0. Box 1510 Little Rock, AR 72203-1510 Mr. Christopher Heller Friday, Eldredge \u0026amp; Clark 400 West Capitol, Suite 2000 Little Rock, AR 72201-3493 Mr. Stephen W. Jones Jack, Lyon \u0026amp; Jones 425 West Capitol, Suite 3400 Little Rock, AR 72201 Ms. Ann Marshall One Union National Plaza 124 West Capitol, Suite 1895 Little Rock, AR 72201 IN THE UNITED STATES DISTRICT COURT EASTERN DISTRICT OF ARKANSAS WESTERN DIVISION LITTLE ROCK SCHOOL DISTRICT, ET AL PLAINTIFFS V. NO. LR-C-82-866 PULASKI COUNTY SPECIAL SCHOOL DISTRICT, ET AL DEFENDANTS MRS.LORENEJOSHUA,ETAL INTERVENORS KATHERINE W. KNIGHT, ET AL INTERVENORS ADE'S PROJECT MANAGEMENT TOOL In compliance with the Court's Order of December 10, 1993, the Arkansas Department of Education (ADE) submits the following Project Management Tool to the parties and the Court. This document describes the progress the ADE has made since March 15, 1994, in complying with provisions of the Implementation Plan and itemizes the ADE's progress against timelines presented in the Plan. - IMPLEMENTATION PHASE ACTIVITY I. FINANCIAL OBLIGATIONS A. Use the previous year's three quarter average daily membership to calculate MFPA (State Equalization) for the current school year. 1. Projected Ending Date Last day of each month, August - June. 2. Actual as of September 30, 2003 Based on the information available at August 31, 2003, the ADE calculated the Equalization Funding for FY 03/04, subject to periodic adjustments. B. Include all Magnet students in the resident District's average daily membership for calculation. 1. Projected Ending Date Last day of each month, August - June. I. FINANCIAL OBLIGATIONS (Continued) B. Include all Magnet students in the resident District's average daily membership for calculation. (Continued) 2. Actual as of September 30, 2003 Based on the information available at August 31, 2003, the ADE calculated for FY 03/04, subject to periodic adjustments. C. Process and distribute State MFPA. 1. Projected Ending Date Last day of each month, August - June. 2. Actual as of September 30, 2003 On August 31 , 2003, distributions of State Equalization Funding for FY 03/04 were as follows: LRSD - $4,838,739 NLRSD - $2,552,280 PCSSD - $4,633,437 The allotments of State Equalization Funding calculated for FY 03/04 at August 31, 2003, subject to periodic adjustments, were as follows: LRSD - $53,226, 139 NLRSD - $28,075,080 PCSSD - $50,967,808 D. Determine the number of Magnet students residing in each District and attending a Magnet School. 1. Projected Ending Date Last day of each month, August - June. 2. Actual as of September 30, 2003 Based on the information available, the ADE calculated at August 31, 2003 for FY 03/04, subject to periodic adjustments. E. Desegregation Staff Attorney reports the Magnet Operational Charge to the Fiscal Services Office. 1. Projected Ending Date Ongoing, as ordered by the Court. 2 I. FINANCIAL OBLIGATIONS (Continued) E. Desegregation Staff Attorney reports the Magnet Operational Charge to the Fiscal Services Office. (Continued) 2. Actual as of September 30, 2003 Based on the information available, the ADE calculated at August 31, 2003 for Pf 03/04, subject to 'periodic adjustments. It should be noted that currently the Magnet Review Committee is reporting this information instead of the staff attorney as indicated in the Implementation Plan. F. Calculate state aid due the LRSD based upon the Magnet Operational Charge. 1. Projected Ending Date Last day of each month, August - June. 2. Actual as of September 30, 2003 Based on the infomiation available, the ADE calculated at August 31, 2003 for FY 03/04, subject to periodic adjustments. G. Process and distribute state aid for Magnet Operational Charge. 1. Projected Ending Date Last day of each month, August - June. 2. Actual as of September 30, 2003 Distributions for FY 03/04 at August 31, 2003, totaled $1,139,445. Allotment calculated for FY 03/04 was $12,533,889 subject to periodic adjustments. H. Calculate the amount of M-to-M incentive money to which each school district is entitled. 1. Projected Ending Date Last day of each month, August - June. 2. Actual as of September 30, 2003 Calculated for FY 02/03, subject to periodic adjustments. I. Process and distribute M-to-M incentive checks. 1. Projected Ending Date Last day of each month, September - June. 3 I. FINANCIAL OBLIGATIONS (Continued) I. Process and distribute M-to-M incentive checks. (Continued) 2. Actual as of September 30, 2003 Distributions' for FY 02103 aiAugust 31\n2003 were: LRSD - $3,684,217 NLRSD - $2,590,278 PCSSD - $9,309,708 The :anotme.nts calculated fof f'{0~/03 aiAugusf31\n2003, sUt\u0026gt;j~ct to periodic adjustments, were: LRSD - $3,684,217 NLRSD - $2,590,278 PCSSD - $9,309,708 J. Districts submit an estimated Magnet and M-to-M transportation budget to ADE. 1. Projected Ending Date 2. Ongoing, December of each year. Actual as of September 30, 2003 In September 2002, the Magnet and M-to-M transportation budgets for FY 02/03 were submitted to the ADE by the Districts. K. The Coordinator of School Transportation notifies General Finance to pay districts for the Districts' proposed budget. 1. Projected Ending Date Ongoing, annually. 2. Actual as of September 30, 2003 In January 2003, General Finance was notified to pay the second one-third payment for FY 02/03 to the Districts. It should be noted that the Transportation Coordinator is currently performing this function instead of Reginald Wilson as indicated in the Implementation Plan. L. ADE pays districts three equal installments of their proposed budget. 1. Projected Ending Date Ongoing, annually. 4 I. FINANCIAL OBLIGATIONS (Continued) L. ADE pays districts three equal installments of their proposed budget. (Continued) 2. Actual as of September 30, 2003 In January 2003, General Finance made the second one-third payment to the Districts for their FY 02/03 transportation budget. The budget is now paid out in three equal installments. At January 31 , 2003, the following had been paid for FY 02/03: LRSD - $2,453,084.00 NLRSD - $469,000.00 PCSSD - $1 ,305,848.96 M. ADE verifies actual expenditures submitted by Districts and reviews each bill with each District's transportation coordinator. 1. Projected Ending Date Ongoing, annually. 2. Actual as of September 30, 2003 In August 1997, the ADE transportation coordinator reviewed each district's Magnet and M-to-M transportation costs for FY 96/97. In July 1998, each district was asked to submit an estimated budget for the 98/99 school year. In September 1998, paperwork was generated for the first payment in the 98/99 school year for the Magnet and M-to-M transportation program. Schopl districts should receive payment by October 1, 1998 In July 1999, each district submitted an estimated budget for the 99/00 school year. In September 1999, paperwork was generated for the first payment in the 99/00 school year for the Magnet and M-to-M transportation program. In September 2000, paperwork was generated for the first payment in the 00/01 school year for the Magnet and M-to-M transportation program. In September 2001, paperwork was generated for the first payment in the 01/02 school year for the Magnet and M-to-M transportation program. In September 2002, paperwork was generated for the first payment in the 02/03 school year for the Magnet and M-to-M transportation program. 5 I. FINANCIAL OBLIGATIONS (Continued) N. Purchase buses for the Districts to replace existing Magnet and M-to-M fleets and to provide a larger fleet for the Districts' Magnet and M-to-M Transportation needs. 1. Projected Ending Date Ongoing, as stated in Exhibit A of the Implementation Plan. 2. Actual as of September 30, 2003 In FY 94/95, the State purchased 52 buses at a cost of $1 ,799,431 which were added to or replaced existing Magnet and M-to-M buses in the Districts. The buses were distributed to the Districts as follows: LRSD - 32\nNLRSD - 6\nand PCSSD - 14. The ADE purchased 64 Magnet and M-to-M buses at a cost of $2,334,800 in FY 95/96. The buses were distributed accordingly: LRSD - 45\nNLRSD - 7\nand PCSSD - 12. In May 1997, the ADE purchased 16 Magnet and M-to-M buses at a cost of $646,400. In July 1997, the ADE purchased 16 Magnet and M-to-M buses at a cost of $624,879. In July 1998, the ADE purchased 16 new Magnet and M-to-M buses at a cost of $695,235. The buses were distributed accordingly: LRSD - 8\nNLRSD - 2\nand PCSSD -6. Specifications for 16 school buses have been forwarded to state purchasing for bidding in January, 1999 for delivery in July, 1999. The ADE accepted a bid on 16 buses for the Magnet and M/M transportation program. The buses will be delivered after July 1, 1999 and before August 1, 1999. The buses will be distributed accordingly: LRSD - 8\nNLRSD - 2\nPCSSD- 6. In July 1999, the ADE purchased 16 new Magnet and M-to-M buses at a cost of $718,355. The buses were distributed accordingly: LRSD - 8\nNLRSD - 2\nand PCSSD- 6. In July 2000, the ADE purchased 16 new Magnet and M-to-M buses at a cost of $724,165. The buses were distributed accordingly: LRSD - 8\nNLRSD - 2\nand PCSSD - 6. 6 I. FINANCIAL OBLIGATIONS (Continued) N. Purchase buses for the Districts to replace existing Magnet and M-to-M fleets and to provide a larger fleet for the Districts' Magnet and M-to-M Transportation needs. (Continued) 2. Actual as of September 30, 2003 (Continued) The bid for 16 new Magnet and M-to-M buses was let by State Purchasing on February 22, 2001. The contract was awarded to Ward Transportation Services, Inc. The buses to be purchased include two type C 47 passenger buses and fourteen type C 65 passenger buses. Prices on these units are $43,426.00 each on the 47 passenger buses, and $44,289.00 each on the 65 passenger buses. The buses will be distributed accordingly: LRSD - 8 of the 65 passenger\nNLRSD - 2 of the 65 passenger\nPCSSD - 2 of the 47 passenger and 4 of the 65 passenger buses. On August 2, 2001 , the ADE took possession of 16 new Magnet and M-to-M buses. The total amount paid was $706,898. In June 2002, a bid for 16 new Magnet and M-to-M buses was awarded to Ward Transportation Services, Inc. The buses to be purchased include five 47 passenger buses for $42,155.00 each, ten 65 passenger buses for $43,850.00 each, and one 47 passenger bus with a wheelchair lift for $46,952.00. The total amount was $696,227. In August of 2002, the ADE purchased 16 new Magnet and M-to-M buses. The total amount paid was $696,227. Specifications for 16 new Magnet and M-to-M school buses have been forwarded to State Purchasing for bidding. Bids will be opened on May 12, 2003. The buses will have a required delivery date after July 1, 2003 and before August 8, 2003. In June 2003, a bid for 16 new Magnet and M-to-M buses was awarded to Ward Transportation Services, Inc. The buses to be purchased include 5 - 47 passenger buses for $47,052.00 each, and 11 - 65 passenger buses for $48,895.00 each. The total amount was $773,105. The buses will be distributed accordingly: LRSD - 8 of the 65 passenger\nNLRSD - 2 of the 65 passenger\nPCSSD - 5 of the 47 passenger and 1 of the 65 passenger buses. 0 . Process and distribute compensatory education payments to LRSD as required by page 23 of the Settlement Agreement. 1. Projected Ending Date July 1 and January 1, of each school year through January 1, 1999. 7 I. FINANCIAL OBLIGATIONS (Continued) 0 . Process and distribute compensatory education payments to LRSD as required by page 23 of the Settlement Agreement. (Continued) 2. Actual as of September 30, 2003 Obligation fulfilled in FY 96/97. P. Process and distribute additional payments in lieu of formula to LRSD as required by page 24 of the Settlement Agreement. 1. Projected Ending Date Payment due date and ending July 1, 1995. 2. Actual as of September 30, 2003 Obligation fulfilled in FY 95/96. Q. Process and distribute payments to PCSSD as required by Page 28 of the Settlement Agreement. 1. Projected Ending Date Payment due date and ending July 1, 1994. 2. Actual as of September 30, 2003 Final payment was distributed July 1994. R. Upon loan request by LRSD accompanied by a promissory note, the ADE makes loans to LRSD. 1. Projected Ending Date Ongoing through July 1, 1999. See Settlement Agreement page 24. 2. Actual as of September 30, 2003 The LRSD received $3,000,000 on September 10, 1998. As of this reporting date, the LRSD has received $20,000,000 in loan proceeds. S. Process and distribute payments in lieu of formula to PCSSD required by page 29 of the Settlement Agreement. 1. Projected Ending Date Payment due date and ending July 1, 1995. 8 I. FINANCIAL OBLIGATIONS (Continued) s. Process and distribute payments in lieu of formula to PCSSD required by page 29 of the Settlement Agreement. (Continued) 2. Actual as of September 30, 2003 Obligation fulfilled in FY 95/96. T. Process and distribute compensatory education payments to NLRSD as required by page 31 of the Settlement Agreement. 1. Projected Ending Date July 1 of each school year through June 30, 1996. 2. Actual as of September 30, 2003 Obligation fulfilled in FY 95/96. U. Process and distribute check to Magnet Review Committee. 1. Projected Ending Date Payment due date and ending July 1, 1995. 2. Actual as of September 30, 2003 Distribution in July 1997 for FY 97/98 was $75,000. This was the total amount due to the Magnet Review Committee for FY 97/98. Distribution in July 1998 for FY 98/99 was $75,000. This was the total amount due to the Magnet Review Committee for FY 98/99. Distribution in July 1999 for FY 99/00 was $92,500. This was the total amount due to the Magnet Review Committee for FY 99/00. Distribution in July 2000 for FY 00/01 was $92,500. This was the total amount due to the Magnet Review Committee for FY 00/01 . Distribution in August 2001 for FY 01 /02 was $92,500. This was the total amount due to the Magnet Review Committee for FY 01/02. Distribution in July 2002 for FY 02/03 was $92,500. This was the total amount due to the Magnet Review Committee for FY 02/03. Distribution in July 2003 for FY 03/04 was $92,500. This was the total amount due to the Magnet Review Committee for FY 03/04. 9 I. FINANCIAL OBLIGATIONS (Continued) V. Process and distribute payments for Office of Desegregation Monitoring. 1. Projected Ending Date Not applicable. 2. Actual as of September 30, 2003 Distribution in July 1997 for FY 97/98 was $200,000. This was the total amount due to the ODM for FY 97/98. Distribution in July 1998 for FY 98/99 was $200,000. This was the total amount due to the ODM for FY 98/99. Distribution in July 1999 for FY 99/00 was $200,000. This was the total amount due to the ODM for FY 99/00. Distribution in July 2000 for FY 00/01 was $200,000. This was the total amount due to the ODM for FY 00/01 . Distribution in August 2001 for FY 01/02 was $200,000. This was the total amount due to the ODM for FY 01/02. Distribution in July 2002 for FY 02/03 was $200,000. This was the total amount due to the ODM for FY 02/03. Distribution in July 2003 for FY 03/04 was $200,000. This was the total amount due to the ODM for FY 03/04. 10 II. MONITORING COMPENSATORY EDUCATION A. Begin testing and evaluating the monitoring instrument and monitoring system to assure that data is appropriate and useful in monitoring the impacts of compensatory education programs on disparities in academic achievement for black students and white students. 1. Projected Ending Date January 15, 1995 2. Actual as of September 30, 2003 In May 1995, monitors completed the unannounced visits of schools in Pulaski County. The monitoring process involved a qualitative process of document reviews, interviews, and observations. The monitoring focused on progress made since the announced monitoring visits. In June 1995, monitoring data from unannounced visits was included in the July Semiannual Report. Twenty-five per cent of all classrooms were visited, and all of the schools in Pulaski County were monitored. All principals were interviewed to determine any additional progress since the announced visits. The July 1995 Monitoring Report was reviewed by the ADE administrative team, the Arkansas State Board of Education, and the Districts and filed with the Court. The report was formatted in accordance with the Allen Letter. In October 1995, a common terminology was developed by principals from the Districts and the Lead Planning and Desegregation staff to facilitate the monitoring process. The announced monitoring visits began on November 14, 1995 and were completed on January 26, 1996. Copies of the preliminary Semiannual Monitoring Report and its executive summary were provided to the ADE administrative team and the State Board of Education in January 1996. A report on the current status of the Cycle 5 schools in the ECOE process and their school improvement plans was filed with the Court on February 1, 1996. The unannounced monitoring visits began in February 1996 and ended on May 10, 1996. In June 1996, all announced and unannounced monitoring visits were completed, and the data was analyzed using descriptive statistics. The Districts provided data on enrollment in compensatory education programs. The Districts and the ADE Desegregation Monitoring staff developed a definition for instructional programs. 11 II. MONITORING COMPENSATORY EDUCATION (Continued) A. Begin testing and evaluating the monitoring instrument and monitoring system to assure that data is appropriate and useful in monitoring the impacts of compensatory education programs on disparities in academic achievement for black students and white students. (Continued) 2. Actual as of September 30, 2003 (Continued) The Semiannual Monitoring Report was completed and filed with the Court on July 15, 1996 with copies distributed to the parties. Announced monitoring visits of the Cycle 1 schools began on October 28, 1996 and concluded in December 1996. In January 1997, presentations were made to the State Board of Education, the Desegregation Litigation Oversight Subcommittee, and the parties to review the draft Semiannual Monitoring Report. The monitoring instrument and process were evaluated for their usefulness in monitoring the impacts of compensatory education programs on achievement disparities. In February 1997, the Semiannual Monitoring Report was filed. Unannounced monitoring visits began on February 3, 1997 and concluded in May 1997. In March 1997, letters were sent to the Districts regarding data requirements for the July 1997 Semiannual Monitoring Report and the additional discipline data element that was requested by the Desegregation Litigation Oversight Subcommittee. Desegregation data collection workshops were conducted in the Districts from March 28, 1997 to April 7, 1997. A meeting was conducted on April 3, 1997 to finalize plans for the July 15, 1997 Semiannual Monitoring Report. Onsite visits were made to Cycle 1 schools who did not submit accurate and timely data on discipline, M-to-M transfers, and policy. The July 15, 1997 Semiannual Monitoring Report and its executive summary were finalized in June 1997. In July 1997, the Semiannual Monitoring Report and its executive summary were filed with the court, and the ADE sponsored a School Improvement Conference. On July 10, 1997, copies of the Semiannual Monitoring Report and its executive summary were made available to the Districts for their review prior to filing it with the Court. In August 1997, procedures and schedules were organized for the monitoring of the Cycle 2 schools in FY 97/98. 12 II. MONITORING COMPENSATORY EDUCATION (Continued) A. Begin testing and evaluating the monitoring instrument and monitoring system to assure that data is appropriate and useful in monitoring the impacts of compensatory education programs on disparities in academic achievement for black students and white students. (Continued) 2. Actual as of September 30, 2003 (Continued) A Desegregation Monitoring and School Improvement Workshop for the Districts was held on September 10, 1997 to discuss monitoring expectations, instruments, data collection and school improvement visits. On October 9, 1997, a planning meeting was held with the desegregation monitoring staff to discuss deadlines, responsibilities, and strategic planning issues regarding the Semiannual Monitoring Report. Reminder letters were sent to the Cycle 2 principals outlining the data collection deadlines and availability of technical assistance. In October and November 1997, technical assistance visits were conducted, and announced monitoring visits of the Cycle 2 schools were completed. In December 1997 and January 1998, technical assistance visits were conducted regarding team visits, technical review recommendations, and consensus building. Copies of the infusion document and perceptual surveys were provided to schools in the ECOE process. The February 1998 Semiannual Monitoring Report was submitted for review and approval to the State Board of Education, the Director, the Administrative Team, the Attorney General's Office, and the Desegregation Litigation Oversight Subcommittee. Unannounced monitoring visits began in February 1998, and technical assistance was provided on the school improvement process, external team visits and finalizing school improvement plans. On February 18, 1998, the representatives of all parties met to discuss possible revisions to the ADE's monitoring plan and monitoring reports. Additional meetings will be scheduled. Unannounced monitoring visits were conducted in March 1998, and technical assistance was provided on the school improvement process and external team visits. In April 1998, unannounced monitoring visits were conducted, and technical assistance was provided on the school improvement process. 13 II. MONITORING COMPENSATORY EDUCATION (Continued) A. Begin testing and evaluating the monitoring instrument and monitoring system to assure that data is appropriate and useful in monitoring the impacts of compensatory education programs on disparities in academic achievement for black students and white students. (Continued) 2. Actual as of September 30, 2003 (Continued) In May 1998, unannounced monitoring visits were completed, and technical assistance was provided on the school improvement process. On May 18, 1998, the Court granted the ADE relief from its obligation to file the July 1998 Semiannual Monitoring Report to develop proposed modifications to ADE's monitoring and reporting obligations. In June 1998, monitoring information previously submitted by the districts in the Spring of 1998 was reviewed and prepared for historical files and presentation to the Arkansas State Board. Also, in June the following occurred: a) The Extended COE Team Visit Reports were completed, b) the Semiannual Monitoring COE Data Report was completed, c) progress reports were submitted from previous cycles, and d.) staff development on assessment (SAT-9) and curriculum alignment was conducted with three supervisors. In July, the Lead Planner provided the Desegregation Litigation Oversight Committee with (1) a review of the court Order relieving ADE of its obligation to file a July Semiannual Monitoring Report, and (2) an update of ADE's progress toward work with the parties and ODM to develop proposed revisions to ADE's monitoring and reporting obligations. The Committee encouraged ODM, the parties and the ADE to continue to work toward revision of the monitoring and reporting process. In August 1998, the ADE Implementation Phase Working group met to review the Implementation Phase activities for the previous quarter. The Assistant Attorney General, the Assistant Director for Accountability and the Education Lead Planner updated the group on all relevant desegregation legal issues and proposed revisions to monitoring and reporting activities during the quarter. In September 1998, tentative monitoring dates were established and they will be finalized once proposed revisions to the Desegregation Monitoring Plan are finalized and approved. In September/October 1998, progress was being made on the proposed revisions to the monitoring process by committee representatives of all the Parties in the Pulaski County Settlement Agreement. While the revised monitoring plan is finalized and approved, the ADE monitoring staff will continue to provide technical assistance to schools upon request. 14 II. MONITORING COMPENSATORY EDUCATION (Continued) A. Begin testing and evaluating the monitoring instrument and monitoring system to assure that data is appropriate and useful in monitoring the impacts of compensatory education programs on disparities in academic achievement for black students and white students. (Continued) 2. Actual as of September 30, 2003 (Continued) In December 1998, requests were received from schools in PCSSD regarding test score analysis and staff Development. Oak Grove is scheduled for January 21 , 1999 and Lawson Elementary is also tentatively scheduled in January. Staff development regarding test score analysis for Oak Grove and Lawson Elementary in the PCSSD has been rescheduled for April 2000. Staff development regarding test score analysis for Oak Grove and Lawson Elementary in the PCSSD was conducted on May 5, 2000 and May 9, 2000 respectively. Staff development regarding classroom management was provided to the Franklin Elementary School in LRSD on November 8, 2000. Staff development regarding ways to improve academic achievement was presented to College Station Elementary in PCSSD on November 22, 2000. On November 1, 2000, the ADE Implementation Phase Working group met to review the Implementation Phase activities for the previous quarter. The Assistant Director for Accountability updated the group on all relevant desegregation legal issues and discussed revisions to monitoring and reporting activities during the quarter. The next Implementation Phase Working Group Meeting is scheduled for February 27, 2001 in room 201-A at the ADE. The Implementation Phase Working Group meeting that was scheduled for February 27 had to be postponed. It will be rescheduled as soon as possible. The quarterly Implementation Phase Working Group meeting is scheduled for June 27, 2001 . The quarterly Implementation Phase Working Group meeting was rescheduled from June 27. It will take place on July 26, 2001 in room 201-A at 1 :30 p.m. at the ADE. 15 II. MONITORING COMPENSATORY EDUCATION (Continued) A. Begin testing and evaluating the monitoring instrument and monitoring system to assure that data is appropriate and useful in monitoring the impacts of compensatory education programs on disparities in academic achievement for black students and white students. (Continued) 2. Actual as of September 30, 2003 (Continued) On July 26, 2001 , the ADE Implementation Phase Working group met to review the Implementation Phase activities for the previous quarter. Mr. Willie Morris, ADE Lead Planner for Desegregation, updated the group on all relevant desegregation issues. Mr. Mark Hagemeier, Assistant Attorney General, and Mr. Scott Smith, ADE Staff Attorney, discussed the court case involving the LRSD seeking unitary status. The next Implementation Phase Working Group Meeting is scheduled for October 11, 2001 in room 201-A at the ADE. On October 11, 2001 , the ADE Implementation Phase Working group met to review the Implementation Phase activities for the previous quarter. Mr. Willie Morris, ADE Lead Planner for Desegregation, updated the group on all relevant desegregation issues. Mr. Scott Smith, ADE Staff Attorney, discussed the ADE's intent to take a proactive role in Desegregation Monitoring. The next Implementation Phase Working Group Meeting is scheduled for January 10, 2002 in room 201-A at the ADE. The Implementation Phase Working Group Meeting that was scheduled for January 10 was postponed. It has been rescheduled for February 14, 2002 in room 201-A at the ADE. On February 12, 2002, the ADE Implementation Phase Working group met to review the Implementation Phase activities for the previous quarter. Mr. Willie Morris, ADE Lead Planner for Desegregation, updated the group on all relevant desegregation issues. Mr. Mark Hagemeier, Assistant Attorney General, discussed the court case involving the LRSD seeking unitary status. The next Implementation Phase Working Group Meeting is scheduled for April 11 , 2002 in room 201-A at the ADE. On April 11 , 2002, the ADE Implementation Phase Working group met to review the Implementation Phase activities for the previous quarter. Mr. Willie Morris, ADE Lead Planner for Desegregation, updated the group on all relevant desegregation issues. Mr. Mark Hagemeier, Assistant Attorney General, discussed the court case involving the LRSD seeking unitary status. The next Implementation Phase Working Group Meeting is scheduled for July 11 , 2002 in room 201-A at the ADE. 16 II. MONITORING COMPENSATORY EDUCATION (Continued) A. Begin testing and evaluating the monitoring instrument and monitoring system to assure that data is appropriate and useful in monitoring the impacts of compensatory education programs on disparities in academic achievement for black students and white students. (Continued) 2. Actual as of September 30, 2003 (Continued) On July 18, 2002, the ADE Implementation Phase Working group met to review the Implementation Phase activities for the previous quarter. Mr. Willie Morris, ADE Lead Planner for Desegregation, updated the group on all relevant desegregation issues. Dr. Charity Smith, Assistant Director for Accountability, talked about section XV in the Project Management Tool (PMT) on Standardized Test Selection to Determine Loan Forgiveness. She said that the goal has been completed, and no additional reporting is required for section XV. Mr. Morris discussed the court case involving the LRSD seeking unitary status. He handed out a Court Order from May 9, 2002, which contained comments from U.S. District Judge Bill Wilson Jr., about hearings on the LRSD request for unitary status. Mr. Morris also handed out a document from the Secretary of Education about the No Child Left Behind Act. There was discussion about how this could have an affect on Desegregation issues. The next Implementation Phase Working Group Meeting is scheduled for October 10, 2002 at 1 :30 p.m. in room 201-A at the ADE. The quarterly Implementation Phase Working Group meeting was rescheduled from October 10. It will take place on October 29, 2002 in room 201-A at 1 :30 p.m. at the ADE. On October 29, 2002, the ADE Implementation Phase Working Group met to review the Implementation Phase activities for the previous quarter. Mr. Willie Morris, ADE Lead Planner for Desegregation, updated the group on all relevant desegregation issues. Meetings with the parties to discuss possible revisions to the ADE's monitoring plan will be postponed by request of the school districts in Pulaski County. Additional meetings could be scheduled after the Desegregation ruling is finalized. The next Implementation Phase Working Group Meeting is scheduled for January 9, 2003 at 1 :30 p.m. in room 201-A at the ADE. On January 9, 2003, the ADE Implementation Phase Working Group met to review the Implementation Phase activities for the previous quarter. Mr. Willie Morris, ADE Lead Planner for Desegregation, updated the group on all relevant desegregation issues. No Child Left Behind and the Desegregation ruling on unitary status for LRSD were discussed. The next Implementation Phase Working Group Meeting is scheduled for April 10, 2003 at 1 :30 p.m. in room 201- A at the ADE. The quarterly Implementation Phase Working Group meeting was rescheduled from April 10. It will take place on April 24, 2003 in room 201-A at 1 :30 p.m. at the ADE. 17 II. MONITORING COMPENSATORY EDUCATION (Continued) A. Begin testing and evaluating the monitoring instrument and monitoring system to assure that data is appropriate and useful in monitoring the impacts of compensatory education programs on disparities in academic achievement for black students and white students. (Continued) 2. Actual as of September 30, 2003 (Continued) On April 24, 2003, the ADE Implementation Phase Working Group met to review the Implementation Phase activities for the previous quarter. Mr. Willie Morris, ADE Lead Planner for Desegregation, updated the group on all relevant desegregation issues. Laws passed by the legislature need to be checked to make sure none of them impede desegregation. Ray Lumpkin was chairman of the last committee to check legislation. Since he left, we will discuss the legislation with Clearence Lovell. The Desegregation ruling on unitary status for LRSD was discussed. The next Implementation Phase Working Group Meeting is scheduled for July 10, 2003 at 1:30 p.m. in room 201-A at the ADE. On August 28, 2003, the ADE Jmplementation Phase Working Group met to review the Implementation Phase activities for the previous quarter. Mr. Willie Morris, ADE Lead Planner for Desegregation, updated the group on all relevant desegregation issues. The Desegregation ruling.on unitary status for LRSD was discussed. The LRSD has been instructed to submit evidence showing progress in reducing disparities in academic achievemenf for black students and white students. This is supposed to be done by March-of 2004, so that the LRSD can achieve unitary status . . The next Implementation Phase Working Group Meeting is scheduled for October 9, 2003 at the ADE. 18 Ill. A PETITION FOR ELECTION FOR LRSD WILL BE SUPPORTED SHOULD A MILLAGE BE REQUIRED A. Monitor court pleadings to determine if LRSD has petitioned the Court for a special election. 1. Projected Ending Date Ongoing. 2. Actual as of September 30, 2003 Ongoing. All Court pleadings are monitored monthly. B. Draft and file appropriate pleadings if LRSD petitions the Court for a special election. 1. Projected Ending Date Ongoing 2. Actual as of September 30, 2003 To date, no action has been taken by the LRSD. 19 IV. REPEAL STATUTES AND REGULATIONS THAT IMPEDE DESEGREGATION A. Using a collaborative approach, immediately identify those laws and regulations that appear to impede desegregation. 1. Projected Ending Date December, 1994 2. Actual as of September 30, 2003 The information for this item is detailed under Section IV.E. of this report. B. Conduct a review within ADE of existing legislation and regulations that appear to impede desegregation. C. 1. Projected Ending Date November, 1994 2. Actual as of September 30, 2003 The information for this item is detailed under Section IV.E. of this report. Request of the other parties to the Settlement Agreement that they identify laws and regulations that appear to impede desegregation. 1. Projected Ending Date November, 1994 2. Actual as of September 30, 2003 The information for this item is detailed under Section IV. E. of this report. D. Submit proposals to the State Board of Education for repeal of those regulations that are confirmed to be impediments to desegregation. 1. Projected Ending Date Ongoing 2. Actual as of September 30, 2003 The information for this item is detailed under Section IV. E. of this report. 20 IV. REPEAL STATUTES AND REGULATIONS THAT IMPEDE DESEGREGATION (Continued) E. Submit proposals to the Legislature for repeal of those laws that appear to be impediments to desegregation. 2. Actual as of September 30, 2003 A committee within the ADE was formed in May 1995 to review and collect data on existing legislation and regulations identified by the parties as impediments to desegregation. The committee researched the Districts' concerns to determine if any of the rules, regulations, or legislation cited impede desegregation. The legislation cited by the Districts regarding loss funding and worker's compensation were not reviewed because they had already been litigated. In September 1995, the committee reviewed the following statutes, acts, and regulations: Act 113 of 1993\nADE Director's Communication 93-205\nAct 145 of 1989\nADE Director's Memo 91-67\nADE Program Standards Eligibility Criteria for Special Education\nArkansas Codes 6-18-206, 6-20-307, 6-20-319, and 6-17- 1506. In October 1995, the individual reports prepared by committee members in their areas of expertise and the data used to support their conclusions were submitted to the ADE administrative team for their review. A report was prepared and submitted to the State Board of Education in July 1996. The report concluded that none of the items reviewed impeded desegregation. As of February 3, 1997, no laws or regulations have been determined to impede desegregation efforts. Any new education laws enacted during the Arkansas 81 st Legislative Session will be reviewed at the close of the legislative session to ensure that they do not impede desegregation. In April 1997, copies of all laws passed during the 1997 Regular Session of the 81 st General Assembly were requested from the office of the ADE Liaison to the Legislature for distribution to the Districts for their input and review of possible impediments to their desegregation efforts. In August 1997, a meeting to review the statutes passed in the prior legislative session was scheduled for September 9, 1997. 21 IV. REPEAL STATUTES AND REGULATIONS THAT IMPEDE DESEGREGATION (Continued) E. Submit proposals to the Legislature for repeal of those laws that appear to be impediments to desegregation. (Continued) 2. Actual as of September 30, 2003 (Continued) On September 9, 1997, a meeting was held to discuss the review of the statutes passed in the prior legislative session and new ADE regulations. The Districts will be contacted in writing for their input regarding any new laws or regulations that they feel may impede desegregation. Additionally, the Districts will be asked to review their regulations to ensure that they do not impede their desegregation efforts. The committee will convene on December 1, 1997 to review their findings and finalize their report to the Administrative Team and the State Board of Education. In October 1997, the Districts were asked to review new regulations and statutes for impediments to their desegregation efforts, and advise the ADE, in writing, if they feel a regulation or statute may impede their desegregation efforts. In October 1997, the Districts were requested to advise the ADE, in writing, no later than November 1, 1997 of any new law that might impede their desegregation efforts. As of November 12, 1997, no written responses were received from the Districts. The ADE concludes that the Districts do not feel that any new law negatively impacts their desegregation efforts. The committee met on December 1, 1997 to discuss their findings regarding statutes and regulations that may impede the desegregation efforts of the Districts. The committee concluded that there were no laws or regulations that impede the desegregation efforts of the Districts. It was decided that the committee chair would prepare a report of the committee's findings for the Administrative Team and the State Board of Education. The committee to review statutes and regulations that impede desegregation is now reviewing proposed bills and regulations, as well as laws that are being signed in, for the current 1999 legislative session. They will continue to do so until the session is over. The committee to review statutes and regulations that impede desegregation will meet on April 26, 1999 at the ADE. The committee met on April 26, 1999 at the ADE. The purpose of the meeting was to identify rules and regulations that might impede desegregation, and review within the existing legislation any regulations that might result in an impediment to desegregation. This is a standing committee that is ongoing and a report will be submitted to the State Board of Education once the process is completed. 22 IV. REPEAL STATUTES AND REGULATIONS THAT IMPEDE DESEGREGATION (Continued) E. Submit proposals to the Legislature for repeal of those laws that appear to be impediments to desegregation. (Continued) 2. Actual as of September 30, 2003 (Continued) The committee met on May 24, 1999 at the ADE. The committee was asked to review within the existing legislation any regulations that might result in an impediment to desegregation. The committee determined that Mr. Ray Lumpkin would contact the Pulaski County districts to request written response to any rules, regulations or laws that might impede desegregation. The committee would also collect information and data to prepare a report for the State Board. This will be a standing committee. This data gathering will be ongoing until the final report is given to the State Board. On July 26, 1999, the committee met at the ADE. The committee did not report any laws or regulations that they currently thought would impede desegregation, and are still waiting for a response from the three districts in Pulaski County. The committee met on August 30, 1999 at the ADE to review rules and regulations that might impede desegregation. At that time, there were no laws under review that appeared to impede desegregation. In November, the three districts sent letters to the ADE stating that they have reviewed the laws passed by the 82nd legislative session as well as current rules \u0026amp; regulations and district policies to ensure that they have no ill effect on desegregation efforts. There was some concern from PCSSD concerning a charter school proposal in the Maumelle area. The work of the committee is on-going each month depending on the information that comes before the committee. Any rules, laws or regulations that would impede desegregation will be discussed and reported to the State Board of Education. On October 4, 2000, the ADE presented staff development for assistant superintendents in LRSD, NLRSD and PCSSD regarding school laws of Arkansas. The ADE is in the process of forming a committee to review all Rules and Regulations from the ADE and State Laws that might impede desegregation. The ADE Committee on Statutes and Regulations will review all new laws that might impede desegregation once the 83rd General Assembly has completed this session. The ADE Committee on Statutes and Regulations will meet for the first time on June 11, 2001 at 9:00 a.m. in room 204-A at the ADE. The committee will review all new laws that might impede desegregation that were passed during the 2001 Legislative Session. 23 IV. REPEAL STATUTES AND REGULATIONS THAT IMPEDE DESEGREGATION (Continued) E. Submit proposals to the Legislature for repeal of those laws that appear to be impediments to desegregation. (Continued) 2. Actual as of September 30, 2003 (Continued) The ADE Committee on Statutes and Regulations rescheduled the meeting that was planned for June 11 , in order to review new regulations proposed to the State Board of Education. The meeting will take place on July 16, 2001 at 9:00 a.m. at the ADE. The ADE Committee to Repeal Statutes and Regulations that Impede Desegregation met on July 16, 2001 at the ADE. The following Items were discussed: (1) Review of 2001 state laws which appear to impede desegregation. (2) Review of existing ADE regulations which appear to impede desegregation. (3) Report any laws or regulations found to impede desegregation to the Arkansas State Legislature, the ADE and the Pulaski County school districts. The next meeting will take place on August 27, 2001 at 9:00 a.m. at the ADE. The ADE Committee to Repeal Statutes and Regulations that Impede Desegregation met on August 27, 2001 at the ADE. The Committee is reviewing all relevant laws or regulations produced by the Arkansas State Legislature, the ADE and the Pulaski County school districts in FY 2000/2001 to determine if they may impede desegregation. The next meeting will take place on September 10, 2001 in Conference Room 204-B at 2:00 p.m. at the ADE. The ADE Committee to Repeal Statutes and Regulations that Impede Desegregation met on September 10, 2001 at the ADE. The Committee is reviewing all relevant laws or regulations produced by the Arkansas State Legislature, the ADE and the Pulaski County school districts in FY 2000/2001 to determine if they may impede desegregation. The next meeting will take place on October 24, 2001 in Conference Room 204-B at 2:00 p.m. at the ADE. The ADE Committee to Repeal Statutes and Regulations that Impede Desegregation met on October 24, 2001 at the ADE. The Committee is reviewing all relevant laws or regulations produced by the Arkansas State Legislature, the ADE and the Pulaski County school districts in FY 2000/2001 to determine if they may impede desegregation. On December 17, 2001 , the ADE Committee to Repeal Statutes and Regulations that Impede Desegregation composed letters that will be sent to the school districts in Pulaski County. The letters ask for input regarding any new laws or regulations that may impede desegregation. Laws to review include those of the 83rd General Assembly, ADE regulations, and regulations of the Districts. 24 IV. REPEAL STATUTES AND REGULATIONS THAT IMPEDE DESEGREGATION (Continued) E. Submit proposals to the Legislature for repeal of those laws that appear to be impediments to desegregation. (Continued) 2. Actual as of September 30, 2003 (Continued) On January 10, 2002, the ADE Committee to Repeal Statutes and Regulations that Impede Desegregation sent letters to the school districts in Pulaski County. The letters ask for input regarding any new laws or regulations that may impede desegregation. The districts were asked to respond by March 8, 2002. On March 5, 2002, A letter was sent from the LRSD which mentioned Act 1748 and Act 1667 passed during the 83rd Legislative Session which may impede desegregation. These laws will be researched to determine if changes need to be made. A letter was sent from the NLRSD on March 19, noting that the district did not find any laws which impede desegregation. On April 26, 2002, A letter was sent for the PCSSD to the ADE, noting that the district did not find any laws which impede desegregation except the \"deannexation\" legislation which the District opposed before the Senate committee. 25 V. COMMITMENT TO PRINCIPLES A. Through a preamble to the Implementation Plan, the Board of Education will reaffirm its commitment to the principles of the Settlement Agreement and outcomes of programs intended to apply those principles. 1. Projected Ending Date Ongoing 2. Actual as of September 30, 2003 The preamble was contained in the Implementation Plan filed with the Court on March 15, 1994. B. Through execution of the Implementation Plan, the Board of Education will continue to reaffirm its commitment to the principles of the Settlement Agreement and outcomes of programs intended to apply those principles. 1. Projected Ending Date Ongoing 2. Actual as of September 30, 2003 Ongoing C. Through execution of the Implementation Plan, the Board of Education will continue to reaffirm its commitment to the principles of the Settlement Agreement by actions taken by ADE in response to monitoring results. 1. Projected Ending Date Ongoing 2. Actual as of September 30, 2003 Ongoing D. Through regular oversight of the Implementation Phase's Project Management Tool, and scrutiny of results of ADE's actions, the Board of Education will act on its commitment to the principles of the Settlement Agreement. 1. Projected Ending Date Ongoing 26 V. COMMITMENT TO PRINCIPLES (Continued) D. Through regular oversight of the Implementation Phase's Project Management Tool, and scrutiny of results of ADE's actions, the Board of Education will act on its commitment to the principles of the Settlement Agreement. (Continued) 2. Actual as of September 30, 2003 At each regular monthly meeting of the State Board of Education, the Board is provided copies of the most recent Project Management Tool (PMT) and an executive summary of the PMT for their review and approval. Only activities that are in addition to the Board's monthly review of the PMT are detailed below. In May 1995, the State Board of Education was informed of the total number of schools visited during the monitoring phase and the data collection process. Suggestions were presented to the State Board of Education on how recommendations could be presented in the monitoring reports. In June 1995, an update on the status of the pending Semiannual Monitoring Report was provided to the State Board of Education. In July 1995, the July Semiannual Monitoring Report was reviewed by the State Board of Education. On August 14, 1995, the State Board of Education was informed of the need to increase minority participation in the teacher scholarship program and provided tentative monitoring dates to facilitate reporting requests by the ADE administrative team and the Desegregation Litigation Oversight Subcommittee. In September 1995, the State Board of Education was advised of a change in the PMT from a table format to a narrative format. The Board was also briefed about a meeting with the Office of Desegregation Monitoring regarding the PMT. In October 1995, the State Board of Education was updated on monitoring timelines. The Board was also informed of a meeting with the parties regarding a review of the Semiannual Monitoring Report and the monitoring process, and the progress of the test validation study. In November 1995, a report was made to the State Board of Education regarding the monitoring schedule and a meeting with the parties concerning the development of a common terminology for monitoring purposes. In December 1995, the State Board of Education was updated regarding announced monitoring visits. In January 1996, copies of the draft February Semiannual Monitoring Report and its executive summary were provided to the State Board of Education. 27 V. COMMITMENT TO PRINCIPLES (Continued) D. Through regular oversight of the Implementation Phase's Project Management Tool, and scrutiny of results of ADE's actions, the Board of Education will act on its commitment to the principles of the Settlement Agreement. (Continued) 2. Actual as of September 30, 2003 (Continued) During the months of February 1996 through May 1996, the PMT report was the only item on the agenda regarding the status of the implementation of the Monitoring Plan. In June 1996, the State Board of Education was updated on the status of the bias review study. In July 1996, the Semiannual Monitoring Report was provided to the Court, the parties, ODM, the State Board of Education, and the Desegregation Litigation Oversight Subcommittee. In August 1996, the State Board of Education and the ADE administrative team were provided with copies of the test validation study prepared by Dr. Paul Williams. During the months of September 1996 through December 1996, the PMT was the only item on the agenda regarding the status of the implementation of the Monitoring Plan. On January 13, 1997, a presentation was made to the State Board of Education regarding the February 1997 Semiannual Monitoring Report, and copies of the report and its executive summary were distributed to all Board members. The Project Management Tool and its executive summary were addressed at the February 10, 1997 State Board of Education meeting regarding the ADE's progress in fulfilling their obligations as set forth in the Implementation Plan. In March 1997, the State Board of Education was notified that historical information in the PMT had been summarized at the direction of the Assistant Attorney General in order to reduce the size and increase the clarity of the report. The Board was updated on the Pulaski County Desegregation Case and reviewed the Memorandum Opinion and Order issued by the Court on February 18, 1997 in response to the Districts' motion for summary judgment on the issue of state funding for teacher retirement matching contributions. During the months of April 1997 through June 1997, the PMTwas the only item on the agenda regarding the status of the implementation of the Monitoring Plan. The State Board of Education received copies of the July 15, 1997 Semiannual Monitoring Report and executive summary at the July Board meeting. 28 V. COMMITMENT TO PRINCIPLES (Continued) D. Through regular oversight of the Implementation Phase's Project Management Tool, and scrutiny of results of ADE's actions, the Board of Education will act on its commitment to the principles of the Settlement Agreement. (Continued) 2. Actual as of September 30, 2003 (Continued) The Implementation Phase Working Group held its quarterly meeting on August 4, 1997 to discuss the progress made in attaining the goals set forth in the Implementation Plan and the critical areas for the current quarter. A special report regarding a historical review of the Pulaski County Settlement Agreement and the AD E's role and monitoring obligations were presented to the State Board of Education on September 8, 1997. Additionally, the July 15, 1997 Semiannual Monitoring Report was presented to the Board for their review. In October 1997, a special draft report regarding disparity in achievement was submitted to the State Board Chairman and the Desegregation Litigation Oversight Subcommittee. In November 1997, the State Board of Education was provided copies of the monthly PMT and its executive summary. The Implementation Phase Working Group held its quarterly meeting on November 3, 1997 to discuss the progress made in attaining the goals set forth in the Implementation Plan and the critical areas for the current quarter. In December 1997, the State Board of Education was provided copies of the monthly PMT and its executive summary. In January 1998, the State Board of Education reviewed and discussed ODM's report on the ADE's monitoring activities and instructed the Director to meet with the parties to discuss revisions to the ADE's monitoring plan and monitoring reports. In February 1998, the State Board of Education reviewed and approved the PMT and discussed the February 1998 Semiannual Monitoring Report. In March 1998, the State Board of Education reviewed and approved the PMT and its executive summary and was provided an update regarding proposed revisions to the monitoring process. In April 1998, the State Board of Education reviewed and approved the PMT and its executive summary. In May 1998, the State Board of Education reviewed and approved the PMT and its executive summary. 29 V. COMMITMENT TO PRINCIPLES (Continued) D. Through regular oversight of the Implementation Phase's Project Management Tool, and scrutiny of results of ADE's actions, the Board of Education will act on its commitment to the principles of the Settlement Agreement. (Continued) 2. Actual as of September 30, 2003 (Continued) In June 1998, the State Board of Education reviewed and approved the PMT and its executive summary. The State Board of Education also reviewed how the ADE would report progress in the PMT concerning revisions in ADE's Monitoring Plan. In July 1998, the State Board of Education reviewed and approved the PMT and its executive summary. The State Board of Education also received an update on Test Validation, the Desegregation Litigation Oversight Committee Meeting, and revisions in ADE's Monitoring Plan. In August 1998, the State Board of Education reviewed and approved the PMT and its executive summary. The Board also received an update on the five discussion points regarding the proposed revisions to the monitoring and reporting process. The Board also reviewed the basic goal of the Minority Recruitment Committee. In September 1998, the State Board of Education reviewed the proposed modifications to the Monitoring plans by reviewing the common core of written response received from the districts. The primary commonalities were (1) Staff Development, (2) Achievement Disparity and (3) Disciplinary Disparity. A meeting of the parties is scheduled to be conducted on Thursday, September 17, 1998. The Board encouraged the Department to identify a deadline for Standardized Test Validation and Test Selection. In October 1998, the Board received the progress report on Proposed Revisions to the Desegregation Monitoring and Reporting Process (see XVIII). The Board also reviewed and approved the PMT and its executive summary. In November, the Arkansas State Board of Education reviewed the PMT and its executive summary. The Board also received an update on the proposed revisions in the Desegregation monitoring Process and the update on Test validation and Test Selection provisions of the Settlement Agreement. The Board was also notified that the Implementation Plan Working Committee held its quarterly meeting to review progress and identify quarterly priorities. In December, the State Board of Education reviewed the PMT and its executive summary. The Board also received an update on the joint motion by the ADE, the LRSD, NLRSD, and the PCSSD, to relieve the Department of its obligation to file a February Semiannual Monitoring Report. The Board was also notified that the Joshua lntervenors filed a motion opposing the joint motion. The Board was informed that the ADE was waiting on a response from Court. 30 V. COMMITMENT TO PRINCIPLES (Continued) D. Through regular oversight of the Implementation Phase's Project Management Tool, and scrutiny of results of ADE's actions, the Board of Education will act on its commitment to the principles of the Settlement Agreement. (Continued) 2. Actual as of September 30, 2003 (Continued) In January, the Arkansas State Board of Education reviewed the PMT and its executive summary. The Board also received an update on the joint motion of the ADE, LRSD, PCSSD, and NLRSD for an order relieving the ADE of filing a February 1999 Monitoring Report. The motion was granted subject to the following three conditions: (1) notify the Joshua intervenors of all meetings between the parties to discuss proposed changes, (2) file with the Court on or before February 1, 1999, a report detailing the progress made in developing proposed changes and (3) identify ways in which ADE might assist districts in their efforts to improve academic achievement. In February, the Arkansas State Board of Education reviewed the PMT and its executive summary. The Board was informed that the three conditions: (1) notify the Joshua lntervenors of all meetings between the parties to discuss proposed changes, (2) file with the Court on or before February 1, 1999, a report detailing the progress made in developing proposed changes and (3) identify ways in which ADE might assist districts in their efforts to improve academic achievement had been satisfied. The Joshua lntervenors were invited again to attend the meeting of the parties and they attended on January 13, and January 28, 1999. They are also scheduled to attend on February 17, 1998. The report of progress, a collaborative effort from all parties was presented to court on February 1, 1999. The Board was also informed that additional items were received for inclusion in the revised report, after the deadline for the submission of the progress report and the ADE would: (1) check them for feasibility, and fiscal impact if any, and (2) include the items in future drafts of the report. In March, the Arkansas State Board of Education reviewed the PMT and its executive summary. The Board also received and reviewed the Desegregation Monitoring and Assistance Progress Report submitted to Court on February 1, 1999. On April 12, and May 10, 1999, the Arkansas State Board of Education reviewed the PMT and its executive summary. The Board also was notified that once the financial section of the proposed plan was completed, the revised plan would be submitted to the board for approval. On June 14, 1999, the Arkansas State Board of Education reviewed the PMT and its executive summary. The Board also was notified that once the financial section of the proposed plan was completed, the revised plan would be submitted to the board for approval. 31 V. COMMITMENT TO PRINCIPLES (Continued) D. Through regular oversight of the Implementation Phase's Project Management Tool, and scrutiny of results of ADE's actions, the Board of Education will act on its commitment to the principles of the Settlement Agreement. (Continued) 2. Actual as of September 30, 2003 (Continued) On July 12, 1999, the Arkansas State Board of Education reviewed the PMT and its executive summary. The Board also was notified that once the financial section of the proposed plan was completed, the revised plan would be submitted to the board for approval. On August 9, 1999, the Arkansas State Board of Education reviewed the PMT and its executive summary. The Board was also notified that the new Desegregation Monitoring and Assistance Plan would be ready to submit to the Board for their review \u0026amp; approval as soon as plans were finalized. On September 13, 1999, the Arkansas State Board of Education reviewed the PMT and its executive summary. The Board was also notified that the new Desegregation Monitoring and Assistance Plan would be ready to submit to the Board for their review \u0026amp; approval as soon as plans were finalized. On October 12, 1999, the Arkansas State Board of Education reviewed the PMT and its executive summary. The Board was notified that on September 21 , 1999 that the Office of Education Lead Planning and Desegregation Monitoring meet before the Desegregation Litigation Oversight Subcommittee and presented them with the draft version of the new Desegregation Monitoring and Assistance Plan. The State Board was notified that the plan would be submitted for Board review and approval when finalized. On November 8, 1999, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of October. On December 13, 1999, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of November. On January 10, 2000, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of December. On February 14, 2000, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of January. On March 13, 2000, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of February. On April 10, 2000, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of March. 32 V. COMMITMENT TO PRINCIPLES (Continued) D. Through regular oversight of the Implementation Phase's Project Management Tool, and scrutiny of results of ADE's actions, the Board of Education will act on its commitment to the principles of the Settlement Agreement. (Continued) 2. Actual as of September 30, 2003 (Continued) On May 8, 2000, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of April. On June 12, 2000, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of May. On July 10, 2000, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of June. On August 14, 2000, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of July. On September 11, 2000, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of August. On October 9, 2000, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of September. On November 13, 2000, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of October. On December 11 , 2000, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of November. On January 8, 2001 , the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of December. On February 12, 2001 , the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of January. On March 12, 2001 , the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of February. On April 9, 2001 , the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of March. On May 14, 2001 , the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of April. On June 11, 2001, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of May. 33 V. COMMITMENT TO PRINCIPLES (Continued) D. Through regularoversightofthe Implementation Phase's ProjectManagementTool, and scrutiny of results of ADE's actions, the Board of Education will act on its commitment to the principles of the Settlement Agreement. (Continued) 2. Actual as of September 30, 2003 (Continued) On July 9, 2001 , the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of June. On August 13, 2001, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of July. On September 10, 2001 , the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of August. On October 8, 2001, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of September. On November 19, 2001, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of October. On December 10, 2001, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of November. On January 14, 2002, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of December. On February 11 , 2002, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of January. On March 11 , 2002, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of February. On April 8, 2002, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of March. On May 13, 2002, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of April. On June 10, 2002, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of May. On July 8, 2002, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of June. On August 12, 2002, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of July. 34 V. COMMITMENT TO PRINCIPLES (Continued) D. Through regular oversight of the Implementation Phase's Project Management Tool, and scrutiny of results of ADE's actions, the Board of Education will act on its commitment to the principles of the Settlement Agreement. (Continued) 2. Actual as of September 30, 2003 (Continued) On September 9, 2002, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of August. On October 14, 2002, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of September. On November 18, 2002, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of October. On December 9, 2002, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of November. On January 13, 2003, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of December. On February 10, 2003, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of January. On March 10, 2003, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of February. On April 14, 2003, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of March. On May 12, 2003, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of April. On June 9, 2003, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of May. On August 11 , 2003, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the months of June and July. On September 8, 2003, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of August. 35 VI. REM ED IA TION A. Through the Extended COE process, the needs for technical assistance by District, by School, and by desegregation compensatory education programs will be identified. 1. Projected Ending Date Ongoing 2. Actual as of September 30, 2003 During May 1995, team visits to Cycle 4 schools were conducted, and plans were developed for reviewing the Cycle 5 schools. In June 1995, the current Extended COE packet was reviewed, and enhancements to the Extended COE packet were prepared. In July 1995, year end reports were finalized by the Pulaski County field service specialists, and plans were finalized for reviewing the draft improvement plans of the Cycle 5 schools. In August 1995, Phase I - Cycle 5 school improvement plans were reviewed. Plans were developed for meeting with the Districts to discuss plans for Phase 11 - Cycle 1 schools of Extended COE, and a school improvement conference was conducted in Hot Springs. The technical review visits for the FY 95/96 year and the documentation process were also discussed. In October 1995, two computer programs, the Effective Schools Planner and the Effective Schools Research Assistant, were ordered for review, and the first draft of a monitoring checklist for Extended COE was developed. Through the Extended COE process, the field service representatives provided technical assistance based on the needs identified within the Districts from the data gathered. In November 1995, ADE personnel discussed and planned for the FY 95/96 monitoring, and onsite visits were conducted to prepare schools for the FY 95/96 team visits. Technical review visits continued in the Districts. In December 1995, announced monitoring and technical assistance visits were conducted in the Districts. At December 31 , 1995, approximately 59% of the schools in the Districts had been monitored. Technical review visits were conducted during January 1996. In February 1996, announced monitoring visits and midyear monitoring reports were completed, and the field service specialists prepared for the spring NCA/COE peer team visits. 36 VI. REMEDIATION (Continued) A. Through the Extended COE process, the needs for technical assistance by District, by School, and by desegregation compensatory education programs will be identified. (Continued) 2. Actual as of September 30, 2003 (Continued) In March 1996, unannounced monitoring visits of Cycle 5 schools commenced, and two-day peer team visits of Cycle 5 schools were conducted. Two-day team visit materials, team lists and reports were prepared. Technical assistance was provided to schools in final preparation for team visits and to schools needing any school improvement information. In April and May 1996, the unannounced monitoring visits were completed. The unannounced monitoring forms were reviewed and included in the July monitoring report. The two-day peer team visits were completed, and annual COE monitoring reports were prepared. In June 1996, all announced and unannounced monitoring visits of the Cycle 5 schools were completed, and the data was analyzed. The Districts identified enrollment in compensatory education programs. The Semiannual Monitoring Report was completed and filed with the Court on July 15, 1996, and copies were distributed to the parties. During August 1996, meetings were held with the Districts to discuss the monitoring requirements. Technical assistance meetings with Cycle 1 schools were planned for 96/97. The Districts were requested to record discipline data in accordance with the Allen Letter. In September 1996, recommendations regarding the ADE monitoring schedule for Cycle 1 schools and content layouts of the semiannual report were submitted to the ADE administrative team for their review. Training materials were developed and schedules outlined for Cycle 1 schools. In October 1996, technical assistance needs were identified and addressed to prepare each school for their team visits. Announced monitoring visits of the Cycle 1 schools began on October 28, 1996. In December 1996, the announced monitoring visits of the Cycle 1 schools were completed, and technical assistance needs were identified from school site visits. In January 1997, the ECOE monitoring section identified technical assistance needs of the Cycle 1 schools, and the data was reviewed when the draft February Semiannual Monitoring Report was presented to the Desegregation Litigation Oversight Subcommittee, the State Board of Education, and the parties. 37 VI. REMEDIATION (Continued) A. Through the Extended COE process, the needs for technical assistance by District, by School, and by desegregation compensatory education programs will be identified. (Continued) 2. Actual as of September 30, 2003 (Continued) In February 1997, field service specialists prepared for the peer team visits of the Cycle 1 schools. NCA accreditation reports were presented to the NCA Committee, and NCA reports were prepared for presentation at the April NCA meeting in Chicago. From March to May 1997, 111 visits were made to schools or central offices to work with principals, ECOE steering committees, and designated district personnel concerning school improvement planning. A workshop was conducted on Learning Styles for Geyer Springs Elementary School. A School Improvement Conference was held in Hot Springs on July 15-17, 1997. The conference included information on the process of continuous school improvement, results of the first five years of COE, connecting the mission with the school improvement plan, and improving academic performance. Technical assistance needs were evaluated for the FY 97 /98 school year in August 1997. From October 1997 to February 1998, technical reviews of the ECOE process were conducted by the field service representatives. Technical assistance was provided to the Districts through meetings with the ECOE steering committees, assistance in analyzing perceptual surveys, and by providing samples of school improvement plans, Gold File catalogs, and web site addresses to schools visited. Additional technical assistance was provided to the Districts through discussions with the ECOE committees and chairs about the process. In November 1997, technical reviews of the ECOE process were conducted by the field service representatives in conjunction with the announced monitoring visits. Workshops on brainstorming and consensus building and asking strategic questions were held in January and February 1998. In March 1998, the field service representatives conducted ECOE team visits and prepared materials for the NCA workshop. Technical assistance was provided in workshops on the ECOE process and team visits. In April 1998, technical assistance was provided on the ECOE process and academically distressed schools. In May 1998, technical assistance was provided on the ECOE process, and team visits were conducted. 38 VI. REMEDIATION (Continued) A. Through the Extended COE process, the needs for technical assistance by District, by School, and by desegregation compensatory education programs will be identified. (Continued) 2. Actual as of September 30, 2003 (Continued) In June 1998, the Extended COE Team Visit Reports were completed. A School Improvement Conference was held in Hot Springs on July 13-15, 1998. Major conference topics included information on the process of continuous school improvement, curriculum alignment, \"Smart Start,\" Distance Learning, using data to improve academic performance, educational technology, and multicultural education. All school districts in Arkansas were invited and representatives from Pulaski County attended. In September 1998, requests for technical assistance were received, visitation schedules were established, and assistance teams began visiting the Districts. Assistance was provided by telephone and on-site visits. The ADE provided inservice training on \"Using Data to Sharpen the Focus on Student Achievement\" at Gibbs Magnet Elementary school on October 5, 1998 at their request. The staff was taught how to increase test scores through data disaggregation, analysis, alignment, longitudinal achievement review, and use of individualized test data by student, teacher, class and content area. Information was also provided regarding the \"Smart Start\" and the \"Academic Distress\" initiatives. On October 20, 1998, ECOE technical assistance was provided to Southwest Jr. High School. B. Identify available resources for providing technical assistance for the specific condition, or circumstances of need, considering resources within ADE and the Districts, and also resources available from outside sources and experts. 1. Projected Ending Date Ongoing 2. Actual as of September 30, 2003 The information for this item is detailed under Section VI.F. of this report. C. Through the ERIC system, conduct a literature search for research evaluating compensatory education programs. 1. Projected Ending Date Ongoing 39 VI. REMEDIATION (Continued) C. Through the ERIC system, conduct a literature search for research evaluating compensatory education programs. (Continued) 2. Actual as of September 30, 2003 An updated ERIC Search was conducted on May 15, 1995 to locate research on evaluating compensatory education programs. The ADE received the updated ERIC disc that covered material through March 1995. An ERIC search was conducted in September 30, 1996 to identify current research dealing with the evaluation of compensatory education programs, and the articles were reviewed. An ERIC search was conducted in April 1997 to identify current research on compensatory education programs and sent to the Cycle 1 principals and the field service specialists for their use. An Eric search was conducted in October 1998 on the topic of Compensatory Education and related descriptors. The search included articles with publication dates from 1997 through July 1998. D. Identify and research technical resources available to ADE and the Districts through programs and organizations such as the Desegregation Assistance Center in San Antonio, Texas. 1. Projected Ending Date Summer 1994 2. Actual as of September 30, 2003 The information for this item is detailed under Section VI.F. of this report. E. Solicit, obtain, and use available resources for technical assistance. 1. Projected Ending Date Ongoing 2. Actual as of September 30, 2003 The information for this item is detailed under Section VI.F. of this report. 40 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. 1. Projected Ending Date Ongoing 2. Actual as of September 30, 2003 From March 1995 through July 1995, technical assistance and resources were obtained from the following sources: the Southwest Regional Cooperative\nUALR regarding training for monitors\nODM on a project management software\nADHE regarding data review and display\nand Phi Delta Kappa, the Desegregation Assistance Center and the Dawson Cooperative regarding perceptual surveys. Technical assistance was received on the Microsoft Project software in November 1995, and a draft of the PMT report using the new software package was presented to the ADE administrative team for review. In December 1995, a data manager was hired permanently to provide technical assistance with computer software and hardware. In October 1996, the field service specialists conducted workshops in the Districts to address their technical assistance needs and provided assistance for upcoming team visits. In November and December 1996, the field service specialists addressed technical assistance needs of the schools in the Districts as they were identified and continued to provide technical assistance for the upcoming team visits. In January 1997, a draft of the February 1997 Semiannual Monitoring Report was presented to the State Board of Education, the Desegregation Litigation Oversight Subcommittee, and the parties. The ECOE monitoring section of the report included information that identified technical assistance needs and resources available to the Cycle 1 schools. Technical assistance was provided during the January 29-31, 1997 Title I MidWinter Conference. The conference emphasized creating a learning community by building capacity schools to better serve all children and empowering parents to acquire additional skills and knowledge to better support the education of their children. In February 1997, three ADE employees attended the Southeast Regional Conference on Educating Black Children. Participants received training from national experts who outlined specific steps that promote and improve the education of black children. 41 VI. REMEDIATION (Continued) F. Evaluate the 'impact of the use of resources for technical assistance. (Continued) 2. Actual as of September 30, 2003 (Continued) On March 6-9, 1997, three members of the ADE's Technical Assistance Section attended the National Committee for School Desegregation Conference. The participants received training in strategies for Excellence and Equity: Empowerment and Training for the Future. Specific information was received regarding the current status of court-ordered desegregation, unitary status, and resegregation and distributed to the Districts and ADE personnel. The field service specialists attended workshops in March on ACT testing and school improvement to identify technical assistance resources available to the Districts and the ADE that will facilitate desegregation efforts. ADE personnel attended the Eighth Annual Conference on Middle Level Education in Arkansas presented by the Arkansas Association of Middle Level Education on April 6-8, 1997. The theme of the conference was Sailing Toward New Horizons. In May 1997, the field service specialists attended the NCA annual conference and an inservice session with Mutiu Fagbayi. An Implementation Oversight Committee member participated in the Consolidated COE Plan in service training. In June and July 1997, field service staff attended an SA T-9 testing workshop and participated in the three-day School Improvement Conference held in Hot Springs. The conference provided the Districts with information on the COE school improvement process, technical assistance on monitoring and assessing achievement, availability of technology for the classroom teacher, and teaching strategies for successful student achievement. In August 1997, field service personnel attended the ASCD Statewide Conference and the AAEA Administrators Conference. On August 18, 1997, the bi-monthly Team V meeting was held and presentations were made on the Early Literacy Learning in Arkansas (ELLA) program and the Schools of the 21st Century program. In September 1997, technical assistance was provided to the Cycle 2 principals on data collection for onsite and offsite monitoring. ADE personnel attended the Region VI Desegregation Conference in October 1997. Current desegregation and educational equity cases and unitary status issues were the primary focus of the conference. On October 14, 1997, the bi-monthly Team V meeting was held in Paragould to enable members to observe a 21st Century school and a school that incorporates traditional and multi-age classes in its curriculum . 42 VI. REM ED IA TION (Continued) F. Evaluate the impact of the use of resources for technical assista~ce. (Continued) 2. Actual as of September 30, 2003 (Continued) In November 1997, the field service representatives attended the Governor's Partnership Workshop to discuss how to tie the committee's activities with the ECOE process. In March 1998, the field service representatives attended a school improvement conference and conducted workshops on team building and ECOE team visits. Staff development seminars on Using Data to Sharpen the Focus on Student Achievement are scheduled for March 23, 1998 and March 27, 1998 for the Districts. In April 1998, the Districts participated in an ADE seminar to aid them in evaluating and improving student achievement. In August 1998, the Field Service Staff attended inservice to provide further assistance to schools, i.e., Title I Summer Planning Session, ADE session on Smart Start, and the School Improvement Workshops. All schools and districts in Pulaski County were invited to attend the \"Smart Start\" Summit November 9, 10, and 11 to learn more about strategies to increase student performance. \"Smart Start\" is a standards-driven educational initiative which emphasizes the articulation of clear standards for student achievement and accurate measures of progress against those standards through assessments, staff development and individual school accountability. The Smart Start Initiative focused on improving reading and mathematics achievement for all students in Grades K-4. Representatives from all three districts attended. On January 21 , 1998, the ADE provided staff development for the staff at Oak Grove Elementary School designed to assist them with their efforts to improve student achievement. Using achievement data from Oak Grove, educators reviewed trends in achievement data, identified areas of greatest need, and reviewed seven steps for improving student performance. On February 24, 1999, the ADE provided staff development for the administrative staff at Clinton Elementary School regarding analysis of achievement data. On February 15, 1999, staff development was rescheduled for Lawson Elementary School. The staff development program was designed to assist them with their efforts to improve student achievement using achievement data from Lawson, educators reviewed the components of the Arkansas Smart Initiative, trends in achievement data, identified areas of greatest need, and reviewed seven steps for improving student performance. Student Achievement Workshops were rescheduled for Southwest Jr. High in the Little Rock School District, and the Oak Grove Elementary School in the Pulaski County School District. 4 3 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of September 30, 2003 (Continued) On April 30, 1999, a Student Achievement Workshop was conducted for Oak Grove Elementary School in PCSSD. The Student Achievement Workshop for Southwest Jr. High in LRSD has been rescheduled. On June 8, 1999, a workshop was presented to representatives from each of the Arkansas Education Service Cooperatives and representatives from each of the three districts in Pulaski County. The workshop detailed the Arkansas Comprehensive Testing, Assessment and Accountability Program (ACTAAP). On June 18, 1999, a workshop was presented to administrators of the NLRSD. The workshop detailed the Arkansas Comprehensive Testing, Assessment and Accountability Program (ACTAAP). On August 16, 1999, professional development on ways to increase student achievement and the components of the new ACT AAP program was presented during the preschool staff development activities for teaching assistant in the LRSD. On August 20, 1999, professional development on ways to increase student achievement and the components of the new ACT AAP program was presented during the preschool staff development activities for the Accelerated Learning Center in the LRSD. On September 13, 1999, professional development on ways to increase student achievement and the components of the new ACTAAP program were presented to the staff at Booker T. Washington Magnet Elementary School. On September 27, 1999, professional development on ways to increase student achievement was presented to the Middle and High School staffs of the NLRSD. The workshop also covered the components of the new ACT AAP program, and ACT 999 of 1999. On October 26, 1999, professional development on ways to increase student achievement was presented to LRSD personnel through a staff development training class. The workshop also covered the components of the new ACTAAP program, and ACT 999 of 1999. On December 7, 1999, professional development on ways to increase student achievement was scheduled for Southwest Middle School in the LRSD. The workshop was also set to cover the components of the new ACTAAP program, and ACT 999 of 1999. However, Southwest Middle School administrators had a need to reschedule, therefore the workshop will be rescheduled. 44 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of September 30, 2003 (Continued) On January 10, 2000, professional development on ways to increase student achievement was conducted for both Dr. Martin Luther King Magnet Elementary School \u0026amp; Little Rock Central High School. The workshops also covered the components of the new ACTAAP program, and ACT 999 of 1999. On March 1, 2000, professional development on ways to increase student achievement was conducted for all principals and district level administrators in the PCSSD. The workshop also covered the components of the new ACTAAP program, and ACT 999 of 1999. On April 12, 2000, professional development on ways to increase student achievement was conducted for the LRSD. The workshop also covered the components of the new ACTAAP program, and ACT 999 of 1999. Targeted staffs from the middle and junior high schools in the three districts in Pulaski County attended the Smart Step Summit on May 1 and May 2. Training was provided regarding the overview of the \"Smart Step\" initiative, \"Standard and Accountability in Action ,\" and \"Creating Learning Environments Through Leadership Teams.\" The ADE provided training on the development of alternative assessment September 12-13, 2000. Information was provided regarding the assessment of Special Education and LEP students. Representatives from each district were provided the opportunity to select a team of educators from each school within the district to participate in professional development regarding Integrating Curriculum and Assessment K-12. The professional development activity was directed by the national consultant, Dr. Heidi Hays Jacobs, on September 14 and 15, 2000. The ADE provided professional development workshops from October 2 through October 13, 2000 regarding , \"The Write Stuff: Curriculum Frameworks, Content Standards and Item Development.\" Experts from the Data Recognition Corporation provided the training. Representatives from each district were provided the opportunity to select a team of educators from each school within the district to participate. The ADE provided training on Alternative Assessment Portfolio Systems by video conference for Special Education and LEP Teachers on November 17, 2000. Also, Alternative Assessment Portfolio System Training was provided for testing coordinators through teleconference broadcast on November 27, 2000. 45 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of September 30, 2003 (Continued) On December 12, 2000, the ADE provided training for Test Coordinators on end of course assessments in Geometry and Algebra I Pilot examination. Experts from the Data Recognition Corporation conducted the professional development at the Arkansas Teacher Retirement Building. The ADE presented a one-day training session with Dr. Cecil Reynolds on the Behavior Assessment for Children (BASC). This took place on December 7, 2000 at the NLRSD Administrative Annex. Dr. Reynolds is a practicing clinical psychologist. He is also a professor at Texas A \u0026amp; M University and a nationally known author. In the training, Dr. Reynolds addressed the following: 1) how to use and interpret information obtained on the direct observation form, 2) how to use this information for programming, 3) when to use the BASC, 4) when to refer for more or additional testing or evaluation, 5) who should complete the forms and when, (i.e., parents, teachers, students), 6) how to correctly interpret scores. This training was intended to especially benefit School Psychology Specialists, psychologists, psychological examiners, educational examiners and counselors. During January 22-26, 2001 the ADE presented the ACTAAP Intermediate (Grade 6) Benchmark Professional Development Workshop on Item Writing. Experts from the Data Recognition Corporation provided the training. Representatives from each district were invited to attend. On January 12, 2001 the ADE presented test administrators training for mid-year End of Course (Pilot) Algebra I and Geometry exams. This was provided for schools with block scheduling. On January 13, 2001 the ADE presented SmartScience Lessons and worked with teachers to produce curriculum. This was shared with eight Master Teachers. The SmartScience Lessons were developed by the Arkansas Science Teachers Association in conjunction with the Wilbur Mills Educational Cooperative under an Eisenhower grant provided by the ADE. The purpose of SmartScience is to provide K-6 teachers with activity-oriented science lessons that incorporate reading, writing, and mathematics skills. The following training has been provided for educators in the three districts in Pulaski County by the Division of Special Education at the ADE since January 2000: On January 6, 2000, training was conducted for the Shannon Hills Pre-school Program, entitled \"Things you can do at home to support your child's learning.\" This was presented by Don Boyd - ASERC and Shelley Weir. The school's director and seven parents attended. 46 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of September 30, 2003 (Continued) On March 8, 2000, training was conducted for the Southwest Middle School in Little Rock, on ADD. Six people attended the training. There was follow-up training on Learning and Reading Styles on March 26. This was presented by Don Boyd - ASERC and Shelley Weir. On September 7, 2000, Autism and Classroom Accommodations for the LRSD at Chicot Elementary School was presented. Bryan Ayres and Shelley Weir were presenters. The participants were: Karen Sabo, Kindergarten Teacher\nMelissa Gleason, Paraprofessional\nCurtis Mayfield, P.E. Teacher\nLisa Poteet, Speech Language Pathologist\nJane Harkey, Principal\nKathy Penn-Norman, Special Education Coordinator\nAlice Phillips, Occupational Therapist. On September 15, 2000, the Governor's Developmental Disability Coalition Conference presented Assistive Technology Devices \u0026amp; Services. This was held at the Arlington Hotel in Hot Springs. Bryan Ayres was the presenter. On September 19, 2000, Autism and Classroom Accommodations for the LRSD at Jefferson Elementary School was presented. Bryan Ayres and Shelley Weir were presenters. The participants were: Melissa Chaney, Special Education Teacher\nBarbara Barnes, Special Education Coordinator\na Principal, a Counselor, a Librarian, and a Paraprofessional. On October 6, 2000, Integrating Assistive Technology Into Curriculum was presented at a conference in the Hot Springs Convention Center. Presenters were: Bryan Ayers and Aleecia Starkey. Speech Language Pathologists from LRSD and NLRSD attended. On October 24, 2000, Consideration and Assessment of Assistive Technology was presented through Compressed Video-Teleconference at the ADE facility in West Little Rock. Bryan Ayres was the presenter. On October 25 and 26, 2000, Alternate Assessment for Students with Severe Disabilities for the LRSD at J. A. Fair High School was presented. Bryan Ayres was the presenter. The participants were: Susan Chapman, Special Education Coordinator\nMary Steele, Special Education Teacher\nDenise Nesbit, Speech Language Pathologist\nand three Paraprofessionals. On November 14, 2000, Consideration and Assessment of Assistive Technology was presented through Compressed Video-Teleconference at the ADE facility in West Little Rock. Bryan Ayres was the presenter. On November 17, 2000, training was conducted on Autism for the LRSD at the Instructional Resource Center. Bryan Ayres and Shelley Weir were presenters. 47 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of September 30, 2003 (Continued) On December 5, 2000, Access to the Curriculum Via the use of Assistive Technology Computer Lab was presented. Bryan Ayres was the presenter of this teleconference. The participants were: Tim Fisk, Speech Language Pathologist from Arch Ford Education Service Cooperative at Plumerville and Patsy Lewis, Special Education Teacher from Mabelvale Middle School in the LRSD. On January 9, 2001 , Consideration and Assessment of Assistive Technology was presented through Compressed Video-Teleconference at the ADE facility in West Little Rock. Bryan Ayres was the presenter. Kathy Brown, a vision consultant from the LRSD, was a participant. On January 23, 2001 , Autism and Classroom Modifications for the LRSD at Brady Elementary School was presented. Bryan Ayres and Shelley Weir were presenters. The participants were: Beverly Cook, Special Education Teacher\nAmy Littrell, Speech Language Pathologist\nJan Feurig, Occupational Therapist\nCarolyn James, Paraprofessional\nCindy Kackly, Paraprofessional\nand Rita Deloney, Paraprofessional. The ADE provided training on Alternative Assessment Portfolio Systems for Special Education and Limited English Proficient students through teleconference broadcast on February 5, 2001 . Presenters were: Charlotte Marvel, ADE\nDr. Gayle Potter, ADE\nMarcia Harding, ADE\nLynn Springfield, ASERC\nMary Steele, J. A. Fair High School, LRSD\nBryan Ayres, Easter Seals Outreach. This was provided for Special Education teachers and supervisors in the morning, and Limited English Proficient teachers and supervisors in the afternoon. The Special Education session was attended by 29 teachers/administrators and provided answers to specific questions about the alternate assessment portfolio system and the scoring rubric and points on the rubric to be used to score the portfolios. The LEP session was attended by 16 teachers/administrators and disseminated the common tasks to be included in the portfolios: one each in mathematics, writing and reading. On February 12-23, 2001, the ADE and Data Recognition Corporation personnel trained Test Coordinators in the administration of the spring Criterion-Referenced Test. This was provided in 20 sessions at 10 regional sites. Testing protocol, released items, and other testing materials were presented and discussed. The sessions provided training for Primary, Intermediate, and Middle Level Benchmark Exams as well as End of Course Literacy, Algebra and Geometry Pilot Tests. The LRSD had 2 in attendance for the End of Course session and 2 for the Benchmark session. The NLRSD had 1 in attendance for the End of Course session and 1 for the Benchmark session. The PCSSD had 1 in attendance for the End of Course session and 1 for the Benchmark session. 48 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of September 30, 2003 (Continued) On March 15, 2001, there was a meeting at the ADE to plan professional development for staff who work with Limited English Proficiency (LEP) students. A $30,000 grant has been created to provide LEP training at Chicot Elementary for a year, starting in April 2001 . A $40,000 grant was created to provide a Summer English as Second Language (ESL) Academy for the LRSD from June 18 through 29, 2001. Andre Guerrero from the ADE Accountability section met with Karen Broadnax, ESL Coordinator at LRSD, Pat Price, Early Childhood Curriculum Supervisor at LRSD, and Jane Harkey, Principal of Chicot Elementary. On March 1-2 and 8-29, 2001, ADE staff performed the following activities: processed registration for April 2 and 3 Alternate Portfolio Assessment video conference quarterly meeting\nanswered questions about Individualized Educational Plan (IEP) and LEP Alternate Portfolio Assessment by phone from schools and Education Service Cooperatives\nand signed up students for alternate portfolio assessment from school districts. On March 6, 2001, ADE staff attended a Smart Step Technology Leadership Conference at the State House Convention Center. On March 7, 2001, ADE staff attended a National Assessment of Educational Progress (NAEP) Regional Math Framework Meeting about the Consensus Project 2004. On March 8, 2001, there was a one-on-one conference with Carole Villarreal from Pulaski County at the ADE about the LEP students with portfolios. She was given pertinent data, including all the materials that have been given out at the video conferences. The conference lasted for at least an hour. On March 14, 2001, a Test Administrator's Training Session was presented specifically to LRSD Test Coordinators and Principals. About 60 LRSD personnel attended. The following meetings have been conducted with educators in the three districts in Pulaski County since July 2000. On July 10-13, 2000 the ADE provided Smart Step training. The sessions covered Standards-based classroom practices. 49 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of September 30, 2003 (Continued) On July 19-21, 2000 the ADE held the Math/Science Leadership Conference at UCA. This provided services for Arkansas math and science teachers to support systemic reform in math/science and training for 8th grade Benchmark. There were 200 teachers from across the state in attendance. On August 14-31 , 2000 the ADE presented Science Smart Start Lessons and worked with teachers to produce curriculum. This will provide K-6 teachers with activity-oriented science lessons that incorporate reading, writing, and mathematics skills. On September 5, 2000 the ADE held an Eisenhower Informational meeting with Teacher Center Coordinators. The purpose of the Eisenhower Professional Development Program is to prepare teachers, school staff, and administrators to help all students meet challenging standards in the core academic subjects. A summary of the program was presented at the meeting. On November 2-3, 2000 the ADE held the Arkansas Conference on Teaching. This presented curriculum and activity workshops. More than 1200 attended the conference. On November 6, 2000 there was a review of Science Benchmarks and sample model curriculum. A committee of 6 reviewed and revised a drafted document. The committee was made up of ADE and K-8 teachers. On November 7-10, 2000 the ADE held a meeting of the Benchmark and End of Course Mathematics Content Area Committee. Classroom teachers reviewed items for grades 4, 6, 8 and EOC mathematics assessment. There were 60 participants. On December 4-8, 2000 the ADE conducted grades 4 and 8 Benchmark Scoring for Writing Assessment. This professional development was attended by approximately 750 teachers. On December 8, 2000 the ADE conducted Rubric development for Special Education Portfolio scoring. This was a meeting with special education supervisors to revise rubric and plan for scoring in June. On December 8, 2000 the ADE presented the Transition Mathematics Pilot Training Workshop. This provided follow-up training and activities for fourth-year mathematics professional development. On December 12, 2000 the ADE presented test administrators training for midyear End of Course (Pilot) Algebra I and Geometry exams. This was provided for schools with block scheduling. 50 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of September 30, 2003 (Continued) The ADE provided training on Alternative Assessment Portfolio Systems for Special Education and Limited English Proficient students through teleconference broadcasts on April 2-3, 2001 . Administration of the Primary, Intermediate, and Middle Level Benchmark Exams as well as End of Course Literacy took place on April 23-27, 2001 . Administration of the End of Course Algebra and Geometry Exams took place on May 2-3, 2001 . Over 1,100 Arkansas educators attended the Smart Step Growing Smarter Conference on July 10 and 11 , 2001 , at the Little Rock Statehouse Convention Center. Smart Step focuses on improving student achievement for Grades 5-8. The Smart Step effort seeks to provide intense professional development for teachers and administrators at the middle school level, as well as additional materials and assistance to the state's middle school teachers. The event began with opening remarks by Ray Simon, Director of the ADE. Carl Boyd, a longtime educator and staff consultant for Learning 24-7, presented the first keynote address on \"The Character-Centered Teacher''. Debra Pickering, an education consultant from Denver, Colorado, presented the second keynote address on \"Characteristics of Middle Level Education\". Throughout the Smart Step conference, educators attended breakout sessions that were grade-specific and curriculum area-specific. Pat Davenport, an education consultant from Houston, Texas, delivered two addresses. She spoke on \"A Blueprint for Raising Student Achievement\". Representatives from all three districts in Pulaski County attended. Over 1,200 Arkansas teachers and administrators attended the Smart Start Conference on July 12, 2001 , at the Little Rock Statehouse Convention Center. Smart Start is a standards-driven educational initiative which emphasizes the articulation of clear standards for student achievement and accurate measures of progress against those standards through assessments, staff development and individual school accountability. The Smart Start Initiative focused on improving reading and mathematics achievement for all students in Grades K-4. The event began with opening remarks by Ray Simon, Director of the ADE. Carl Boyd, a longtime educator and staff consultant for Learning 24-7, presented the keynote address. The day featured a series of 15 breakout sessions on best classroom practices. Representatives from all three districts in Pulaski County attended. On July 18-20, 2001 , the ADE held the Math/Science Leadership Conference at UCA. This provided services for Arkansas math and science teachers to support systemic reform in math/science and training for 8th grade Benchmark. There were approximately 300 teachers from across the state in attendance. 51 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of September 30, 2003 (Continued) The ADE and Harcourt Educational Measurement conducted Stanford 9 test administrator training from August 1-9, 2001 . The training was held at Little Rock, Jonesboro, Fort Smith, Forrest City, Springdale, Mountain Home, Prescott, and Monticello. Another session was held at the ADE on August 30, for those who were unable to attend August 1-9. The ADE conducted the Smart Start quarterly meeting by video conference at the Education Service Cooperatives and at the ADE from 9:00 a.m. until 11 :30 a.m. on September 5, 2001 . The ADE released the performance of all schools on the Primary and Middle Level Benchmark Exams on September 5, 2001 . The ADE conducted Transition Core Teacher In-Service training for Central in the LRSD on September 6, 2001 . The ADE conducted Transition Checklist training for Hall in the LRSD on September 7, 2001. The ADE conducted Transition Checklist training for McClellan in the LRSD on September 13, 2001 . The ADE conducted Basic Co-teaching training for the LRSD on October 9, 2001 . The ADE conducted training on autism spectrum disorder for the PCSSD on October 15, 2001 . Professional Development workshops (1 day in length) in scoring End of Course assessments in algebra, geometry and reading were provided for all districts in the state. Each school was invited to send three representatives (one for each of the sessions). LRSD, NLRSD, and PCSSD participated. Information and training materials pertaining to the Alternate Portfolio Assessment were provided to all districts in the state and were supplied as requested to LRSD, PCSSD and David 0 . Dodd Elementary. On November 1-2, 2001 the ADE held the Arkansas Conference on Teaching at the Excelsior Hotel \u0026amp; Statehouse Convention Center. This presented sessions, workshops and short courses to promote exceptional teaching and learning. Educators could become involved in integrated math , science, English \u0026amp; language arts and social studies learning. The ADE received from the schools selected to participate in the National Assessment of Educational Progress (NAEP), a list of students who will take the test. 52 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of September 30, 2003 (Continued) On December 3-7, 2001 the ADE conducted grade 6 Benchmark scoring training for reading and math. Each school district was invited to send a math and a reading specialist. The training was held at the Holiday Inn Airport in Little Rock. On December 4 and 6, 2001 the ADE conducted Mid-Year Test Administrator Training for Algebra and Geometry. This was held at the Arkansas Activities Association's conference room in North Little Rock. On January 24, 2002, the ADE conducted the Smart Start quarterly meeting by ADE compressed video with Fred Jones presenting. On January 31 , 2002, the ADE conducted the Smart Step quarterly meeting by NSCI satellite with Fred Jones presenting. On February 7, 2002, the ADE Smart Step co-sponsored the AR Association of Middle Level Principal's/ADE curriculum, assessment and instruction workshop with Bena Kallick presenting. On February 11-21 , 2002, the ADE provided training for Test Administrators on the Primary, Intermediate, and Middle Level Benchmark Exams as well as End of Course Literacy, Algebra and Geometry Exams. The sessions took place at Forrest City, Jonesboro, Mountain Home, Springdale, Fort Smith, Monticello, Prescott, Arkadelphia and Little Rock. A make-up training broadcast was given at 15 Educational Cooperative Video sites on February 22. During February 2002, the LRSD had two attendees for the Benchmark Exam training and one attendee for the End of Course Exam training. The N LRSD and PCSSD each had one attendee at the Benchmark Exam training and one attendee for the End of Course Exam training. The ADE conducted the Smart Start quarterly meeting by compressed interactive video at the South Central Education Service Cooperative from 9:30 a.m. until 11 :30 a.m. on May 2, 2002. Telecast topics included creating a standards-based classroom and a seven-step implementation plan. The principal's role in the process was explained. The ADE conducted the Smart Step quarterly meeting by compressed interactive video at the South Central Education Service Cooperative from 9:30 a.m. until 11 :30 a.m. on May 9, 2002. Telecast topics included creating a standards-based classroom and a seven-step implementation plan. The principal's role in the process was explained. 53 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of September 30, 2003 (Continued) The Twenty-First Annual Curriculum and Instruction Conference, cosponsored by the Arkansas Association for Supervision and Curriculum Development and the Arkansas Department of Education, will be held June 24-26, 2002, at the Arlington Hotel in Hot Springs, Arkansas. \"Ignite Your Enthusiasm for Learning\" is the theme for this year's conference, which will feature educational consultant, Dr. Debbie Silver, as well as other very knowledgeable presenters. Additionally, there will be small group sessions on Curriculum Alignment, North Central Accreditation, Section 504, Building Level Assessment, Administrator Standards, Data Disaggregation, and National Board. The Educational Accountability Unit of the ADE hosted a workshop entitled \"Strategies for Increasing Achievement on the ACTAAP Benchmark Examination\" on June 13-14, 2002 at the Agora Center in Conway. The workshop was presented for schools in which 100% of students scored below the proficient level on one or more parts of the most recent Benchmark Examination. The agenda included presentations on \"The Plan-Do-Check-Act Instructional Cycle\" by the nationally known speaker Pat Davenport. ADE personnel provided an explanation of the MPH point program. Presentations were made by Math and Literacy Specialists. Dr. Charity Smith, Assistant Director for Accountability, gave a presentation about ACTAAP. Break out sessions were held, in which school districts with high scores on the MPH point program offered strategies and insights into increasing student achievement. The NLRSD, LRSD, and PCSSD were invited to attend. The NLRSD attended the workshop. The Smart Start Summer Conference took place on July 8-9, 2002, at the Little Rock Statehouse Convention Center and Peabody Hotel. The Smart Start Initiative focuses on improving reading and mathematics achievement for all students in Grades K-4. The event included remarks by Ray Simon, Director of the ADE. After comments by the Director, Bena Kallick presented the keynote address \"Beyond Mapping: Essential Questions, Assessment, Higher Order Thinking\". This was followed by a series of breakout sessions on best classroom practices. On the second day, Vivian Moore gave the keynote address \"Overcoming Obstacles: Avenues for Student Success\". Krista Underwood gave the presentation \"Put Reading First in Arkansas\". This was followed by a series of breakout sessions on best classroom practices. 54 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for techn ical assistance. (Continued) 2. Actual as of September 30, 2003 (Continued) The Smart Step Summer Conference took place on July 10-11 , 2002, at the Little Rock Statehouse Convention Center and Peabody Hotel. Smart Step focuses on improving student achievement for Grades 5-8. The event included remarks by Ray Simon, Director of the ADE. After comments by the Director, Vivian Moore presented the keynote address \"Overcoming Obstacles: Avenues for Student Success\". This was followed by a series of breakout sessions on best classroom practices. On the second day, Bena Kallick presented \"Beyond Mapping: Essential Questions, Assessment, Higher Order Thinking\". Ken Stamatis presented \"Smart Steps to Creating a School Culture That Supports Adolescent Comprehension\". This was followed by a series of breakout sessions on best classroom practices. On August 8, 2002, Steven Weber held a workshop at Booker T. Washington Elementary on \"Best Practices in Social Studies\". It was presented to the 4th grade teachers in the Little Rock School District. The workshop focused around the five themes of geography and the social studies (fourth grade) framework/standards. Several Internet web sites were shared with the teachers, and the teachers were shown methods for incorporating writing into fourth grade social studies. One of the topics was using primary source photos and technology to stimulate the students to write about diverse regions. A theme of the workshop included identifying web sites which apply to fourth grade social studies teachers and interactive web sites for fourth grade students. This was a Back-to-School In-service workshop. The teachers were actively involved in the workshop. On August 13 Steven Weber conducted a workshop at Parkview High School in the LRSD. Topics of the workshop included: 1. Incorporating Writing in the Social Studies Classroom 2. Document Based (open-ended) Questioning Techniques 3. How to practice writing on a weekly basis without assigning a lengthy research report 4. Developing Higher Level Thinking Skills in order to produce active citizens, rather than passive, uninformed citizens 5. Using the Social Studies Framework 6. Identifying state and national Web Sites which contain Primary Sources for use in the classroom The 8:30 - 11 :30 session was for the 6 - 8 grade social studies teachers. The 12:30 - 3:00 session was for the 9 - 12 grade social studies teachers. Several handouts were used, also PowerPoint, primary source photos and documents, and Internet web sites (i.e ., Library of Congress, Butler Center for Arkansas Studies, National Archives, etc.). This was a Back-to-School In-service workshop. The teachers were actively involved in the workshop. Marie McNeal is the Social Studies Specialist for the Little Rock School District. She invited Steven Weber to present at the workshop, and was in attendance. 55 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of September 30, 2003 (Continued) On September 30 through October 11 , 2002, the ADE provided Professional Development for Test Administrators on the End of Course Literacy, Algebra and Geometry Exams. The training was held at the Holiday Inn Airport. All three districts in Pulaski County sent representatives to the training . On October 3, 2002, Charlotte Marvel provided in-service training for LEP teachers in the Little Rock School District. On December 6, 2002, the Community and Parent Empowerment Summit was held for parents of children attending the LRSD. It took place at the Saint Mark Baptist Church in Little Rock. Dr. Charity Smith, Assistant Director for Accountability, presented information on No Child Left Behind, Supplemental Services, after school tutoring, how parents can help, and the Refrigerator Curriculum. Mr. Reginald Wilson, Senior Coordinator for Accountability, presented information on ACTAAP, including how to find information on the AS-IS Website and what is included in the school report cards. Donna Elam spoke on the topic \"From the School House to the Jail House\". On December 10 - 12, 2002, the Math Workshop \"Investigations in Number, Data and Space\" was held at the Clinton Elementary Magnet School in Sherwood. Training for Kindergarten and First Grade Teachers was held on December 10, and included Making Shapes and Building Blocks, Quilts, Squares and Block Towns. Training for Second and Third Grade Teachers was held on December 11 , and included Shapes, Halves, Symmetry and Turtle Paths. Training for Fourth and Fifth Grade Teachers was held on December 12. Fourth grade covered Seeing Solids and Silhouettes. Fifth Grade was about Containers and Cubes. The sessions provided quality time for teachers to discuss the curriculum, reflect on implications, provide mutual support, and continue planning. The ADE provided professional development for all school districts on Alternative Assessment Portfolio Systems on January 7-9, 2003 at the Holiday Inn Airport. The LRSD had two in attendance, NLRSD had one in attendance, and the PCSSD had two in attendance. The ADE conducted the Smart Start Statewide Professional Staff Development Video Conference at the ADE/AETN Studio and at participating Education Service Cooperatives from 9:30 a.m. until 11 :30 a.m. on February 12, 2003. The ADE conducted the Smart Step Statewide Professional Staff Development Video Conference at the ADE/AETN Studio and at participating Education Service Cooperatives from 9:30 a.m. until 11 :30 a.m. on February 13, 2003. 56 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of September 30, 2003 (Continued) Test Coordinator training was provided throughout the state during the weeks starting February 10 and February 17, 2003. The training in Little Rock was February 20, 2003. The Little Rock School District had two attendees for the Benchmark, End of Course, and Stanford 9 training. The North Little Rock School District had one attendee at the Benchmark, End of Course, and Stanford 9 training. The Pulaski County Special School District had one attendee at the Benchmark, End of Course, and Stanford 9 training. Two sixth grade teachers from each district attended the Professional Development for Benchmark assessments during the week of February 17, 2003 at the Holiday Inn Airport. Two fourth and two eighth grade teachers from each district attended the Professional Development for Benchmark assessments during the week of March 3, 2003 at the Holiday Inn Airport. The ADE announces the opportunity for schools to participate in the Arkansas Literacy Coaching Model and to train a school employee to serve as a full-time literacy coach. Training will be held at the Early Literacy Training Center at UALR. A literacy coach is a site-based employee who works full time with the school staff providing professional development, technical assistance, and support to teachers. They demonstrate exemplary classroom literacy practices, observe and coach teachers, provide sustained mentoring to classroom teachers, plan and conduct professional literacy team meetings, provide workshops on the literacy framework, and maintain data on student performance. Depending on the number of qualifying school districts who agree to participate, training expenses will be funded by the ADE through the Early Literacy Training Center at UALR. Grant funds will provide graduate level training, lodging and travel expenses, and materials to establish a model classroom. The Smart Summer Conference took place on July 14-17, 2003, at the Little Rock Statehouse Convention Center and Peabody Hotel. The event covered Smart Start and Smart Step. The following topics were included: Lisa Carter - Instructional Alignment John Antonetti - Assessment Literacy for Literacy(and Numeracy) Assessment Jim Garver - Authentic Student Engagement Evelyn Arroyo - High Yield Strategies in Action Barbara Brown - Focusing in on the Benchmarks Dana Chadwick \u0026amp; Lynn Nash - Teaching From the Heart Tommy Tyler \u0026amp; Monticello Team - Actions, Changes, and Results. 57 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of September 30, 2003 (Continued) The ADE did workshops on the No Child Left Behind legislation for the following groups from the LRSD: August 11, 2003 - Horace Mann Midd\nThis project was supported in part by a Digitizing Hidden Special Collections and Archives project grant from The Andrew W. Mellon Foundation and Council on Library and Information Resoources.\n   \n\n   \n\n  \n\n\n   \n\n  \n\n \n\n\n   \n\n   \n\n \n\n\n   \n\n  \n\n \n\n\u003cdcterms_creator\u003eArkansas. Department of Education\u003c/dcterms_creator\u003e\n   \n\n \n\n  \n\n\n   \n\n \n\n  \n\n\n\n   \n\n  \n\n  \n\n\n\n\n   \n\n   \n\n  \n\n \n\n \n\n\n   \n\n  \n\n \n\n\n\n\n\n\n\n\n   \n\n \n\n\n\n  \n\n\n   \n\n\n\n  \n\n\n\n "},{"id":"bcas_bcmss0837_1752","title":"Includes motions and responses regarding Pulaski County Special School District's (PCSSD)'s motion for an award of attorneys' fees and temporary portable buildings at Robinson High School, Sylvan Hills band room, Arkansas Department of Education (ADE) project management tool.","collection_id":"bcas_bcmss0837","collection_title":"Office of Desegregation Management","dcterms_contributor":null,"dcterms_spatial":["United States, 39.76, -98.5","United States, Arkansas, 34.75037, -92.50044","United States, Arkansas, Pulaski County, 34.76993, -92.3118","United States, Arkansas, Pulaski County, Little Rock, 34.74648, -92.28959"],"dcterms_creator":["United States. District Court (Arkansas: Eastern District)"],"dc_date":["2003-09"],"dcterms_description":null,"dc_format":["application/pdf"],"dcterms_identifier":null,"dcterms_language":["eng"],"dcterms_publisher":["Little Rock, Ark. : Butler Center for Arkansas Studies. Central Arkansas Library System"],"dc_relation":null,"dc_right":["http://rightsstatements.org/vocab/InC-EDU/1.0/"],"dcterms_is_part_of":["Office of Desegregation Monitoring records (BC.MSS.08.37)","History of Segregation and Integration of Arkansas's Educational System"],"dcterms_subject":["Little Rock (Ark.)--History--21st Century","Education--Arkansas","School districts","Pulaski County Special School District","Sylvan Hills High School (Little Rock, Ark.)","Arkansas. Department of Education","Project management","School enrollment","African Americans--Education"],"dcterms_title":["Includes motions and responses regarding Pulaski County Special School District's (PCSSD)'s motion for an award of attorneys' fees and temporary portable buildings at Robinson High School, Sylvan Hills band room, Arkansas Department of Education (ADE) project management tool."],"dcterms_type":["Text"],"dcterms_provenance":["Butler Center for Arkansas Studies"],"edm_is_shown_by":null,"edm_is_shown_at":["http://arstudies.contentdm.oclc.org/cdm/ref/collection/bcmss0837/id/1752"],"dcterms_temporal":null,"dcterms_rights_holder":null,"dcterms_bibliographic_citation":null,"dlg_local_right":["Available for use in research, teaching, and private study. Any other use requires permission from the Butler Center."],"dcterms_medium":["filing"],"dcterms_extent":["108 pages"],"dlg_subject_personal":null,"dcterms_subject_fast":null,"fulltext":"\u003c?xml version=\"1.0\" encoding=\"utf-8\"?\u003e\n\u003citems type=\"array\"\u003e  \u003citem\u003e   \n\n   \n\n   \n\n\n   \n\n   \n\n\n   \n\n\n   \n\n   \n\n\n   \n\n   \n\n\n   \n\n   \n\n\n\n\n\n\n\n\n\n   \n\n \n\n \n\n \n\n\n   \n\n   \n\n   \n\n\n   \n\n  \n\n   \n\n\n   \n\n  \n\n   \n\n\n   \n\n \n\n\u003cdcterms_description type=\"array\"\u003e   \n\n\u003cdcterms_description\u003eDistrict Court, order; District Court, motion of the Pulaski County Special School District (PCSSD) for an award of attorneys' fees; District Court, notice of appeal; District Court, motion for extension of time to respond to Pulaski County Special School District's (PCSSD's) motion for an award of its attorneys' fees; District Court, order; District Court, Pulaski County Special School District (PCSSD) motion for temporary portable buildings at Robinson High School; District Court, renewed and supplemental motion regarding Sylvan Hills band room; District Court, amended and supplemental motion regarding Sylvan Hills band room; District Court, notice of filing, Arkansas Department of Education (ADE) project management tool    This transcript was create using Optical Character Recognition (OCR) and may contain some errors.    FILED U.S. DISTRICT COURT EASTERN DISTRICT ARKANSAS IN THE UNITED STATES DISTRICT COURT SEP - 2 2003 EASTERN DISTRICT OF ARKANSAS LITTLE ROCK DIVISION JAMES W. McCORMACK CLEF By: I LITTLE ROCK SCHOOL DISTRICT v. No. 4:82CV00866 WRW PULASKI COUNTY SPECIAL SCHOOL DISTRICT NO. 1, ET AL. MRS. LORENE JOSHUA, ET AL. KATHERINE KNIGHT, ET AL. GREG BOLLEN, JAMES BOLDEN, MARTHA WHATLEY AND SUE ANN WHISKER ORDER PLAINTIFF DEFENDANTS INTERVENORS INTERVENORS INTERVENORS Pending is PCCSD's Motion for Enlargement of Time to File Fee Petition (Doc. No. 3797). On August 19, 2003, an order was emered granting the PCSSD's Motion to Enforce Settlement Agreement and for Allied Relief \"Bollen\" Intervenors appealed this judgment and requested a stay from the Eighth Circuit Court of Appeals. The Court of Appeals has yet to address this matter on appeal. According to this Court's Local Rule 54.1 and Rule 54 of the Arkansas Rules of Civil Procedure a party has fourteen (14) days following the entry of judgment. However, PCCSD requests a stay for its motion for attorney's fees and costs until twenty (20) days after the Court of Appeals issues its ruling. Because no party has objected to the motion, the requested extension is GRANTED. OEP CLE, IN THE UNITED STATES DISTRICT COURT EASTERN DISTRICT OF ARKANSAS WESTERN DIVISION LITTLE ROCK SCHOOL DISTRICT V. NO. 4:82CV00866WRW PULASKI COUNTY SPECIAL SCHOOL DISTRICT NO. 1, ET AL. MRS. LORENE JOSHUA, ET AL. KATHERINE KNIGHT, ET AL. RECEIVED SEP 1 5 2003 OFACEOF DESEGREGATION MONITORING PLAINTIFF DEFENDANTS INTERVENORS INTERVENORS MOTION OF THE PULASKI COUNTY SPECIAL SCHOOL DISTRICT FOR AN AWARD OF ATTORNEYS' FEES The PCSSD for its motion, states: ',   1. Ori August 18, 2003, at the conclusion of a hearing on the \"detachment issue, this Court announced its ruling that, inter alia, the State Board of Education's authorization of an election on the issue of detachment of the Greater Jacksonville area from the PCSSD violated the 1989 Settlement Agreement. A written order was entered that day and a corrected order was entered on August 19, 2003 . 2. A motion to stay said order was heard on August 20, 2003, and denied. 3. This Court has previously and exhaustively analyzed the entitlement of the PCSSD to an award of attorneys' fees for successfully enforcing the Settlement Agreement. (Please see Order dated January 30, 1998, at page 2). Counsel's regular hourly rates are to be utilized as the \"lodestar\" for determining the award even though the PCSSD received the legal services at discounted hourly rates. Id. at page 4. 4. Exhibit A to the accompanying affidavit sets forth in narrative fashion those legal services for which a fee award is sought. The narrative includes a modest amount of 446311 -v1 time devoted toward evaluating the initial legislation, monitoring its progress through legislative committees and testifying against the passage of the legislation. The narrative also includes a small amount of time devoted to objecting to the legislation once it was passed as required by Section ill D of the 1989 Settlement Agreement. 5. The remainder of the narrative commences on May 16, 2003, when the petition . proposing detachment was filed with the Arkansas State Board .of Education. The ensuing legal activities track tire development of the PCSSD's position before the State Board of Education and the two hearings before the State Board as well as the efforts of the PCSSD to identify, research and develop the legal issues which the passage of the legislation and the filing of the detachment petition generated. 6. Beginning on or about July 14, 2003, the Court will see a shift in the activities from the proceedings before the State Board of Education to the development of the successful ,, Fourth Motion to enf~rce Settlement Agreement as well as the separate action commenced in State Court. Indeed, it is anticipated that an argument will be made that activities devoted exclusively toward development and prosecution of the State Court action are not compensable and that the PCSSD should be denied fees for those efforts. Accordingly, the PCSSD has segregated those entries which relate exclusively to the State Court action as a separate portion of the narrative. 7. However, the PCSSD submits that all of the efforts and activities described in the fee narrative are compensable. It cannot be logically disputed that but for the passage of the detachment legislation (which this Court found violated the Settlement Agreement) and but for the State Board of Education's acceptance of and activation of the legislation (which this Court found violated the Settlement Agreement), none of the activities described in the 446311-v1 2 narrative would have been necessary or would have occurred. Thus, it is respectfully submitted, the only position which could have any legal vitality would be an argument that the PCSSD \"wasted time\" on issues that were not somehow reasonably related to the end of nullifying the election authorized by the State Board. 8. This Court did not reach the issues of special and local legislation and the equal ' . protection issue preferring to leave those two issues for resolution in State Court. Nevertheless, it cannot be reasonably gainsaid that these were not issues that the PCSSD was reasonably obligated to identify and develop toward the ultimate end of prevailing on the election issue. 9. Further, the PCS SD spent a modest amount of time developing other subsidiary issues as described in the State Court complaint. However, it cannot be reasonably said that '1' ., the identification and modest research associated with those issues was somehow a waste of ' time. Indeed, the PCSSD believes it submitted substantial separate issues to both reviewing forums any one of which in isolation was sufficient to nullify the election. 10. This motion is accompanied by an affidavit which further explains the history of enforcement of the 1989 Settlement Agreement, the bases for the district's entitlement to a fee award and the narrative description of legal services rendered. 11. The PCSSD seeks a total fee award of $78,326.50 as reflected in Exhibit B to the affidavit. 446311-v1 3 Respectfully submitted, WRIGHT, LINDSEY \u0026amp; JENNINGS LLP 200 West Capitol Avenue, Suite 2300 Little Rock, Arkansas 72201-3699 ' (501) 371-0808 FAX: (501) 376-9442 CERTIFICATE OF SERVICE On September 11, 2003, a copy of the foregoing was served via U.S. Mail on the following: Mr. Scott Smith General Counsel Arkansas Department of Education #4 Capitol Mall, Room 404-A Little Rock, AR 72201 Mr. John C. Fendley, Jr. John C. Fendley, Jr. , P.A. 51 Wingate Drive  Little Rock, AR 72205 Mr. John W. Walker John W. Walker, P.A. 1723 Broadway Little Rock, Arkansas 72201 Mr. Christopher Heller Friday, Eldredge \u0026amp; Clark 2000 Regions Center 400 West Capitol Little Rock, Arkansas 72201 446311-v1 Mr. Mike Wilson Mr. Will Bond 602 W. Main Jacksonville, AR 72076 Mr. Timothy Gauger Assistant Attorney General 323 Center Street, Suite 200 Little Rock, AR 72201 4 Mr. Mark A. Hagemeier Assistant Attorney General Arkansas Attorney General's Office 323 Center Street, Suite 200 Little Rock, Arkansas 72201 Mr. Stephen W. Jones 3400 TCBY Tower 425 West Capitol Avenue Little Rock, Arkansas 72201 Ms. Ann Brown Marshall ODM One Union National Plaza 124 West Capitol, Suite 1895 Little Rock, AR 72201 446311-v1 Mr. Richard Roachell Roachell Law Finn Plaza West Building 415 N. McKinley, Suite 465 Little Rock, Arkansas 72205 Mr. Clayton Blackstock Mr. Mark Burnett 1010 W. Third Street Little Rock, AR 72201 5 IN THE UNITED STATES DISTRICT COURT EASTERN DISTRICT OF ARKANSAS WESTERN DIVISION LITTLE ROCK SCHOOL DISTRICT V. NO. 4:82CV00866WRW PULASKI COUNTY SPECIAL SCHOOL DISTRICT NO. 1, ET AL. MRS. LORENE JOSHUA, ET AL. KATHERINE KNIGHT, ET AL. RECEIVED SEP 1 5 2003 OFFICE OF DESEGREGATION MONITORING AFFIDAVIT OF SAM JONES PLAINTIFF DEFENDANTS INTERVENORS INTERVENORS The legal services described in Exhibit \"A\" to this Affidavit have either all been billed - to and paid for by the PCSSD or, in the case of the most recent entries, will be b~led to and paid for the PCSSD. Since at least 1993, the hourly rates for partners charged to PCSSD have been frozen at $150 per hour in recognition of the financial circumstances of the PCSSD. The principal partner timekeeper for purposes of this fee petition is Sam Jones whose current hourly rate is $215 per hour. This represents a discount to the PCSSD of just over 30% of regular hourly rates. Several other partner timekeepers appear briefly in this petition and their rates have likewise been frozen at $150.00 per hour. For purposes of this petition, and consistent with prior fee awards to the PCSSD in this case, reimbursement is sought at the current regular hourly rates of all timekeepers. The effort associated with the exposition of the 1989 Settlement Agreement, especially before the State Board of Education, was difficult and time-consuming. The files, documents, 446157-v1 orders and transcripts a decade old had to be located and thoroughly reviewed. While in the final analysis this Court appeared to have little difficulty in interpreting the clear meaning of the 1989 Settlement Agreement, the PCSSD necessarily had to prepare for an argument that the language in the agreement is ambiguous and that parole evidence was necessary for a full and complete understanding of the key provisions. The PCSSD submits it would have been .remiss in not completely reviewing the exhaustive history of kc;:y provision of the Settlement Agreement both in an, effort to make the State Board understand and to supply a full context for this Court. On an issue of this moment, the PCSSD perceived that thoroughness was absolutely required. It is my considered judgment that the activities described in Exhibit A were all , ' completely required for compliance with the Model Rules of Professional Conduct and were - appropriate for the ultimate purpose of prevailing upon this most significant and far-reaching issue. Indeed, failure was not an option. This Court first awarded fees to the PCSSD as a prevailing party in the matters of \"workers' compensation\" and \"loss funding\" . That petition covered work performed from 1994 through 1996. See Order dated December 10, 1996 (Docket 2880) and as corrected on December 12, 1996 (Docket 2883). This Court later awarded Mr. Jones $160.00 per hour, $170.00 per hour, and $175.00 per hour for 1996. (Order dated December 31, 1997, see also Court of Appeals Decision 97-1350EA dated October 14, 1997). This Court also awarded fees to counsel for the PCSSD as respects the pooling issue. In that Order, the Court awarded fees for the years 1993 through 1997 at $150.00 per hour, 446157-v1 2 $160.00 per hour, $170.00 per hour, $175.00 per hour and $180.00 per hour for 1997. (Order dated January 30, 1998). On August 27, 1998, the United States Court of Appeals for the Eighth Circuit awarded fees to counsel for the PCSSD for the successful prosecution of the teacher retirement and health insurance appeal. It awarded $185.00 per hour for work done during 1998. (Order ' -dated August 27, 1998, 97-1794EA). STATE OF ARKANSAS COUNTY OF PULASKI SUBSCRIBED AND SWORN to before me, a Notary Public, on this 11th day of ' September, 2003. Notary Public My Commission Expires: 446157-v1 3 CERTIFICATE OF SERVICE On September 11, 2003, a copy of the foregoing was served via U.S. Mail on the following: Mr. Scott Smith General Counsel Arkansas Department of Education #4 Capitol Mall, Room 404-A Little Rock, AR 72201  Mr. John C. Fendley, Jr. John C. Fendley, Jr., P:.A. 51 Wingate Drive Little Rock, AR 72205  Mr. John W. Walker John W. Walker, P.A. 1723 Broadway Little Rock, Arkansas 72201 Mr. Christopher Heller Friday, Eldred~ \u0026amp; Clark 2000 Regions Center 400 West Capitol Little Rock, Arkans~ 72201 Ms. Ann Brown Marshall . QOM One Union National Plaza 124 West Capitol, Suite 1895 Little Rock, AR 72201 446157-v1 Mr. Mike Wilson Mr. Will Bond 602 W. Main Jacksonville, AR 72076 Mr. Timothy Gauger Assistant Attorney General 323 Center Street, Suite 200 Little Rock, AR 72201 Mr. Mark A. Hagemeier Assistant Attorney General Arkansas Attorney General's Office 323 Center Street, Suite 200 Little Rock, Arkansas 72201 Mr. Stephen W. Jones 3400 TCBY Tower 425 West Capitol Avenue Little Rock, Arkansas 72201 Mr. Richard Roachell Roachell Law Firm Plaza West Building 415 N. Mc.Kinley, Suite 465 Little Rock, Arkansas 72205 Mr. Clayton Blackstock Mr. Mark Burnett 1010 W. Third Street Little Rock, AR 72201 4 C. 6Y\u0026gt;'1/\u0026gt; /~/.-e. Copy \"~ t;.,J-,. '/.\u0026gt;t'I /-J IS t .'/(:J : ltssD - J,,c.l\u0026lt;sc,w, lie Se/, I-FOR PROFESSIONAL SERVICES RENDERED: Date Timekeeper 03/19/01 MS Jones, III 03/20/01 MS Jones, III 03/21/01 MS Jones, III 03/21/01 MS Jones, III 03/22/01 MS Jones, III 03/23/01 ~s Jones, III 03/28/01 MS Jones, III 03/28/01 MS Jones, III 03/28/01 MS Jones, III 03/i~/01 MS Jones, III 03/29/01 MS Jones, III TIMEKEEPER SUMMARY 2001 Telephone conference with Gary Smith Prepare for Senate Education hearing Meet with Governor's staff regarding HB 1882; confer with Dr. Smith and Mr. Manfredini; attend entirety of Senate Education Committee hearing Telephone conference with Dr. Smith Telephone conference with Dr. Smith Appear at Senate Education hearing regarding HB 1882 Testify before legislature regarding HB 1882 Telephone conference with David Colbert Telephone conference with Gary Smith Review letter from John Walker to Representative Pat Bond Review letter from John Walker to Judge Wright HOURS/RATES/VALUE MS Jones Total 55404-v1 9 . 8 $150 $1,470.00 $1,470.00 Hours 0 .2 0.7 3.9 0.2 0.2 2 . 2 1.8 0.2 0.2 0.1 0.1 I EXHIBIT 8 LITTLE ROCK SCHOOL DISTRICT V. NO. 4:82CV00866WRW PULASKI COUNTY SPECIAL SCHOOL DISTRICT NO. 1, ET AL. MRS. LORENE JOSHUA, ET AL. KATHERINE KNIGHT, ET AL. DEFENDANTS INTERVENORS INTERVENORS NOTICE OF APPEAL The Pulaski County Special School District (PCSSD) hereby gives notice of its appeal from a portion of the order of the district court filed on August 18, 2003 , and the corrected order filed on August 19, 2003 , as respects the District Court's interpretation of the 8th Circuit - Court of Appeals' decision dated November 19, 1986 as reported at 805 F.2d 815, (8th Circuit, 1986). 447430-v1 Respectfully submitted, WRIGHT, LINDSEY \u0026amp; JENNINGS LLP 200 West Capitol Avenue, Suite 2300 Little Rock, Arkansas 72201-3699 (501) 371-0808 FAX: (501) 376-9442 By ~(}''-'-----'( ~  / 'M. Samue Jones mp6~60) ( Attorneys r Pulaski-County Special , School 806 UNITED STATES DISTRICT COURT Eastern District of Arkansas Office of the Clerk 600 West Capitol, Room 402 Little Rock, Arkansas 72201-3325 September 16, 2003 Mr. Michael E. Gans, Clerk United States Court of Appeals 111 S. 10th Street, Room 24.329 St. Louis, MO 63102 Case No . 4:82CV00866 WRW Re: LITTLE ROCK SHCOOL DIST vs. PULASKI COUNTY SPECIAL Dear Sir : Enclosed please find in duplicate, copies of the following in the above case: Notice of Appeal Docket Entries [certified] Order filed 8/ 18 / 03 Order filed 8/ 19 / 03 RECEIVED SEP 1 9 2003 OFFICE OF DESEGREGATION MONITORING The appellant is in non-compliance with Eighth Circuit Rule 3B for not submitting an Appeal Information Form (Form A) with the Notice of Appeal. Accordingly, we are providing the appellant (Form A) to complete and submit to the Court of Appeals and (Form B) to serve upon the appellee. Sincerely, Ja~. McCormack, Clerk . ,  r~~ By:~~ Doris Collins, Deputy Clerk cc: w/ encs. Counsel of Record U.S. COURT OF APPEALS - EIGHTH CIRCUIT APPELLEE'S FORM B Appeal Information Form CASE NAME (Underline name of Appellee): GREG BOLLEN, JAMES BOLDEN, MARTIIA WHATLEY, SUE ANN WHISKER vs. PULASKI COUNTY SPECIAL SCHOOL DISTRICT IS THE ALIGNMENT OF PARTIES, NAMES, ADDRESSES, AND TELEPHONE NUMBERS Appeal Docket No. 03-3088 CORRECT ON APPELLANT'S FORM A? t8J Yes O No Ifno, list corrections below. IF YOU WISH TO CLARIFY THE JURISDICTIONAL STATEMENT OR GENERAL STATEMENT, LIST THE ADDITIONAL ISSUES OR COMMENTS. Whether or not the District Court erred in his interpretation of the 8th Circuit Court of Appeals' decision dated November 19, 1986 as reported at 805 F.2d 815, (8th Circuit, 1986) DO YOU BELIEVE THIS CASE IS SUITABLE FOR CONSIDERATION IN THIS COURT' SETTLEMENT PROGRAM? 0 Yes. t8J No. Ifno, state why. Appellee has no desire or motivation to discuss settlement. NAME, ADDRESS, AND TELEPHONE NUMBER OF COUNSEL COMPLETING THIS FORM: M. SAMUEL JONES III WRIGHT, LINDSEY \u0026amp; JENNINGS LLP 200 West Capitol Avenue, Suite 2300 Little Rock, Arkansas 72201 (501) 371-0808 Copy 1 - Send to Appellant Copy 2 \u0026amp; 3 - Send to Clerk, Eighth Circuit Court of Appeals Copy 4 - Retain 445092-vl EDWARD L. WRIGHT (1903 - 1977) ROBERT S. LINDSEY (1913-1991 ) ISAAC A. SCOTT , JR . JOHN G. LILE WRIGHT, LINDSEY \u0026amp; JENNINGS LLP ATTORNEYS AT LAW KIMBERLY WOOD TUCKER RAY F. COX, JR . TROY A. PRICE PATRICIA SIEVERS HARRIS KATHRYN A . PRYOR GORDON S. RATHER, JR . ROGER A. GLASGOW C. DOUGLAS BUFORD, JR . PATRICK J. GOSS ALSTON JENNINGS , JR . JOHN R. TISDALE KATHLYN GRAVES M. SAMUEL JONES Ill JOHN WILLIAM SPIVEY Ill LEE J . MULDROW N.M. NORTON CHARLES C. PRICE CHARLES T. COLEMAN JAMES J. GLOVER EDWIN L. LOWTHER, JR . WALTER E. MAY GREGORY T . JONES H. KEITH MORRISON BETTINA E. BROWNSTEIN WALTER McSPADDEN JO HN D. DAVIS JI/DY SIMMONS HENRY Michael Gans, Clerk of the Court 200 WEST CAPITOL A VENUE SUITE 2300 LITTLE ROCK, ARKANSAS 72201 -3699 (501) 371 -0808 FAX (501 ) 376-9442 www . wlj .com OF COUNSEL ALSTON JENNINGS RONA LD A. MAY BRUCE R . LINDSEY JAMES R. VAN DOV ER Writer's Direct Dia l No . 501-212- 1273 mjoncs@wlj .com September 16, 2003 U.S. Court of Appeals for the Eighth Circuit Thomas F. Eagleton Court House, Room 24.329 111 South 10th Street St. Louis, Missouri 63102 RE: 03-3088 Greg Bollen, James Bolden, Martha Whatley, J. MARK DAVIS CLAIRE SHOWS HANCOCK KEVIN W. KENNEDY JERRY J. SALLINGS WILLIAM STUART JACKSON MICHAEL D. BARNES STEPHEN R. LANCASTER JUDY ROBINSON WILBER KYLER. WILSON C. TAD BOHANNON KRISTI M. MOODY J. CHARLES DOUGHERTY M. SEAN HATCH J. ANDREW VINES JUSTIN T . ALLEN MICHELLE M. KAEMMERLING SCOTT ANDREW IRBY PATRICK D. WILSON REGINA A. SPAULDING  .Lkeasted1opn,tCIK:ebelamtbt: Uai Sates hlt:DI mt/ Ttadt:awr Of6ce RECEIVED SEP 18 2003 OFFICE OF DESEGREGATION MONITORING Sue Ann Whisker (Appellants) vs. Pulaski County Special School District (Appellee) On Appeal from the United States District Court, Eastern District of Arkansas; USDC No. 4:82CV00866WRW Dear Michael: Enclosed are two copies of Appellee's Form B - Appeal Information Form. By copy of this letter, I am forwarding copies of the above to the attorney for the Appellant. MSJ:ao Enclosure cc: Mr. Will Bond All Other Counsel of Record Cordially yours, WRIGHT, LINDSEY \u0026amp; JENNINGS LLP t:..- IN THE UNITED STATES DISTRICT COURT EASTERN DISTRICT OF ARKANSAS WESTERN DIVISION LITTLE ROCK SCHOOL DISTRICT v . No. 4:82CV00866 WRW RECEIVED SEP 2 3 2003 OFFICE OF DESEGREGATION MONITOfffNG PLAINTIFF . PULASKI COUNTY SPECIAL SCHOOL DISTRICT NO. 1, et al. DEFENDANTS MOTION FOR EXTENSION OF TIME TO RESPOND TO PULASKI COUNTY SPECIAL SCHOOL DISTRICT'S MOTION FOR AN AW ARD OF ATTORNEYS' FEES Comes now the Arkansas Department of Education, and for its Motion for Extension of Time, states: 1. On September 11 , 2003, PCSSD filed a Motion for an Award of Attorneys ' Fees with this Court. 2. A response is currently due to this Motion on or before September 25 , 2003. Due to undersigned counsel's travel and deposition schedule, he has been unable to prepare a response to date. Undersigned requests a ten-day extension of time to respond to PCSSD's Motion, that is, until October 6, 2003. 3. Pursuant to local rules, undersigned contacted opposing counsel, Mr. Samuel Jones III, with regard to this Motion, and opposing counsel does not object to the extension. WHEREFORE, the Arkansas Department of Education requests that the Court grant its Motion for Extension of Time. Respectfully Submitted, MIKE BEEBE Attorney General #94127 Assistant Attorney Gen al 323 Center Street, Suite 200 Little Rock, Arkansas 72201 (501) 682-2007 Attorney for Arkansas Department of Education CERTIFICATE OF SERVICE I, Mark A. Hagemeier, certify that on September :l )., 2003, a copy of the foregoing document was be served by first-class U.S. mail, postage prepaid, on the following person(s) at the address( es) indicated: Stephen W. Jones Jack, Lyon \u0026amp; Jones 3400 TCBY Tower 425 W. Capitol Little Rock, AR 72201 M. Samuel Jones, III Wright, Lindsey \u0026amp; Jennings LLP 200 W. Capitol, Suite 2300 Little Rock, AR 72201-3699 Will Bond Bond \u0026amp; Chamberlin 602 W. Main Street Jacksonville, AR 72076 Mike Wilson 602 W. Main Street Jacksonville, AR 72076 Ann Brown Marshall ODM One Union National Plaza 124 West Capitol, Suite 1895 Little Rock, AR 72201 Christopher Heller Friday, Eldredge \u0026amp; Clark 2000 Regions Center 400 W. Capitol Little Rock, AR 72201-3493 John W. Walker John Walker, P.A. 1 723 Broadway Little Rock, AR 72201 Mr. Mark Burnette Attorney at Law 1010 W. 3rd Little Rock, AR 72201 John C. Fendley, Jr. 51 Wingate Drive Little Rock, AR 72205 Mark A. Hagemci IN THE UNITED ST ATES DISTRICT COURT EASTERN DISTRICT OF ARKANSAS LITTLE ROCK DMSION LITTLE ROCK SCHOOL DISTRICT V. No. 4:82CV00866 WRW/JTR PULASKI COUNTY SPECIAL SCHOOL . DISTRICT NO. 1, ET AL. MRS. LORENE JOSHUA, ET AL. KATHERINE KNIGHT, ET AL. ORDER FILED ' S O1 ~TR' C1' COURT L!.   1-s---1cT A''KANSAS c:ASTERN ' '' \" SEP 2 \u0026gt;2003 JAMES W. McCORMACK. CLERK By; OEP CLERK PLAINTIFF DEFENDANTS INTERVENORS INTERVENORS Pending is the Arkansas Department of Education's Motion for Extension of Time (Doc. No. 3807) to reply to the PCSSD's fee petition (Doc. No. 3804). The ADE requesi:s an exte1;1Sion - to October 6, 2003, ten days from the original deadline, to respond, and opposing counsel does not object to the extension. The ADE's motion is GRANTED. IT IS SO ORDERED1his 23rd day of September, 2003. THIS DOCUMENT ENTEREO ON TJNfi/Jli'l:ff.4~~ OOCKET SHEET IN COMPLIANCE WM. R. WILSON, JR. WITH RULE 58 AN~~ FRCF oN 9-a~-0-1-sv~wc + TO: DATE: FAX COVER SHEET UNITED STATES DISTRICT COURT EASTERN DISTRICT OF ARKA1~SAS Chris Heller Sam Jones Steve Jones John Walker Timothy Gauger Mark Hagemeier Ann Marshall Mark Burnette 9 ... z::; ~ 05 Telephone: 501-604-5140 Fax Number: 501-604 5149 376-2147 376-9442 375-1027 374-4187 682-2591 682-2591 371-0100 375-1940 There are 2 pages, including this Cover Sheet, being sent by this facsimile transmissioni MESSAGE SENT BY: rt; Office of Judge Wm. U.S. District Court 600 West Capitol, Room 423 Little Rock, Arkansas 72201 Matt Morgan, LRSD Law Clerk 501-604-5141 IN THE UNITED STATES DISTRICT COURT EASTERN DISTRICT OF ARKANSAS WESTERN DIVISION LITTLE ROCK SCHOOL DISTRICT V . NO. 4:82CV00866WRW  PULASKI COUNTY SPECIAL SCHOOL DISTRICT NO. 1, ET AL. MRS. LORENE JOSHUA, ET AL. KATHERINE KNIGHT, ET AL. RECEIVED SEP 2 9 2003 omcEOF ~st{3{E~AllON MONITORING PLAINTIFF DEFENDANTS INTERVENORS INTERVENORS PCSSD MOTION FOR TEMPORARY PORTABLE BUILDINGS AT ROBINSON HIGH SCHOOL The PCSSD for its motion, states: 1. For the 2002-2003 school year, the 11th day enrollment at Robinson High School was 593 students. 2. The 11th day enrollment for the current school year is 681 students of whom 307 are African-American and 374 are other. 3. The increase in enrollment is attributed to an increase in M-to-M students, the closing of Faith Christian Academy's secondary program which was a predominately AfricanAmerican institution and the change in 9th grade athletic participation instituted by the Little Rock School District. 4. Robinson is currently holding class in the cafeteria, the band room, the rAW auditorium and the gym. 449094-vl 5. To accommodate the increased enrollment for the balance of the school year and to evaluate the propriety and necessity for permanent classroom additions, the PCSSD requests permission to lease two portable buildings for the balance of the school year to accommodate the current enrollment. 6. If during the coming weeks the PCSSD determines that the increased enrollment is likely permanent, it will evaluate the prospect of classroom additions to the campus and apply to this Court at the appropriate time for permission to construct such additions should they prove necessary. 7. These circumstances are more fully explained in a memo dated September 4, 2003, from the principal at Robinson, which is attached as Exhibit A to this motion. WHEREFORE, and as an interim measure, the PCSSD requests permission to lease two portable classrooms for the balance of the 2003-2004 school year and for all proper relief. 449094-vl Respectfully submitted, WRIGHT, LINDSEY \u0026amp; JENNINGS LLP 200 West Capitol Avenue, Suite 2300 Little Rock, Arkansas 72201-3699 (501) 371-0808 FAX: (501) 376-9442 School  trict 2 CERTIFICATE OF SERVICE On September 23, 2003, a copy of the foregoing was served via U.S. mail on each of the following : Mr. John W. Walker John W. Walker, P.A. 1723 Broadway Little Rock, Arkansas 72201 Mr. Christopher Heller Friday, Eldredge \u0026amp; Clark 2000 Regions Center 400 West Capitol Little Rock, Arkansas 72201 Ms. Ann Brown Marshall ODM One Union National Plaza 124 West Capitol, Suite 1895 Little Rock, AR 72201 Mr. Mark Burnette Mr. Clayton Blackstock 1010 W. Third Street Little Rock, AR 72201 449094-vl Mr. Mark A. Hagemeier Assistant Attorney General Arkansas Attorney General's Office 323 Center Street, Suite 200 Little Rock, Arkansas 72201 Mr. Stephen W. Jones 3400 TCBY Tower 425 West Capitol A venue Little Rock, Arkansas 72201 3 Mr. Richard Roachell Roachell Law Firm Plaza West Building 415 N. McKinley, Suite 465 Little Rock, Arkansas 72205 Judge J. Thomas Ray U.S. District Courthouse 600 West Capitol Avenue, Suite 149 Little Rock, Arkansas 72201  09/18/2003 14:58 5014901352 EQUI1Y PUPIL SERVICE PAGE 03/03 SEP O 9.2003 Robinson High School 21501Hwy10 Little Rock, Arkansas 72223 Phone: 501-86~400 Joy L Plants Principal Emall-jplants@pcud.org MEMO To: Dr. Brenda Bowles From: Ms. Joy Plants )( Date: Thursday, September 04, 2003 Fax: 50.1-868-2405 Dr. Yoloundro Williams Assistant Princ:ipal Emoil-ywlJliams@pcssd.org John Pearee As~istant l'rlnc:ipal fmail-Jpearce@pcssd.org - Re: Increased Enrollm':fJtlFaci/ity Needs Due to a larger than usual influx of students, we are in desperate need of three portable classrooms. This year we have had an increase of Minority to Majority enrollment from 33 percent to 45 percent. This enrollment change was in part due to the closing of Faith Christian Academy's secondary program which is a predominately minority institution. As well as, Little Rock School District's change In ninth grade athletic participation. We also have had some students that have moved from the private sector to Robinson High School. In effort to hold true to Desegregation Plan 2000, we have continued to welcome students to our school. These are indeed excellent problems to have. However, our total enrollment has increased from 594 at the end of last year to 682 to date. We have at present classes being held in the cafeteria, the band room, the auditorium, and the gym. We also have some teachers sharing classrooms at the same time. To accommodate our increase in numbers, we have also had to hire two new teachers. We continue to be in the midst of schedule changes to accommodate students and balance classes. Yet and still with those changes, we still need classroom space for .classes. EXHIBIT I ---'I)_,,____ IN THE UNITED STATES DISTRICT COURT EASTERN DISTRICT OF ARKANSAS WESTERN DIVISION LITTLE ROCK SCHOOL DISTRICT V. NO. 4:82CV00866WRW PULASKI COUNTY SPECIAL SCHOOL DISTRICT NO. 1, ET AL. MRS. LORENE JOSHUA, ET AL. KATHERINE KNIGHT, ET AL. RECEIVED SEP 2 9 2003 OFFICE OF DESEGREGATION MONITCi1lNG RENEWED AND SUPPLEMENTAL MOTION REGARDING SYLVAN HILLS BAND ROOM The PCSSD for its motion, states: PLAINTIFF DEFENDANTS INTERVENORS INTERVENORS 1. On March 11 , 2003, this Court entered its Order authorizing the PCS SD. to temporarily utilize a portable building, until the end of the 2002-2003 school year, for the Sylvan Hills band room because of persistent water problems. 2. In the interim, the PCSSD solicited proposals from contractors toward the end of \"correcting\" the water problem. The Sylvan Hills band room is built partially underground. 3. Counsel is informed that one contractor agreed to guarantee his work for one year and that all other contractors declined to extend any guarantee whatsoever. 4. Because the problem persists, the PCSSD has made the decision to abandon efforts to correct the water problem and to commit to new construction on the same campus. 5. Accordingly, the PCSSD now requests two approvals from this Court: First, authorization to lease a portable building to be used as the band room until permanent construction is concluded, and second, to approve construction of a replacement facility on the 447293-v1 current Sylvan Hills campus. Neither authorization will affect the capacity of the Sylvan Hills school. WHEREFORE, the PCSSD prays for authority to lease a portable building to be used as a temporary band room and for further authority to construct a permanent replacement for the current band room on the Sylvan Hills campus. 447293-v1 Respectfully submitted, WRIGHT, LINDSEY \u0026amp; JENNINGS LLP 200 West Capitol Avenue, Suite 2300 Little Rock, Arkansas 72201-3699 (501) 371-0808 FAX: (501) 376-9442 School District 2 CERTIFICATE OF SERVICE On September 23, 2003 , a copy of the foregoing was served via U.S. Mail on the following: Mr. John W. Walker John W. Walker, P.A. 1723 Broadway Little Rock, Arkansas 72201 Mr. Christopher Heller Friday, Eldredge \u0026amp; Clark 2000 Regions Center 400 West Capitol Little Rock, Arkansas 72201 Ms. Ann Brown Marshall ODM One Union National Plaza 124 West Capitol, Suite 1895 Little Rock, AR 72201 Judge J. Thomas Ray U.S. District Courthouse 600 West Capitol Avenue, Suite 149 Little Rock, Arkansas 72201 447293-v1 Mr. Mark A. Hagemeier Assistant Attorney General Arkansas Attorney General's Office 323 Center Street, Suite 200 Little Rock, Arkansas 72201 Mr. Stephen W. Jones 3400 TCBY Tower 425 West Capitol Avenue Little Rock, Arkansas 72201 Mr. Richard Roachell Roachell Law Firm Plaza West Building 415 N. McKinley, Suite 465 Little Rock, Arkansas 72205 Mr. Clayton Blackstock Mr. Mark Burnett 1010 W. Third Street Little Rock, AR 72201 3 EDWARD L. WRIGHT (1903  1977) ROBERT S. LINDSEY (1913  1991 ) ISAAC A. SCOTT , JR . JOHN G. LILE GORDON S. RATHER, JR . ROGER A. GLASGOW C. DOUGLAS BUFORD, JR. PATRICK I. GOSS ALSTON JENNINGS , JR , JOHN R. TISDALE KATHLYN GRAVES M. SAMUEL JONES Ill JOHN WILLIAM SPIVEY Ill LEE J. MULDROW N.M. NORTON CHARLES C. PRICE CHARLES T. COLEMAN JAMBS J. GLOVER EDWIN L. LOWTHER, JR . WALTER E. MAY GREGORY T. JONES H. KEITH MORRISON BETTINA E. BROWNSTEIN WALTER McSPADDEN JOHN D. DAVIS JUDY SIMMONS HENRY WRIGHT, LINDSEY \u0026amp; JENNINGS LLP ATTORNEYS AT LAW 200 WEST CAPITOL AVENUE SUITE 2300 LITTLE ROCK, ARKANSAS 72201  3699 (501) 3710808 FAX (501) 3769442 www.wlj.com OF COUNSEL ALSTON JENNINGS RONALD A. MAY BRUCE R. LINDSEY JAMES R. VAN DOVER Writer 's Direct Dial No. S0l-212-1273 mjones@wlj .com September 26, 2003 KIMBERLY WOOD TUCKER RAY F . COX , JR . TROY A. PRICE PATRICIA SIEVERS HARRIS KATHRYN A. PRYOR J. MARK DAVIS CLAIRE SHOWS HANCOCK KEVIN W. KENNEDY IBRRY I. SALLINGS WILLIAM STUART JACKSON MICHAEL D. BARNES STEPHEN R. LANCASTER JUDY ROBINSON WILBER KYLE R. WILSON C . TAD BOHANNON KRISTI M. MOODY l . CHARLES DOUGHERTY M. SEAN HATCH J. ANDREW VINES JUSTIN T. ALLEN MICHELLE M. KAEMMERLING SCOTT ANDREW JR.BY PATRICK D. WILSON REGINA A. SPAULDING MARY ELIZABETH ELDRIDGE BLAKE S. RUTHERFORD  I...iot!mod1opn,;tic,:bt:Afftbt: Uaill:lt!Sarcs h1e111 ud Tndt:llwk O/fk% RECEIVED VIA HAND DELIVERY The Honorable Wm. R. Wilson, Jr. U.S. District Courthouse 600 West Capitol Avenue, Suite 423 Little Rock, Arkansas 72201 SEP 2 6 2003 OfRCf OF OESEGREGAT!Oti MONITORING Re: Little Rock School District v. Pulaski County Special School District; et al. USDC Docket No.: 4:82CV00866WRW Dear Judge Wilson: I am informed that the PCSSD Board is taking another look at the potential for repairing the Sylvan Hills band room. Hence, I have amended our motion, courtesy copy enclosed. MSJ:ao Encls. cc/w/encls.: 450331-vl Cordially yours, WRIGHT, LINDSEY \u0026amp; JENNINGS LLP 6~ Honorable J. Thomas Ray Counsel of Record IN THE UNITED STATES DISTRICT COURT EASTERN DISTRICT OF ARKANSAS WESTERN DMSION LITTLE ROCK SCHOOL DISTRICT V. NO. 4:82CV00866WRW PULASKI COUNTY SPECIAL SCHOOL DISTRICT NO. 1, ET AL. MRS. LORENE JOSHUA, ET AL. KATHERINE KNIGHT, ET AL. RECEIVED SEP 2 6 2003 OFFICE OF DESEGREGATION MONITORING AMENDED AND SUPPLEMENTAL MOTION REGARDING SYLVAN HILLS BAND ROOM The PCSSD for its amended and supplemental motion, states: PLAINTIFF DEFENDANTS INTERVENORS INTERVENORS 1. The PCSSD filed a motion on September 23, 2003, seeking certain reli~f as respects the Sylvan Hills band room. That motion remains pending. 2. Today counsel for the PCSSD was informed that the Board has reconsidered the issue of a permanent replacement for the structure and has instructed the Assistant Superintendent for Support Services to re-examine the prospects of securing a workable and practicable repair solution to the water problems in this band room. 3. Accordingly, the PCSSD hereby amends its pending motion to drop, at least for the moment, its request for permission to build a new structure while it re-examines the prospect that a less costly but effective repair solution can be pursued. 4. The PCSSD retains its request for permission to lease a portable building to house the band program for the balance of the current school year, and states that it has located an \"acoustically appropriate\" structure for lease. 450309-v1 WHEREFORE, the PCSSD prays for an order of this Court permitting it to lease a portable building for the balance of the school year to house the band program at Sylvan Hills and for all proper relief. 450309-v1 Respectfully submitted, WRIGHT, LINDSEY \u0026amp; JENNINGS LLP 200 West Capitol Avenue, Suite 2300 Little Rock, Arkansas 72201-3699 (501) 371-0808 FAX: (501) 376-9442 B ~:....::::::::::::::._~~~~~=----ch o o l 2 CERTIFICATE OF SERVICE On September 26, 2003, a copy of the foregoing was served via U.S. Mail on the following: Mr. John W. Walker John W. Walker, P.A. 1723 Broadway Little Rock, Arkansas 72201 Mr. Christopher Heller Friday, Eldredge \u0026amp; Clark 2000 Regions Center 400 West Capitol Little Rock, Arkansas 72201 Ms. Ann Brown Marshall ODM One Union National Plaza 124 West Capitol, Suite 1895 Little Rock, AR 72201 Judge J. Thomas Ray U.S . District Courthouse 600 West Capitol Avenue, Suite 149 Little Rock, Arkansas 72201 450309-v1 Mr. Mark A. Hagemeier Assistant Attorney General Arkansas Attorney General's Office 323 Center Street, Suite 200 Little Rock, Arkansas 72201 Mr. Stephen W. Jones 3400 TCBY Tower 425 West Capitol Avenue Little Rock, Arkansas 72201 Mr. Richard Roachell Roachell Law Firm Plaza West Building 415 N. McKinley, Suite 465 Little Rock, Arkansas 72205 Mr. Clayton Blackstock Mr. Mark Burnett 1010 W. Third Street Little Rock, AR 72201 3 Raymond Simon Director State Board of Education JoNell Caldwell, Chair Littls Rock Shelby Hillman, Vice Chair Carfis/s Luke Gordy Van Bursn Robert Hackler Mountain Home caMn King Marianna Randy Lawson Bentonville - ~ebick I. I Diane Tatum I I Pine Bluff I l Jeanna Westmoreland I Arkadelphia :l i :1 :i ,1 !l ;, ;J if 1J I l 'l /j Department of Education #4 CapiJol Mall, Little Rock, AR 72201-1071 September 29, 2003 501-682-4475 Mr. M. Samuel Jones, III Wright, Lindsey \u0026amp; Jennings 200 West Capitol, Suite 2000 Little Rock, AR 72201 Mr. John W. Walker John Walker, P.A. 1723 Broadway Little Rock, AR 72201 Mr. Mark Burnette Mitchell, Blackstock, Barnes, Wagoner, Ivers \u0026amp; Sneddon P. 0. Box 1510 Little Rock, AR 72203-1510 Mr. Christopher Heller Friday, Eldredge \u0026amp; Clark 400 West Capitol, Suite 2000 Little Rock, AR 72201-3493 Mr. Stephen W. Jones Jack, Lyon \u0026amp; Jones 425 West Capitol, Suite 3400 Little Rock, AR 72201 Ms. Ann Marshall One Union National Plaza 124 West Capitol, Suite 1895 Little Rock, AR 72201 http:/ larked11.state.ar.,u RECEIVED SEP 3 o 2003 OFFICE OF DESEGREG~TIOH MONITORING RE: Little Rock School District v. Pulaski County Special School District, et al. US. District Court No. 4:82-CV-866 Dear Gentlemen and Ms. Marshall: Per an agreement with the Attorney General's Office, I am filing the Arkansas Department of Education's Project Management Tool for the month of September 2003 in the above-referenced case. If you have any questions, please feel free to contact me at your convenience. General Counsel Arkansas Department of Education SS:law cc: Mark Hagemeier - --- ---- - - - - - UNITED STATES DISTRICT COURT EASTERN DISTRICT OF ARKANSAS WESTERN DIVISION LITTLE ROCK SCHOOL DISTRICT PLAINTIFF V. No. LR-C-82-866 PULASKI COUNTY SPECIAL SCHOOL DISTRICT NO. 1, et al DEFENDANTS NOTICE OF FILING In accordance with the Court's Order of December 10, 1993, the Arkansas Department of Education hereby gives notice of the filing of the ADE's Project Management Tool for September 2003. Respectfully Submitted, cott Smith, #92251 Attorney, Arkansas Department of Education #4 Capitol Mall, Room 404-A Little Rock, AR 72201 501-682-4227 CERTIFICATE OF SERVICE I, Scott Smith, certify that on September 29, 2003, I caused the foregoing document to be served by depositing a copy in the United States mail, postage prepaid, addressed to each of the following: Mr. M. Samuel Jones, III Wright, Lindsey \u0026amp; Jennings 200 West Capitol, Suite 2000 Little Rock, AR 72201 Mr. John W. Walker John Walker, P.A. 1723 Broadway Little Rock, AR 72201 Mr. Mark Burnette Mitchell, Blackstock, Barnes Wagoner, Ivers \u0026amp; Sneddon P. 0. Box 1510 Little Rock, AR 72203-1510 Mr. Christopher Heller Friday, Eldredge \u0026amp; Clark 400 West Capitol, Suite 2000 Little Rock, AR 72201-3493 Mr. Stephen W. Jones Jack, Lyon \u0026amp; Jones 425 West Capitol, Suite 3400 Little Rock, AR 72201 Ms. Ann Marshall One Union National Plaza 124 West Capitol, Suite 1895 Little Rock, AR 72201 IN THE UNITED STATES DISTRICT COURT EASTERN DISTRICT OF ARKANSAS WESTERN DIVISION LITTLE ROCK SCHOOL DISTRICT, ET AL V. PULASKI COUNTY SPECIAL SCHOOL DISTRICT, ET AL MRS. LORENE JOSHUA, ET AL KATHERINE W. KNIGHT, ET AL NO. LR-C-82-866 PLAINTIFFS DEFENDANTS INTERVENORS INTERVENORS ADE'S PROJECT MANAGEMENT TOOL In compliance with the Court's Order of December 10, 1993, the Arkansas Department of Education (ADE) submits the following Project Management Tool to the parties and the Court. This document describes the progress the ADE has made since March 15, 1994, in complying with provisions of the Implementation Plan and itemizes the AD E's progress against timelines presented in the Plan. IMPLEMENTATION PHASE ACTIVITY I. FINANCIAL OBLIGATIONS A. Use the previous year's three quarter average daily membership to calculate MFPA (State Equalization) for the current school year. 1. Projected Ending Date Last day of each month, August - June. 2. Actual as of September 30, 2003 B.ased :on.~e' informat,onjivailabie at August 31 ;-: 2003.,tpe APE calculated the Eqllalizaiio'n Furidirig for;fY03i04;' s~bjecf to penod1c adjustments'. B. Include all Magnet students in the resident District's average daily membership for calculation. 1. Projected Ending Date Last day of each month, August - June.    This project was supported in part by a Digitizing Hidden Special Collections and Archives project grant from The Andrew W. Mellon Foundation and Council on Library and Information Resources.\u003c/dcterms_description\u003e\n   \n\n\u003c/dcterms_description\u003e   \n\n  \n\n\n   \n\n   \n\n   \n\n\n   \n\n   \n\n   \n\n\n   \n\n  \n\n \n\n\n   \n\n   \n\n   \n\n\n   \n\n   \n\n   \n\n\n\n   \n\n   \n\n   \n\n\n   \n\n   \n\n  \n\n  \n\n   \n\n\n   \n\n   \n\n   \n\n\n   \n\n   \n\n   \n\n   \n\n   \n\n   \n\n\n\n\n\n   \n\n   \n\n   \n\n   \n\n\n   \n\n   \n\n   \n\n\n   \n\n   \n\n   \n\n   \n\n\u003c/item\u003e\n\u003c/items\u003e"},{"id":"bcas_bcmss0837_1756","title":"Includes Pulaski County Special School District (PCSSD) reply to all responses regarding its fourth motion to enforce settlement agreement, District Court motion for stay of judgment and order made pursuant to Rule 62 of the Federal Rules of Civil Procedure and Rule 8.A of the Eighth Circuit Rules of Appellate Practice.","collection_id":"bcas_bcmss0837","collection_title":"Office of Desegregation Management","dcterms_contributor":null,"dcterms_spatial":["United States, 39.76, -98.5","United States, Arkansas, 34.75037, -92.50044","United States, Arkansas, Pulaski County, 34.76993, -92.3118","United States, Arkansas, Pulaski County, Little Rock, 34.74648, -92.28959"],"dcterms_creator":["United States. District Court (Arkansas: Eastern District)"],"dc_date":["2003-08-12/2003-08-29"],"dcterms_description":null,"dc_format":["application/pdf"],"dcterms_identifier":null,"dcterms_language":["eng"],"dcterms_publisher":["Little Rock, Ark. : Butler Center for Arkansas Studies. Central Arkansas Library System"],"dc_relation":null,"dc_right":["http://rightsstatements.org/vocab/InC-EDU/1.0/"],"dcterms_is_part_of":["Office of Desegregation Monitoring records (BC.MSS.08.37)","History of Segregation and Integration of Arkansas's Educational System"],"dcterms_subject":["Little Rock (Ark.)--History--21st Century","Education--Arkansas","Pulaski County Special School District","School districts","Arkansas. Department of Education","Project management","School integration"],"dcterms_title":["Includes Pulaski County Special School District (PCSSD) reply to all responses regarding its fourth motion to enforce settlement agreement, District Court motion for stay of judgment and order made pursuant to Rule 62 of the Federal Rules of Civil Procedure and Rule 8.A of the Eighth Circuit Rules of Appellate Practice."],"dcterms_type":["Text"],"dcterms_provenance":["Butler Center for Arkansas Studies"],"edm_is_shown_by":null,"edm_is_shown_at":["http://arstudies.contentdm.oclc.org/cdm/ref/collection/bcmss0837/id/1756"],"dcterms_temporal":null,"dcterms_rights_holder":null,"dcterms_bibliographic_citation":null,"dlg_local_right":["Available for use in research, teaching, and private study. Any other use requires permission from the Butler Center."],"dcterms_medium":["filing"],"dcterms_extent":["158 pages"],"dlg_subject_personal":null,"dcterms_subject_fast":null,"fulltext":"\u003c?xml version=\"1.0\" encoding=\"utf-8\"?\u003e\n\u003citems type=\"array\"\u003e  \u003citem\u003e   \n\n   \n\n   \n\n\n   \n\n   \n\n\n   \n\n\n   \n\n   \n\n\n   \n\n   \n\n\n   \n\n   \n\n\n\n\n\n\n\n   \n\n \n\n \n\n \n\n\n   \n\n   \n\n   \n\n\n   \n\n  \n\n   \n\n\n   \n\n  \n\n   \n\n\n   \n\n \n\n\u003cdcterms_description type=\"array\"\u003e   \n\n\u003cdcterms_description\u003eDistrict Court, letter order; District Court, memorandum; District Court, order; District Court, Pulaski County Special School District (PCSSD) consolidated brief in support of its reply to all responses to its fourth motion to enforce settlement agreement; District Court, two orders; District Court, corrected order; District Court, motion for stay of judgment and order made pursuant to Rule 62 of the Federal Rules of Civil Procedure and to Rule 8.A of the Eighth Circuit Rules of Apellate Practice; District Court, order; District Court, notice of appeal; Court of Appeals, emergency motion for espedited review and suspension of the rules pursuant to Rule 2 of the Federal Rules of Apellate Procedure and motion for emergency stay of judgment of the district court; District Court, Pulaski County Special School District (PCSSD) motion for enlargement of time to file fee petition; District Court, order; District Court, notice of filing, Arkansas Department of Education (ADE) project management tool; District Court, motion for extension of time; District Court, order of transcripts pursuant to Rule 10 of the Federal Rules of Appellate Procedure; District Court, corporate disclosure statement; District Court, order    This transcript was create using Optical Character Recognition (OCR) and may contain some errors.    - BILL WILSON JUDGE To: Mr. Will Bond Bond \u0026amp; Chamberlin 602 West Main UNITED STATES DISTRICT COURT EASTERN DISTRIC'r OF ARKANSAS 800W. CAPITOL, ROOM 423 . LITTLE ROCK, ARKANSAS 72201--3325 (501) 604-5140 Facsimile (501) 804-5149 August 12, 2003 BYFAX Jacksonville, Arkansas 72075 LETTER-ORDER RE: Little Rock School District v. Pulaski County Special School District, et al., United States District Court, Eastern District of Arkansas, Western Division, Case No. 4:82CV00866 WRW/JTR- August 18th Hearing - Dear Mr. Bond: This is in response to your letter of yesterday, August 11 , 2003, regarding Mr. Fendley's conflicting schedule. I often reschedule hearing when they conflict with long standing vacation plans; and, on occasion, I have allowed a lav-,-yer to participate by telephone. In view of the crucial and immediate interests involved, I believe the hearing must be held as scheduled. Participation by telephone is a little unwieldy, and I do not think it would appropriate in this instance. cc: The Honorable Joe Thomas Ray Other counsel of record Original to Clerk Cordially, [;~~ Wm. R. Wilson, Jr. - ---- --- - - - - -------- - - ----- - - -- BILL WILSON JUDGE TO: All Counsel UNITED STATES DISTRICT COURT EASTERN DISTRICT OF ARKANSAS 600 W. CAPITOL, ROOM 423 LITTLE ROCK, ARKANSAS 72201-3325 (501) 804-5140 Facsimile (501) 604-5149 August 12, 2003 BYFAX MEMORANDUM RE: Knight lntervenors' Motion to Withdraw as Counsel and for Substitution of Counsel Pending is the Knight Intervenors' Motion to Withdraw as Counsel and for Substitution of Counsel. The Knight Intervenors assert that former cow1sel, Richard W. Roachell, has retired from the practice of law and requests to withdraw as their counsel. The Knight Intervenors have engaged Clayton Blackstock and Mark Burnette as counsel to replace Mr. Roachell. This issue will be addressed at the commencement of the hearing scheduled for 10:00 a.m., Monday, August 18, 2003. cc: The Honorable Joe Thomas Ray Original to Clerk Cordially, Y./~ IN THE UNITED STATES DISTRICT COURT EASTERN DISTRICT OF ARKANSAS LITTLE ROCK DMSION LITTLE ROCK SCHOOL DISTRICT . V. No. 4:82CV00866 WRW/JTR PULASKI COUNTY SPECIAL SCHOOL DISTRICT NO. 1, ET AL. MRS. LORENE JOSHUA, ET AL. KATHERINE KNIGHT, ET AL. ORDER FILED U.S. DISTRICT COURT EASTERN 01sr.:i,cT ARKANSAS Al 1r, 1 3 2003 JAMES W. McCORMACK, CLERK By: ______. .....,,o\"\"ep\"\"'c\"\"'L.\"E\"'R,,.K..,. PLAINTIFF DEFENDANTS INTERVENORS INTERVENORS The Pulaski County Special School District may have until 12:00 p.m., noon, Friday, August 1S, 2003, to file a reply to the responses to its Fourth Motion to Enforce Settlement Agreement and for Allied Relief (Doc. No. 3760). The reply should be short (no more than five pages), and citations of authority are more desired than prose. This Order provides an opportunity to reply and is not a mandate. IT IS SO ORDERED this 13 th day of August 2003. THIS DOCUMENT ENTERED ON DOCKET SHEET IN COMPLIANCE WITH RULE 58 A~9(a) FRCF , ON ~-t ~-0;\\ B 3:\u0026gt;Q +:: ~ FAX COVER SHEET UNITED STATES DISTRICT COURT EASTERN DISTRICT OF ARKAI'fSAS  TO; Chris Heller Sam Jones Steve Jones Richard Roachell John Walker Timothy Gauger Mark Hagemeier Alm Marshall Mark Burnette Scott Smith Clay Fendley Will Bond Mike Wilson DATE: f. D. O'b Telephone: 501-604-5140 Fax Number: 501-604 5149 376-2147 376-9442 375-1027 374-4187 682-2591 682-2591 371-0100 375-1940 682-4249 907-9798 982-9414 982-9414 There are )--pages, including this Cover Sheet, being sent by this facsimile transmission. MESSAGE SENT BY: Office of Judge Wm. . Wilson, Jr. U.S. Dis1:rict Court 600 West Capitol, Room 423 Little Rock, Arkansas 72201 Matt Morgan, LRSD Law Clerk 501-604--5141 IN THE UNITED STATES DISTRICT COURT EASTERN DISTRICT OF ARKANSAS WESTERN DIVISION LITTLE ROCK SCHOOL DISTRICT V. NO. 4:82CV00866WRW PULASKI COUNTY SPECIAL SCHOOL -DISTRICT NO. 1, ET AL. MRS. LORENE JOSHUA, ET AL. KATHERINE KNIGHT, ET AL. GREG BOLLEN, JAMES BOLDEN, RECEIVED AUG 1 8 2003 OFFICE OF DESEGREGATION MONITOIHNG PLAINTIFF DEFENDANTS INTERVENORS INTERVENORS MARTHA WHATLEY and SUE ANN WHISKER MOV ANTS/INTERVENORS PCSSD CONSOLIDATED BRIEF IN SUPPORT OF ITS REPLY TO ALL RESPONSES TO ITS FOURTH MOTION TO ENFORCE SETTLEMENT AGREEMENT I. Ripeness Hardship would be occasioned to the PCSSD because it is required to pay for the detachment election even though most of its patrons are denied the right to vote. The current proceedings do not interfere with an on-going administrative action because the State Board has already ordered the election. Simply stated, the legislature should not have passed a statute which substantially affects the ability of the PCSSD to desegregate and which violates Section II.J of the Settlement Agreement. All matters currently pending \"flow from\" passage of the statute. 440824-v1 II. The Settlement Agreement While it is fundamentally true that the equal protection arguments presented have an independent constitutional footing, at the same time, \"but for\" the State's enactment of an unconstitutional statute and the State Board's activation of that statute, these claims would have no reason to arise. The situation presented is much the same as confronted the Court of Appeals in 1990. After first finding that the District Court should have approved the desegregation plans, it then went on to note that: \"If the plans had been approved, the question of appointment of a metropolitan supervisor would never have arisen, and the tri-district plan would neither had been written nor submitted. The order appointing a metropolitan supervisor and commanding the parties to comply with the tri-district plan therefore necessarily falls along with the order declining to approve the settlement plan submitted by the parties. 921 F.2d 1371 at 1388. Here, had the legislation never been passed, the equal protection claims would have never had occasion to arise. Accordingly, in this literal sense, all of the issues presented now flow from the Settlement Agreement. ,. m. Equal Protection The PCSSD adopts that certain memorandum brief filed by the individual school board directors on August 8, 2003. The Bollen intervenors have simply missed the point with their argument that the board members have \"no constitutional right to vote on detachment.\" Bollen Mem. Brief at 4. The Bollen intervenors have no constitutional right to vote on detachment, either. What both parties have, however, is a constitutional right to vote on equal terms with those living in the 440824-v1 2 relevant political jurisdiction. See Board of County Commissioners of Shelby County v. Burson, 121 F.3d 244, 247 (6th Cir. 1997) When a citizen can show that he lives in the relevant jurisdiction, there is a \"strong presumption\" of entitlement to vote in its elections. Id. Indeed, \"exclusion of such a citizen from the franchise is subject to strict scrutiny, and will be only be upheld upon a showing of a compelling state interest.\" Id. ( citing Kramer v. Union  Free School Dist. No. 15, 395 U.S. 621 (1969)). Thus the question before the Court focuses on what is the \"relevant political jurisdiction,\" and it is both irrational and arbitrary to award that label to any jurisdiction other than the preexisting entity charged with the responsibility in question. For purposes of the local government's role in education, there is currently only one jurisdiction--Pulaski County-and only one set of voters whose desires and interests are \"relevant\" to the education of public school students not enrolled in the Little Rock or North Little Rock districts--voters in areas comprising the PCSSD. The appropriate \"jurisdiction\" is the existing school district, for its citizens have a signal and profound interest in the outcome of any election that could alter its boundaries, tax base, student enrollment, and property.\" Furthermore, the state legislature has embraced a definition of the \"relevant political jurisdiction\" that is based on school districts. Having for generations endowed local school districts with the control, taxing authority, voting mechanisms and other indicia of \"the relevant political jurisdiction\" for public education purposes, the legislature cannot turn on its heels by enacting a law that treats a city, or a neighborhood, or state representative district, or historic zoning district as the \"relevant political jurisdiction\" entitled to make its own public education choices free from the desires of the larger and authentic \"relevant political jurisdiction\" already in place. 440824-v1 3 Compounding the equal protection dilemma is the fact that the State wrote the statute in a way that it currently applies only to the PCSSD and no other school district. While it is true that the Waldron School District meets the \"square mile test\", only the PCSSD meets the enrollment test of a district between 15,000 and 20,000 students. The statute applies neither to the largest school district in the State, the Little Rock School District, nor any of the next 100 1argest districts in terms of enrollment. Thus, those patrons residing in the PCSSD in areas other than those proposed for detachment are the only voters disenfranchised statewide. The detachment effort is the legal equivalent of a divorce. However, the party \"moving out\" does not get to control the process in a divorce. Rather, both parties are accorded due process and equal protection of the law. However, in the case of this attempted divorce, the State has seen fit to allow the party moving out to control the process. This is unfair, denies equal protection and should be declared unconstitutional. 440824-v1 Respectfully submitted, WRIGHT, LINDSEY \u0026amp; JENNINGS LLP 200 West Capitol Avenue, Suite 2300 Little Rock, Arkansas 72201-3699 (501) 371-0808 FAX: (501) 376-9442 '- By __ ~~\"\"t\"------=-------:-::,~~------- pecial s 4 CERTIFICATE OF SERVICE On August 15, 2003, a copy of the foregoing was served via facsimile and U.S. Mail on the following: Mr. Scott Smith General Counsel Arkansas Department of Education #4 Capitol Mall, Room 404-A Little Rock, AR 72201 Mr. John C. Fendley, Jr. John C. Fendley, Jr., P.A. 51 Wingate Drive Little Rock, AR 72205 Mr. John W. Walker John W. Walker, P.A. 1723 Broadway Little Rock, Arkansas 72201 Mr. Christopher Heller Friday, Eldredge \u0026amp; Clark 2000 Regions Center 400 West Capitol Little Rock, Arkansas 72201 Ms. Ann Brown Marshall ODM One Union National Plaza 124 West Capitol, Suite 1895 Little Rock, AR 72201 Mr. Ray Simon Director of the Arkansas Department of Education 4 State Capitol Mall Little Rock, Arkansas 72201-1071 440824-v1 5 Mr. Mike Wilson Mr. Will Bond 602 W. Main Jacksonville, AR 72076 Mr. Timothy Gauger Assistant Attorney General 323 Center Street, Suite 200 Little Rock, AR 72201 Mr. Mark A. Hagemeier Assistant Attorney General Arkansas Attorney General's Office 323 Center Street, Suite 200 Little Rock, Arkansas 72201 Mr. Stephen W. Jones 3400 TCBY Tower 425 West Capitol Avenue Little Rock, Arkansas 72201 Mr. Richard Roachell Roachell Law Firm Plaza West Building 415 N. McKinley, Suite 465 Little Rock, Arkansas 72205 Mr. Clayton Blackstock Mr. Mark Burnett 1010 W. Third Street Little Rock, AR 72201 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 ~end~ Chamberlin t)r, /:, Yd ,n C,,11f'ere,.'-~ (501 l 982-941 _ (j p. 2 / ,P',,1 IN THE UNITED STATES DISTRICT COURT EASTERN DISTRICT OF ARKANSAS WESTERN DIVISION LITTLE ROCK SCHOOL DISTRICT, Plaintiff, v. 1 . PULASKI COUNTY SPECIAL SCHOOL DISTR:ICT _NO. 1, et al., Defendants. No. 4:82CV00866WRW Monday, August 18, 2003 Little. Rock, Arkansas 10:06 a.m. MRS. LORENE JOSHUA, et al., Intervenors. KATHERINE KNIGHT, et al., Intervenors. GREG BOLLEN, JAMES BOLDEN, MARTHA WHATLEY, and SUE ANN WHISKER, . Movants/1:ntervenors TRANSCRIPT OF MOTIONS HEARING BEFORE THE HONORABLE WILLIAM R. WILSON, JR . , UNITED STATES DISTRICT JUDGE APPEARANCES: On Behalf of Little Rock School District: MR. CHRISTOPHER HELLER, Attorney at Law Friday, Eldredge \u0026amp; Clark Regioris Center, Suite 2000 400 West Capitol Avenue Little Rock ; Arkansas 72201-3493 On Behalf of Pulaski County Special School District : MR. M. SAMUEL JONES, II 1, . At t.orney at Law Wright, Lindsey \u0026amp; Jennings 2200 NationsBank Bui1ding -200 West Capitol Avenue Little Rock, Arkansas 72201-3699 El aine Hinson, RMR, CRR, CCR United States Court Reporter [Continued] FILED EAsrMR~ g',f~1,g ~~sAS IN THE UNITED STATES DISTRICT COURT .Allr, l S 200l EASTERN DISTRICT OF ARKANSAS LITTLE ROCl( DMSION .::MES W. McCORMACK, CLERK D~PCLERI( LITTLE ROCK SCHOOL DISTRICT PLAINTIFF V. No. 4:82CV00866 WRW PULASKI COUNTY SPECIAL SCHOOL DISTRICT NO. l, ET AL. MRS. LORENE JOSHUA, ET AL. KATHERINE KNIGHT, ET AL. GREG BOLLEN, JAMES BOLDEN, MARTHA WHATLEY AND SUE ANN WHISKER ORDER DEFENDANTS INTERVENORS INTERVENORS INTERVENORS For the reasons stated in the finding facts in conclusion with the law, given earlier today from the bench, aft~r hearing arguments of counsel, the Arkansas Dep:3rtmcnt of Education/State is directed to rescind the vote by which it approved an election in Jacksonville, Arkansas on September 16, 2003-whereby the citizens of that area would vote on the question of whether Jacksonville should be or would be a new district, separate in part fron1 the Pulaski County Special School District (which it is now a part). Additionally, the ADE/State is ordered to notify all affected county clerks and election officials that this rescission has taken place. The findings of fact and conclusions of law stated in court today are adopted and incorporated by reference in this order. Among other things, the facts and conclusions of law announ,~ed from the bench, the \"Bollen Intervenol'l!\"' Motion to Intervene (Doc. No. 3766) and the Motion to Intervene by the PCSSD Board Members in their individual capacities (Doc. No. 3769) are DENIED. IT IS SO ORDERED this 181h day of August, 2003 THIS 0OCUMENT ENTERED ON_ DOCKET SHEET IN COMPLIANCt: WITH RULi= 513 AND~79(a) FRCP ON 8-l t-o~. BY S+l q d FILED U.S. DISTRICT COURT EA.STERN DISTRICT ARl(ANSAS IN THE UNITED STATES DISTRICT COURT Af Jr, t B EASTERN DISTRICT OF ARKANSAS 2003 LITTLE ROCK DMSION JA:-4ES W. McCORMACK, CLERK By. ______ --=,_- oeP Cl..eRI( LITTLE ROCK SCHOOL DISTRICT PLAINTIFF V. No. 4:82CV00866 WRW/.TJ'R PULASKI COUNTY SPECIAL SCHOOL DISTRICT NO. 1, ET AL. MRS. LORENE JOSHUA, ET AL. KATHERINE KNIGHT, ET AL. ORDER DEFENDANTS INTERVENORS INTERVENORS Pending is the Knight Intervenors' Motion to Withdraw as Counsel and for Substitution of Counsel (Doc. No. 3783). The Knight Intervenors assert that former counsel, Richard W. Roachell, has retired :\u0026amp;-.osn the practice of law and requests to withdraw as their counsel. The Knight Intervenors have engaged Clayton Blackstock and Mark Burnette as counsel to replace Mr. Roachell. The Knight Intervenors' motion was addressed at a hearing this morning, August 18,  2003, and was not objected to by any parties in this case. Therefore, the Knight Intervenors may substitute counsel. IT IS so ORDERED this u day of August, 2003. ~~ I I ~4 THIS DOCUMENT ENTERED ON lJ~ DOCKET SHEET IN COMPLIANCE UNITED STATES DISTRICT JUDGE \\NITH RULE 58 ANOlQ_~9{aj FRCF oN re/ t (J{o 3 av~ ~,.,,;o - - ----- ------ - -- - IN THE UNITED STATES DISTRICT COURT Al ltt I 9 2003 FILED U.S. DISTRICT COUR\"T\" EASTE~N OISfRICT ARKA.NSAS EASTERN DISTRICT OF ARKANSAS LITTLE ROCK DIVISION ~~;MES W. McCORMACK, CLERK DEP CLiaRK LITTLE ROCK SCHOOL DISTRICT PLAINTIFF V. No. 4:82CV00866 WRW PULASKI COUNTY SPECIAL SCHOOL DISTRICT NO. 1, ET AL. MRS. LORENE JOSHUA, ET AL. KATHERINE KNIGHT, ET AL. GREG BOLLEN, JAMES BOLDEN, MARTHA WHATLEY AND SUE ANN WHISKER CORRECTED ORDER DEFENDANTS INTERVENORS INTERVENORS INTERVENORS For the reasons stated in the finding facts and conclusions of the law, given earlier today - from the bench, after hearing arguments of counsel, the Arkansas Department of Education/ State Board of Education is directed to rescind the vote and order by which it approved an election in Jacksonville, Arkansas on September 16, 2003-whereby the citizens ,)fthat area would vote on the question of whether Jacksonville should be or would be a new distzict, separate and apart from the Pulaski County Special School District (of which it is now a part). Additionally, the ADE/State Board of Education is ordered to notify all affected county clerks and election officials that this rescission has taken place. The findings of fact and conclusions of law stated in court today are adopted and incorporated by reference in this order. Among other things, the findings of facts and conclusions of law announced from the bench, the \"Bollen Intervenors\"' Motion to Intervene (Doc. No. 3766) and the Motion to Intervene by the PCSSD Board Members in their individual capacitks (Doc. No. 3769) are DENIED. IT IS SO ORDERED this l 9c1, day of August, 2003, nunc pro tune as of August 18'\\ 2003 . THIS DOCUMENT ENTERED ON OOCKEi SHEET IN COMPLIANCE W!Tli.RULE 58 AND/~ ~p ON ~- l 'i-0~ BY'-2-~=-~- u/WI? UltP ==- UNITED STA TES DISTRICT JUDGE TO: FAX COVER SHEET UNITED STATES DISTRICT COURT EASTERN DISTRICT OF ARKANSAS Chris Heller Sam Jones Steve Jones John Walker Timothy Gauger Mark Hagemeier Ann Marshall Mark Burnette Clay Fendley Will Bond Mike Wilson Telephone: 501-604-5140 Fax Number: 501-604 5149 376-2147 376-9442 375-1027 374-4187 682-2591 682-2591 371-0100 375-1940 907-9798 982-9414 982-9414 DATE: \u0026lt;i' I~  o:\u0026gt; - There are \"3 pages, including this Cover Sheet, being sent by this facsimile transmission. MESSAGE SENT BY: Offiai'of Judge Wm. R. w U.S. District Court 600 West Capitol, Room Little Roel:, Arkansas 72201 Matt Morgan, LRSD Law Clerk 501-604-5141 --- - - - - - - ---- - -  - - - - BOND \u0026amp; CHAMBERLIN TulAL LAWYERS 602 W. MAIN JACKSONVILLE, ARKANSAS 72076 l 982-9414 p.2 WILL BOND NEIL CHAMBERLIN August 19 , 2003 TELEPHONE: (501) 982-9411 FAX: (501) 982-9414 VIA FAX 3~6-9442 Sam Jones Wright, L~ndsey \u0026amp; Jennings, LLP Suite 2200 200 W. Capitol Ave. Little Rock, AR 72201-3699 RE: School Di strict Dear Sam: Attached is our Motion for Stay of Judgment. It is our understanding the judge is going to take this up in a 3:00 p.m. telephone conference. Wi th Warmest Regards, Wi ll Bond 'l'WB:tt cc: John Walker Via Fax@ 374-4186 Scott Smith Via Fax@ 682-4249 Christ opher Heller Via Fax@ 376-21 47 Mark Burnette Via Fax@ 375-94 10 St ephen Jones Via Fax@ 375-1027 Ann Marshall Via Fax@ 371-0lOC Ka r la Burnett Vi a Fax@ 340-8282 arpart choo.l\\\"\"\"' jone.aug. 1fl. 03 IN THE UNITED STA'l'ES . OIS'l'RICT COURT EASTERN DISTRICT OF ARDNSAS LITTLE ROCK DIVISION LITTLE ROCK SCHOOL DISTRICT V. No. 4:82CV00866 WRW/JTR J?UI.ASll COUNTY SPECIAL SCHOOL .DISTRICT NO. 1,  ET AL. MRS . LORENE JOSHUA , E'l' AL .  KATHERINE KNIGHT, ET AL. GREG BOLI,.EN, JAMES BOLDEN, PLAINTIFF DEFENDANTS INTERVENORS INTERVENORS MARTHA WHATLEY ANO SUE ANN WHISKER INTERVENORS/MOVANTS MOTION FOR .STAY OF JUDGMENT AND ORDER MADE PURSUANT TO RULE 62 OF THE FEDERAL RULES OF CIVIL PROCEDURE AND TO RULE 8 . A : OF THE EIGB'l'B .C:IRCUIT ROLES OF APELLATE PRACTICE 1. The rules of the Eighth Circ~it require that the moving party request a stay of judgment from the District Court prio r to see king such relief from the Eighth Circui t Court. 2. Yesterday, this Court ente~ed an order in effect stopping an ' election that was to occ~r within the Northeast Pulaski County area on September 16, 2003. P~oposed Intervencrs/Mov~nts conterid that the Order was contrary to existing case law. Particularly, the Fifth Circuit has held that a District Court excee6ed its discretion when it enjoined the ability of a separate s~hool district to naintain its corporate existence and to pursue its organizational rights under state law that did not involve the independent operation p.3 of a desegrating school district. See Ross v. United States 583 F , 2 d 712 5th Cir . ( 1 9 7 8 ) . 3. Failure of this Court to stay its order and judgment until proposed Intervenors/Movants can seek relief from the Eighth Circuit would in essence prohibit an election taking place on September 16, 2003. This Court ordered the State Board of Education to rescind its order of election and to ~nform election officials of the fact that the order had been rescinded and that the election coulc ~ot go forward . . 4. There are certain ministerial acts that election officials must take to ensure that an electio~ could take place on September 16, 2003. Those acts include making absentee - ballots available, ensuring that certain publications are made in newspapers concerning the election, ensur~ng that election officials define which voters are allowed to vote in the detachment election and other duties. 5. As menticned, failure to st~y the order and judgment until relief can be sought from tha Eighth Circuit wo~ld in effect stop the September election. 6. Proposed Intervenors/Movants were denied intervention by this Court in the ace of case law which states that the threshold to intervention is minimal; they are being denied their right to vote pursuant to a statute passed by the duly elected representatives of the General Assembly of State of 2 p. .. - - ~-- . .. Arkansas; and they are being denied their right to organize a school district under state law by this Court. Failure to stay the Court's decision would prohibit an election from being held pursuant to what is a validly passed and enacted state statute. WHEREFORE, Intervenors/Movants request that the Court's order be stayed until relief can be sought frcm the Eighth Circuit Court of Appeals, and for all other just and equitable relief to which they may be entitled. Respectfully S~bmitted, BOND \u0026amp; CHAMBERtIN Trial Lawyers 602 w. Main Jacksonville, AR ~076 Telephone (501) 2 9081 Telefax (501) - 414 CERTIFICATE OF SERVICE i, Will Bond, do hereby certify that I have served a copy of the foregoing pleaoing by United States Mail, addressed to such attorney or party with ,:_~ficier.t prepaid postage to ensure first-class delivery this --f::l..L'-d.ay of August, 2003: Mr. Sam Jones Wright, Lindsey \u0026amp; Jennings, . LLP 200 W. Capitol, Ste~ 2300 ~ittle Rock, AR 72201-3699 S::::ott Smit:i State Department of Education #4 Capito],. Mall Little Rock, AR 72201 Also Via f3x@ 376-9442 Also Via Fax@ 682-4249 3 p.5 Mr. Christopher Heller Friday, Eldredge \u0026amp; Clark, LLP 2000 Regions Center 400 W. Capitol Little Ro~k , AR 72201 Also Via Fax@ 376-2147 John W. Walker P.A. Also Via Fax @ 37 4-4186 1723 S. Broadway\" Little Rock, AR 72206 Mr. Mark 3urnette Also Via Fax@ 3 75-9410 Mitchell, Blackstock, Barnes, Wagoner, Ivers \u0026amp; Sneddon 1010 W. ~hird Street Lit tle Rock, AR Mr. Stephen Jones Jack, Lyon \u0026amp; Jones, P.A. 3400 TCBY Tower 425 West Capitol Avenue ~ittle Rock, AR .72201 Telephone (501)375-1122 Ann Marshall Office of Desegregation Monitoring 1 Union National Plaza 124 W. Capitol, Suite 1895 Little Rock, AR 72201 Ms. Karla Burnett Suite 400, 201 South Broadway Littl e Rock, AR 72201 By: 4 Al s o Via Fax@ 375-1027 Also Via Fax@ 371-0100 Also Via Neil Bar 93222 p.6 To: Ann Marshall Fax: 371-0100 Pharla= Ile: School District  Attachments:  Commentss BOND \u0026amp; CHAMBERLIN Trial Lawyers 602 West Main Street Jacksonville, AR 72076 Telephone (501) 982-9081 Telefa\u0026gt;\u0026lt; (501) 982-9414 Prom: Will Bond Pa ... Including Con,..._.:~ fJ Date: August 19, 2003 The lnfannltlon contained In thl9 fax transmltal ls conlldenttal attorney-client privilaged information and is intended 90ltly for the use of ttle lnclvldual or entity nmnecl H N1Clplent. If this message Is ,-Mid by aomeone other than the Intended niclplant, you .. JIR)hiblled from anv dl.-ninMion, distribution cir copying of tnla ccmmunlcatlon aimept to the addrasH. If thla communication ha bNn received by you in error, or  you ani not aunt of itB intended dlltrl)utlon, plaaN notify the ~ced office at 1.a88-245-1!77. p. 1 IN THE UNITED STATES DISTRICT COURT EASTERN DISTRICT OF ARKANSAS LITTLE ROCK DIVISION LITTLE ROCK SCHOOL DISTRICT V. No. 4:82CV00866 WRW PULASKI COUNTY SPECIAL SCHOOL DISTRICT NO. 1, ET AL. MRS. LORENE JOSHUA. ET AL. KATHERINE KNIGHT. ET AL. GREG BOLLEN, JAMES BOLDEN. MARTHA WHATLEY AND SUE ANN WIDSKER ORDER AUG 19 2003 JAMES WM By:_  cCORMACK, CLERK PLAINTIFF DEFENDANTS INTERVENORS INTERVENORS INTERVENORS Greg Bollen, James Bolden, Martha Whatley, and Sue Ann Whisker, \"intervenors\"/ Movants, filed a Motion for Stay of Judgment and Order Made Pursuallt to Rule 62 of the - Federal Rules of Civil Procedure and to Rule 8.A of the Eighth Circuit Rules of Appellate Practice (Doc. No. 3791). This motion is in response to :findings of facts, conclusions of law, and an Order of this Court (Doc. No. 3790) entered yesterday. Since the Movants' Request for Intervention was denied in yest,~rday's ruling, I have considerable doubt as to their standing to file the above-referenced motion-particularly since the Arkansas Department of Education/State Board of Education declin.ed to join the motion (although it did not specifically oppose the motion); but, be that~ it m.:iy, the motion is hereby denied. IT IS SO ORDERED this I 9m day of August, 2003. THJS DOCUMENT ENTERED ON DOCKET SHEET IN COMF\u0026gt;l.lANCE 0:'~!{~:i,~ A~~=- TO: DATE: FAX COVER SHEET UNITED STATES DISTRICT COURT EASTERN DISTRICT OF ARKANSAS Chris Heller Sam Jones Steve Jones John Walker Timothy Gauger Mark Hagemeier Ann Marshall Mark Burnette Clay Fendley Will Bond Mike Wilson ----- Telephone: 501-604-5140 Fax Number: 501-604 5149 376-2147 376-9442 375-1027 374-4187 682-2591 682-2591 371-0100 375-1940 907-9798 982-9414 982-9414 There are 2 pages, including this Cover Sheet, being sent by this facsimile transmission. MESSAGE SENT BY: P1-t ,;::i::;-? 16-------- Office of Judge Wm. ~son, Jr. U.S. Distric:t Court 600 West Capitol, Room 423 Little Rock, Arkansas 72201 Matt Morgan, LRSD Law Clerk 501-604-5141 4 ' \\ FlLeo .! c: \"\" .... u.s o,sr  ~ TERN D!slR1c;;_r couRT l~T ARKANSAs IN THE UNITED STATES DISTRICT COURT AUG 2 0 2D03 EASTERN DISTRICT OF ARKANSAS ~AyMEs w. McCORv11cK LITTLE ROCK DIVISION  . . 1,..._ , CLERK LITTLE ROCK SCHOOL DISTRICT PLAINTIFF V. No. 4 :82CV00866 WRW/JTR PULASKI COUNTY SPECIAL SCHOOL DISTRI CT NO . 1 , ET AL . MRS . LORENE JOSHUA , ET AL. KATHERINE KNIGHT , ET AL . GREG BOLLEN , JAMES BOLDEN, DEFENDANTS INTERVENORS INTERVENORS MARTHA WHATLEY AND SUE ANN WHI SKER INTERVENORS/MOVANTS NOTICE OF APPEAL Proposed Intervenors/Movants hereby appeal the decisions made by the District Court in the above-referenced case on August 19 , 2003 with judgment being filed on August 19, 2003. This appeal is hereby taken to the Eighth Circuit Court of Appeals. The proposed Intervenors/Movants appeal the denial of their intervention and appeal the District Court ' s ultimate decision granting Pulaski County Special District ' s Motion to Enforce Settlement Agreement . Proposed Intervenors/Movants will be submitting a motion for expedited review and for emergency relief with the Eighth Circuit Court of Appeals . Respectful ly Submitted, BOND \u0026amp; CHAMBERLIN Trial Lawyers 602 W. Main Jacksonville, AR 72076 Telephone (501)982 - 9081 k. Bar #95245 CERTIFICATE OF SERVICE I , Will Bond, do hereby certify that I have served a copy of the foregoing pleading by United States Mail, addressed to  such attorney or party with/,7':;i;ficient prepaid postage to ensure first-class delivery this -#1-'-day of August , 2003: Mr. Sam Jones Wright, Lindsey \u0026amp; Jennings , LLP 200 W. Capitol, Ste. 2300 Little Rock, AR 72201-3699 Scott Smith State Department of Education #4 Capitol Mall Little Rock, AR 72201 Mr. Christopher Heller Friday , Eldredge \u0026amp; Clark, LLP 2000 Regions Center 400 W. Capitol Little Rock , AR 72201 Also Via Fax@ 376-9442 Also Via Fax@ 682-4249 Also Via Fax@ 376-2147 John W. Walker P.A . Also Via Fax@ 374-4186 1723 S . Broadway Little Rock , AR 72206 Mr. Mark Burnette Also Via Fax@ 375-1940 Mitchell , Blackstock , Barnes , Wagoner, Ivers \u0026amp; Sneddon 1010 W. Third Street Little Rock , AR Mr . Stephen Jones Jack , Lyon \u0026amp; Jones, P.A. 3400 TCBY Tower 425 West Capitol Avenue Little Rock , AR 72201 Telephone (501)375-1122 Also Via Fax@ 375-1027 2 Ann Marshall Also Via Fax@ 371-0100 Office of Desegregation Monitoring 1 Union National Plaza 124 W. Capitol, Suite 1895 Little Rock, AR 72201 Ms. Karla Burnett Suite 400, 201 South Broadway Little Rock, AR 72201 By: @ 340-8282 Wil AR Bar 95145 separate school district .pleadings . federal\\motion for appeal.aug.19.03 3 WILL BOND NEIL CHAMBERLIN PRESS BOND \u0026amp; CHAMBERLIN TRIAL L AWYERS 602 W. MAIN JACKSONVILLE, ARKANSAS 72076 August 20 , 2003 Michael~ . Gans , Clerk Eighth ircuit Court of Appeals . 24 . 32 Thomas F. Eagleton U.S. Courthouse 111 10th Street St Louis , MO 63101 14) 244 - 2400 RECEIVED AUG 2 1 2003 DESEGR OFFICE OF EG4fLQ!MdQN/1'(JMW8-9411  FAX (50\"1j~M\u0026gt;-9414 RE : Motion for Expedited Review and Stay o f Order of District Court Dear Mr . Gans : Enclosed along with this letter are a copy of our file marked Notice of Appeal , a certified copy of docket entries , and a copy of the order of the District Court from which we are appealing . Also enclosed are the original and five COQies of our Motion for Ex edited Review and Stay of: t-he... Di tr ict Gou_rt dB . If you could please file-mark these pleadings and return a file-marked copy to us in the self- addressed , stamped envelope enclosed , your help would be greatly appreciated. One of the exhibits to the motion is a transcript of the proceedings. As I mentioned to you on the telephone , the transcript was not to be completed until August 21 , 2003 . We intend to fax the transcript to you so that you will have it in the record. By copy of involved of our TWB : tt Enclosure ( s ) this letter , I am informing other counsel forwarding these documents to you . I\\ With(; 1 ]mes):_ Regards , ///,_~/ ~i J[d uvc \\ Michael E. Gans August 20 , 2003 Page Two cc: Greg Bollen Sam Jones Scott Smith Christopher Heller John W. Walker P.A . Mark Burnette Stephen Jones/ Ann Marshall Karla Burnett Tim Gauger f. , ?Jh j ~ ldt f+-~~ P c.J~scv,v,'lf.:. 5 1:il-+- UNITED STATES COURT OF APPEALS FOR THE EIGHTH CIRCUIT LITTLE ROCK SCHOOL DISTRICT V. No. 4:82CV00866 WRW/JTR RECEIVED AUG 2 1 2003 OFFICE OF DESEGREGATION MONITOAJNG PLAINTIFF PULASKI COUNTY SPECIAL SCHOOL DEFENDANTS (APPELLEES) . DISTRICT NO. 1, ET AL. MRS. LORENE JOSHUA, ET AL. INTERVENORS KATHERINE KNIGHT, ET AL. INTERVENORS GREG BOLLEN, JAMES BOLDEN, MARTHA WHATLEY AND SUE ANN WHISKER INTERVENORS/MOV ANTS (APPELLANTS) EMERGENCY MOTION FOR EXPEDITED REVIEW AND SUSPENSION OF THE RULES PURSUANT TO RULE 2 OF THE FEDERAL RULES OF APPELLATE PROCEDURE AND MOTION FOR EMERGENCY STAY OF JUDGMENT OF THE DISTRICT COURT Come the proposed Intervenors/Movants (appellants), and for their request for expedited review of their appeal and for a stay of the District Court's Order state: 1. On August 20, 2003, proposed Intervenors/Movants, Greg Bollen, James Bolden, Martha Whatley, and Sue Ann Whisker, filed a Notice of Appeal in the above-referenced case. 2. The proposed Intervenors/Movants represented a group of individuals living and residing in approximately the northeast portion of Pulaski County, - Arkansas who sought to form a new school district by detachment pursuant to Ark. ' J IN THE UNITED STATES DISTRICT COURT EASTERN DISTRICT OF ARKANSAS WESTERN DMSION LITTLE ROCK SCHOOL DISTRICT V. NO. 4:82CV00866WRW PULASKI COUNTY SPECIAL SCHOOL DISTRICT NO. 1, ET AL. MRS. LORENE JOSHUA, ET AL. KA THERINE KNIGHT, ET AL. PCSSD MOTION FOR ENLARGEMENT ,. OF TIME TO FILE FEE PETITION The PCSSD for its motion, states: RE/~IYPi AUG 2 5 2003 ) OFFICE OF DESEGREGATION MONITORfNG PLAINTIFF DEFENDANTS INTERVENORS INTERVENORS 1. On August 18, 2003, this Court announced its decision from the Bench granting the PCSSD's motion to enforce Settlement Agreement and for allied relief. A final order was entered on August 19, 2003. 2. Since that time, the putative intervenors have begun the prosecution of a notice of appeal and have requested a stay from the Court of Appeals as well as expedited processing of their appeal. 3. The PCSSD believes that the Court of Appeals will deal with these issues on some kind of expedited basis and that it would promote judicial economy to await the Court of Appeals' ruling on a stay before presenting any motion for attorneys' fees and costs in this Court. 443086-v1  J 4. The PCSSD thus requests an enlargement of time until and including twenty (20) days after the Court of Appeals issues its ruling on the putative appellants' request for a stay before finalizing and filing any motion for attorneys' fees and costs. WHEREFORE, the PCSSD prays for an order of this Court enlarging its time until and including twenty (20) days after The United States Court of Appeals for the Eighth Circuit issues it ruling upon the pending stay request, and for all proper relief. 443086-v1 Respectfully submitted, WRIGHT, LINDSEY \u0026amp; JENNINGS LLP 200 West Capitol Avenue, Suite 2300 Little Rock, Arkansas 72201-3699 (501) 371-0808 FAX: (501) 376-9442 2 CERTIFICATE OF SERVICE On August 22, 2003, a copy of the foregoing was served via U.S. Mail on the following: Mr. Scott Smith General Counsel Arkansas Department of Education #4 Capitol Mall, Room 404-A Little Rock, AR 72201 Mr. John C. Fendley, Jr. John C. Fendley, Jr., P.A. 51 Wingate Drive Little Rock, AR 72205 Mr. John W. Walker John.W. Walker, P.A. 1723 Broadway Little Rock, Arkansas 72201 Mr. Christopher Ileller Friday, Eldredge \u0026amp; Clark 2000 Regions Center 400 West Capitol Little Rock, ArkanSas 72201 Ms. Ann Brown Marshall ODM One Union National Plaza 124 West Capitol, Suite 1895 Little Rock, AR 72201 443086-v1 Mr. Mike Wilson Mr. Will Bond 602 W. Main Jacksonville, AR 72076 Mr. Timothy Gauger Assistant Attorney General 323 Center Street, Suite 200 Little Rock, AR 72201 Mr. Mark A. Hagemeier Assistant Attorney General Arkansas Attorney General's Office 323 Center Street, Suite 200 Little Rock, Arkansas 72201 Mr. Stephen W. Jones 3400 TCBY Tower 425 West Capitol Avenue Little Rock, Arkansas 72201 Mr. Richard Roachell Roachell Law Firm Plaza West Building 415 N. McKinley, Suite 465 Little Rock, Arkansas 72205 Mr. Clayton Blackstock Mr. Mark Burnett 1010 W. Third Street Little Rock, AR 72201 3 IN THE UNITED STATES DISTRICT COURT EASTERN DISTRICT OF ARKANSAS LITUE ROCK DMSION LITTLE ROCK SCHOOL DISTRICT V. No. 4:8lCV00866 WRW PULASKI COUNTY SPECIAL SCHOOL DISTRICT NO. 1, ET AL. MRS. LORENE JOSHUA, ET AL. KATHERINE KNIGHT, ET AL. GREG BOLLEN, JAMES BOLDEN, MARTHA WHA UEY AND SUE ANN WIIlSKER ORDER FILED U S DISTRICT COURT EASTE;RN DISTRICT ARKANSAS AUG 2 5 2003 JAMES W. McCORMACK, CLE By: CEP CL PLAINTIFF DEFENDANTS INTERVENORS INTERVENORS INTERVENORS Pending is PCCSb's Motion for Enlargement of Time to File :Fee Petition (Doc. No. 3797). If any party has an objection to this extension, that party, or parties, should file a response within three days of the date of this order. IT IS SO ORDERED this 25th day of August, 2003. THIS DOCUMENT ENTERED uN DOCKET SHEET lN COMPLIANCE WITH RULE 58 AN~ FRCf- ON R-~~ ...o~ BY Q..) 111 !!Lfl{;J~ ~ATESDISTRICTGE WM. R. WILSON, JR. . TO: FAX COVER SHEET UNITED STATES DISTRICT COURT EASTERN DISTRICT OF ARKANSAS Chris Heller Sam Jones Steve Jones John Walker Timothy Gauger Mark Hagemeier Ann Marshall Mark Burnette Clay Fendley Will Bond Mike Wilson Telephone: 501-604-5140 Fax Nwnber: 501-604 5149 376-2147 376-9442 375-1027 374-4187 682-2591  682-2591 371-0100 375-1940 907-9798 982-9414 982-9414 DATE: __\u0026lt;3 _Z_~_-_17_\"J - There are Z-pages, including this Cover Sheet, being sent by this facsimile transmission. MESSAGE SENT BY: ~~?\"?-tr~ Office of Judge Wm. R. w n, Jr. U.S. District Court 600 West Capitol, R 423 Little Rock, Arkansas 72201 Matt Morgan, LRSD Law Clerk 501-604-5l41 Raymond Simon Director State Board of Education JoNell caldwell, Chair Utt/a Rock Shelby HIiiman, Vice Chair Carlisle Luke Gordy Van Buren Robert Hackler Mountain Home calvln King Marianna Randy Lawson IIJJJJ.fonvllle W.,Jane Rebick little Rock Diane Tatum Pine Bluff Jeanna Westmoreland Arkadelphia Arkansas Department of Education #4 Capitol Mall, LiJtle Rock, AR 72201-1071 August 28, 2003 501-682-4475 Mr. M. Samuel Jones, III Wright, Lindsey \u0026amp; Jennings 200 West Capitol, Suite 2000 Little Rock, AR 72201 Mr. John W. Walker John Walker, P.A. 1723 Broadway Little Rock, AR 72201 Mr. Mark Burnette Mitchell, Blackstock, Barnes, Wagoner, Ivers \u0026amp; Sneddon P. 0. Box 1510 Little Rock, AR 72203-1510 Mr. Christopher Heller Friday, Eldredge \u0026amp; Clark 400 West Capitol, Suite 2000 Little Rock, AR 72201-3493 Mr. Stephen W. Jones Jack, Lyon \u0026amp; Jones 425 West Capitol, Suite 3400 Little Rock, AR 72201 Ms. Ann Marshall One Union National Plaza 124 West Capitol, Suite 1895 Little Rock, AR 72201 htlp:/ larkedu.staJe.ar.us RECEIVED AUG 2 8 2003 OFFICE OF DESEGREGATION MONITOmN  RE: Little Rock School District v. Pulaski County Special School District, et al. US. District Court No. 4:82-CV-866 Dear Gentlemen and Ms. Marshall: Per an agreement with the Attorney General's Office, I am filing the Arkansas Department of Education's Project Management Tool for the month of August 2003 in the above-referenced case. If you have any questions, please feel free to contact me at your convenience. ld:~ General Counsel Arkansas Department of Education SS:law cc: Mark Hagemeier ,, UNITED STATES DISTRICT COURT EASTERN DISTRICT OF ARKANSAS WESTERN DNISION LITTLE ROCK SCHOOL DISTRICT PLAINTIFF V. No. LR-C-82-866 PULASKI COUNTY SPECIAL SCHOOL DISTRICT NO. 1, et al DEFENDANTS NOTICE OF FILING In accordance with the Court's Order of December 10, 1993, the Arkansas Department of Education hereby gives notice of the filing of the ADE's Project Management Tool for August 2003. Rg::z~ Scott Smith, #92251 Attorney, Arkansas Department of Education #4 Capitol Mall, Room 404-A Little Rock, AR 72201 501-682-4227 CERTIFICATE OF SERVICE I, Scott Smith, certify that on Augu~ 2003, I caused the foregoing document to be served by depositing a copy in the United States mail, postage prepaid, addressed to each of the following: Mr. M. Samuel Jones, III Wright, Lindsey \u0026amp; Jennings 200 West Capitol, Suite 2000 Little Rock, AR 72201 Mr. John W. Walker John Walker, P.A. 1 723 Broadway Little Rock, AR 72201 Mr. Mark Burnette Mitchell, Blackstock, Barnes Wagoner, Ivers \u0026amp; Sneddon P. 0 . Box 1510 Little Rock, AR 72203-1510 Mr. Christopher Heller Friday, Eldredge \u0026amp; Clark 400 West Capitol, Suite 2000 Little Rock, AR 72201-3493 Mr. Stephen W. Jones Jack, Lyon \u0026amp; Jones 425 West Capitol, Suite 3400 Little Rock, AR 72201 Ms. Ann Marshall One Union National Plaza 124 West Capitol, Suite 1895 Little Rock, AR 72201 ~od~ ottSmith RECEIVED AUG 2c1 2003 OFFICE OF OESEGREGATIOH MONITORING Fl I s:: D --- ~-'= U.S. 01s\"rl:t1t'f COURT EASTERN DISTRICT ARKANSAS AUti 2 8 2003 JAMES W. McCORMACK, CLERK By_ --------,o=e=p-=c.,..,Le=R\"\"\"K IN THE UNITED ST ATES DISTRICT COURT EASTERN DISTRICT OF ARKANSAS WESTERN DMSION LITTLE ROCK SCHOOL DISTRICT CASE NO. 4:82CV00866WRW/JTR PULASKI COUNTY SPECIAL SCHOOL DISTRICT :tvIB.S. LORENE JOSHUA, ET AL. KATHERINE KN1GHT, ET AL. MOTION FOR EXTENSION OF TIME PLAINTIFF DEFENDANTS INTER VENO RS INTER VENO RS Come now the Joshua Intervenors, by and through undersigned counsel, for their Motion - for Extension of Time to submit a fee petition regarding PCSSD's Motion to Enforce the Settlement Agreement, state: 1. The Joshua Intervenors believe their counsel is entitled to a fee award. 2. Counsel, therefore, requests that the court allow undersigned counsel the same time it allows counsel for PCS SD to file such motion and supporting documentation and brief 3. Counsel incorporates by reference the motion and supporting documentation of the PCSSD in this matter. WHEREFORE, the Joshua Intervenors pray that the Court enter an order granting Joshua's counsel such time that His Honor allows the PCSSD file its petition for fees, costs and other appropriate relief Respectfully submitted, John W. Walker Rickey Hicks John W. Walker, P.A. 1723 Broadway Little Rock, AR 72206 501-374-3758 501-374-4187 (fax) I do hereby state that a copy of the forego 0 motion has been served all counsel of record on this 28th day of August, 2003. IN THE UNITED STATES DISTRICT COURT EASTERN DISTRICT OF ARKANSAS LITTLE ROCK DIVISION LITTLE ROCK SCHOOL DISTRICT PLAINTIFF V. No. 4:82CV00866 WRW/JTR PULASKI COUNTY SPECIAL SCHOOL DISTRICT NO. 1, ET AL. MRS. LORENE JOSHUA, ET AL. KATHERINE KNIGHT, ET AL . GREG BOLLEN, JAMES BOLDEN, DEFENDANTS INTERVENORS INTERVENORS MARTHA WHATLEY AND SUE ANN WHISKER INTERVENORS/MOVANTS ORDER OF TRANSCRIPTS PURSUANT TO RULE 10 OF THE FEDERAL RULES OF APPELLATE PROCEDURE Appellants , Greg Bollen , James Bolden , Martha Whatley and - Sue Ann Whisker , have ordered from the court reporter a transcript of the entire proceeding which consists of one hearing and a telephone conference . Appellants have already made payment for the transcript . The entire transcript has been ordered . Respectfully Submitted , Bond \u0026amp; Chamberlin Trial Lawyers 602 West Main Street Jacksonville , AR 72076 Telephone (501) - 9081 Telefax (501) 8 - 414 By : W.1.l Bar 95145 CERTIFICATE OF SERVICE I , Will Bond , do hereby certify that I have served a copy of the foregoing pleading by United States Mail , addressed to such attorney or party wit~~ujfj'ficient prepaid postage to ensure first-class delivery this ~ay of August , 2003: v  Mr . Sam Jones Wright , Lindsey \u0026amp; Jennings , LLP 200 W. Capitol , Ste . 2300 \"Little Rock , AR 72201 - 3699 Scott Smith State Department of Education #4 Capitol Mall Little Rock , AR 72201 Mr . Christopher Heller Friday , Eldredge \u0026amp; Clark , LLP 2000 Regions Center 400 W. Capitol Little Rock , AR 72201 John W. Walker P .A. 1723 S . Broadway Little Rock , AR 72206 Mr . Mark Burnette Mitchell , Blackstock , Barnes , Wagoner , Ivers \u0026amp; Sneddon 1010 W. Third Street Little Rock , AR Mr . Stephen Jones Jack , Lyon \u0026amp; Jones , P .A. 3400 TCBY Tower 425 West Capitol Avenue Little Rock , AR 72201 Telephone (501) 375 - 1122 Ann Marshall Office of Desegregation Monitoring 1 Union National Plaza 124 W. Capitol , Suite 1895 Little Rock , AR 72201 2 - Ms . Karla Burnett Suite 400 , 201 South Broadway Little Rock, AR 72201 Tim Gauger Senior Assistant Attorney General 323 Center Street Suite 200 Little Rock , AR 72201 - 2610 By: 3 AR Bar 95145 WILL BOND BOND \u0026amp; CHAMBERLIN TRIAL LAWYERS 602 W. MAIN JACKSONVILLE, ARKANSAS 72076 _.,A,- ugust 28 , 2003 TELEPHONE: (501) 982-9411 FAX: (501) 982-9414 NEIL CHAMBERLIN / Mr. James W. Mc mack 402 ffice \u0026amp; Courthouse 600 Ca  ol Avenue Little R\u0026amp;ck , AR 72201 - 3325 RE : In the United States District Court , Eastern District of Arkansas , Little Rock Division , Little Rock School District v . Pulaski County Special School District no. 1 , et al. , Katherine Knight , et al ., Greg Bollen , et al ., Case No . 4 : 82CV00866 WRW/JTR Dear/~ . McCormack : Enclosed are an original and .two copies of an Order of Transcripts Pursuant to Rule 10 of the Federal Rules of Appellate Procedure in the above- referenced case. Please fil e this pleading and return file-marked copies to me in the encl osed self- addressed , stamped envelope . Thank you for your attention to this TWB : ab Enclosure(s) cc: Elaine Hinson Greg Bollen Sam Jones Scott Smith Chris Heller John Walker Mark Burnette Stephen Jones / Ann Marshall Karla Burnett Tim Gauger ( Regards , RECEIVED r::P 2  2003 OFFICE OF DESEGREGATION MONITORING UNITED STATES COURT OF APPEALS FOR THE EIGHTH CIRCUIT LITTLE ROCK SCHOOL DISTRICT V. No. 03-3088 PLAINTIFF PULASKI COUNTY SPECIAL SCHOOL DEFENDANTS (APPELLEES) DISTRICT NO. 1, ET AL. MRS. LORENE JOSHUA, ET AL. INTERVENORS KA THERINE KNIGHT, ET AL. INTERVENORS GREG BOLLEN, JAMES BOLDEN, MARTHA WHATLEY AND SUE ANN WHISKER INTERVENORS/MOV ANTS (APPELLANTS) CORPORATE DISCLOSURE STATEMENT Appellants, Greg Bollen, James Bolden, Martha Whatley and Sue Ann Whisker, are not a - corporate entity and do not have any parent corporation. Appellants file this statement to comply with Rule 26. l of the Federal Rules of Appellate Procedure and 26. l A of the Eighth Circuit Rules. Respectfully Submitted, Bond \u0026amp; Chamberlin Attorneys for Plaintiff 602 West Main Street Jacksonville, AR 72076 Telephone (501) 982-9 1 Telefax (501) 982-941 By: CERTIFICATE OF SERVICE I, Will Bond, do hereby certify that I have served a copy of the foregoing pleading by United States Mail, addr;;\u0026gt;s;:911~uch attorney or party with sufficient prepaid postage to ensure first-class delivery this p..t aay of August, 2003: Mr. Sam Jones Wright, Lindsey \u0026amp; Jennings, LLP 200 W. Capitol, Ste. 2300 Little Rock, AR 72201-3699 Scott Smith State Department of Education #4 Capitol Mall Little Rock, AR 72201 Mr. Christopher Heller Friday, Eldredge \u0026amp; Clark, LLP 2000 Regions Center 400 W. Capitol Little Rock, AR 72201 John W. Walker P.A. 1723 S. Broadway Little Rock, AR 72206 Mr. Mark Burnette Mitchell, Blackstock, Barnes, Wagoner, Ivers \u0026amp; Sneddon 1010 W. Third Street Little Rock, AR Mr. Stephen Jones Jack, Lyon \u0026amp; Jones, P.A. 3400 TCBY Tower 425 West Capitol Avenue Little Rock, AR.72201 Telephone (501)375-1122 Ann Marshall Office of Desegregation Monitoring 1 Union National Plaza 124 W. Capitol, Suite 1895 - Little Rock, AR 72201 2 Ms. Karla Burnett Suite 400, 201 South Broadway Little Rock, AR 72201 Tim Gauger Senior Assistant Attorney General 323 Center Street Suite 200 Little Rock, AR 72201-2610 By: 3 WI LL BOND NEIL CHAMBERLIN Michael E. Gans~ Clerk BOND \u0026amp; CHAMBERLIN TRIAL LAWYERS 602 W. MAIN JACKSONVILLE, ARKANSAS 72076 August 28 , 2003 Eighth Circui Court of Appeals 24 . 329 s F. Eagleton U.S . Courthouse 111 S . Street St. Lo s , MO 63101 (314) 244 - 2400 TELEPHONE: (501) 982-9411 FAX: (501) 982-9414 RECEIVED SEP 2 - 2003 OFACEOF DESEGREGATION MONITORING RE : United States Court of Appeals for the 8th Circuit , Case No . 03 - 3088 Dear Mr . Gans : Enclosed are an original and five copies of a Corporate Disclosure Statement in the above- referenced case . Please file and return file - marked copies to me in the enclosed self-addressed , stamped envelope . Thank you for your attention to this matter . Regards , TWB : ab Enclosure(s) Michael E. Gans August 20 , 2003 Page Two cc: Greg Bollen Sam Jones Scott Smith Christopher Heller John W. Walker P .A. Mark Burnette Stephen Jones Ann Marshall  Karla Burnett FILED US DISTRICT COURT EAST!:~,;. DISTRICT AF!KA~JSAS IN THE UNITED STATES DISTRICT COURT AUG 2 9 2003\" EASTERN DISTRICT OF ARKANSAS LITTLE ROCK DMSION JAMES W. McCORMACK, CLERK LITTLE ROCK SCHOOL DISTRICT V. No. 4:82CV00866 WRW/JTR PULASKI COUNTY SPECIAL SCHOOL DISTRICT NO. 1, ET AL. MRS. LORENE JOSHUA, ET AL. KATHERINE KNIGHT, ET AL. ORDER By: DEP CLERK PLAINTIFF DEFENDANTS INTERVENORS INTERVENORS Pending is Joshua Intervenors' Motion for Extension of Time (Doc. No. 3799) to submit a fee petition regarding PCSSD's Motion to Enforce Settlement Agree:ment. Joshua Intervenors' motion is GRANTED. IT IS SO ORDERED this 29th day of August, 2003. UN!WuS~WJIJ!lti Wm. R. WILSON, JR. TO: DATE: FAX COVER SHEET UNITED STATES DISTRICT COlURT EASTERN DISTRICT OF ARKANSAS Chris Heller Sam Jones Steve Jones Jolm Walker Timothy Gauger Mark Hagemeier Ann Marshall Mark Burnette Clay Fendley Will Bond Mike Wilson e-z..y.o-, Telephone: 501-604-5140 Fax Nwnber: 501-604 5149 376-2147 376-9442 375-1027 374-4187 682-2591 682-2591 371-0100 375-1940 907-9798 982-9414 982-9414 There are Z. pages, including this Cover Sheet, being sent by this facsimile transmission. MESSAGE SENT BY: ?\"\"'t:~~9~-- Office of Judge Wm. R. W~ U.S. District Court 600 West Capitol, Room 423 Little Rock, Arkansas 72201 Matt Morgan, LRSD Law Clerk 501-604-5141    This project was supported in part by a Digitizing Hidden Special Collections and Archives project grant from The Andrew W. Mellon Foundation and Council on Library and Information Resources.\u003c/dcterms_description\u003e\n   \n\n\u003c/dcterms_description\u003e   \n\n  \n\n\n   \n\n   \n\n   \n\n\n   \n\n   \n\n   \n\n\n   \n\n  \n\n \n\n\n   \n\n   \n\n   \n\n\n   \n\n   \n\n   \n\n\n\n   \n\n   \n\n   \n\n\n   \n\n   \n\n  \n\n  \n\n   \n\n\n   \n\n   \n\n   \n\n\n   \n\n   \n\n   \n\n   \n\n   \n\n   \n\n\n\n\n\n   \n\n   \n\n   \n\n   \n\n\n   \n\n   \n\n   \n\n\n   \n\n   \n\n   \n\n   \n\n\u003c/item\u003e\n\u003c/items\u003e"},{"id":"bcas_bcmss0837_1758","title":"Brief regarding Pulaski County Special School District (PCSSD), response to petition to de-annex territory from PCSSD, motion to enforce settlement agreement, motion and support for allied relief, Arkansas Department of Education (ADE) project management tool, and Office of Desegregation Management report.","collection_id":"bcas_bcmss0837","collection_title":"Office of Desegregation Management","dcterms_contributor":null,"dcterms_spatial":["United States, 39.76, -98.5","United States, Arkansas, 34.75037, -92.50044","United States, Arkansas, Pulaski County, 34.76993, -92.3118","United States, Arkansas, Pulaski County, Little Rock, 34.74648, -92.28959"],"dcterms_creator":["United States. District Court (Arkansas: Eastern District)"],"dc_date":["2003-07"],"dcterms_description":null,"dc_format":["application/pdf"],"dcterms_identifier":null,"dcterms_language":["eng"],"dcterms_publisher":["Little Rock, Ark. : Butler Center for Arkansas Studies. Central Arkansas Library System"],"dc_relation":null,"dc_right":["http://rightsstatements.org/vocab/InC-EDU/1.0/"],"dcterms_is_part_of":["Office of Desegregation Monitoring records (BC.MSS.08.37)","History of Segregation and Integration of Arkansas's Educational System"],"dcterms_subject":["Little Rock (Ark.)--History--21st Century","Education--Arkansas","School districts","Pulaski County Special School District","Arkansas. Department of Education","Project management","Office of Desegregation Monitoring (Little Rock, Ark.)","Elementary schools","Harris Elementary School (North Little Rock, Ark.)","Education--Finance","School integration","School enrollment","African Americans--Education","Education--Evaluation","Magnet schools","Teachers"],"dcterms_title":["Brief regarding Pulaski County Special School District (PCSSD), response to petition to de-annex territory from PCSSD, motion to enforce settlement agreement, motion and support for allied relief, Arkansas Department of Education (ADE) project management tool, and Office of Desegregation Management report."],"dcterms_type":["Text"],"dcterms_provenance":["Butler Center for Arkansas Studies"],"edm_is_shown_by":null,"edm_is_shown_at":["http://arstudies.contentdm.oclc.org/cdm/ref/collection/bcmss0837/id/1758"],"dcterms_temporal":null,"dcterms_rights_holder":null,"dcterms_bibliographic_citation":null,"dlg_local_right":["Available for use in research, teaching, and private study. Any other use requires permission from the Butler Center."],"dcterms_medium":["filing"],"dcterms_extent":["57 pages"],"dlg_subject_personal":null,"dcterms_subject_fast":null,"fulltext":"\u003c?xml version=\"1.0\" encoding=\"utf-8\"?\u003e\n\u003citems type=\"array\"\u003e  \u003citem\u003e   \n\n   \n\n   \n\n\n   \n\n   \n\n\n   \n\n\n   \n\n   \n\n\n   \n\n   \n\n\n   \n\n   \n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n   \n\n \n\n \n\n \n\n\n   \n\n   \n\n   \n\n\n   \n\n  \n\n   \n\n\n   \n\n  \n\n   \n\n\n   \n\n \n\n\u003cdcterms_description type=\"array\"\u003e   \n\n\u003cdcterms_description\u003eBefore the Arkansas State Board of Education, brief of the Pulaski County Special School District (PCSSD) in re: petition to de-annex territory from the Pulaski County Special School District (PCSSD); District Court, fourth motion to enforce settlement agreement and for allied relief; District Court, memorandum brief in support of fourth motion to enforce settlement agreement and for allied relief; District Court, statement of material facts; District Court, notice of filing, Arkansas Department of Education (ADE) project management tool; District Court, notice of hearing; District Court, notice of filing, Office of Desegregation Management report, ''Update on the Redesign of Harris Elementary School and the Rezoning of Schools in the Sherwood Area of the Pulaski County Special School District (PCSSD)''    This transcript was create using Optical Character Recognition (OCR) and may contain some errors.     I P. 03 RECEIVED BEFORE THE ARKANSAS STATE :SOARD OF EDUCATION JUL 1 O 2003 OFFICEOF DESEGREGATION MONITORING IN RE: PETITION TO DE-ANNEX TERRITORY FROM THE PCSSD BRIBf OF TiiE PCSSD Introduction Prior to tl1e hearing held on June 9, 2003, the PCSSD submjtted its \"Analysis\" of how the detachment, if approved, would negatively impact desegregation not only in the PCSSD but in tllc LRSD and the NLRSD as well. For -lbe _convenience of the Board another ~PY is included as Exhibit 1. The PCSSD asked ti1at 1hat document be made-part of the record and its cssenLial conclusions will only be briefly reiterated here . Although the PCS SD believes that its previously submitted Analysis is more than ample reason to deny Lhe petition for detachment, there is an even more fundamental reason why it should be turned down. SifI!Ply stated, the 1989 Settlement Agreement with the State, to which this -Board is a signatory i precJudes such a usurpation of the District's sovereignty and independence. 428241-vl The Settlement Agreement Provision Section II J of_the 1989 comprehensive Settlement Agreement states in its entirety: The State, Joshua and LRSD recognize that PCSSD and NLRSD are independent, sovereign desegregating school districts -operating pursuant to court orders and agreements and chat this agreement is both necessary and desirable to facilitate their desegregation activities as well as their cooperative desegregation .activities with the LRSD and others. [emphasis added] ----- - -- -- -- ~ Thi, language, whiCh remain, operative, was notsome idle boileiplaie.or filler. Indeed, as we will explain .further, it was not part of the original agreement between the State, LRSD and Joshua but was only negotiated after.the State had first reached .agreement with the LRSD and then turned its attention toward securing agreement from the PCSSD and the NLRSD. Further, thcr.e was a real and immediate specter of consolidation which prompted this _] negotiated language which, whHe it survived the legislative and judicial approval process, came I under attack from many legislators, commentators and in editorials. Indeed, for those who did not personally participate in or who do not clearly recall this historic process, a brief chronology might be useful. 1982 1985 1985 Late 1988 January 12, 1989 January 31, 1989 4?.8244-vl Not So Ancient History The LRSD sues the State, the PCSSD and the NLRSD successfully seeking consolidation of the three districts in Pulaski County. 9Zl F.2d 1371@ 1376. The Court of Appeals rejects consolidation but orders that the boundary between LRSD and PCSSD be adjusted. 921 F .2d 1371 @ 1377. This boundary adjusLinent caused PCSSD to lose sixteen schools and over one-third of its tax base_ Initial setLlerncntdiscussions are commenced among the State, the LRSD and the Joshua Intervenors. 921 F.2d 1371 @ 1376 . . Senator Jerry Jewell introduces Senate Bill 39 to consolidate the Little Rock, North Little Rock.and _P.ulaski County Special School District schools. Exhibit 2. The State Board, LRSD and Joshua Intervenors reach a proposed seulcment. The State's attorney reports that \"meetings to obtain-t11e agreement of the otl1er _parties are underway today between attorneys and representatives of the State Boar\u0026lt;l, PCSSD aml NLRSD.\" Exhibit 3. 2 i -I vUI.. I February 14, 1989 March 1989 March 3, 1989 March 7, 1989 March 11, 1989 March U, 1989 March 16, 1989 428244-vl The State hires t.lie national law furn of Hogan \u0026amp; Hartson which specialized in school desegregation to advise it concerning desegregation. Exhibit 4. Counsel .for the LRSD delivers a draft of Proposed Settlement Agreement to the State's attorney. This draft does not contain a Section II J. Exhibit 5. The settlement is agreed to by all of the parties. The final version contains Section 11 J. Exhibit 6. It is submined to the legislature for funding. In an editorial discussing the settlement, the. Arkansas Gazette note~: that: \"A key-provision is that the Little Rock, North Little Rock- and Pulaski County School Districts recognize that they remain  independent, sovereign desegregating' districts. This could -becon,e an impediment to a countywide consolidation in the future, and if so it is an unfortunate pr.ovision.\" Exhibit 7. The Atkansas Gazette reports that the county district's attorney told the county board that the settlement went through 27 revisions before being made publi~ because of the complexity of the issues. Exhibit 8. .In .explaining .the settlement to the Joint Budget Committee, the State's attorney noted that: \"This agreement. is so fragile that if it starts to unravel in any way, if there's any kind of modification to it, it'.s .going co fall apart and unravel in 100 djffcreht ways.\" In the same articfo, Senator Max Howell noted he djd not wanno vote Jor1he settlement if it meant forever prohibiting consolidation of the three county districts. \"I'm not antagonistic toward the dollars, but I am concerned that I .under.stand the small print.\" Exhibit 9. One starewide commentator, in characterizing Section II J, o.pined that: \"A brazen provision slipped into this settlement at the last minute guarantees there will be no consolidation of the school districts. Surprise!\" Exhibit 10. The Arkansas Senate approves the bill funding the settlement but .idds an amendmenr asking tbe Federal Courts to consider four changes in the seLtlcment including: \"Disapproval of language that would rctiin the autonomy of the three Pulaski County districts-.\" As Senator Max Howell stated: \"I would hope tbt: Court woulil be aware that we hl the Legislature feel the folks who caused this should not continue to be in control of the situation.\" Exhibit 11. 3  I l '  II March 18, 1989 March 24, 1989 March 31, 1989 December 11, 1989 December 12, 1990. The press reported that: \"Legislators have expressed concern that the provision would forever bar the State from merging the three districts, ancl the State Education Department's attorney told them Monday that McCutcheon (the _special Master) apparently shared that concern. n Exhibit 11. Press reports described II J as one of.the \"key\" provisions of the settlement. Exhibit 12. Mr. Herschel Friday writes the attorneys for the parties noting that: \"During the debate which preceded the v.ote to fund the settlement in this case, l was repeatedly questioned on whether changes requested by the legislature could be made in the settlement. A copy of the requested changes is enclosed for your ready reference. I agreed to follow through to see that the legislative requests were auly considered by .the .parties and to use my best efforts in this regard. . .. Will you please discuss these requests with your clients so that we can meet in the near future and address these matters .\" Exhibit 13. A copy of the requested changes, which included Section II J, is attached~ Exhibit 14 . Counsel for the AEA informs.Mr. Friday that they object to removing a.ny of the items from the settlement agreement. Exhibit 15. The District Court purports to approve the settlement agreement but only after imposing certain modifications. 726 F.Supp. 1544, 1549. The Court of Appeals reverses the District Court, ruling that the Settlement Agreement should hav.e been .approved as written by the parties. 971 F.2d 160 @ 164, 165. It should thus be clear that Section n J. was a key component of the settlement for which the PCSSD (as well as the NLRSO) separately negotiated. The reasons are clear, Not only was the PCSSD guarding against consolidation, but also any new usurpation of its territory. facilities and assets similar to the appropriation (albeit by judicial order) that occurred in the .early phases of the school case. While it is clear that many in the legislature 42$M4-vl 4  and those \"commentin_g on tbe scene\" opposed Section II J., the fact remains that it is an l integral part of the Settlement Agreement and retains full force and vitality today. In his June 4, 2003 letter, the Attorney General appropriately discussed the fact that while \"successor district\" language was included in the settlement agreement as respects the LRSD, it noted thar no such language is presented as regards the PCSSD or the NLRSD. As lhe Attorney General explained: All of this suggests that either (a) the parties simply did not anticipate that a \"successor\" district might be created from territory that was formerly within1he PCSSD, or (b) the parties specificaHy intended that there would not be any such \"successor\" district created under any circumstances, or that any successor district would not be a parcy to the Settlement Agreement. Subparagraph (b) of course is the correct outcome because of the presence of Section II J. On the san1e page and same footnote the Attorney General further noted that: Logic suggests, however, that a group of individual schools could not so easily extricate themselves from federal court supervision (and court-imposed obligations) in a desegregation case by merely \"detaching\" themselves from a schooJ district under supervision, at least not without the consem of all parties to the case and the Court overseeing the litigation. (Emphasis supplied). The Attorney General notes in his last footnote that: In this parcicular case, the parties with standing to object would be the Sr.ate it.o;clf, the three Pulaski County districts, and the 1osbua and Knight intervenors. The Potential For New Claims The principal motivation for the State to enter into and subsequently fund the Settlement Agreement was co minimize the dollar cost for its past constitutional violations and to obtain a release -of all claims for .all v.iolations which had occurred prior to execution of the Settlem~nt Agreement. While the State has been subjected to successful .claims by the school districts for 4282411-vl 5 ~ I I departures from the Settlement Agreement, it has, thus far, for over fourteen years, avoided a cbim or contention that .it has violated the constitution or enacted statutes which either prom~\u0026gt;tc segregation or hamper desegregation. 1 However, the statute at issue, by its own legislative language, sets up an interesting dynamic not otherwise present in ATkansas law. As counsel for the Pcpanment of Education and the Attorney General's office have repeatedly pointed out: \"the state board is proh~itcd by law from approving any petition fo1 detachment which hampers, delays or in any manner negative~y affects desegregation efforts of a school district or districts .in this state.\" Even if the Board makes a negative determination on this issue, it is virtually a foregone conclusion that one or another or more of the parties in the school case would contend in Federal Court that the detachment does \"hamper, delay or ... negatively affects  desegregation efforts ... \", would seek to hoist the State upon the petard of its own legislation, and, if successful, expose the State to new claims for millions of dollars, an exposure the S1ate avoic.Js if it .properly denies the petition. Indeed, it would appear that the legjsJature had the proscriptions of the Settlement Agreement in mind when it crafted this very narr.ow and rigorous test for detachment. The Settlement Agreement at page 10 states: \"The State will enact no legislation which has a substantial adverse impact on the ability of the [Pulaski] I  Districts to desegregate.\" 1 After each legisl:llive session, die ADE invites the PCSSD, as well as the olher Pulaski disu-icrs, to identify aew lc!gislation which the district believes will hamper or negatively affecc its desegregation efforts. The PCSSD duly noted by }ell.er dated April 26, 2002, thaUt believed tile detachment scaruce at issue would negatively -:tffoct it; desegregation efforts. 4282'14-vl 6 Thus, those who might pursue a new claim, where none currently exists, would likely si.multancously argue that the Settlement Agreement itself has been breached, a claim that carries with it not only the potential for new money damages .but substantial legal fees as well. The petitioners are correct that the racial balance tests for the -PCS SD accommodate a growing. black enrollment. However, the racial balance test is only a fraction of the issue involved. By ultimately approving a new school district, the State- will have participated in a process that artificially accelerates the evolution of the PCCSD to a majority black school district. When all three districts become majority black, then the State will argue that its oblig~tion to fund M-to.:M payments will suddenly and abruptly end. (Indeed, a cynic.might wonder if there are those in authority who may have already figured this out.) lf and when this day comes, the financial consequenct;S to the three current districts in this county would be crippling. Thus, to lhc extent that the State endorses steps to hasten and accelerate this day, then perhaps a new round of claims against the Slate would logically follow. The black student population of the PCSSD has grown on average between one-half percent and one percent per year. By accelerating tlle process by 6.5 -percentage points (sec further analysis) in 1hc year of detachment, the State will have \"gained\" approximately 7 .5 years toward the day when M-to-M funding might end. (See 15 years enrollment trend.) The Detachment Statute Constitutes Impermissible Special Local Legislation The Arkansas Constimtion succinctly provides that: \"The legislature shall not pass any local or-special Act\". (Arkansas Constitution Amendment 14). 428244vl 7 I'   l As the staff of -the ADE can verify, this statute, by its tcnns, can_only apply to the _PCSSD. No ot:h,er school district in the State meets the quaJifying characteristics of the legislation. Further, there is no plausible .argument that the statute could ever apply to any other school district in Arkansas -in the future. -Bottom line: It was carefully crafted to apply only to the Jacksonville area, cannot apply elsewhere, and as such is impermissible special, local legislation which should not be enforced. Not-All Of The Pai1ies Have Been Consulted_ The Attorney General's letter ofJime 4, 2003 (hereafter-the June 4 letter), strongly urges the Board to seek input from the three school districts in Pulaski as well as Joshua and the Knight Intervenors before determining whether or not .creation of the new district would \"hamper, delay, or in any manner affect 'desegregation efforts of a school district or distrkts in the State.\" While tht'. PCSSD has supplied information to the Board, the -PCSSD is unaware that the Knight Intcrvenors have been solicited for their input. The Focus Of The Petitioner's New Submissions Is Much Too Nan-ow As .the June 4 lctter explains (and even Mr. Fendley's letter quotes the same language), dest:grcgation includes much more than racial balance from school to school. Accordingly, the Board should look nor only at student assignments, but to every facet of school operations including faculty, staff, transportation, extl'acurricular activities and facilities. (June 4 letter at page 2). While the submissions of the petitioners do touch upon student assignment, faculty and somewhat upon transportation, there is no mention of staff (which is also unionized in the PCSSD) or extracurricular activities. This omission alone is sufficient for this Board to 428244-vl 8 I   1 conclude that insufficient information concerning desegregation in the area of staff and extracurricular activities has been presented. While .the supplemental submissions address current enrollments by school, enrolhnents before and after M-to-M and magnet transfers and deployment .of staff at schools, (all under cenain assumptions about which we will write later), the submission is otherwise largely devoid of analysis and specificity, particularly as it relates to specific matters set forth in the PCSSD's \"Analysis\" previously submitted to this Board. '\\, for instance, there is scant mention of the three specialty schools. in th~ southeast portion of Pulaski County, all of which contain programs which were specifically designed for aml gained Court approval for .desegregation. The supplemental filings simply do not contest the PCSSD calculation that approximately 200 students from the area proposed for detachment  attended those schools last year. These students are necessary for the continued vitality of these programs, all of which feed to Mills Uniyersity Studies High School, recently recognized as the 201 !, \"best\" high school in the country. }lewsweek, May 2003. (Exhibit 16). Does this Board really want to play a role in undermining one of the most shining success stories in Arkansas .education? el 1 Included as Exhibit 17 is a memor11ndum from Davis Hendricks, the.District Director of Talented and Gifted Programs, prepared the day after the Board's June 9 hearing. The memorandum explains at least two things. First, it shows the extensive array of AP courses currently available at both JacksonviJle High School and North Pulaski High School. It also explains in some detail how the detachment would negatively impact the College Station, .Fuller and Mills progl'ams. 428244-vJ 9 - I  While the supplemental submissions do purport to Cl!lculate enrollment in the / \u0026lt;letachment.schools if M-to-M and magnet transfers ended, Lhey singularly do not provide any analysis as to what affect the lack of such transfers would have not only upon the finances of the PCSSD but upon the schools and finances affected in the NLRSD.and .theLRSD. Although the June 4 letter was necessarily fairly general in most respects, it was quite ~pecific as regards certain areas. As the Allorney General opined: (a]ny detachment of a significant amount of territory from the PCSSD could almost certainly be expected to have an \"impact\" on the -PCSSD's ability to comply with its desegregation plan and have an impact on the operation of the Settlement Agreement, including the Agreement's provisjons concerning M.:M students and the Magnet schoolsjh the LRSD. Teacher Deployment As to teacher deployment, the petitioners stake out thena1ve position that the Federal  District Court could simply order all the teachers to stay where they are. This assumption ignores the realities of teacher unions, teacher contracts and previous admonitions from the United States Court of Appeals. For instance, the PCSSD successfully enjoined an on-goinJ teacher strike fo .1996. The union appealed to the Federal Court of A.ppeals arguing that the union negotiated contract beLwccn lhc PCSSD and .the Teachers' Union was none of the District Court's business. The Court of Appeals agreed, reversed the District Court ~d explained to the parties that the role of the District Court is to enforce the Settlement Agreement (which is silent as to the master contracts), but not to otherwise interfere with the rights of employees and organizations of employers. 112 F.3d 953 @ 955 . . Petitioners' position is completely silent regarding recognition of a new teacher organization for a new district . .Is this or js this not pan of their proposed calculus? As the.! 428244-vl 10 - - - - - --- -  PCSSD knows from prior difficult and n-ying circrunst\u0026gt;nccs, many teacliers prefer working in / a district which reco_gnizes a union. I I  e l J The PCSSD \"Analysis\" Revisited Petitioners claim u1at Exhibit 5 in their supplemental submission demonstrates that detachment will not have a negative impact upon the PCSSD. However, even though petitioners purport to have used data obtained from the PCSSD, the PCSSD cannot reconcik its data with chat presented by tne petitioncr.2 For instance, petitioners' Exhibit 5 predicts that the detached school district would have 3,345 elementary students of whom 34.1 % would bt! black. However, the PCSSD .calculates lhat the detached district would have 3,700 elementrtry srudents of wlmm only 32. 7% would be black. (Exhibit 18).. At the secondary level, the petitiom;:rs project 3,750 students of whom 36.6% would be black. While the total number calculated by the PCSSD is similar a.t 3,757, it calculates that ollly 32.4 % of those students would be black. (Exhibit 18). Since the petitioners calculate that the residual PCSSD would be 39 % black, there is a difference of six and one-half percentaie points. Also, while the petitioners project a .total .enrollment of 7,095 students, the PCSSD calculates that the new district would enrolt 7,457 srudents. (Exhibit 18), As for individual schools, the impact upon Clinton Elementary is profound. Detachmem would cause the loss of 124 sLudents and would push Clinton from 55 % black to 60% black. (Exhibit 18). It is required to be no more than 50% black. : The PCSSD once a.ga.iu 1ecommends that these discrepancies be .evaluated by the staff of the ADE. 4282M-vl 11 )  l' -! l e l I As we previously projected, 61 students would leave College-Station reducing its enrollment from 215 .to 159. (Exhibit 18) . This would artificially increase the black population at College Station from the current 55 % to 59 % black. The enrollment at Sylvan Hills Middle School would increase from 878 to 972, the African-American percentage would increase from 39 % to 45 % and the building capacity of 925 would be grossly exceed~d- (Exhibit 18). Court Orders While the petitioners seek to cast doubt upon the over capacity reported for the Sylvan Hills schools, they are either unaware of the fact or.have neglected to inform the Board that as recently as March 25, 2003, the District CoUit noted that: Fur.ther, the Court is jnformed that Sylvan Hills Middle School no Ionger has tho capacity .to .accommodate all 6111 _grade M-to-M students who attended Clintou Interdistrict School through the 5111 grade. Those students should be informed of their opportunity to attend the new middle school in Mawnelle. (Order, Exhibit 19, at page 2.) Accordingly, the PCSSD supplements its previous Analysis and reiterates its point that the displaced students, many of whom are black, who the petitioners submit can \"easily be accommodated at Sylvan Hills\" simply cannot be. Part of the detachment proposal flies in the face of another order entered by the District Court on January 28, 2003. In evaluating and approving the PCSSD plans for the redesign of Harris Elementary School, the Federal Court ruled that: 428244-vl African American students from Brushy Island will not be reassigned to Harris but will continue to attend Cato El~mentary. Cato Elementary student enrollment will.remain 75% Caucasian (white) and 25% African American (black). (Order, Exhibit 20 at page 2.) 12 \\ I  l Of course, the petitioners arc excluding the Brushy lsland students from Cato and are leaving them .to he assigned somewhere in the PCSSD. The petitioners say send them to Sylvan Hills but there is no room. The Court has .said they will not be reassigned to Harris. Where can they go? Another aspect of the Court's January order as respects Harris requires the PCSSD to vigorously recruit minority snidents (white) from north of the river for placement at Harris. The Director of Equity and Multicultural Education was ordered to direct this \"intensification\" of.eff 01t. Of course, if most of the PCSSD nonh of the river is allowed to detach, it will render the PCSSD substantially unable to comply with this order. Sylvan Hills Petitioners make some rather astonishing suggestions regarding Sylvan Hills High School. At page 6 of counsel's letter, the following statements are made: Moreover, even assuming a real capacity problem at Sylvan Hills High School, the District Court coo.ld address the problem in a number.of ways to avoid any negative affect on desegregation. One option may be to revise the attendance zones for all of PCSSD's high schools. The ODM reported that the PCSSD has .nor revised its attendance zones in \"many years\" and recommended that it do so. See ODM March 26, 2003, pp. 19 and 21. Another option may be to discontinue the school's specialty program that allows smdents residing outside the attendance zone to attend the school. This program was implemented to increase the African-American enrollment at the school at a tirnc when it was below the minimum of 20 percent. The African-American enrollment at the school in 2002-03 was 35 percent. This calls into question the continuing need for the program to increase African-American enrollment. A rhir4 option may be to build additional classrooms at Sylvan Hills High School. The PCSSD recently addcdnew classrooms at Robinson High.Sc;:hool to address overcrowding at that school. In short, a capacity problem at Sylvan Hills High School can easily be addressed without negatively affecting desegregation. 428244-vl 13 i  l I I J, e l As to revisingattendancezones or disestablishing a specialty program, a cardinal rule in desegre_gation is \"if it ain't broke, don't fix ic\". Any effort to disestablish a successful program would .immediately be attacked by Joshua. Moreover, ifthe PCSSD is compelled Lo build .additional classrooms because of the efforts of the pelitioners and the actions of the State, who is going to pay for this construction? The petitioners? The State'? The upshot of petitioners' suggestions is that the \"suggestions\" prove that the detachment would have a negative impact on desegregation in the PCSSD. Further, they ignore the fact lhat .much of the increase in black enroilment at Sylvan Hills is M-to-M students from- the LRSD. To discontinue or ecn diminish the specialty program, affects not only the; PCSSD but the LRSD as well. F..nrollmcnt The foasibility study at page 1 predicts the new district would contain 5,700 students. Alternative IV predicts 6,578. The supplemental submissions (Exhibit 5) predicts the new district will contain approx.imately 7,500 students if transfers cease. The numbers keep growing and growing. While the feasibility study forecasts that the PCSSD would remain .the .second largest district in the State, it is clear that a comparison of petitioners' Exhibit5 to its \"district size\" exhibit would relegate the PCSSD to only the sixth largest district in the State with fewer tban 10,500 students. (Before the Pulaski County school desegregation case was filed, the PCSSD boasted an enrollment of almost 33;000 students and was by far the largest school district h1 the State.) 42.SZ44-vl 14  I e l l ! Such a dramatic reduction in enrollment will undoubtedly require a reduction in force not only among teachers and staff but within the Central Office as well. Such dislocations, heartache and ,car.eer affecting decisions will be unnecessary if this Board finds the petition to be invalid. Further, lhe feasibility study points outthatdensity ofstudents per square mile would improve from 25 in. the current PCSSD to approximately 53 students per square mile- in 'the new dislrict. While the feasibility study boasts that this will irnprnve transportation in the new district, it singularly fails to point out that the current density of 25 students per square mile logically and .necessarily becomes far less in the residual PCSSD. This sets up the real potential for more and longer bus rides, less efficiency and an undoubted ne_gative impact upon desegregation and the district's ability to stem enrollment declines and to attract more students . The Stipulations The M~to-M stipulation and the magnet schools stipulation are just that: Stipulated agreements among all of the parties. Therefore, as a threshold matter, it would seem that the specific written consent of Joshua, the Knight Intervenors, the Norl.h Little Rock School District, the J,irtle Rock School District, the State and the PCSSD would be required before tllese \"agreements\" cm1ld be made operative as to a detaching district. Indeed, as w~ know from the Eig_hth Circuit, a District Coun cannot impose agreements but can only -accept or reject them. 921 .F.2d 1371@ 1388. Further. both stipulations are part of the 1989 Settlement Agreement. It seems log.ical that the Agreement would have to be renegotiated and rc--cxecuted by all of the parties to the case to include the new district. Query, would the re, negotiated agreement then have to be submitted to the next session of the legislature to 428244-vJ 15 . I  dctcnnine if !he legislature was Willing l-0 fund tl1i modified agreement? Again, as the Eighth Circuit has taught us, the District Court cannot impose an agreement upon the parties to this case unless they all consent. I  Federal-Court An emerging strategy of the petitioners seems to be to shift as muc~ of the process ar,d decision making as possible to the. Federal District Court often re-assuring this 'Board that the Federal Court can do whatever is necessary to 1mpose obligations, agreements and the like. We have previously explained that the District Court is not all powerful. It cannot, for instance, as we have explained, tell teachers where they are going to teach. It cannot create capacity in sehoolswhere11one exist. Indeed, the current jurisdiction of the District Court 'is \"only\" to enforce the -SettlemGnt Agreement (which it has done) and to monitor and enforce the desegregation plans (which it. continues to do). The detachment statute is, in effect, an effort by a State to confer jurisdiction upon a Federal Court. So far as the PCSSD knows, this effort is unprecedented. It is also highly suspect. However, to the extent that the petitioners ,can convince lhis Board that \"the Federal Court will fix it\", it can perhaps win the authorization for an election, presumably hay..c ,a successful election followed by a large street party and then show up onthe District Court's doorstep with a ten page laundry list of issue!i to be decided. This scenario is not likely to result in a very happy District Court judge. 428244-vl 16  I  I The PCSSD Would Have To Rezone In no shape, .form or fashion does the proposed detachment auempt to follow current Board member 'zoneboundarics. For instance, Zone 5,. from which Board Member Carol Burgett was elected last year, is largely eviscerated. The detachment would require the residual PCSSD. to constitute new zones some seven years in advance of the next census. Tliis would constitute an unnecessary and unwarranted ~xpense and disruption to the governance of the residual PCSSD. Conclusion For all of the foregoing reasons, this Board should determine that the petition is invalid and decline to aulhorize an e1ection. 428244-vl Respectfully submitted, WRIGHT, LINDSEY \u0026amp; JENNINGS LLP 200 West Capitol Avenue, .Suite 2.300 Little Rock, Arkansas 72201-3699 (501) 371-0808 FAX: (501) 376:..9442 -- By ----'-=;,.,,\u0026lt;e---.----:...=-r--f=--- cy Special School 17 EDWARD L. WRIGHT (1903-1977) ROBERT S. LINDSEY (1913-1991) WRIGHT, LINDSEY \u0026amp; JENNINGS LLP ATTORNEYS AT LAW ISAAC A. SCOTT, JR. JOHN G. LILE GORDON S. RATHER , JR . ROGER A. GLASGOW C. DOUGLAS BUFORD , JR. PATRICK J. GOSS ALSTON JENNINGS , JR . JOHN R. TISDALE KATHLYN GRAVES M. SAMUEL JONES Ill JOHN WILLIAM SPIVEY 111 LEE J. MULDROW N.M. NORTON CHARLES C. PRICE CHARLEST. COLEMAN JAMES J. GLOVER EDWIN L. LOWTHER. JR . WALTER E. MAY GREGORY T. JONES H. KEITH MORRISON BETTINA E. BROWNSTEIN WALTER McSPADOEN JOHN 0 . DAVIS JJJOY SIMMONS HENRY VIA HAND DELIVERY The Honorable Wm. R. Wilson, Jr. U.S. District Courthouse 600 West Capitol Avenue, Suite 360 Little Rock, Arkansas 72201 200 WEST CAPITOL AVENUE SUITE 2300 LITTLE ROCK, ARKANSAS 72201-3699 (501) 371 -0808 FAX (501) 376-9442 www . wlj. com OF COUNSEL ALSTON JENNINGS RONALD A . MAY BRUCE R . LINDSEY JAMES R . VAN DOVER Writer's Direct Dial No . 501-212-1273 mjoncs@wlj .com July 25, 2003 R5ElYED JUL 2 8 2003 OFFICE OF DESEGREGATION MONITORING Re: Little Rock School District v. Pulaski County Special School District; et al. USDC Docket No.: 4:82CV00866WRW Dear Judge Wilson: KIMBERLY WOOD TUCKER RAY F. COX . JR . TROY A. PRICE PATRICIA SIEVERS HARRIS KATHRYN A . PRYOR J. MARX DAVIS CLAIRE SHOWS HANCOCK KEVIN W. KENNEDY JERRY J. SALLINGS WILLIAM STUART JACKSON MICHAEL 0 . BARNES STEPHEN R . LANCASTER JUDY ROBINSON WILBER KYLER . WILSON C . TAD BOHANNON KRISTI M. MOODY J. CHARLES DOUGHERTY M. SEAN HATCH J . ANDREW VINES JUSTIN T. ALLEN MICHELLE M. KAEMMERLING SCOTT ANDREW IRBY PATRICK 0 . WILSON REGINA A. SPAULDING Lia::Dsi=d IO pn,cti be\u0026amp;-e tbe UDilt/ Suta hlt:DI ud Tndt:mvt Olfice Enclosed is a courtesy copy of PCSSD's fourth motion to enforce settlement agreement and for allied relief, together with supporting memorandum brief and statement of material facts . The originals have been filed and the parties served. Thank you for your consideration in this matter. Cordially yours, WRIGHT, LINDSEY \u0026amp; JENNINGS LLP MSJ:ao Encls. cc/w/encls.: d,(__ \\ Honorable J. Thomas Ray All Counsel of Record Mr. Ray Simon Mr. Scott Smith Mr. Will Bond Mr. Timothy Gauger Mr. Mark Burnett IN THE UNITED STATES DISTRICT COURT EASTERN DISTRICT OF ARKANSAS WESTERN DIVISION LITTLE ROCK SCHOOL DISTRICT V . NO. 4:82CV00866WRW . PULASKI COUNTY SPECIAL SCHOOL DISTRICT NO. 1, ET AL. MRS. LORENE JOSHUA, ET AL. KATHERINE KNIGHT, ET AL. RECEIVED )-c1.,f \\\u0026lt;J JY7uv{_ JUL 2 8 2003 OFFICE OF DESEGREGATION MONITORING FOURTH MOTION TO ENFORCE SETTLEMENT AGREEMENT AND FOR ALLIED RELIEF PLAINTIFF DEFENDANTS INTERVENORS INTERVENORS The PCSSD for its fourth motion to enforce Settlement Agreement, states: 1. This motion is brought both by the PCSSD and its Board of Directors. The individual directors are named defendants in this action. For purposes of this motion, Directors, Mildred Tatum, Pam Roberts, Don Baker, Jeff Shaneyfeld and Gwen Williams, are moving in both their official and individual capacities because of the equal rights issues asserted herein. 2. This motion is accompanied by a lengthy Statement of Material Facts. The movant respectfully suggests that the reader first examine this Statement for a full and complete context for this motion. 3. On July 14, 2003, the Arkansas State Board of Education purportedly acting - pursuant to Ark. Code Ann.  6-13-1501 , et seq., voted to order an election on September 434830-v1 - 16, 2003, for the purpose of allowing voters in the greater Jacksonville area to consider approval of a ballot measure to detach certain territory from the PCSSD and form a new school district. The statute does not provide for a vote by those residing in other areas of the PCS SD. 4. The statutory scheme, as well as the election which the State has authorized, violates the 1989 Settlement Agreement in this case. This Court has continuing jurisdiction over the State via the Arkansas Department of Education to enforce compliance with the Settlement Agreement. 5. The actions described above violate Section II.J of the Settlement Agreement which states in its entirety: 6. The State, Joshua and LRSD recognize that PCSSD and NLRSD are independent, sovereign desegregating school districts operating pursuant to court orders and agreements and that this agreement is both necessary and desirable to facilitate their desegregation activities as well as their cooperative desegregation activities with the LRSD and others. [emphasis added] The above-described actions also violate Section ILL of the Settlement Agreement which states in pertinent part that: The State will enact no legislation which has a substantial adverse impact on the ability of the Districts to desegregate. 7. As the PCSSD will demonstrate, the creation of a \"new\" district as agreed to by the State Board of Education will both \"substantially affect the ability of the district to desegregate\" and will violate Ark. Code Ann.  6-13-1504(b)(2)(b) since the detachment would \"hamper, delay or in any manner negatively affect desegregation efforts\" of the PCSSD. 434830-v1 2 8. The detachment, if successful in the State-authorized scheme, would call upon this Court to recognize a \"new defendant\" in this 20 year old case while the case is in its remedial phase, liability having been long ago established and subsequently settled in the 1989 Settlement Agreement. This Court should not and cannot embark upon such a slippery slope. Unless or until this case ends, the parties have been established, their liability adjudicated, their differences compromised and settled and a new and different entity should not be introduced to this litigation in the remedial phase. 9. The statute is also unconstitutional because it denies due process and equal protection to those patrons in the PCSSD who do not reside in the area proposed in the petition for detachment and therefore are not allowed to exercise their constitutional right to vote upon the issue. Specifically, Directors Tatum, Williams, Roberts, Shaneyfeld and Baker and all others similarly situated are being denied the opportunity to vote upon the detachment question even though each represents a zone of patrons and voters who will be directly and negatively affected if the detachment is successful. Further, each of them will be negatively affected individually if the detachment proves successful. 10. Discreet provisions of orders of this Court would be violated if the detachment proved successful. For instance, this Court noted on March 25, 2003, that: 434830-v1 Further, the Court is informed that Sylvan Hills Middle School no longer has the capacity to accommodate all 6th grade M-to-M students who attended Clinton Interdistrict School through the 5th grade. Those students should be informed of their opportunity to attend the new middle school in Maumelle. (Order, Exhibit 22 to Statement of Material Facts, at page 2.) 3 However, if the detachment proved successful, several hundred students who currently attend Cato and other schools in the area proposed for detachment would, in the eyes of the petitioners, be reassigned to the several Sylvan Hills schools. Simply stated, there is no room for these students, many of whom are black and no feasible alternative exists for reassignment that does not involve a significant bus ride. 11. The detachment, if successful, would also negatively impact this Court's order of January 28, 2003, which stated in pertinent part that: African American students from Brushy Island will not be reassigned to Harris but will continue to attend Cato Elementary. Cato Elementary student enrollment will remain 75 % Caucasian (white) and 25% African American (black). (Order, Exhibit 23 to Statement of Material Facts, at page 2.) The detachment would leave the Brushy Island students in the residual PCSSD but would take Cato from the PCSSD. The petitioners propose that these students be reassigned to Sylvan Hills as well. However, there is simply no room for these mainly black students and they would face a long bus ride somewhere. 12. Sylvan Hills has proven to be a popular destination for M-to-M students from Little Rock. Obviously, the detachment would place all of the Sylvan Hills schools well over capacity. Since the M-to-M stipulation specifies that M-to-M students can only be accepted on a space available basis, it is likely that all current M-to-M students would have to be evicted from Sylvan Hills if the detachment proved successful. 13. The detachment would artificially accelerate the evolution of the PCS SD to a majority black school district, facilitating the State's inevitable argument that, at such a point, 434830-v1 4 - M-to-M funding should end. The State should not be permitted to effect such an artificial change in enrollment percentages. 14. Mills University Studies High School was recently recognized by Newsweekas the twentieth \"best\" high school in the country. This is a remarkable achievement for any Arkansas school. However, if the detachment proves successful, approximately 200 students from the area proposed for detachment would no longer qualify for transfer to College Station, Fuller Middle and Mills. These three schools are among the centerpieces of Plan 2000 and previous desegregation plans and this Court should not tolerate an action that would likely wreck these successful desegregation programs. 15. If successful, the detachment would work a substantial negative impact upon the current employee force in the PCS SD. The PCS SD calculates it would have to undergo a reduction in force of approximately 475 employees. Since seniority controls such a reduction, the PCSSD would be left with an artificially senior teacher corps and with an artificially imposed salary schedule that would be top heavy in the highest paid teachers. Such an outcome would work a substantial financial hardship upon the PCSSD and interfere with its ability to desegregate. 16. Such a reduction in force would also artificially make the residual PCSSD teacher force whiter than it currently is since the PCSSD has been aggressive the past several years in hiring young minority teachers. These would be the first to be laid off in a reduction in force. 17. If the detachment were successful, Clinton Elementary would lose 124 students and would move from being 55 % black to 60 % black. 434830-v1 5 18. College Station would lose 61 students reducing its enrollment from 215 students to 159. This would also artificially increase the black population at College Station from the current 55 % to 59 % black. 19. The enrollment at Sylvan Hills Middle School would increase from 878 to 972. The building capacity is only 925. Even if they could be accommodated, this infusion of students would increase the enrollment from 39 % black to 45 % black. 20. The detachment, if successful, would reduce the student population in the PCSSD to only approximately 10,500 students. It would change it from the second largest district in the State to only the sixth largest district. With a reduction in enrollment of approximately 7,500 students, the PCSSD would be substantially reduced in its capability to send and receive M-to-M students and to send magnet students to the stipulation magnets. 21. The current student density per square mile in the PCSSD is 25 students per square mile. The detachers calculate that the new district would improve this density to 53 students per square mile in the new district. Logically, however, the current density of 25 students per square mile in the current PCSSD would be significantly reduced leading to longer and less efficient transportation of students in the residual PCSSD and likely imposing an artificial and unwarranted busing burden upon black students. 22. The State Board granted the petition and in its subsequent order for elections based its decision largely upon \"the petitioners' willingness to seek, accept, and comply fully with any and all additional orders and requirements that might be imposed by the Federal Court ... \". The PCSSD submits that that which petitioners seek is legally impossible, particularly as respects the agreements entered into in this case. For instance, the M-to-M 434830-v1 6 - stipulation, the magnet stipulation and the 1989 Settlement Agreement are just that. They are agreements entered among the current parties and this Court cannot \"impose\" those agreements upon a new entity. Rather, all of the parties would have to consent and presumably the legislature would have to concur. 23. As the Court of Appeals has explained, the current jurisdiction of this Court is to enforce the Settlement Agreement and to monitor and enforce the desegregation plans. The detachment statute is an effort by a State to confer jurisdiction upon a Federal Court. The PCSSD knows of no precedent for this effort. 24. This motion is brought now because the action of the State Board in authorizing the election has created a clear and current case or controversy. Since the effects of a detachment are palpable and provable, it is respectfully submitted that this Court should exercise its jurisdiction now to end an effort which violates the Settlement Agreement and would work a manifest injury upon the ability of the PCSSD to carry out its Court approved plans and obligations and would have significant adverse outcomes financially and enrollment wise upon the other parties to this case. WHEREFORE, for all of the foregoing reasons, this Court should enter its order finding that the Settlement Agreement has been violated or that the detachment would work an impermissible negative affect upon the PCSSD's efforts to desegregate and comply with Court orders and agreements entered into with the other parties. For all of these reasons, this Court should enter its order directing the State Board of Education to rescind its order of July 16, 2003, and cancel its authorization for an election. 434830-v1 7 Respectfully submitted, WRIGHT, LINDSEY \u0026amp; JENNINGS LLP 200 West Capitol Avenue, Suite 2300 Little Rock, Arkansas 72201-3699 (501) 371-0808 FAX: (501) 376-9442 Att Sc CERTIFICATE OF SERVICE On July 25, 2003, a copy of the foregoing was served via U.S. mail on each of the following: Mr. John W. Walker John W. Walker, P.A. 1723 Broadway Little Rock, Arkansas 72201 Mr. Christopher Heller Friday, Eldredge \u0026amp; Clark 2000 Regions Center 400 West Capitol Little Rock, Arkansas 72201 Ms. Ann Brown Marshall ODM One Union National Plaza 124 West Capitol, Suite 1895 Little Rock, AR 72201 434830-v1 8 Mr. Mark A. Hagemeier Assistant Attorney General Arkansas Attorney General's Office 323 Center Street, Suite 200 Little Rock, Arkansas 72201 Mr. Stephen W. Jones 3400 TCBY Tower 425 West Capitol Avenue Little Rock, Arkansas 72201 Mr. Richard Roach ell Roachell Law Firm Plaza West Building 415 N. McKinley, Suite 465 Little Rock, Arkansas 72205 Mr. Ray Simon Director of the Arkansas Department of Education 4 State Capitol Mall Little Rock, Arkansas 72201-1071 Mr. Will Bond 602 W. Main . Jacksonville, AR 72076 Mr. Mark Burnett 1010 W. Third Street Little Rock, AR 72201 434830-v1 9 Mr. Scott Smith General Counsel Arkansas Department of Edudation #4 Capitol Mall, Room 404-A Little Rock, AR 72201 Mr. Timothy Gauger Assistant Attorney General 323 Center Street, Suite 200 Little Rock, Arkansas 72201 J IN THE UNITED STATES DISTRICT COURT EASTERN DISTRICT OF ARKANSAS WESTERN DIVISION LITTLE ROCK SCHOOL DISTRICT V. NO. 4:82CV00866WRW PULASKI COUNTY SPECIAL SCHOOL DISTRICT NO. 1, ET AL. MRS. LORENE JOSHUA, ET AL. KATHERINE KNIGHT, ET AL. MEMORANDUM BRIEF IN SUPPORT OF FOURTII MOTION TO ENFORCE SETILEMENT AGREEMENT AND FOR ALLIED RELIEF REf,1~0 JUL 2 8 2003 OFFICE OF DESEGREGATION MONITORING PLAINTIFF DEFENDANTS INTERVENORS INTERVENORS Simply stated, the 1989 Settlement Agreement with the State, to which the State Board of Education is a signatory, precludes any such usurpation of the District's sovereignty and independence, as would result from the detachment the State recently authorized. It is the law of the case that the Court retains jurisdiction to insure that the parties, including the State, comply with the terms of the Settlement Agreement as well as the settlement plans. (Order dated January 13, 1995, at page 2, Docket No. 2337). The Settlement Agreement Provision Section II J of the 1989 comprehensive Settlement Agreement states in its entirety: 435830-v1 The State, Joshua and LRSD recognize that PCSSD and NLRSD are independent, sovereign desegregating school districts operating pursuant to court orders and agreements and that this agreement is both necessary and desirable to facilitate their desegregation activities as well as their cooperative desegregation activities with the LRSD and others. [emphasis added] This language, which remains operative, was not some idle boilerplate or filler. Indeed, as we will explain further, it was not part of the original agreement between the State, LRSD and Joshua but was only negotiated after the State bad first reached agreement with the LRSD and  then turned its attention toward securing agreement from the PCSSD and the NLRSD. (Exhibit 2). Further, there was then a real and immediate specter of consolidation which prompted this negotiated language which, while it survived the legislative and judicial approval process, came under attack from many legislators, commentators and in editorials. (Exhibits 1, 6, 7, 8, 9, 10, 12, and 14). It should thus be clear that Section II J. was a key component of the settlement for which the PCSSD (as well as the NLRSD) separately negotiated. The reasons are clear. Not only was the PCSSD guarding against consolidation, but also against any new usurpation of its territory, facilities and assets similar to the appropriation (albeit by judicial order) that occurred in the early phases of this case. Absent this promise by the State, it had no logical reason to join the settlement. Were it to be either consolidated or carved up into pieces, it would have no reason to settle. While it is clear that many in the legislature and those \"commenting on the scene\" opposed Section II J., the fact remains that it is an integral part of the Settlement Agreement and retains full force and vitality today. In his June 4, 2003 letter (Exhibit 16), generated as part of the proceedings before the State Board, the Attorney General appropriately discussed the fact that while \"successor district\" language was included in the settlement agreement as respects the LRSD, he noted 435830-v1 2 that no such language was presented as regards the PCS SD or the NLRSD. As the Attorney General explained: All of this suggests that either (a) the parties simply did not anticipate that a \"successor\" district might be created from territory that was formerly within the PCSSD, or (b) the parties specifically intended that there would not be any such \"successor\" district created under any circumstances, or that any successor district would not be a party to the Settlement Agreement. Subparagraph (b) of course is the correct analysis because of the presence of Section II J. On the same page and same footnote the Attorney General further noted that: Logic suggests, however, that a group of individual schools could not so easily extricate themselves from federal court supervision (and court-imposed obligations) in a desegregation case by merely \"detaching\" themselves from a school district under supervision, at least not without the consent of all parties to the case and the Court overseeing the litigation. (Emphasis supplied). The Attorney General notes in his last footnote that: In this particular case, the parties with standing to object would be the State itself, the three Pulaski County districts, and the Joshua and Knight intervenors. Section II L. The principal motivation for the State to enter into and subsequently fund the Settlement Agreement was to minimize the dollar cost for its past constitutional violations and to obtain a release of all claims for all violations which had occurred prior to execution of the Settlement Agreement. While the State has been subjected to successful claims by the school districts for departures from the Settlement Agreement, (Statement 1s 20, 21, 22 and 23) it has, thus far, for over fourteen years, avoided a claim or contention that it has violated the constitution or 435830-v1 3 enacted statutes which either promote segregation or hamper desegregation. 1 However, the statute at issue, by its own legislative language, sets up an interesting dynamic not otherwise present in Arkansas law. As counsel for the Department of Education and the Attorney General's office have repeatedly pointed out: \"the state board is prohibited by law from approving any petition for detachment which hampers, delays or in any manner negatively affects desegregation efforts of a school district or districts in this state.\" (Exhibit 16) Indeed, it would appear that the legislature had the proscriptions of the Settlement Agreement in mind when it crafted this very rigorous test for detachment. The Settlement Agreement at page 10 states: \"The State will enact no legislation which has a substantial adverse impact on the ability of the [Pulaski] Districts to desegregate.\" By ultimately approving a new school district, the State will have participated in a process that artificially accelerates the evolution of the PCCSD to a majority black school district. When all three districts become majority black, then the State will argue that its obligation to fund M-to-M payments will suddenly and abruptly end. (Indeed, a cynic might wonder if there are those in authority who may have already figured this out.) If and when this day comes, the financial consequences to the three current districts in this county would be crippling. 1 After each legislative session, the ADE invites the PCSSD, as well as the other Pulaski districts, to identify new legislation which the district believes will hamper or negatively affect its desegregation efforts. The PCSSD duly noted by letter dated April 26, 2002, that it believed the detachment statute at issue would negatively affect its desegregation efforts. 435830-v1 4 This Court has consistently reiterated the proposition that: \"A party may not unilaterally change the implementation or language of an agreement or order without the prior approval of the Court and/or the consent of the parties.\" (Order dated January 13, 1995, at page 10, Docket No. 2337). The State of Arkansas needs to focus on its obligation in the settlement to give the Pulaski County school districts special consideration to enable these districts to meet their numerous and burdensome obligations under the settlement. The Court reminds the State of the Eighth Circuit's specific findings about the State's complicated and lengthy history of promotion of unconstitutional racial segregation which has led to this interminable litigation. The swiftest and surest way out of the federal court is to abide by the terms and spirit of this Settlement Agreement, and this includes following proper procedures for modification of the settlement. (Emphasis in the original) (Order dated January 13, 1995, at pages 16, 17, Docket No. 2337). The Equal Protection Claim Under the new detachment statute, when part of a school district attempts to detach itself from the school district, and become its own entity, a majority vote of only the voters in the area to be detached is permitted. Ark. Code Ann.  6-13-1504(3)(C). This provision is clearly unconstitutional and denies equal protection of the laws to those voters remaining in the original school district who are not allowed to vote even though they will be materially affected by detachment. The United States Supreme Court has stated that if a state statute is challenged on the grounds that it grants the right to vote in a limited purpose election to some otherwise qualified voters, but denies it to others, then the court must be called upon to determine whether the exclusion from the election is necessary to promote a compelling state interest. Kramer v. 435830-v1 5 Union Free School District, 395 U.S. 621, 633 (1969); Cipriano v. City of Houma, 395 U.S. 701, 704 (1969). The Kramer court went further to point out, that when the State's sole justification for the statute is that the classification provides merely a reasonable basis upon which to determine which voters have a special interest in the outcome of the election, then the statute fails to meet the \"exacting standard of precision we require of statutes which selectively distribute the franchise .\" Kramer, 395 U.S. at 632. In determining whether there has been a violation of the equal protection clause, the court's attention should be focused on two inquiries: (1) whether there is a genuine difference in interests among the two groups that the State has created, and (2) if so, whether any resulting increase . in voting strength of one group over the other amounts to discrimination under the Equal Protection Clause. Town of Lockport, N. Y. v. Citizens for Cmty. Action At - the Local Level, Inc., 430 U.S. 259, 268 (1976). In several cases the Supreme Court has allowed the electorate of a special-purpose unit of government to be apportioned to give more weight to a certain sector which is found to be most affected by the government unit's functions. Id. at 266. But, as Kramer points out, the classification of voters into \"interested\" and \"non-interested\" groups must be reasonably precise, and the State must have a compelling state interest that the statute, and its classification of voters, furthers. Kramer, 395 U.S. at 633. Several United State Supreme Court cases demonstrate these principles. For example, in Kramer the court found it was unconstitutional and a violation of equal protection to restrict the voting in a school board election to either those people who paid property taxes or rented homes, or to those people who had children enrolled in the schools. Id. The court applied 435830-v1 6 - heightened scrutiny, and reasoned that this distinction among voters was not necessary to promote a compelling state interest. Id. The court did not afford the usual presumption of constitutionality to this election statute. Presumptions of constitutionality for statutes are based on the premise that the state governments are structured to fairly represent people. Id. at 628. But, when the challenge to the statute is basically a challenge of the basic premise, the premise can no longer serve as the basis for presuming constitutionality. Id. Additionally, the court in Kramer pointed out that the statute defining who could vote in school board elections was not narrowly tailored to serve a compelling state interest, because it was simultaneously too over inclusive both as well as too under inclusive. Id. at 632. The court stated that these election criteria excluded \"senior citizens and others living with children or relatives; military personnel, and others who live on tax exempt property; boarders and lodgers; parents who neither lease nor own qualifying property and whose children are too young to attend school; and parents who neither own nor lease property and whose children attend private school.\" Id. at 630. Further, the Supreme Court in Cipriano, decided that a Louisiana statute conferring the right to vote in bond issuance elections only to those people who paid property taxes was unconstitutional as denying equal protection. Cipriano, 395 U.S. at 704. Just as in Kramer, the Cipriano court pointed out that when the vote, in a special purpose election, is given to some people, but denied to others then the court must determine whether the exclusions are necessary to promote a compelling state interest. Id. The Cipriano court also noted that it is unconstitutional to deny the vote to some people because of the way the members of that group might vote. Id. at 705. 435830-v1 7 Similar to the voting classifications drawn in Kramer and Cipriano, the Arkansas statute which only allows voters in the area to be detached to vote in the detachment proceedings, and denies the vote to those in the remaining area is unconstitutional, because the statute offends the notion of \"one person, one vote.\" By denying interested and affected voters the right to vote, the state is ultimately denying equal protection of the laws to those who are not allowed to vote in this school district election. This distinction of the voters does not further a compelling state interest, and is therefore unconstitutional.2 First, as indicated by the Kramer court, this statute should not be given a presumption of constitutionality because the challenge to the statute is to the basic premise that the laws are created by a fair process. Because the process is being challenged in this case, the usual presumption of constitutionality cannot be afforded. Therefore, in analyzing whether there has been an equal protection violation the court must focus on whether there is a genuine difference of interests among the two groups the state has created, and if so whether the resulting increase in voter strength in one of the groups amounts to discrimination under the Equal Protection clause. Since the Arkansas statute allows only those people residing in the area to be detached the vote, one gets no further than the first step under this analysis. There 2 Indeed, the principal interest being endorsed by the State in this instance is to apply detachment only to the PCSSD. As we noted in our State Court complaint (Exhibit 20), the detachment provision applies by definition only to the PCSSD and to no other school district. Thus, is not even dealing with \"special purpose elections\" Statewide but only to one that is limited to the PCSSD. Stated another way, to the extent that others in other school districts might wish detachment, there is no statutory provision available to them to seek it. The detachment statutes apply neither to the largest district in the State, middle sized districts or the smallest. It applies only to the PCSSD. 435830-v1 8 is no real and distinct difference, and certainly not a compelling difference, in the interests between those in the Jacksonville area and those remaining in the Pulaski County Special School District. The state must have a compelling reason or justification for distinguishing between those wanting to be detached and those who would remain from the original school district. It is not enough to say that distinguishing them in this manner is for purposes of determining who is interested or affected by the election and who is not. The residents of the PCSSD who do not seek to be detached have a real and palpable interest in the matter of the detachment, yet they are being denied the right to vote in the election. If Jacksonville were to detach, this would have a definite and immediate impact on the processes and operations of the other schools that would remain in the PCSSD. School funding, transportation and busing, teacher school assignments, and student assignments would most certainly be affected. The school district would have to immediately reconfigure its processes, resources and operations. Therefore, as a result of the sudden impact the detachment would have on the entire PCS SD, it is disingenuous to claim that those residing in the area that would remain the PCSSD are not interested or affected by this vote. Further, this distinction the State has made is not so precise as to satisfy the exacting standard set forth in Kramer. Just as in Kramer, this election statute is not narrowly tailored to achieving the goal of franchising those people interested or affected by the vote. The statute is over inclusive in the sense that it allows people in Jacksonville to vote that have, at best, a remote or indirect interest and are not affected by the school detachment election whatsoever. For example, a senior citizen residing in Jacksonville with no children, and no more children 435830-v1 9 expected in their lifetime are allowed to vote in this school detachment election. A single airman with no children living in base housing during a two year assignment may vote. On the other hand the statute is under inclusive because it denies the right to vote to those people in the PCSSD who do not live in the Jacksonville area and who would be severely affected by the outcome of the election, such as those people with children currently attending a school in the PCSSD particularly schools such as College Station, Fuller and Mills whose very programs are threatened by the detachment. This distinction is not made with the precision necessary to safeguard equal protection of the law. Negative Impact Upon Desegregation Although the June 4 letter of the Attorney General was necessarily fairly general in most respects, it was quite specific as regards certain areas. As the Attorney General opined: [a]ny detachment of a significant amount of territory from the 435830-v1 PCSSD could almost certainly be expected to have an \"impact\" on the PCSSD's ability to comply with its desegregation plan and have an impact on the operation of the Settlement Agreement, including the Agreement's provisions concerning M-M students and the Magnet schools in the LRSD. The Court of Appeals has previously succinctly explained the M-to-M arrangement: M-to-M students are peculiar to the districts that are parties to the Settlement Agreement. They are students who are of the majority race in their home districts, and who voluntarily transfer to .another Pulaski County district where they are of the minority race. The State, by way of a funding formula contained in the Settlement Agreement, compensates both the home district and the receiving district for each M-to-M student. The home, or sending, district receives one-half of the state aid that it would have received if the student had remained in the district, while the receiving, or host, district receives the full cots of educating the student. (United States Court of Appeals, No. 95-1481EA, Docket No. 2718, Opinion filed May 15, 1996). 10 The three specialty schools in the southeast portion of Pulaski County all contain programs which were specifically designed for and gained Court approval for desegregation. The PCSSD calculates that approximately 200 students from the area proposed for detachment attended those schools last year. These students are necessary for the continued vitality of these programs, all of which feed to Mills University Studies High School, recently recognized as the 20th \"best\" high school in the country. Newsweek, May 2003. Included as Exhibit 17 is a memorandum from Davis Hendricks, the District Director of Talented and Gifted Programs, prepared the day after the Board's June 9 hearing. The memorandum explains at least two things. First, it shows the extensive array of AP courses currently available at both Jacksonville High School and North Pulaski High School. It also explains in some detail how the detachment would negatively impact the College Station, Fuller and Mills programs. The PCS SD calculates that the detached district would have 3, 700 elementary students of whom only 32.7% would be black. At the secondary level, the PCSSD calculates an enrollment of 3,757 and that only 32.4% of those students would be black. Since the petitioners calculated that the residual PCSSD would be 39 % black, there is a difference of six and one-half percentage points. The PCSSD calculates that the new district would enroll 7,457 students. Individual Schools As for individual schools, the impact upon Clinton Elementary is profound. Detachment would cause the loss of 124 students and would push Clinton from 55 % black to 60 % black. It is required to be no more than 50 % black. 435830-v1 11 Clinton is an inter-district school. The Court of Appeals has specifically stated that one of the elements of the Settlement Agreement it considers to be crucial, and with respect to which no retreat should be approved, is the operation of the agreed number of inter-district schools according to the agreed timetable. (Appeal of Little Rock School District, 949 F .2d 253,256 (8th Cir. 1991)). The PCSSD projects that 61 students would leave College Station reducing its enrollment from 215 to 159. This would artificially increase the black population at College Station from the current 55 % to 59 % black. The enrollment at Sylvan Hills Middle School would increase from 878 to 972, the African-American percentage would increase from 39% to 45 % and the building capacity of 925 would be grossly exceeded. Court Orders As recently as March 25, 2003, this Court noted that: Further, the Court is informed that Sylvan Hills Middle School no longer has the capacity to accommodate all 6th grade M-to-M students who attended Clinton Interdistrict School through the 5th grade. Those students should be informed of their opportunity to attend the new middle school in Maumelle. (Order, March 25, 2003) Accordingly, the PCSSD reiterates its point that the displaced students, many of whom are black, who the petitioners submit can \"easily be accommodated at Sylvan Hills\" simply cannot be. 435830-v1 12 Part of the detachment proposal flies in the face of another order entered by the District Court on January 28, 2003. In evaluating and approving the PCSSD plans for the redesign of Harris Elementary School, this Court ruled that: African American students from Brushy Island will not be reassigned to Harris but will continue to attend Cato Elementary. Cato Elementary student enrollment will remain 75 % Caucasian (white) and 25% African American (black). (Order, January 28, 2003). However, the petitioners are excluding the Brushy Island students from Cato and are leaving them to be assigned somewhere in the PCS SD. The petitioners say send them to Sylvan Hills but there is no room. The Court has said they will not be reassigned to Harris. Where can they go? Another aspect of the Court's January order as respects Harris requires the PCSSD to vigorously recruit minority students (white) from north of the river for placement at Harris. The Director of Equity and Multicultural Education was ordered to direct this \"intensification\" of effort. Of course, if most of the PCSSD north of the river is allowed to detach, it will render the PCSSD substantially unable to comply with this order. Sylvan Hills Petitioners make some rather astonishing suggestions regarding Sylvan Hills High School. At page 6 of counsel's letter (Exhibit 17), the following statements are made: 435830-v1 Moreover, even assuming a real capacity problem at Sylvan Hills High School, the District Court could address the problem in a number of ways to avoid any negative affect on desegregation. One option may be to revise the attendance zones for all of PCSSD's high schools. The ODM reported that the PCSSD has not revised its attendance zones in \"many years\" and recommended that it do so. See ODM March 26, 2003, pp. 19 13 and 21. Another option may be to discontinue the school's specialty program that allows students residing outside the attendance zone to attend the school. This program was implemented to increase the African-American enrollment at the school at a time when it was below the minimum of 20 percent. The African-American enrollment at the school in 2002-03 was 35 percent. This calls into question the continuing need for the program to increase African-American enrollment. A third option may be to build additional classrooms at Sylvan Hills High School. The PCSSD recently added new classrooms at Robinson High School to address overcrowding at that school. In short, a capacity problem at Sylvan Hills High School can easily be addressed without negatively affecting desegregation. As to revising attendance zones or disestablishing a specialty program, a cardinal rule in desegregation is \"if it ain't broke, don't fix it\". Any effort to disestablish a successful program would immediately be attacked by Joshua. Moreover, if the PCS SD is compelled to build additional classrooms because of the - efforts of the petitioners and the actions of the State, who is going to pay for this construction? The petitioners? The State? The upshot of petitioners' suggestions is that the \"suggestions\" prove that the detachment would have a negative impact on desegregation in the PCSSD. Further, they ignore the fact that much of the increase in black enrollment at Sylvan Hills is M-to-M students from the LRSD. To discontinue or even diminish the specialty program, affects not only the PCSSD but the LRSD as well. Enrollment While the feasibility study forecasts that the PCSSD would remain the second largest district in the State, the PCSSD calculates it would be relegated to only the sixth largest district in the State with fewer than 10,500 students. (Before the Pulaski County school desegregation 435830-v1 14 case was filed, the PCSSD boasted an enrollment of almost 33,000 students and was by far the largest school district in the State.) Such a dramatic reduction in enrollment will undoubtedly require a reduction in force not only among teachers and staff but within the Central Office as well. Such dislocations, heartache and career affecting decisions are simply unnecessary. Further, the feasibility study (Exhibit 15 at page 39) points out that density of students per square mile would improve from 25 in the current PCSSD to approximately 53 students per square mile in the new district. While the feasibility study boasts that this will improve transportation in the new district, it singularly fails to point out that the current density of 25 students per square mile logically and necessarily becomes far less in the residual PCSSD. This sets up the real potential for more and longer bus rides, less efficiency and an undoubted negative impact upon desegregation and the district's ability to stem enrollment declines and to attract more students. Strong Precedent Supports The PCSSD Position Many unsuccessful efforts to detach from districts operating pursuant to desegregation orders litter the legal landscape in this jurisprudence. The latest appears to be Lee vs. Chambers County Board of Education, 849 F.Supp. 1474, (M.D.Ala. 1994). The case is an outgrowth of Lee vs. Macon County Board of Education, 267 F.Supp. 458 (M.D.Ala.) (threejudge court), aff'd sub nom. Wallace v. United States, 389 U.S. 215, 88 S.Ct. 415, 19 L.Ed.2d 422 (1967). In that case, a three-judge district court ordered Alabama's local school districts, including Chambers County and Lanett City, to disestablish their racially segregated - and discriminatory systems. 435830-v1 15 While the Lee case is procedurally and statutorily complicated, it does bear remarkable similarities to the case at bar. By 1990, the City of Valley, located within Chambers County, had become frustrated with the Chambers County Board of Education believing it had ignored requests to improve the schools in the City of Valley. Id. at 1478. The City of Valley attempted to form its own separate school district which was opposed by the county. Among the complaints of the City of Valley was that the county enrollment had been declining, that historically there had been a tension between the Valley area and the rest of the county, and that no new facilities had been built in the Valley area since the early 1980s. As part of its proposal to create its separate school system, Valley agreed to abide by any orders of the Court which orders are designed to assure that such a system will not impede the desegregation process in Chambers County. It also committed itself to operate a totally integrated system including utilizing existing attendance zones. Id. Valley considered at least three options for configuring the district but chose Option 1 because it would leave existing attendance zones intact, cause the least student disruption, allow children to attend schools they or their parents had historically attended and effect no changes in the remaining schools. Id. at 1485. Among the factors that were not considered by Valley was the affect upon children having special educational needs, the Court pointing out that these costs are not fully funded from State or Federal sources and that the local cost for these programs can be a substantial burden. 435830-v1 16 We note that Jacksonville has performed no such analysis in this case either, even though the PCSSD facilities for children with multi handicapping conditions are all located in schools proposed for detachment. As the Court noted in Lee. (Id. at 1490) If the court permits the Valley district to operate, the Chambers County district would have to equip and operate special education programs now offered only at schools in the Valley area, such as the pre-school handicapped student program at Fairfax Elementary School and the gifted student program at Fairfax Elementary School. After a long discussion of the facts and the law, the Court finally came down to the issue of \"Practicability\". Beginning at page 1498, the Court explained that: (Id. at 1498) (Id. at 1498) 435830-v1 The court must also consider whether Valley's proposal introduces a level of complexity to the desegregation process in Chambers County that is so great that it will itself be an impediment to the speedy and effective elimination of the remaining vestiges of the dual school system. Valley takes the position that the ongoing desegregation process in the Chambers County school district will not be affected adversely by its establishment and independent operation as a separate system because any issues that may arise can be negotiated between the school systems, resolved by the State Superintendent of Education, or be determined by this court. Thus, at a time when Chambers County school authorities should be devoting their energies and attention to implementing the recent Orders of this court and to devising and implementing the comprehensive blueprint for final constitutional compliance as agreed by the parties and that is required by the 1993 Agreed Order, if operation of a Valley district were permitted, they would instead be enmeshed in negotiations, state administrative 17 (Id. at 1499) - (Id. at 1499) (Id. at 1500) proceedings, and possible further appearances before this court to resolve disputed matters. If the City of Valley is permitted to operate a separate and independent system, these efforts-and the progress of the Chambers County public schools toward unitary status-will become far more complex. For example, each teacher assignment decision presently is affected by current assignments throughout the existing Chambers County school district. To the extent that full constitutional compliance has not been attained-and it currently has not been attained at the time a separate Valley district begins operations, both school systems will share in the responsibility for achieving the original goal of having racially non-identifiable faculties among all of other schools that either operates. If the districts operate independently, however, ensuring the realization of this goal will inevitably cause friction and ultimately involve this court in a level of detailed supervision and administration of local schools that would be unwieldy and unwise. The court finds that the introduction of an independent decisionmaking body (a new school district) in the midst of the desegregation process in Chambers County will greatly complicate planning and implementation of measures necessary for constitutional compliance, will increase the potential for conflict, will be likely to involve this court in an unnecessarily detailed level of supervision and administration (thus displacing local control), and ultimately will impede the County's progress toward a unitary system from which all vestiges of past discrimination have been eliminated. In its conclusions of law, the Court appropriately traced the cases from the United States Supreme Court which culminate in the lead decision: 435830-v1 Over 20 years ago, the Supreme Court firmly established the test which must be applied in situations such as this: 18 435830-v1 We have today held that any attempt by state of local officials to carve out a new school district from an existing district that is in the process of dismantling a dual school system \"must be judged according to whether it hinders or furthers the process of school desegregation. If the proposal would impede the dismantling of a dual system, then a district court, in the exercise of its remedial discretion, may enjoin it from being carried out.\" United States v. Scottland Neck Bd. of Educ., 401 U.S. 484, 489, 92 S.Ct. 2214, 2217, 33 L.Ed.2d 75 (1972) (citing Wright v. Council of City of Emporia, 401 U.S. 451 , 460, 92 S. Ct. 2196, 2202, 33 L.Ed.2d 51 (1972)). In Wright v. Council of City of Emporia, the city which wished to form and operate a splinter school district made much the same argument as that of Valley here: ... Emporia advances arguments that a separate system is necessary to achieve quality education for city residents, and that it is unfair in any event to force the city to continue to send its children to schools over which the city, because of the character of its arrangement with the county, has very little control. Id. at 467, 92 S.Ct. at 2205. The Supreme Court's answer to that argument must guide the court in its decision in the case at bar: The District Court, with its responsibility to provide an effective remedy for segregation in the entire city-county system could not property allow the city to make its part of that system more attractive where such a result would be accomplished at the expense of the children remaining in the county. Id. at 468, 92 S.Ct. at 2206. The year before, the Fifth Circuit had dealt with the issue of a splinter school district in a case involving Alabama splinters (Pleasant Grove, Vestavia, Midfield and Homewood) withdrawing from their parent (Jefferson County). Stout v. Jefferson County Board of Ed., 448 F .2d 403 (5th Cir., 1971 (\"Stout I\") [FN26] The court held: .. . [W]here the formulation of splinter school districts, albeit validly created under state law, have the effect of 19 435830-v1 thwarting the implementation of a unitary school system, the district court may not ... recognize their creation. Id. at 404 (footnote omitted). On remand, the district court ordered the splinter districts to accept a proper role in the desegregation of the county system. This was affirmed on appeal, Stout v. Jefferson County Board of Education, 466 F2d 1213 (5th Cir. 1972) (\"Stout II\"), cert. denied, sub nom., Stripling v. Jefferson County Bd. of Educ., 410 U.S. 928, 93 S.Ct. 1361, 35 L.Ed.2d 589 (1973), with the Fifth Circuit holding that legally created splinter school districts could be disregarded if their existence thwarted implementation of a unitary school system in the county as a whole. The court went on to say that courts should not remove local control indefinitely and that sovereignty should be returned to a splinter district when the splinter demonstrates \"by clear and convincing evidence\" that it is able and intends to comply with the court's orders concerning its role in the desegregation of the county school district. Id. at 1215. Valley argues that the latter holding in Stout II should cause this court to authorize it to operate a separate school system because it has pledged to the court that it would follow any order which the court might issue as to the role which the Valley district should play in assisting to complete desegregation of the schools in Chambers County. Valley also emphasizes its commitment to operate an integrated system, even hopefully a \"model\" system, within its new district for the benefit of children of all races. While the court accepts the sincerity of Valley's officer, accepts Valley's assurance that it intends to operate a fully integrated school system that would be eligible to be adjudged a unitary system if judged along, and accepts Valley's commitment that it has no intention to impede the progress of desegregation in the county system, this begs the real issue. As the Supreme Court has stated, \"[t]he existence of a permissible purpose cannot sustain any action that has an impermissible effect.\" Wright, 407 U.S. at 462, 92 S.Ct. at 2203. The issue here is not whether Valley could create a fully integrated unitary system for itself, or whether Valley is willing to accept a role in desegregating the county system. The basic issue before the court is whether a separate Valley system can be operated at this time, even accepting whatever role the court might assign it, in a way which does not impede the final dismantling of a dual school system in Chambers County. (Id. at 1500, 1501). 20 (Id. at 1502) (Id. at 1503) (Id. at 1503) The court has carefully considered Valley's proposals. Although it has expressed preferences, Valley has suggested several alternatives designed to address the various Green factors, all of which it is willing to accept. And, while the burden of proof is properly on Valley, the court has struggled with Valley's request that it \"mandate a desegregation plan that incorporates, recognizes and accommodates the existence of and in turn operation of a city school system by the Valley City Board of Education.\" (Brief in Support of Amended Petition to Intervene on Behalf of the Valley City Board of Education and the City of Valley, Alabama.). The court has concluded that it cannot be done at this time. What we must all seek -- the parties, the lawyers, and the court -is to finally remedy the constitutional violations created by the old state-imposed system of segregated schools to the end that the federal courts no longer have to supervise the operation of the public schools of Chambers County, not to adopt a patchwork approach which depends on continued court involvement to make it work. The facts in this case impel the court to the inevitable conclusion that this ultimate objective for the Chambers County schools would be impeded by the operation of a Valley school system at this time. Accordingly, the court will deny Valley's request to operate as a separate school district. Teacher Deployment As to teacher deployment, the petitioners stake out the naive position that the Federal District Court could simply order all the teachers to stay where they are. (Exhibit 17 at 8). This assumption ignores the realities of teacher unions, teacher contracts and previous admonitions from the United States Court of Appeals. For instance, the PCSSD successfully 435830-v1 21 enjoined an on-going teacher strike in 1996. The union appealed to the Federal Court of Appeals arguing that the union negotiated contract between the PCSSD and the Teachers' Union was none of the District Court's business. The Court of Appeals agreed, reversed the District Court and explained to the parties that the role of the District Court is to enforce the Settlement Agreement (which is silent as to the master contracts), but not to otherwise interfere with the rights of employees and organizations of employers. 112 F.3d 953@ 955. Petitioners' position is completely silent regarding recognition of a new teacher organization for a new district. Is this or is this not part of their proposed calculus? As the PCSSD knows from prior difficult and trying circumstances, many teachers prefer working in a district which recognizes a union. The Stipulations The M-to-M stipulation and the magnet schools stipulation are just that: Stipulated agreements among all of the parties. Therefore, as a threshold matter, it would seem that the specific written consent of Joshua, the Knight Intervenors, the North Little Rock School District, the Little Rock School District, the State and the PCSSD would be required before these \"agreements\" could be made operative in a detaching district. Indeed, as we know from the Eighth Circuit, a District Court cannot impose agreements but can only accept or reject them. 921 F.2d 1371@ 1388. Further, both stipulations are part of the 1989 Settlement Agreement. It seems logical that the Agreement would have to be renegotiated and reexecuted by all of the parties to the case to include the new district. Query, would the renegotiated agreement then have to be submitted to the next session of the legislature to determine if the legislature was willing to fund this modified agreement? Again, as the Eighth 435830-v1 22 Circuit has taught us, the District Court cannot impose an agreement upon the parties to this case unless they all consent. The PCSSD Would Have To Rezone Zones 4 and 5 would be completely removed from the PCSSD. The detachment would require the residual PCSSD to constitute new zones some seven years in advance of the next census. This would constitute an unnecessary and unwarranted expense and disruption to the governance of the residual PCS SD. Time has yet to permit an analysis as to the effect such rezoning would have upon those protected by the Voting Rights Act if detachment was successful. Federal Court The strategy of the petitioners seems to be to shift as much of the process and decision - making as possible to the Federal District Court often re-assuring the State Board that the Federal Court can do whatever is necessary to impose obligations, agreements and the like. We have previously explained that the District Court is not all powerful. It cannot, for instance, as we have explained, tell teachers where they are going to teach. It cannot create capacity in schools where none exist. Indeed, the current jurisdiction of the District Court is \"only\" to enforce the Settlement Agreement (which it has done) and to monitor and enforce the desegregation plans (which it continues to do). The detachment statute is, in effect, an effort by a State to confer jurisdiction upon a Federal Court. So far as the PCSSD knows, this effort is unprecedented. It is also highly suspect. 435830-v1 23 However, petitioners successfully convinced the Board that \"the Federal Court will fix it\" , and won authorization for the election. Presuming a successful election followed by a large street party, the new district would then show up on the District Court's doorstep with a ten page laundry list of issues to be decided. This scenario is not calculated to advance the ultimate resolution of the case and should be ended now. Conclusion For all of the foregoing reasons, this Court should determine that the statutes violate the Settlement Agreement, are an unconstitutional denial of equal protection, and will negatively impact desegregation and the ultimate resolution of this case. 435830-v1 Respectfully submitted, WRIGHT, LINDSEY \u0026amp; JENNINGS LLP 200 West Capitol Avenue, Suite 2300 Little Rock, Arkansas 72201-3699 (501) 371-0808 FAX: (501) 376-9442 By '-y)7 ' ?~ ~0~ M. _Srunuel Jones III (769 0) A-ifurneys 'or Pulaski c6un Special School strict 24 CERTIFICATE OF SERVICE On July ;25, 2003, a copy of the foregoing was served via U.S. mail on each of the following: Mr. John W. Walker John W. Walker, P.A. 1723 Broadway . Little Rock, Arkansas 72201 Mr. Christopher Heller Friday, Eldredge \u0026amp; Clark 2000 Regions Center 400 West Capitol Little Rock, Arkansas 72201 Ms. Ann Brown Marshall ODM One Union National Plaza 124 West Capitol, Suite 1895 Little Rock, AR 72201 Mr. Ray Simon Director of the Arkansas Department of Education 4 State Capitol Mall Little Rock, Arkansas 72201-1071 Mr. Will Bond 602 W. Main Jacksonville, AR 72076 Mr. Mark Burnette 1010 W. Third Street Little Rock, AR 72201 435830-v1 Mr. Mark A. Hagemeier Assistant Attorney General Arkansas Attorney General's Office 323 Center Street, Suite 200 Little Rock, Arkansas 72201 Mr. Stephen W. Jones 3400 TCBY Tower 425 West Capitol Avenue Little Rock, Arkansas 72201 Mr. Richard Roachell Roachell Law Firm Plaza West Building 415 N. McKinley, Suite 465 Little Rock, Arkansas 72205 Mr. Scott Smith General Counsel Arkansas Department of Edudation #4 Capitol Mall, Room 404-A Little Rock, AR 72201 Mr. Timothy Gauger Assistant Attorney General 323 Center Street, Suite 200 Little Rock, Arkansas 72201 M.S~nesII( 25 .. I  II II II II II  I I I I I I I .. I IN THE UNITED STATES DISTRICT COURT EASTERN DISTRICT OF ARKANSAS WESTERN DIVISION LITTLE ROCK SCHOOL DISTRICT V. NO. 4:82CV00866WRW  PULASKI COUNTY SPECIAL SCHOOL DISTRICT NO. 1, ET AL. MRS. LORENE JOSHUA, ET AL. KATHERINE KNIGHT, ET AL. STATEMENT OF MATERIAL FACTS History of the Settlement Agreement RE?L~D JUL 2 8 2003 OFFICE OF DESEGREGATION MONITORING PLAINTIFF DEFENDANTS  INTERVENORS INTERVENORS 1. 1982. The LRSD sues the State, the PCSSD and the NLRSD successfully seeking consolidation of the three districts in Pulaski County. 921 F.2d 1371@ 1376. 2. 1985. The Court of Appeals rejects consolidation but orders that the boundary between LRSD and PCSSD be adjusted. 921 F.2d 1371@ 1377. 3. 1985. This boundary adjustment caused PCSSD to lose fourteen schools and over one-third of its tax base. 4. Late 1988. Initial settlement discussions are commenced among the State, the LRSD and the Joshua Intervenors. 921 F.2d 1371 @ 1376. 5. January 12, 1989. Senator Jerry Jewell introduces Senate Bill 39 to consolidate the Little Rock, North Little Rock and Pulaski County Special School District schools . (Exhibit 1) 434696-v1 I   I 1:  .- 1  I I I I .. I I 6. January 31, 1989. The State Board, LRSD and Joshua Intervenors reach a proposed settlement. The State's attorney reports that \"meetings to obtain the agreement of the other parties are underway today between attorneys and representatives of the State Board, PCSSD and NLRSD.\" (Exhibit 2) 7. February 9, 1989. The State hires the national law firm of Hogan \u0026amp; Hartson which specialized in school desegregation to advise it concerning desegregation. (Exhibit 3) 8. February 14, 1989. Counsel for the LRSD delivers a draft of Proposed Settlement Agreement to the State's attorney. This draft does not contain a Section II J . (Exhibit 4) 9. March 1989. The settlement is agreed to by all of the parties. The final version contains Section II J. (Exhibit 5) It is submitted to the legislature for funding . 10. March 3, 1989. In an editorial discussing the settlement, the Arkansas Gazette notes that: \"A key provision is that the Little Rock, North Little Rock and Pulaski County School Districts recognize that they remain 'independent, sovereign desegregating' districts. This could become an impediment to a countywide consolidation in the future, and if so it is an unfortunate provision.\" (Exhibit 6) 11. March 7, 1989. The Arkansas Gazette reports that the county district's attorney told the county board that the settlement went through 27 revisions before being made public because of the complexity of the issues. (Exhibit 7) 12. March 11, 1989. In explaining the settlement to the Joint Budget Committee, the State's attorney noted that: \"This agreement is so fragile that if it starts to unravel in any way, if there's any kind of modification to it, it's going to fall apart and unravel in 100 434696-v1 2 I   I I I  I I I I I I -~ I different ways.\" In the same article, Senator Max Howell noted he did not want to vote for the settlement if it meant forever prohibiting consolidation of the three county districts. \"I'm not antagonistic toward the dollars, but I am concerned that I understand the small print.\" (Exhibit 8) 13. March 12, 1989. One statewide commentator, in characterizing Section II J, opined that: \"A brazen provision slipped into this settlement at the last minute guarantees there will be no consolidation of the school districts. Surprise!\" (Exhibit 9) 14. March 16, 1989. The Arkansas Senate approves the bill funding the settlement but adds an amendment asking the Federal Courts to consider four changes in the settlement including: \"Disapproval of language that would retain the autonomy of the three Pulaski County districts.\" As Senator Max Howell stated: \"I would hope the Court would be aware that we in the Legislature feel the folks who caused this should not continue to be in control of the situation.\" (Exhibit 10) The press reported that: \"Legislators have expressed concern that the provision would forever bar the State from merging the three districts, and the State Education Department's attorney told them Monday that McCutcheon (the Special Master) apparently shared that concern.\" (Exhibit 10) 15. March 18, 1989. Press reports described II J as one of the \"key\" provisions of the settlement. (Exhibit 11) 16. March 24, 1989. Mr. Herschel Friday writes the attorneys for the parties noting that: \"During the debate which preceded the vote to fund the settlement in this case, I was repeatedly questioned on whether changes requested by the legislature could be made in the settlement. A copy of the requested changes is enclosed for your 434696-v1 3       I I I . I  I ready reference. I agreed to follow through to see that the legislative requests were duly considered by the parties and to use my best efforts in this regard. . . . Will you please discuss these requests with your clients so that we can meet in the near future and address these matters.\" (Exhibit 12) A copy of the requested changes, which included Section II J, is attached as (Exhibit 13) . 17. March 31, 1989. Counsel for the AEA informs Mr. Friday that they object to removing any of the items from the settlement agreement. (Exhibit 14) 18. December 11 , 1989. The District Court purports to approve the settlement agreement but only after imposing certain modifications. 726 F.Supp. 1544, 1549 . 19. December 12, 1990. The Court of Appeals reverses the District Court, ruling that the Settlement Agreement should have been approved as written by the parties. 971 F.2d 160@ 164, 165 . Previous Efforts To Enforce Violations Of The Settlement Agreement 20. At least three times during the decade of the 1990s, the Pulaski districts were forced to sue the State to enforce the Settlement Agreement. 21. On January 13, 1995, the District Court ruled that the State had violated the Settlement Agreement as respects Workers' Compensation payments due the three Pulaski districts. (Docket No. 2337). This order was affirmed on appeal. 22. On January 13, 1995, the District Court ruled that the State had violated the Settlement Agreement as respects \"loss funding\" for M-to-M students (Docket No. 2337) and the financial award was affirmed on appeal. 23. Later, the District Court rules that the State has violated the Settlement Agreement as respects reimbursement for teacher retirement and health insurance benefits due 434696-v1 4 I  I I I I I I II I  l _i I . I . I le I the three Pulaski districts. This matter was subsequently settled and the three districts continue to receive these payments to this day. The Detachment Effort 24. 2001. The General Assembly enacts ACA 6-13-1501, et seq. Representatives of the PCSSD testify against the measure. The statute permits detachment under specified circumstances but only for districts with an average membership of at least 15,000 students but not more than 20,000 students. The PCSSD is the only district in the State of Arkansas which fits this criterion. 25. November 21, 2002. A so-called feasibility study for forming an independent school district in Northeast Pulaski County detached from The Pulaski County Special School District is completed. (Exhibit 15) 26. The study examines three alternative areas for detachment and concludes at page 39 that Alternative I be selected. (Exhibit 15) 27. February 25, 2003. An \"Addendum\" to the feasibility study is completed and is inserted in the back of the November 21, 2002, study behind page 89, the concluding page of the November study. (Exhibit 15) 28. March, 2003. A petition drive is commenced, subsequently concluded and petitions are delivered on May 19, 2003, to the Arkansas Department of Education. 29. April 15, 2003. The Legislature approves an amendment to ACA 6-13-1501, et seq. adding a criterion allowing detachment from school districts which encompass a total area of 700 square miles or more. The Pulaski district, at 726 square miles, is the only district which meets this criterion. 434696-v1 5        ,      le I I 30. May 30, 2003 . Carolyn Staley certifies that the petition has sufficient signatures. 31. June 4, 2003. The Attorney General's office, as required by this statutory scheme, renders an opinion but states he is unable to clearly opine as to whether or not the statutory requirements have been met because of the lack of information in the feasibility study. (Exhibit 16) 32. June 9, 2003. The State Board of Education conducts a hearing on the detachment petition but delays action. It instructs the petitioners to \"answer the questions\" raised by the Attorney General and to submit that information to the Attorney General's office so that the Attorney General may issue a \"definitive\" opinion on the issue. 33 . June 27, 2003 . The petitioners deliver their supplemental materials to the State Board and to the Attorney General's office including an opinion from an attorney regarding the affects or lack thereof upon desegregation. (Exhibit 17) 34. July 11, 2003. The Attorney General issues a new opinion which, while still highly qualified in many respects, opines that the petition could be granted if certain findings are made. (Exhibit 18) 35. July 11, 2003 . The State Board of Education, in the afternoon, gives notice that it has scheduled a hearing to take up this matter again on July 14, 2003. 36. The PCSSD objects to the timing of the meeting and the lack of notice. (Exhibit 19) 37. July 14, 2003 . The State Board of Education conducts another hearing and votes unanimously to authorize an election on the detachment issue. 434696-v1 6 I le I I I I I I I -I I I I I I  I I 38. 39. July 16, 2003. The State Board issues its \"Order for Election\". (Exhibit 20) July 24, 2003 . The PCSSD files suit in Pulaski County Circuit Court arguing that the Detachment Statute is unconstitutional and that the petition is invalid. (Exhibit 21) 434696-v1 Respectfully submitted, WRIGHT, LINDSEY \u0026amp; JENNINGS LLP 200 West Capitol Avenue, Suite 2300 Little Rock, Arkansas 72201-3699 (501) 371-0808 FAX: (501) 376-9442 7 I I I I I I I I - I I I I I I I  I CERTIFICATE OF SERVICE On July J.(io03 , a copy of the foregoing was served via U.S. mail on each of the following : Mr. John W. Walker John W. Walker, P.A. 1723 Broadway Little Rock, Arkansas 72201 Mr. Christopher Heller Friday, Eldredge \u0026amp; Clark 2000 Regions Center 400 West Capitol Little Rock, Arkansas 72201 Ms. Ann Brown Marshall ODM One Union National Plaza 124 West Capitol, Suite 1895 Little Rock, AR 72201 Mr. Ray Simon Director of the Arkansas Department of Education 4 State Capitol Mall Little Rock, Arkansas 72201-1071 Mr. Will Bond 602 W. Main Jacksonville, AR 72076 Mr. Timothy Gauger Assistant Attorney General 323 Center Street, Suite 200 Little Rock, AR 72201 434696-v1 8 Mr. Mark A. Hagemeier Assistant Attorney General Arkansas Attorney General's Office 323 Center Street, Suite 200 Little Rock, Arkansas 72201 Mr. Stephen W. Jones 3400 TCBY Tower 425 West Capitol Avenue Little Rock, Arkansas 72201 Mr. Richard Roachell Roachell Law Firm Plaza West Building 415 N. McKinley, Suite 465 Little Rock, Arkansas 72205 Mr. Scott Smith General Counsel Arkansas Department of Edudation #4 Capitol Mall, Room 404-A Little Rock, AR 72201 Mr. Mark Burnette 1010 W. Third Street Little Rock, AR 72201 CERTIFICATE OF SERVICE II On July.2~003, a copy of the foregoing was served via U.S. mail on each of the  following :  II   I I I  I I Mr. John W. Walker John W. Walker, P.A. 1723 Broadway  Little Rock, Arkansas 72201 Mr. Christopher Heller Friday, Eldredge \u0026amp; Clark 2000 Regions Center 400 West Capitol Little Rock, Arkansas 72201 Ms. Ann Brown Marshall ODM One Union National Plaza 124 West Capitol, Suite 1895 Little Rock, AR 72201 Mr. Ray Simon Director of the Arkansas Department of Education 4 State Capitol Mall Little Rock, Arkansas 72201-1071 Mr. Will Bond 602 W. Main Jacksonville, AR 72076 Mr. Timothy Gauger Assistant Attorney General 323 Center Street, Suite 200 Little Rock, AR 72201 434696-v1 8 Mr. Mark A. Hagemeier Assistant Attorney General Arkansas Attorney General's Office 323 Center Street, Suite 200 Little Rock, Arkansas 72201 Mr. Stephen W. Jones 3400 TCBY Tower 425 West Capitol Avenue Little Rock, Arkansas 72201 Mr. Richard Roachell Roachell Law Firm Plaza West Building 415 N. McKinley, Suite 465 Little Rock, Arkansas 72205 Mr. Scott Smith General Counsel Arkansas Department of Edudation #4 Capitol Mall, Room 404-A Little Rock, AR 72201 Mr. Mark Burnette 1010 W. Third Street Little Rock, AR 72201 Raymond Simon Director State Board of Eaucation JoNell Caldwell, Chair Little Rock Shelby Hillman, Vice Chair Carlisle Luke Gordy Van Buren Robert Hackler Mountain Home Calvin King Marianna Randy Lawson Bentonville Ma~- Rebick u;7:'ffock Diane Tatum Pine Bluff Jeanna Westmoreland Arkadelphia REl, ... .-vED JUL 2 9 2003 OFFICE OF Arkansas D EGREGATIOH MONITORING Department of Education #4 Capitol Mall, Little Rock, AR 72201-1071 501-682-4475 July 28, 2003 Mr. M. Samuel Jones, III Wright, Lindsey \u0026amp; Jennings 200 West Capitol, Suite 2000 Little Rock, AR 72201 Mr. John W. Walker John Walker, P.A. 1723 Broadway Little Rock, AR 72201 Mr. Mark Burnette Mitchell, Blackstock, Barnes, Wagoner, Ivers \u0026amp; Sneddon P. 0. Box 1510 Little Rock, AR 72203-1510 Mr. Christopher Heller Friday, Eldredge \u0026amp; Clark 400 West Capitol, Suite 2000 Little Rock, AR 72201-3493 Mr. Stephen W. Jones Jack, Lyon \u0026amp; Jones 425 West Capitol, Suite 3400 Little Rock, AR 72201 Ms. Ann Marshall One Union National Plaza 124 West Capitol, Suite 1895 Little Rock, AR 72201 http:/ /arkedu.state.ar.us RE: Little Rock School District v. Pulaski County Special School District, et al. U.S. District Court No. 4:82-CV-866 Dear Gentlemen and Ms. Marshall: Per an agreement with the Attorney General's Office, I am filing the Arkansas Department of Education's Project Management Tool for the month ofJuly 2003 in the above-referenced case. If you have any questions, please feel free to contact me at your convenience. ia~ General Counsel Arkansas Department of Education SS:law cc: Mark Hagemeier RECEIVED UNITED STATES DISTRICT COURT JUL 2 9 2003 EASTERN DISTRICT OF ARKANSAS WESTERN DNISION OFFICE OF DESEGREGATION MONITORING LITTLE ROCK SCHOOL DISTRICT PLAlNTIFF V. No. LR-C-82-866 PULASKI COUNTY SPECIAL SCHOOL DISTRICT NO. 1, et al DEFENDANTS NOTICE OF FILING In accordance with the Court's Order of December 10, 1993, the Arkansas Department of Education hereby gives notice of the filing of the ADE's Project Management Tool for July 2003. Respectfully Submitted, ~ Attorney, Arkansas Department of Education #4 Capitol Mall, Room 404-A Little Rock, AR 72201 501-682-4227 CERTIFICATE OF SERVICE I, Scott Smith, certify that on July __ , 2003, I caused the foregoing document to be served by depositing a copy in the United States mail, postage prepaid, addressed to each of the following: Mr. M. Samuel Jones, III Wright, Lindsey \u0026amp; Jennings 200 West Capitol, Suite 2000 Little Rock, AR 72201 Mr. John W. Walker John Walker, P.A. 1 723 Broadway Little Rock, AR 72201 Mr. Mark Burnette Mitchell, Blackstock, Barnes Wagoner, Ivers \u0026amp; Sneddon P. 0. Box 1510 Little Rock, AR 72203-1510 Mr. Christopher Heller Friday, Eldredge \u0026amp; Clark 400 West Capitol, Suite 2000 Little Rock, AR 72201-3493 Mr. Stephen W. Jones Jack, Lyon \u0026amp; Jones 425 West Capitol, Suite 3400 Little Rock, AR 72201 Ms. Ann Marshall One Union National Plaza 124 West Capitol, Suite 1895 Little Rock, AR 72201 j.1aL~ Smit IN THE UNITED STATES DISTRICT COURT EASTERN DISTRICT OF ARKANSAS WESTERN DIVISION RECEIVED JUL 2 9 2003 LITTLE ROCK SCHOOL DISTRICT, ET AL OFFICE OF PLAINTIF~SEGREGATION MONITORING V. NO. LR-C-82-866 PULASKI COUNTY SPECIAL SCHOOL DISTRICT, ET AL DEFENDANTS MRS. LORENE JOSHUA, ET AL INTERVENORS KATHERINE W. KNIGHT, ET AL INTERVENORS ADE'S PROJECT MANAGEMENT TOOL In compliance with the Court's Order of December 10, 1993, the Arkansas Department of Education (ADE) submits the following Project Management Tool to the parties and the Court. This document describes the progress the ADE has made since March 15, 1994, in complying with provisions of the Implementation Plan and itemizes the ADE's progress against timelines presented in the Plan. - IMPLEMENTATION PHASE ACTIVITY I. FINANCIAL OBLIGATIONS A. Us_!:! the previous year's three quarter average daily membership to calculate MFPA (State Equalization) for the current school year. 1. Projected Ending Date Last day of each month, August - June. 2. Actual as of July 31 , 2003 l@b.!iiij1w:~b.~ffii:;~~ii!ir~B~Jli~f.~'2'-i9.ailii!li!l:ifYt.~t~d.\\ffi~ B. Include all Magnet students in the resident District's average daily membership for calculation. 1. Projected Ending Date Last day of each month, August - June. - ---- - - I. FINANCIAL OBLIGATIONS (Continued) B. Include all Magnet students in the resident District's average daily membership for calculation. (Continued) 2. Actual as of July 31, 2003 ~lt.\\i;ie~iil~i~tlll\u0026amp;.i:1ir\u0026amp;liifi4nif;.$.QJ~i\u0026gt;.O~;Iif.i~:.A:t.li;\\~I~.a:r~:i~:tj_fq,r.;;fX C. Process and distribute State MFPA. 1. Projected Ending Date Last day of each month, August - June. 2. Actual as of July 31, 2003 ~1i~~~-~~91i::g91t~E~t~.td~.Yti9'0:;2.f~~I~;:~!J~.!\\~~'tr2.t\\.\"'E;~nfffri:ef1.9.f.~.6X:q?/.9~-w.~re D. Determine the number of Magnet students residing in each District and attending a Magnet School. 1. Projected Ending Date Last day of each month, August - June. 2. Actual as of July 31, 2003 ~1'9\\1~ Bi~~{~!~flilj~;i~f \u0026amp;iliklr40g:9.?lti'.ai~c(a(::JlJH~::3.0}~'bo~.f.off.Y E. Desegregation Staff Attorney reports the Magnet Operational Charge to the Fiscal Services Office. 1. Projected Ending Date Ongoing, as ordered by the Court. 2 UNITED STATES DISTRICT COURT Little Rock Division Eastern District of Arkansas JUL 3 0 2003 NOTICE JAMES W. McCORMACK, CLERK .By: ______ __,,=~- DEP CLERK LITTLE ROCK SCHOOL DISTRICT, Plaintiff vs. Case No.: 4:82CV00866-WRW PULASKI COUNTY SPECIAL SCHOOL DISTRICT, et al, Defendant ******************************************************************* Type of Case: CIVIL ** ****** ***************************** *** *************************** TAKE NOTICE that a proceeding in this case has been set for the place, date and time set forth below: ******************************************************************* Place: U. S . Courthouse 600 West Capitol Little Rock, AR Ave., Room 431 72201 Date: MONDAY, AUGUST 18, 2003 Time: 10:00 A.M. *- **************************************************************** Type of Proceeding: MOTION TO ENFORCE SETTLEMENT AGREEMENT HEARING ******************************************************************* Presiding Judge : BILL WILSON ******************************************************************* Instructions: ******************************************************************* James W. McCormack, Clerk of Court r By: JOHNSON Deput c9 Counsel of Record Dated: 07/30/03 RECEIVED JUL 3 1 2003 OFFICE OF DESEGREGATION MONITORING Fit1: ~-- tAsr~1:it g\\SiR1cr P STR1cr A2!J~, '\"\"NSAs JUL 3 0 20u3 JAMES W By:  McCORMACK - , CLERK UPDATE ON THE REDESIGN OF HARRIS ELEMENTARY SCHOOL AND THEEPCLERi,; REZONING OF SCHOOLS IN THE SHERWOOD AREA OF THE Ann S. Marshall Federal Monitor PULASKI COUNTY SPECIAL SCHOOL DISTRICT July 30, 2003 Office of Desegregation Monitoring United States District Court Little Rock, Arkansas Horace R. Smith Associate Monitor    This project was supported in part by a Digitizing Hidden Special Collections and Archives project grant from The Andrew W. Mellon Foundation and Council on Library and Information Resources.\u003c/dcterms_description\u003e\n   \n\n\u003c/dcterms_description\u003e   \n\n  \n\n\n   \n\n   \n\n   \n\n\n   \n\n   \n\n   \n\n\n   \n\n  \n\n \n\n\n   \n\n   \n\n   \n\n\n   \n\n   \n\n   \n\n\n\n   \n\n   \n\n   \n\n\n   \n\n   \n\n  \n\n  \n\n   \n\n\n   \n\n   \n\n   \n\n\n   \n\n   \n\n   \n\n   \n\n   \n\n   \n\n\n\n\n\n   \n\n   \n\n   \n\n   \n\n\n   \n\n   \n\n   \n\n\n   \n\n   \n\n   \n\n   \n\n\u003c/item\u003e\n\u003c/items\u003e"},{"id":"bcas_bcmss0837_88","title":"Arkansas Department of Education's (ADE's) Project Management Tool","collection_id":"bcas_bcmss0837","collection_title":"Office of Desegregation Management","dcterms_contributor":null,"dcterms_spatial":["United States, 39.76, -98.5","United States, Arkansas, 34.75037, -92.50044","United States, Arkansas, Pulaski County, 34.76993, -92.3118"],"dcterms_creator":["Arkansas. Department of Education"],"dc_date":["2003-06/2003-08"],"dcterms_description":null,"dc_format":["application/pdf"],"dcterms_identifier":null,"dcterms_language":["eng"],"dcterms_publisher":["Little Rock, Ark. : Butler Center for Arkansas Studies. Central Arkansas Library System"],"dc_relation":null,"dc_right":["http://rightsstatements.org/vocab/InC-EDU/1.0/"],"dcterms_is_part_of":["Office of Desegregation Monitoring records (BC.MSS.08.37)","History of Segregation and Integration of Arkansas's Educational System"],"dcterms_subject":["Education--Arkansas","Office of Desegregation Monitoring (Little Rock, Ark.)","School integration--Arkansas","Arkansas. Department of Education","Project management"],"dcterms_title":["Arkansas Department of Education's (ADE's) Project Management Tool"],"dcterms_type":["Text"],"dcterms_provenance":["Butler Center for Arkansas Studies"],"edm_is_shown_by":null,"edm_is_shown_at":["http://arstudies.contentdm.oclc.org/cdm/ref/collection/bcmss0837/id/88"],"dcterms_temporal":null,"dcterms_rights_holder":null,"dcterms_bibliographic_citation":null,"dlg_local_right":["Available for use in research, teaching, and private study. Any other use requires permission from the Butler Center."],"dcterms_medium":["documents (object genre)"],"dcterms_extent":["272 pages"],"dlg_subject_personal":null,"dcterms_subject_fast":null,"fulltext":"\n \n\n\n\n\n\n\n\n  \n\n\n   \n\n   \n\n\n   \n\n\n   \n\n\n\n\n   \n\n\n\n\n   \n\n\n\n\n\n\n\n\n   \n\n   \n\n \n\n\n   \n\n   \n\n  \n\n\n   \n\n  \n\n \n\n\n   \n\n  \n\n \n\n\n   \n\n  \n\n  \n\nLittle Rock School District, plaintiff vs. Pulaski County Special School District, defendant.\nRaymond Simon Director s: 3te Board of Education Shelby Hillman, Chair car/isle JoNell Caldwell, Vice Chair Little Rock Luke Gordy Van Buren Robert Hackler Mountain Home Peggy Jeffries Fort Smith Calvin King Marianna MAieRebick L-ock Lewis Thompson, Jr. Texarkana Jeanna Westmoreland Arkadelphia Arkansas Department of Education #4 Capitol Mall, Little Rock, AR 72201-1071 501-682-4475 June 30, 2003 http:/ /arkedu.state.ar.us RECEIVED JUL 1- 2003 Mr. M. Samuel Jones, III Wright, Lindsey \u0026amp; Jennings 200 West Capitol, Suite 2000 Little Rock, AR 72201 Mr. Christopher Heller OFACE Of Friday, Eldredge \u0026amp; Clark DESEGREGA1l0N MON\\10RlNG Mr. John W. Walker John Walker, P.A. 1 723 Broadway Little Rock, AR 72201 Mr. Richard Roachell Plaza West Building 415 N. Mc.Kinley, Suite 465 Little Rock, AR 72205 400 West Capitol, Suite 2000 Little Rock, AR 72201-3493 Mr. Stephen W. Jones Jack, Lyon \u0026amp; Jones 425 West Capitol, Suite 3400 Little Rock, AR 72201 Ms. Ann Marshall One Union National Plaza 124 West Capitol, Suite 1895 Little Rock, AR 72201 RE: Little Rock School District v. Pulaski County Special School District, et al. U.S. District Court No. 4:82-CV-866 Dear Gentlemen and Ms. Marshall: Per an agreement with the Attorney General's Office, I am filing the Arkansas Department of Education's Project Management Tool for the month of June 2003 in the above-referenced case. If you have any questions, please feel free to contact me at your convenience. Sincerely, gL~ J)wt-L f~!vJ Scott Smith - ~ General Counsel Arkansas Department of Education SS:law cc: Mark Hagemeier RECEIVED UNITED STATES DISTRICT COURT JUL 1- 2003 EASTERN DISTRICT OF ARKANSAS WESTERN DIVISION OFFICE OF DESEGREGATION MONITORING LITTLE ROCK SCHOOL DISTRICT PLAINTIFF V. No. LR-C-82-866 PULASKI COUNTY SPECIAL SCHOOL DISTRICT NO. 1, et al DEFENDANTS NOTICE OF FILING In accordance with the Court's Order of December 10, 1993, the Arkansas Department of Education hereby gives notice of the filing of the ADE's Project Management Tool for June 2003. Respectfully Submitted,\n6~~ 2~xttA . L Jt,tJ Scott Smith, #92251 7 Attorney, Arkansas Department of Education #4 Capitol Mall, Room 404-A Little Rock, AR 72201 501-682-4227 CERTIFICATE OF SERVICE I, Scott Smith, certify that on June 30, 2003, I caused the foregoing document to be served by depo~iting a copy in the United States mail, postage prepaid, ad~~'WI-IVED each of the followmg: 11. C \\., C Mr. M. Samuel Jones, III Wright, Lindsey \u0026amp; Jennings 200 West Capitol, Suite 2000 Little Rock, AR 72201 Mr. John W. Walker John Walker, P.A. 1 723 Broadway Little Rock, AR 72201 Mr. Richard Roachell Plaza West Building 415 N. McKinley, Suite 465 Little Rock, AR 72205 Mr. Christopher Heller Friday, Eldredge \u0026amp; Clark 400 West Capitol, Suite 2000 Little Rock, AR 72201-3493 Mr. Stephen W. Jones Jack, Lyon \u0026amp; Jones 425 West Capitol, Suite 3400 Little Rock, AR 72201 Ms. Ann Marshall One Union National Plaza 124 West Capitol, Suite 1895 Little Rock, AR 72201 JUL 1 - 2003 OFFICE OF DESEGREGATION MONITORING RECEIVED IN THE UNITED STATES DISTRICT COURT JUL 1- 2003 EASTERN DISTRICT OF ARKANSAS WESTERN DIVISION OFACE OF DESEGREGATION MONITORING LITTLE ROCK SCHOOL DISTRICT, ET AL PLAINTIFFS V. NO. LR-C-82-866 PULASKI COUNTY SPECIAL SCHOOL DISTRICT, ET AL DEFENDANTS MRS. LORENE JOSHUA, ET AL INTERVENORS KA THERINE W. KNIGHT, ET AL INTERVENORS ADE'S PROJECT MANAGEMENT TOOL In compliance with the Court's Order of December 10, 1993, the Arkansas Department of Education (ADE) submits the following Project Management Tool to the parties and the Court. This document describes the progress the ADE has made since March 15, 1994, in complying with provisions of the Implementation Plan and itemizes the ADE's progress against timelines presented in the Plan. IMPLEMENTATION PHASE ACTIVITY I. FINANCIAL OBLIGATIONS A. Use the previous year's three quarter average daily membership to calculate MFPA (State Equalization) for the current school year. 1. Projected Ending Date Last day of each month, August - June. 2. Actual as of June 30, 2003 ~ltll~i!l~1t~!i.!.tlW.f-illl!il~~1tiffif~ir~t~~,me B. Include all Magnet students in the resident District's average daily membership for calculation. 1. Projected Ending Date Last day of each month, August - June. I. FINANCIAL OBLIGATIONS (Continued) B. Include all Magnet students in the resident District's average daily membership for calculation. (Continued) 2. Actual as of June 30, 2003 ~~~~1,:je~i!lif\u0026amp;ii::: ... ::/ii.il~liii:m~r-~y\n:a:uf~gq:~g!tigU\\QgjgjJqW:~J~ciIQfX C. Process and distribute State MFPA. 1. Projected Ending Date Last day of each month, August - June. 2. Actual as of June 30, 2003 i~u?]p20@:l'olstnoatlonstotsta1eTtciuattzauomEuaa,n~ffotEYrlt2.1oa.wefe mt1!?1fI!1::!I~t .. , Nbfs$P:H~::'Z1Zl1. ~tJ.\\H$4.]ij~~~I ~~~~rl.~~l~liill\niif3~~~~~ils~::: :, --:::\n::::f:::::::::-,:~lr-lfgr\nBXllP.,?ld~:'.~t'.:Mgy\n~\n,:1 ligs1lliiillil~, ecsso:M$$3i203128.1 D. Determine the number of Magnet students residing in each District and attending a Magnet School. 1. Projected Ending Date Last day of each month, August - June. 2. Actual as of June 30, 2003 ~~~ta.~~I~lf l1il!1.i11\n~~r:~pt\n:~1~Qf~t~cf~(~~yi1\n\"2q~:tQr:l:X E. Desegregation Staff Attorney reports the Magnet Operational Charge to the Fiscal Services Office. 1. Projected Ending Date Ongoing, as ordered by the Court. 2 I. FINANCIAL OBLIGATIONS (Continued) E. Desegregation Staff Attorney reports the Magnet Operational Charge to the Fiscal Services Office. (Continued) 2. Actual as of June 30, 2003 ~~~~~\n~~\n~~~i~t~r.\n1~7~1~~1~:~~\nA~~:~~i~=d~~l~~r~!\n~!~~~~~~'r~: Magnet Review Committee is reporting this information instead of the staff attorney as indicated in the Implementation Plan. F. Calculate state aid due the LRSD based upon the Magnet Operational Charge. 1. Projected Ending Date Last day of each month, August - June. 2. Actual as of June 30, 2003 iJl~111i~~i~i~flli211~1lr.!1:At2!\n~Jgy~t~ij~~t\n:M~:@,l~lz.QOO\nfQtil~ G. Process and distribute state aid for Magnet Operational Charge. 1. Projected Ending Date Last day of each month, August - June. 2. Actual as of June 30, 2003 H. Calculate the amount of M-to-M incentive money to which each school district is entitled. 1. Projected Ending Date Last day of each month, August - June. 2. Actual as of June 30, 2003 p~fifql.\nf\naJotJ~IQ~o~\nffiioBJ\nttl8:]j~rr4cil.i\n~,aig\nimeni~'.! I. Process and distribute M-to-M incentive checks. 1. Projected Ending Date Last day of each month, September - June. 3 I. FINANCIAL OBLIGATIONS (Continued) I. Process and distribute M-to-M incentive checks. (Continued) 2. Actual as of June 30, 2003 l~i5!i~!: :+. :  e'.c.ssD i~ffili~-,.,, ................ ,,w,'~ii~a]r2fitGlP2l.o~ll~UMl1:tiffliI2.oo~mti\u0026amp;t\u0026gt;l\u0026amp;GfUitlPgni~ ERs  Nt'Rs e\u0026gt;\"\" J. Districts submit an estimated Magnet and M-to-M transportation budget to ADE. 1. Projected Ending Date 2. Ongoing, December of each year. Actual as of June 30, 2003 In September 2002, the Magnet and M-to-M transportation budgets for FY 02/03 were submitted to the ADE by the Districts. K. The Coordinator of School Transportation notifies General Finance to pay districts for the Districts' proposed budget. 1. Projected Ending Date Ongoing, annually. 2. Actual as of June 30, 2003 In January 2003, General Finance was notified to pay the second one-third payment for FY 02/03 to the Districts. It should be noted that the Transportation Coordinator is currently performing this function instead of Reginald Wilson as indicated in the Implementation Plan. L. ADE pays districts three equal installments of their proposed budget. 1. Projected Ending Date Ongoing, annually. 4 I. FINANCIAL OBLIGATIONS (Continued) L. ADE pays districts three equal installments of their proposed budget. (Continued) 2. Actual as of June 30, 2003 In January 2003, General Finance made the second one-third payment to the Districts for their FY 02/03 transportation budget. The budget is now paid out in three equal installments. At January 31, 2003, the following had been paid for FY 02/03: LRSD - $2,453,084.00 NLRSD - $469,000.00 PCSSD - $1,305,848.96 M. ADE verifies actual expenditures submitted by Districts and reviews each bill with each District's transportation coordinator. 1. Projected Ending Date Ongoing, annually. 2. Actual as of June 30, 2003 In August 1997, the ADE transportation coordinator reviewed each district's Magnet and M-to-M transportation costs for FY 96/97. In July 1998, each district was asked to submit an estimated budget for the 98/99 school year. In September 1998, paperwork was generated for the first payment in the 98/99 school year for the Magnet and M-to-M transportation program. School districts should receive payment by October 1, 1998 In July 1999, each district submitted an estimated budget for the 99/00 school year. In September 1999, paperwork was generated for the first payment in the 99/00 school year for the Magnet and M-to-M transportation program. In September 2000, paperwork was generated for the first payment in the 00/01 school year for the Magnet and M-to-M transportation program. In September 2001, paperwork was generated for the first payment in the 01/02 school year for the Magnet and M-to-M transportation program. In September 2002, paperwork was generated for the first payment in the 02/03 school year for the Magnet and M-to-M transportation program. 5 I. FINANCIAL OBLIGATIONS (Continued) N. Purchase buses for the Districts to replace existing Magnet and M-to-M fleets and to provide a larger fleet for the Districts' Magnet and M-to-M Transportation needs. 1. Projected Ending Date Ongoing, as stated in Exhibit A of the Implementation Plan. 2. Actual as of June 30, 2003 In FY 94/95, the State purchased 52 buses at a cost of $1,799,431 which were added to or replaced existing Magnet and M-to-M buses in the Districts. The buses were distributed to the Districts as follows: LRSD - 32\nNLRSD - 6\nand PCSSD-14. The ADE purchased 64 Magnet and M-to-M buses at a cost of $2,334,800 in FY 95/96. The buses were distributed accordingly: LRSD - 45\nNLRSD - 7\nand PCSSD - 12. In May 1997, the ADE purchased 16 Magnet and M-to-M buses at a cost of $646,400. In July 1997, the ADE purchased 16 Magnet and M-to-M buses at a cost of $624,879. In July 1998, the ADE purchased 16 new Magnet and M-to-M buses at a cost of $695,235. The buses were distributed accordingly: LRSD - 8\nNLRSD - 2\nand PCSSD-6. Specifications for 16 school buses have been forwarded to state purchasing for bidding in January, 1999 for delivery in July, 1999. The ADE accepted a bid on 16 buses for the Magnet and M/M transportation program. The buses will be delivered after July 1, 1999 and before August 1, 1999. The buses will be distributed accordingly: LRSD - 8\nNLRSD - 2\nPCSSD- 6. In July 1999, the ADE purchased 16 new Magnet and M-to-M buses at a cost of $718,355. The buses were distributed accordingly: LRSD - 8\nNLRSD - 2\nand PCSSD- 6. In July 2000, the ADE purchased 16 new Magnet and M-to-M buses at a cost of $724,165. The buses were distributed accordingly: LRSD - 8\nNLRSD - 2\nand PCSSD- 6. 6 I. FINANCIAL OBLIGATIONS (Continued) N. Purchase buses for the Districts to replace existing Magnet and M-to-M fleets and to provide a larger fleet for the Districts' Magnet and M-to-M Transportation needs. (Continued) 2. Actual as of June 30, 2003 (Continued) The bid for 16 new Magnet and M-to-M buses was let by State Purchasing on February 22, 2001 . The contract was awarded to Ward Transportation Services, Inc. The buses to be purchased include two type C 47 passenger buses and fourteen type C 65 passenger buses. Prices on these units are $43,426.00 each on the 47 passenger buses, and $44,289.00 each on the 65 passenger buses. The buses will be distributed accordingly: LRSD - 8 of the 65 passenger\nNLRSD - 2 of the 65 passenger\nPCSSD - 2 of the 47 passenger and 4 of the 65 passenger buses. On August 2, 2001, the ADE took possession of 16 new Magnet and M-to-M buses. The total amount paid was $706,898. In June 2002, a bid for 16 new Magnet and M-to-M buses was awarded to Ward Transportation Services, Inc. The buses to be purchased include five 47 passenger buses for $42,155.00 each, ten 65 passenger buses for $43,850.00 each, and one 47 passenger bus with a wheelchair lift for $46,952.00. The total amount was $696,227. In August of 2002, the ADE purchased 16 new Magnet and M-to-M buses. The total amount paid was $696,227. Specifications for 16 new Magnet and M-to-M school buses have been forwarded to State Purchasing for bidding. Bids will be opened on May 12, 2003. The buses will have a required delivery date after July 1, 2003 and before August 8, 2003. 0 . Process and distribute compensatory education payments to LRSD as required by page 23 of the Settlement Agreement. 1. Projected Ending Date July 1 and January 1, of each school year through January 1, 1999. 2. Actual as of June 30, 2003 Obligation fulfilled in FY 96/97. 7 I. FINANCIAL OBLIGATIONS (Continued) P. Process and distribute additional payments in lieu of formula to LRSD as required by page 24 of the Settlement Agreement. 1. Projected Ending Date Payment due date and ending July 1, 1995. 2. Actual as of June 30, 2003 Obligation fulfilled in FY 95/96. Q. Process and distribute payments to PCSSD as required by Page 28 of the Settlement Agreement. 1. Projected Ending Date Payment due date and ending July 1, 1994. 2. Actual as of June 30, 2003 Final payment was distributed July 1994. R. Upon loan request by LRSD accompanied by a promissory note, the ADE makes loans to LRSD. 1. Projected Ending Date Ongoing through July 1, 1999. See Settlement Agreement page 24. 2. Actual as of June 30, 2003 The LRSD received $3,000,000 on September 10, 1998. As of this reporting date, the LRSD has received $20,000,000 in loan proceeds. S. Process and distribute payments in lieu of formula to PCSSD required by page 29 of the Settlement Agreement. 1. Projected Ending Date Payment due date and ending July 1, 1995. 2. Actual as of June 30, 2003 Obligation fulfilled in FY 95/96. 8 I. FINANCIAL OBLIGATIONS (Continued) T. Process and distribute compensatory education payments to NLRSD as required by page 31 of the Settlement Agreement. 1. Projected Ending Date July 1 of each school year through June 30, 1996. 2. Actual as of June 30, 2003 Obligation fulfilled in FY 95/96. U. Process and distribute check to Magnet Review Committee. 1. Projected Ending Date Payment due date and ending July 1, 1995. 2. Actual as of June 30, 2003 Distribution in July 1997 for FY 97/98 was $75,000. This was the total amount due to the Magnet Review Committee for FY 97/98. Distribution in July 1998 for FY 98/99 was $75,000. This was the total amount due to the Magnet Review Committee for FY 98/99. Distribution in July 1999 for FY 99/00 was $92,500. This was the total amount due to the Magnet Review Committee for FY 99/00. Distribution in July 2000 for FY 00/01 was $92,500. This was the total amount due to the Magnet Review Committee for FY 00/01. Distribution in August 2001 for FY 01/02 was $92,500. This was the total amount due to the Magnet Review Committee for FY 01/02. Distribution in July 2002 for FY 02/03 was $92,500. This was the total amount due to the Magnet Review Committee for FY 02/03. V. Process and distribute payments for Office of Desegregation Monitoring. 1. Projected Ending Date Not applicable. 2. Actual as of June 30, 2003 Distribution in July 1997 for FY 97/98 was $200,000. This was the total amount due to the ODM for FY 97/98. 9 I. FINANCIAL OBLIGATIONS (Continued) V. Process and distribute payments for Office of Desegregation Monitoring. (Continued) 2. Actual as of June 30, 2003 (Continued) Distribution in July 1998 for FY 98/99 was $200,000. This was the total amount due to the ODM for FY 98/99. Distribution in July 1999 for FY 99/00 was $200,000. This was the total amount due to the ODM for FY 99/00. Distribution in July 2000 for FY 00/01 was $200,000. This was the total amount due to the ODM for FY 00/01 . Distribution in August 2001 for FY 01/02 was $200,000. This was the total amount due to the ODM for FY 01/02. Distribution in July 2002 for FY 02/03 was $200,000. This was the total amount due to the ODM for FY 02/03. 10 II. MONITORING COMPENSATORY EDUCATION A. Begin testing and evaluating the monitoring instrument and monitoring system to assure that data is appropriate and useful in monitoring the impacts of compensatory education programs on disparities in academic achievement for black students and white students. 1. Projected Ending Date January 15, 1995 2. Actual as of June 30, 2003 In May 1995, monitors completed the unannounced visits of schools in Pulaski County. The monitoring process involved a qualitative process of document reviews, interviews, and observations. The monitoring focused on progress made since the announced monitoring visits. In June 1995, monitoring data from unannounced visits was included in the July Semiannual Report. Twenty-five per cent of all classrooms were visited, and all of the schools in Pulaski County were monitored. All principals were interviewed to determine any additional progress since the announced visits. The July 1995 Monitoring Report was reviewed by the ADE administrative team, the Arkansas State Board of Education, and the Districts and filed with the Court. The report was formatted in accordance with the Allen Letter. In October 1995, a common terminology was developed by principals from the Districts and the Lead Planning and Desegregation staff to facilitate the monitoring process. The announced monitoring visits began on November 14, 1995 and were completed on January 26, 1996. Copies of the preliminary Semiannual Monitoring Report and its executive summary were provided to the ADE administrative team and the State Board of Education in January 1996. A report on the current status of the Cycle 5 schools in the ECOE process and their school improvement plans was filed with the Court on February 1, 1996. The unannounced monitoring visits began in February 1996 and ended on May 10, 1996. In June 1996, all announced and unannounced monitoring visits were completed, and the data was analyzed using descriptive statistics. The Districts provided data on enrollment in compensatory education programs. The Districts and the ADE Desegregation Monitoring staff developed a definition for instructional programs. 11 II. MONITORING COMPENSATORY EDUCATION (Continued) A. Begin testing and evaluating the monitoring instrument and monitoring system to assure that data is appropriate and useful in monitoring the impacts of compensatory education programs on disparities in academic achievement for black students and white students. (Continued) 2. Actual as of June 30, 2003 (Continued) The Semiannual Monitoring Report was completed and filed with the Court on July 15, 1996 with copies distributed to the parties. Announced monitoring visits of the Cycle 1 schools began on October 28, 1996 and concluded in December 1996. In January 1997, presentations were made to the State Board of Education, the Desegregation Litigation Oversight Subcommittee, and the parties to review the draft Semiannual Monitoring Report. The monitoring instrument and process were evaluated for their usefulness in monitoring the impacts of compensatory education programs on achievement disparities. In February 1997, the Semiannual Monitoring Report was filed. Unannounced monitoring visits began on February 3, 1997 and concluded in May 1997. In March 1997, letters were sent to the Districts regarding data requirements for the July 1997 Semiannual Monitoring Report and the additional discipline data element that was requested by the Desegregation Litigation Oversight Subcommittee. Desegregation data collection workshops were conducted in the Districts from March 28, 1997 to April 7, 1997. A meeting was conducted on April 3, 1997 to finalize plans for the July 15, 1997 Semiannual Monitoring Report. Onsite visits were made to Cycle 1 schools who did not submit accurate and timely data on discipline, M-to-M transfers, and policy. The July 15, 1997 Semiannual Monitoring Report and its executive summary were finalized in June 1997. In July 1997, the Semiannual Monitoring Report and its executive summary were filed with the court, and the ADE sponsored a School Improvement Conference. On July 10, 1997, copies of the Semiannual Monitoring Report and its executive summary were made available to the Districts for their review prior to filing it with the Court. In August 1997, procedures and schedules were organized for the monitoring of the Cycle 2 schools in FY 97/98. 12 II. MONITORING COMPENSATORY EDUCATION (Continued) A. Begin testing and evaluating the monitoring instrument and monitoring system to assure that data is appropriate and useful in monitoring the impacts of compensatory education programs on disparities in academic achievement for black students and white students. (Continued) 2. Actual as of June 30, 2003 (Continued) A Desegregation Monitoring and School Improvement Workshop for the Districts was held on September 10, 1997 to discuss monitoring expectations, instruments, data collection and school improvement visits. On October 9, 1997, a planning meeting was held with the desegregation monitoring staff to discuss deadlines, responsibilities, and strategic planning issues regarding the Semiannual Monitoring Report. Reminder letters were sent to the Cycle 2 principals outlining the data collection deadlines and availability of technical assistance. In October and November 1997, technical assistance visits were conducted, and announced monitoring visits of the Cycle 2 schools were completed. In December 1997 and January 1998, technical assistance visits were conducted regarding team visits, technical review recommendations, and consensus building. Copies of the infusion document and perceptual surveys were provided to schools in the ECOE process. The February 1998 Semiannual Monitoring Report was submitted for review and approval to the State Board of Education, the Director, the Administrative Team, the Attorney General's Office, and the Desegregation Litigation Oversight Subcommittee. Unannounced monitoring visits began in February 1998, and technical assistance was provided on the school improvement process, external team visits and finalizing school improvement plans. On February 18, 1998, the representatives of all parties met to discuss possible revisions to the ADE's monitoring plan and monitoring reports. Additional meetings will be scheduled. Unannounced monitoring visits were conducted in March 1998, and technical assistance was provided on the school improvement process and external team visits. In April 1998, unannounced monitoring visits were conducted, and technical assistance was provided on the school improvement process. 13 11. MONITORING COMPENSATORY EDUCATION (Continued) A. Begin testing and evaluating the monitoring instrument and monitoring system to assure that data is appropriate and useful in monitoring the impacts of compensatory education programs on disparities in academic achievement for black students and white students. (Continued) 2. Actual as of June 30, 2003 (Continued) In May 1998, unannounced monitoring visits were completed, and technical assistance was provided on the school improvement process. On May 18, 1998, the Court granted the ADE relief from its obligation to file the July 1998 Semiannual Monitoring Report to develop proposed modifications to ADE's monitoring and reporting obligations. In June 1998, monitoring information previously submitted by the districts in the Spring of 1998 was reviewed and prepared for historical files and presentation to the Arkansas State Board. Also, in June the following occurred: a) The Extended COE Team Visit Reports were completed, b) the Semiannual Monitoring COE Data Report was completed, c) progress reports were submitted from previous cycles, and d.) staff development on assessment (SAT-9) and cunriculum alignment was conducted with three supervisors. In July, the Lead Planner provided the Desegregation Litigation Oversight Committee with (1) a review of the court Order relieving ADE of its obligation to file a July Semiannual Monitoring Report, and (2) an update of ADE's progress toward work with the parties and ODM to develop proposed revisions to ADE's monitoring and reporting obligations. The Committee encouraged ODM, the parties and the ADE to continue to work toward revision of the monitoring and reporting process. In August 1998, the ADE Implementation Phase Working group met to review the Implementation Phase activities for the previous quarter. The Assistant Attorney General, the Assistant Director for Accountability and the Education Lead Planner updated the group on all relevant desegregation legal issues and proposed revisions to monitoring and reporting activities during the quarter. In September 1998, tentative monitoring dates were established and they will be finalized once -proposed revisions to the Desegregation Monitoring Plan are finalized and approved. In September/October 1998, progress was being made on the proposed revisions to the monitoring process by committee representatives of all the Parties in the Pulaski County Settlement Agreement. While the revised monitoring plan is finalized and approved, the ADE monitoring staff will continue to provide technical assistance to schools upon request. 14 11. MONITORING COMPENSATORY EDUCATION (Continued) A. Begin testing and evaluating the monitoring instrument and monitoring system to assure that data is appropriate and useful in monitoring the impacts of compensatory education programs on disparities in academic achievement for black students and white students. (Continued) 2. Actual as of June 30, 2003 (Continued) In December 1998, requests were received from schools in PCSSD regarding test score analysis and staff Development. Oak Grove is scheduled for January 21, 1999 and Lawson Elementary is also tentatively scheduled in January. Staff development regarding test score analysis for Oak Grove and Lawson Elementary in the PCSSD has been rescheduled for April 2000. Staff development regarding test score analysis for Oak Grove and Lawson Elementary in the PCSSD was conducted on May 5, 2000 and May 9, 2000 respectively. Staff development regarding classroom management was provided to the Franklin Elementary School in LRSD on November 8, 2000. Staff development regarding ways to improve academic achievement was presented to College Station Elementary in PCSSD on November 22, 2000. On November 1, 2000, the ADE Implementation Phase Working group met to review the Implementation Phase activities for the previous quarter. The Assistant Director for Accountability updated the group on all relevant desegregation legal issues and discussed revisions to monitoring and reporting activities during the quarter. The next Implementation Phase Working Group Meeting is scheduled for February 27, 2001 in room 201-A at the ADE. The Implementation Phase Working Group meeting that was scheduled for February 27 had to be postponed. It will be rescheduled as soon as possible. The quarterly Implementation Phase Working Group meeting is scheduled for June 27, 2001. The quarterly Implementation Phase Working Group meeting was rescheduled from June 27. It will take place on July 26, 2001 in room 201-A at 1 :30 p.m. at the ADE. 15 11. MONITORING COMPENSATORY EDUCATION (Continued) A. Begin testing and evaluating the monitoring instrument and monitoring system to assure that data is appropriate and useful in monitoring the impacts of compensatory education programs on disparities in academic achievement for black students and white students. (Continued) 2. Actual as of June 30, 2003 (Continued) On July 26, 2001, the ADE Implementation Phase Working group met to review the Implementation Phase activities for the previous quarter. Mr. Willie Morris, ADE Lead Planner for Desegregation, updated the group on all relevant desegregation issues. Mr. Mark Hagemeier, Assistant Attorney General, and Mr. Scott Smith, ADE Staff Attorney, discussed the court case involving the LRSD seeking unitary status. The next Implementation Phase Working Group Meeting is scheduled for October 11, 2001 in room 201-A at the ADE. On October 11, 2001, the ADE Implementation Phase Working group met to review the Implementation Phase activities for the previous quarter. Mr. Willie Morris, ADE Lead Planner for Desegregation, updated the group on all relevant desegregation issues. Mr. Scott Smith, ADE Staff Attorney, discussed the ADE's intent to take a proactive role in Desegregation Monitoring. The next Implementation Phase Working Group Meeting is scheduled for January 10, 2002 in room 201-A at the ADE. The Implementation Phase Working Group Meeting that was scheduled for January 10 was postponed. It has been rescheduled for February 14, 2002 in room 201-A at the ADE. On February 12, 2002, the ADE Implementation Phase Working group met to review the Implementation Phase activities for the previous quarter. Mr. Willie Morris, ADE Lead Planner for Desegregation, updated the group on all relevant desegregation issues. Mr. Mark Hagemeier, Assistant Attorney General, discussed the court case involving the LRSD seeking unitary status. The next Implementation Phase Working Group Meeting is scheduled for April 11, 2002 in room 201-A at the ADE. On April 11 , 2002, the ADE Implementation Phase Working group met to review the Implementation Phase activities for the previous quarter. Mr. Willie Morris, ADE Lead Planner for Desegregation, updated the group on all relevant desegregation issues. Mr. Mark Hagemeier, Assistant Attorney General, discussed the court case involving the LRSD seeking unitary status. The next Implementation Phase Working Group Meeting is scheduled for July 11, 2002 in room 201-A at the ADE. 16 II. MONITORING COMPENSATORY EDUCATION (Continued) A. Begin testing and evaluating the monitoring instrument and monitoring system to assure that data is appropriate and useful in monitoring the impacts of compensatory education programs on disparities in academic achievement for black students and white students. (Continued) 2. Actual as of June 30, 2003 (Continued) On July 18, 2002, the ADE Implementation Phase Working group met to review the Implementation Phase activities for the previous quarter. Mr. Willie Morris, ADE Lead Planner for Desegregation, updated the group on all relevant desegregation issues. Dr. Charity Smith, Assistant Director for Accountability, talked about section XV in the Project Management Tool (PMT) on Standardized Test Selection to Determine Loan Forgiveness. She said that the goal has been completed, and no additional reporting is required for section XV. Mr. Morris discussed the court case involving the LRSD seeking unitary status. He handed out a Court Order from May 9, 2002, which contained comments from U.S. District Judge Bill Wilson Jr., about hearings on the LRSD request for unitary status. Mr. Morris also handed out a document from the Secretary of Education about the No Child Left Behind Act. There was discussion about how this could have an affect on Desegregation issues. The next Implementation Phase Working Group Meeting is scheduled for October 10, 2002 at 1:30 p.m. in room 201-A at the ADE. The quarterly Implementation Phase Working Group meeting was rescheduled from October 10. It will take place on October 29, 2002 in room 201-A at 1 :30 p.m. at the ADE. On October 29, 2002, the ADE Implementation Phase Working Group met to review the Implementation Phase activities for the previous quarter. Mr. Willie Morris, ADE Lead Planner for Desegregation, updated the group on all relevant desegregation issues. Meetings with the parties to discuss possible revisions to the ADE's monitoring plan will be postponed by request of the school districts in Pulaski County. Additional meetings could be scheduled after the Desegregation ruling is finalized. The next Implementation Phase Working Group Meeting is scheduled for January 9, 2003 at 1:30 p.m. in room 201-A at the ADE. On January 9, 2003, the ADE Implementation Phase Working Group met to review the Implementation Phase activities for the previous quarter. Mr. Willie Morris, ADE Lead Planner for Desegregation, updated the group on all relevant desegregation issues. No Child Left Behind and the Desegregation ruling on unitary status for LRSD were discussed. The next Implementation Phase Working Group Meeting is scheduled for April 10, 2003 at 1 :30 p.m. in room 201- A at the ADE. The quarterly Implementation Phase Working Group meeting was rescheduled from April 10. It will take place on April 24, 2003 in room 201-A at 1 :30 p.m. at the ADE. 17 II. MONITORING COMPENSATORY EDUCATION (Continued) A. Begin testing and evaluating the monitoring instrument and monitoring system to assure that data is appropriate and useful in monitoring the impacts of compensatory education programs on disparities in academic achievement for black students and white students. (Continued) 2. Actual as of June 30, 2003 (Continued) On April 24, 2003, the ADE Implementation Phase Working Group met to review the Implementation Phase activities for the previous quarter. Mr. Willie Morris, ADE Lead Planner for Desegregation, updated the group on all relevant desegregation issues. Laws passed by the legislature need to be checked to make sure none of them impede desegregation. Ray Lumpkin was chairman of the last committee to check legislation. Since he left, we will discuss the legislation with Clarence Lovell. The Desegregation ruling on unitary status for LRSD was discussed. The next Implementation Phase Working Group Meeting is scheduled for July 10, 2003 at 1 :30 p.m. in room 201-A at the ADE. 18 Ill. A PETITION FOR ELECTION FOR LRSD WILL BE SUPPORTED SHOULD A MILLAGE BE REQUIRED A. Monitor court pleadings to determine if LRSD has petitioned the Court for a special election. 1. Projected Ending Date Ongoing. 2. Actual as of June 30, 2003 Ongoing. All Court pleadings are monitored monthly. 8. Draft and file appropriate pleadings if LRSD petitions the Court for a special election. 1. Projected Ending Date Ongoing 2. Actual as of June 30, 2003 To date, no action has been taken by the LRSD. 19 IV. REPEAL STATUTES AND REGULATIONS THAT IMPEDE DESEGREGATION A. Using a collaborative approach, immediately identify those laws and regulations that appear to impede desegregation. 1. Projected Ending Date December, 1994 2. Actual as of June 30, 2003 The information for this item is detailed under Section IV. E. of this report. B. Conduct a review within ADE of existing legislation and regulations that appear to impede desegregation. 1. Projected Ending Date November, 1994 2. Actual as of June 30, 2003 The information for this item is detailed under Section IV.E. of this report. C. Request of the other parties to the Settlement Agreement that they identify laws and regulations that appear to impede desegregation. 1. Projected Ending Date November, 1994 2. Actual as of June 30, 2003 The information for this item is detailed under Section IV.E. of this report. D. Submit proposals to the State Board of Education for repeal of those regulations that are confirmed to be impediments to desegregation. 1 . Projected Ending Date Ongoing 2. Actual as of June 30, 2003 The information for this item is detailed under Section IV. E. of this report. 20 IV. REPEAL STATUTES AND REGULATIONS THAT IMPEDE DESEGREGATION (Continued) E. Submit proposals to the Legislature for repeal of those laws that appear to be impediments to desegregation. 2. Actual as of June 30, 2003 A committee within the ADE was formed in May 1995 to review and collect data on existing legislation and regulations identified by the parties as impediments to desegregation. The committee researched the Districts' concerns to determine if any of the rules, regulations, or legislation cited impede desegregation. The legislation cited by the Districts regarding loss funding and worker's compensation were not reviewed because they had already been litigated. In September 1995, the committee reviewed the following statutes, acts, and regulations: Act 113 of 1993\nADE Director's Communication 93-205\nAct 145 of 1989\nADE Director's Memo 91-67\nADE Program Standards Eligibility Criteria for Special Education\nArkansas Codes 6-18-206, 6-20-307, 6-20-319, and 6-17- 1506. In October 1995, the individual reports prepared by committee members in their areas of expertise and the data used to support their conclusions were submitted to the ADE administrative team for their review. A report was prepared and submitted to the State Board of Education in July 1996. The report concluded that none of the items reviewed impeded desegregation. As of February 3, 1997, no laws or regulations have been determined to impede desegregation efforts. Any new education laws enacted during the Arkansas 81 st Legislative Session will be reviewed at the close of the legislative session to ensure that they do not impede desegregation. In April 1997, copies of all laws passed during the 1997 Regular Session of the 81 st General Assembly were requested from the office of the ADE Liaison to the Legislature for distribution to the Districts for their input and review of possible impediments to their desegregation efforts. In August 1997, a meeting to review the statutes passed in the prior legislative session was scheduled for September 9, 1997. 21 IV. REPEAL STATUTES AND REGULATIONS THAT IMPEDE DESEGREGATION (Continued) E. Submit proposals to the Legislature for repeal of those laws that appear to be impediments to desegregation. (Continued) 2. Actual as of June 30, 2003 (Continued) On September 9, 1997, a meeting was held to discuss the review of the statutes passed in the prior legislative session and new ADE regulations. The Districts will be contacted in writing for their input regarding any new laws or regulations that they feel may impede desegregation. Additionally, the Districts will be asked to review their regulations to ensure that they do not impede their desegregation efforts. The committee will convene on December 1, 1997 to review their findings and finalize their report to the Administrative Team and the State Board of Education. In October 1997, the Districts were asked to review new regulations and statutes for impediments to their desegregation efforts, and advise the ADE, in writing, if they feel a regulation or statute may impede their desegregation efforts. In October 1997, the Districts were requested to advise the ADE, in writing, no later than November 1, 1997 of any new law that might impede their desegregation efforts. As of November 12, 1997, no written responses were received from the Districts. The ADE concludes that the Districts do not feel that any new law negatively impacts their desegregation efforts. The committee met on December 1, 1997 to discuss their findings regarding statutes and regulations that may impede the desegregation efforts of the Districts. The committee concluded that there were no laws or regulations that impede the desegregation efforts of the Districts. It was decided that the committee chair would prepare a report of the committee's findings for the Administrative Team and the State Board of Education. The committee to review statutes and regulations that impede desegregation is now reviewing proposed bills and regulations, as well as laws that are being signed in, for the current 1999 legislative session. They will continue to do so until the session is over. The committee to review statutes and regulations that impede desegregation will meet on April 26, 1999 at the ADE. The committee met on April 26, 1999 at the ADE. The purpose of the meeting was to identify rules and regulations that might impede desegregation, and review within the existing legislation any regulations that might result in an impediment to desegregation. This is a standing committee that is ongoing and a report will be submitted to the State Board of Education once the process is completed. 22 IV. REPEAL STATUTES AND REGULATIONS THAT IMPEDE DESEGREGATION (Continued) E. Submit proposals to the Legislature for repeal of those laws that appear to be impediments to desegregation. (Continued) 2. Actual as of June 30, 2003 (Continued) The committee met on May 24, 1999 at the ADE. The committee was asked to review within the existing legislation any regulations that might result in an impediment to desegregation. The committee determined that Mr. Ray Lumpkin would contact the Pulaski County districts to request written response to any rules, regulations or laws that might impede desegregation. The committee would also collect information and data to prepare a report for the State Board. This will be a standing committee. This data gathering will be ongoing until the final report is given to the State Board. On July 26, 1999, the committee met at the ADE. The committee did not report any laws or regulations that they currently thought would impede desegregation, and are still waiting for a response from the three districts in Pulaski County. The committee met on August 30, 1999 at the ADE to review rules and regulations that might impede desegregation. At that time, there were no laws under review that appeared to impede desegregation. In November, the three districts sent letters to the ADE stating that they have reviewed the laws passed by the 82nd legislative session as well as current rules \u0026amp; regulations and district policies to ensure that they have no ill effect on desegregation efforts. There was some concern from PCSSD concerning a charter school proposal in the Maumelle area. The work of the committee is on-going each month depending on the information that comes before the committee. Any rules, laws or regulations that would impede desegregation will be discussed and reported to the State Board of Education. On October 4, 2000, the ADE presented staff development for assistant superintendents in LRSD, NLRSD and PCSSD regarding school laws of Arkansas. The ADE is in the process of forming a committee to review all Rules and Regulations from the ADE and State Laws that might impede desegregation. The ADE Committee on Statutes and Regulations will review all new laws that might impede desegregation once the 83rd General Assembly has completed this session. The ADE Committee on Statutes and Regulations will meet for the first time on June 11, 2001 at 9:00 a.m. in room 204-A at the ADE. The committee will review all new laws that might impede desegregation that were passed during the 2001 Legislative Session. 23 IV. REPEAL STATUTES AND REGULATIONS THAT IMPEDE DESEGREGATION (Continued) E. Submit proposals to the Legislature for repeal of those laws that appear to be impediments to desegregation. (Continued) 2. Actual as of June 30, 2003 (Continued) The ADE Committee on Statutes and Regulations rescheduled the meeting that was planned for June 11, in order to review new regulations proposed to the State Board of Education. The meeting will take place on July 16, 2001 at 9:00 a.m. at the ADE. The ADE Committee to Repeal Statutes and Regulations that Impede Desegregation met on July 16, 2001 at the ADE. The following Items were discussed: (1) Review of 2001 state laws which appear to impede desegregation. (2) Review of existing ADE regulations which appear to impede desegregation. (3) Report any laws or regulations found to impede desegregation to the Arkansas State Legislature, the ADE and the Pulaski County school districts. The next meeting will take place on August 27, 2001 at 9:00 a.m. at the ADE. The ADE Committee to Repeal Statutes and Regulations that Impede Desegregation met on August 27, 2001 at the ADE. The Committee is reviewing all relevant laws or regulations produced by the Arkansas State Legislature, the ADE and the Pulaski County school districts in FY 2000/2001 to determine if they may impede desegregation. The next meeting will take place on September 10, 2001 in Conference Room 204-B at 2:00 p.m. at the ADE. The ADE Committee to Repeal Statutes and Regulations that Impede Desegregation met on September 10, 2001 at the ADE. The Committee is reviewing all relevant laws or regulations produced by the Arkansas State Legislature, the ADE and the Pulaski County school districts in FY 2000/2001 to determine if they may impede desegregation. The next meeting will take place on October 24, 2001 in Conference Room 204-B at 2:00 p.m. at the ADE. The ADE Committee to Repeal Statutes and Regulations that Impede Desegregation met on October 24, 2001 at the ADE. The Committee is reviewing all relevant laws or regulations produced by the Arkansas State Legislature, the ADE and the Pulaski County school districts in FY 2000/2001 to determine if they may impede desegregation. On December 17, 2001, the ADE Committee to Repeal Statutes and Regulations that Impede Desegregation composed letters that will be sent to the school districts in Pulaski County. The letters ask for input regarding any new laws or regulations that may impede desegregation. Laws to review include those of the 83rd General Assembly, ADE regulations, and regulations of the Districts. 24 IV. REPEAL STATUTES AND REGULATIONS THAT IMPEDE DESEGREGATION (Continued) E. Submit proposals to the Legislature for repeal of those laws that appear to be impediments to desegregation. (Continued) 2. Actual as of June 30, 2003 (Continued) On January 10, 2002, the ADE Committee to Repeal Statutes and Regulations that Impede Desegregation sent letters to the school districts in Pulaski County. The letters ask for input regarding any new laws or regulations that may impede desegregation. The districts were asked to respond by March 8, 2002. On March 5, 2002, A letter was sent from the LRSD which mentioned Act 1748 and Act 1667 passed during the 83rd Legislative Session which may impede desegregation. These laws will be researched to determine if changes need to be made. A letter was sent from the NLRSD on March 19, noting that the district did not find any laws which impede desegregation. On April 26, 2002, A letter was sent for the PCSSD to the ADE, noting that the district did not find any laws which impede desegregation except the \"deannexation\" legislation which the District opposed before the Senate committee. 25 V. COMMITMENT TO PRINCIPLES A. Through a preamble to the Implementation Plan, the Board of Education will reaffirm its commitment to the principles of the Settlement Agreement and outcomes of programs intended to apply those principles. 1. Projected Ending Date Ongoing 2. Actual as of June 30, 2003 The preamble was contained in the Implementation Plan filed with the Court on March 15, 1994. B. Through execution of the Implementation Plan, the Board of Education will continue to reaffirm its commitment to the principles of the Settlement Agreement and outcomes of programs intended to apply those principles. 1. Projected Ending Date Ongoing 2. Actual as of June 30, 2003 Ongoing C. Through execution of the Implementation Plan, the Board of Education will continue to reaffirm its commitment to the principles of the Settlement Agreement by actions taken by ADE in response to monitoring results. 1. Projected Ending Date Ongoing 2. Actual as of June 30, 2003 Ongoing D. Through regular oversight of the Implementation Phase's Project Management Tool, and scrutiny of results of ADE's actions, the Board of Education will act on its commitment to the principles of the Settlement Agreement. 1. Projected Ending Date Ongoing 26 V. COMMITMENT TO PRINCIPLES (Continued) D. Through regular oversight of the Implementation Phase's Project Management Tool, and scrutiny of results of ADE's actions, the Board of Education will act on its commitment to the principles of the Settlement Agreement. (Continued) 2. Actual as of June 30, 2003 At each regular monthly meeting of the State Board of Education, the Board is provided copies of the most recent Project Management Tool (PMT) and an executive summary of the PMT for their review and approval. Only activities that are in addition to the Board's monthly review of the PMT are detailed below. In May 1995, the State Board of Education was informed of the total number of schools visited during the monitoring phase and the data collection process. Suggestions were presented to the State Board of Education on how recommendations could be presented in the monitoring reports. In June 1995, an update on the status of the pending Semiannual Monitoring Report was provided to the State Board of Education. In July 1995, the July Semiannual Monitoring Report was reviewed by the State Board of Education. On August 14, 1995, the State Board of Education was informed of the need to increase minority participation in the teacher scholarship program and provided tentative monitoring dates to facilitate reporting requests by the ADE administrative team and the Desegregation Litigation Oversight Subcommittee. In September 1995, the State Board of Education was advised of a change in the PMT from a table format to a narrative format. The Board was also briefed about a meeting with the Office of Desegregation Monitoring regarding the PMT. In October 1995, the State Board of Education was updated on monitoring timelines. The Board was also informed of a meeting with the parties regarding a review of the Semiannual Monitoring Report and the monitoring process, and the progress of the test validation study. In November 1995, a report was made to the State Board of Education regarding the monitoring schedule and a meeting with the parties concerning the development of a common terminology for monitoring purposes. In December 1995, the State Board of Education was updated regarding announced monitoring visits. In January 1996, copies of the draft February Semiannual Monitoring Report and its executive summary were provided to the State Board of Education. 27 V. COMMITMENT TO PRINCIPLES (Continued) D. Through regular oversight of the Implementation Phase's Project Management Tool, and scrutiny of results of ADE's actions, the Board of Education will act on its commitment to the principles of the Settlement Agreement. (Continued) 2. Actual as of June 30, 2003 (Continued) During the months of February 1996 through May 1996, the PMT report was the only item on the agenda regarding the status of the implementation of the Monitoring Plan. In June 1996, the State Board of Education was updated on the status of the bias review study. In July 1996, the Semiannual Monitoring Report was provided to the Court, the parties, ODM, the State Board of Education, and the Desegregation Litigation Oversight Subcommittee. In August 1996, the State Board of Education and the ADE administrative team were provided with copies of the test validation study prepared by Dr. Paul Williams. During the months of September 1996 through December 1996, the PMT was the only item on the agenda regarding the status of the implementation of the Monitoring Plan. On January 13, 1997, a presentation was made to the State Board of Education regarding the February 1997 Semiannual Monitoring Report, and copies of the report and its executive summary were distributed to all Board members. The Project Management Tool and its executive summary were addressed at the February 10, 1997 State Board of Education meeting regarding the ADE's progress in fulfilling their obligations as set forth in the Implementation Plan. In March 1997, the State Board of Education was notified that historical information in the PMT had been summarized at the direction of the Assistant Attorney General in order to reduce the size and increase the clarity of the report. The Board was updated on the Pulaski County Desegregation Case and reviewed the Memorandum Opinion and Order issued by the Court on February 18, 1997 in response to the Districts' motion for summary judgment on the issue of state funding for teacher retirement matching contributions. During the months of April 1997 through June 1997, the PMT was the only item on the agenda regarding the status of the implementation of the Monitoring Plan. The State Board of Education received copies of the July 15, 1997 Semiannual Monitoring Report and executive summary at the July Board meeting. 28 V. COMMITMENT TO PRINCIPLES (Continued) D. Through regular oversight of the Implementation Phase's Project Management Tool, and scrutiny of results of ADE's actions, the Board of Education will act on its commitment to the principles of the Settlement Agreement. (Continued) 2. Actual as of June 30, 2003 (Continued) The Implementation Phase Working Group held its quarterly meeting on August 4, 1997 to discuss the progress made in attaining the goals set forth in the Implementation Plan and the critical areas for the current quarter. A special report regarding a historical review of the Pulaski County Settlement Agreement and the ADE's role and monitoring obligations were presented to the State Board of Education on September 8, 1997. Additionally, the July 15, 1997 Semiannual Monitoring Report was presented to the Board for their review. In October 1997, a special draft report regarding disparity in achievement was submitted to the State Board Chairman and the Desegregation Litigation Oversight Subcommittee. In November 1997, the State Board of Education was provided copies of the monthly PMT and its executive summary. The Implementation Phase Working Group held its quarterly meeting on November 3, 1997 to discuss the progress made in attaining the goals set forth in the Implementation Plan and the critical areas for the current quarter. In December 1997, the State Board of Education was provided copies of the monthly PMT and its executive summary. In January 1998, the State Board of Education reviewed and discussed ODM's report on the AD E's monitoring activities and instructed the Director to meet with the parties to discuss revisions to the ADE's monitoring plan and monitoring reports. In February 1998, the State Board of Education reviewed and approved the PMT and discussed the February 1998 Semiannual Monitoring Report. In March 1998, the State Board of Education reviewed and approved the PMT and its executive summary and was provided an update regarding proposed revisions to the monitoring process. In April 1998, the State Board of Education reviewed and approved the PMT and its executive summary. In May 1998, the State Board of Education reviewed and approved the PMT and its executive summary. 29 V. COMMITMENT TO PRINCIPLES (Continued) D. Through regular oversight of the Implementation Phase's Project Management Tool, and scrutiny of results of ADE's actions, the Board of Education will act on its commitment to the principles of the Settlement Agreement. (Continued) 2. Actual as of June 30, 2003 (Continued) In June 1998, the State Board of Education reviewed and approved the PMT and its executive summary. The State Board of Education also reviewed how the ADE would report progress in the PMT concerning revisions in ADE's Monitoring Plan. In July 1998, the State Board of Education reviewed and approved the PMT and its executive summary. The State Board of Education also received an update on Test Validation, the Desegregation Litigation Oversight Committee Meeting, and revisions in ADE's Monitoring Plan. In August 1998, the State Board of Education reviewed and approved the PMT and its executive summary. The Board also received an update on the five discussion points regarding the proposed revisions to the monitoring and reporting process. The Board also reviewed the basic goal of the Minority Recruitment Committee. In September 1998, the State Board of Education reviewed the proposed modifications to the Monitoring plans by reviewing the common core of written response received from the districts. The primary commonalities were (1) Staff Development, (2) Achievement Disparity and (3) Disciplinary Disparity. A meeting of the parties is scheduled to be conducted on Thursday, September 17, 1998. The Board encouraged the Department to identify a deadline for Standardized Test Validation and Test Selection. In October 1998, the Board received the progress report on Proposed Revisions to the Desegregation Monitoring and Reporting Process (see XVIII). The Board also reviewed and approved the PMT and its executive summary. In November, the Arkansas State Board of Education reviewed the PMT and its executive summary. The Board also received an update on the proposed revisions in the Desegregation monitoring Process and the update on Test validation and Test Selection provisions of the Settlement Agreement. The Board was also notified that the Implementation Plan Working Committee held its quarterly meeting to review progress and identify quarterly priorities. In December, the State Board of Education reviewed the PMT and its executive summary. The Board also received an update on the joint motion by the ADE, the LRSD, NLRSD, and the PCSSD, to relieve the Department of its obligation to file a February Semiannual Monitoring Report. The Board was also notified that the Joshua lntervenors filed a motion opposing the joint motion. The Board was informed that the ADE was waiting on a response from Court. 30 V. COMMITMENT TO PRINCIPLES (Continued) D. Through regular oversight of the Implementation Phase's Project Management Tool, and scrutiny of results of ADE's actions, the Board of Education will act on its commitment to the principles of the Settlement Agreement. (Continued) 2. Actual as of June 30, 2003 (Continued) In January, the Arkansas State Board of Education reviewed the PMT and its executive summary. The Board also received an update on the joint motion of the ADE, LRSD, PCSSD, and NLRSD for an order relieving the ADE of filing a February 1999 Monitoring Report. The motion was granted subject to the following three conditions: (1) notify the Joshua intervenors of all meetings between the parties to discuss proposed changes, (2) file with the Court on or before February 1, 1999, a report detailing the progress made in developing proposed changes and (3) identify ways in which ADE might assist districts in their efforts to improve academic achievement. In February, the Arkansas State Board of Education reviewed the PMT and its executive summary. The Board was informed that the three conditions: (1) notify the Joshua lntervenors of all meetings between the parties to discuss proposed changes, (2) file with the Court on or before February 1, 1999, a report detailing the progress made in developing proposed changes and (3) identify ways in which ADE might assist districts in their efforts to improve academic achievement had been satisfied. The Joshua lntervenors were invited again to attend the meeting of the parties and they attended on January 13, and January 28, 1999. They are also scheduled to attend on February 17, 1998. The report of progress, a collaborative effort from all parties was presented to court on February 1, 1999. The Board was also informed that additional items were received for inclusion in the revised report, after the deadline for the submission of the progress report and the ADE would: (1) check them for feasibility, and fiscal impact if any, and (2) include the items in future drafts of the report. In March, the Arkansas State Board of Education reviewed the PMT and its executive summary. The Board also received and reviewed the Desegregation Monitoring and Assistance Progress Report submitted to Court on February 1, 1999. On April 12, and May 10, 1999, the Arkansas State Board of Education reviewed the PMT and its executive summary. The Board also was notified that once the financial section of the proposed plan was completed, the revised plan would be submitted to the board for approval. On June 14, 1999, the Arkansas State Board of Education reviewed the PMT and its executive summary. The Board also was notified that once the financial section of the proposed plan was completed, the revised plan would be submitted to the board for approval. 31 V. COMMITMENT TO PRINCIPLES (Continued) D. Through regular oversight of the Implementation Phase's Project Management Tool, and scrutiny of results of ADE's actions, the Board of Education will act on its commitment to the principles of the Settlement Agreement. (Continued) 2. Actual as of June 30, 2003 (Continued) On July 12, 1999, the Arkansas State Board of Education reviewed the PMT and its executive summary. The Board also was notified that once the financial section of the proposed plan was completed, the revised plan would be submitted to the board for approval. On August 9, 1999, the Arkansas State Board of Education reviewed the PMT and its executive summary. The Board was also notified that the new Desegregation Monitoring and Assistance Plan would be ready to submit to the Board for their review \u0026amp; approval as soon as plans were finalized. On September 13, 1999, the Arkansas State Board of Education reviewed the PMT and its executive summary. The Board was also notified that the new Desegregation Monitoring and Assistance Plan would be ready to submit to the Board for their review \u0026amp; approval as soon as plans were finalized. On October 12, 1999, the Arkansas State Board of Education reviewed the PMT and its executive summary. The Board was notified that on September 21, 1999 that the Office of Education Lead Planning and Desegregation Monitoring meet before the Desegregation Litigation Oversight Subcommittee and presented them with the draft version of the new Desegregation Monitoring and Assistance Plan. The State Board was notified that the plan would be submitted for Board review and approval when finalized. On November 8, 1999, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of October. On December 13, 1999, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of November. On January 10, 2000, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of December. On February 14, 2000, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of January. On March 13, 2000, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of February. On April 10, 2000, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of March. 32 V. COMMITMENT TO PRINCIPLES (Continued) D. Through regular oversight of the Implementation Phase's Project Management Tool, and scrutiny of results of ADE's actions, the Board of Education will act on its commitment to the principles of the Settlement Agreement. (Continued) 2. Actual as of June 30, 2003 (Continued) On May 8, 2000, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of April. On June 12, 2000, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of May. On July 10, 2000, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of June. On August 14, 2000, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of July. On September 11, 2000, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of August. On October 9, 2000, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of September. On November 13, 2000, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of October. On December 11, 2000, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of November. On January 8, 2001 , the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of December. On February 12, 2001 , the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of January. On March 12, 2001 , the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of February. On April 9, 2001 , the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of March. On May 14, 2001, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of April. On June 11 , 2001 , the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of May. 33 V. COMMITMENT TO PRINCIPLES (Continued) D. Through regular oversight of the Implementation Phase's ProjectManagementTool, and scrutiny of results of ADE's actions, the Board of Education will act on its commitment to the principles of the Settlement Agreement. (Continued) 2. Actual as of June 30, 2003 (Continued) On July 9, 2001 , the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of June. On August 13, 2001, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of July. On September 10, 2001, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of August. On October 8, 2001 , the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of September. On November 19, 2001, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of October. On December 10, 2001, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of November. On January 14, 2002, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of December. On February 11 , 2002, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of January. On March 11 , 2002, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of February. On April 8, 2002, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of March. On May 13, 2002, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of April. On June 10, 2002, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of May. On July 8, 2002, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of June. On August 12, 2002, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of July. 34 V. COMMITMENT TO PRINCIPLES (Continued) D. Through regular oversight of the Implementation Phase's ProjectManagementTool, and scrutiny of results of ADE's actions, the Board of Education will act on its commitment to the principles of the Settlement Agreement. (Continued) 2. Actual as of June 30, 2003 (Continued) On September 9, 2002, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of August. On October 14, 2002, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of September. On November 18, 2002, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of October. On December 9, 2002, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of November. On January 13, 2003, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of December. On February 10, 2003, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of January. On March 10, 2003, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of February. On April 14, 2003, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of March. On May 12, 2003, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of April. i~lt:iifill~il:fliilfi!ii\\l119n.\n::r.@w~ggtoo.,.~pprgy~~J6~ 35 VI. REMEDIATION A. Through the Extended COE process, the needs for technical assistance by District, by School, and by desegregation compensatory education programs will be identified. 1. Projected Ending Date Ongoing 2. Actual as of June 30, 2003 During May 1995, team visits to Cycle 4 schools were conducted, and plans were developed for reviewing the Cycle 5 schools. In June 1995, the current Extended COE packet was reviewed, and enhancements to the Extended COE packet were prepared. In July 1995, year end reports were finalized by the Pulaski County field service specialists, and plans were finalized for reviewing the draft improvement plans of the Cycle 5 schools. In August 1995, Phase I - Cycle 5 school improvement plans were reviewed. Plans were developed for meeting with the Districts to discuss plans for Phase II - Cycle 1 schools of Extended COE, and a school improvement conference was conducted in Hot Springs. The technical review visits for the FY 95/96 year and the documentation process were also discussed. In October 1995, two computer programs, the Effective Schools Planner and the Effective Schools Research Assistant, were ordered for review, and the first draft of a monitoring checklist for Extended COE was developed. Through the Extended COE process, the field service representatives provided technical assistance based on the needs identified within the Districts from the data gathered. In November 1995, ADE personnel discussed and planned for the FY 95/96 monitoring, and onsite visits were conducted to prepare schools for the FY 95/96 team visits. Technical review visits continued in the Districts. In December 1995, announced monitoring and technical assistance visits were conducted in the Districts. At December 31, 1995, approximately 59% of the schools in the Districts had been monitored. Technical review visits were conducted during January 1996. In February 1996, announced monitoring visits and midyear monitoring reports were completed, and the field service specialists prepared for the spring NCA/COE peer team visits. 36 VI. REMEDIATION (Continued) A. Through the Extended COE process, the needs for technical assistance by District, by School, and by desegregation compensatory education programs will be identified. (Continued) 2. Actual as of June 30, 2003 (Continued) In March 1996, unannounced monitoring visits of Cycle 5 schools commenced, and two-day peer team visits of Cycle 5 schools were conducted. Two-day team visit materials, team lists and reports were prepared. Technical assistance was provided to schools in final preparation for team visits and to schools needing any school improvement information. In April and May 1996, the unannounced monitoring visits were completed. The unannounced monitoring forms were reviewed and included in the July monitoring report. The two-day peer team visits were completed, and annual COE monitoring reports were prepared. In June 1996, all announced and unannounced monitoring visits of the Cycle 5 schools were completed, and the data was analyzed. The Districts identified enrollment in compensatory education programs. The Semiannual Monitoring Report was completed and filed with the Court on July 15, 1996, and copies were distributed to the parties. During August 1996, meetings were held with the Districts to discuss the monitoring requirements. Technical assistance meetings with Cycle 1 schools were planned for 96/97. The Districts were requested to record discipline data in accordance with the Allen Letter. In September 1996, recommendations regarding the ADE monitoring schedule for Cycle 1 schools and content layouts of the semiannual report were submitted to the ADE administrative team for their review. Training materials were developed and schedules outlined for Cycle 1 schools. In October 1996, technical assistance needs were identified and addressed to prepare each school for their team visits. Announced monitoring visits of the Cycle 1 schools began on October 28, 1996. In December 1996, the announced monitoring visits of the Cycle 1 schools were completed, and technical assistance needs were identified from school site visits. In January 1997, the ECOE monitoring section identified technical assistance needs of the Cycle 1 schools, and the data was reviewed when the draft February Semiannual Monitoring Report was presented to the Desegregation Litigation Oversight Subcommittee, the State Board of Education, and the parties. 37 VI. REMEDIATION (Continued) A. Through the Extended COE process, the needs for technical assistance by District, by School, and by desegregation compensatory education programs will be identified. (Continued) 2. Actual as of June 30, 2003 (Continued) In February 1997, field service specialists prepared for the peer team visits of the Cycle 1 schools. NCA accreditation reports were presented to the NCA Committee, and NCA reports were prepared for presentation at the April NCA meeting in Chicago. From March to May 1997, 111 visits were made to schools or central offices to work with principals, ECOE steering committees, and designated district personnel concerning school improvement planning. A workshop was conducted on Learning Styles for Geyer Springs Elementary School. A School Improvement Conference was held in Hot Springs on July 15-17, 1997. The conference included information on the process of continuous school improvement, results of the first five years of COE, connecting the mission with the school improvement plan, and improving academic performance. Technical assistance needs were evaluated for the FY 97/98 school year in August 1997. From October 1997 to February 1998, technical reviews of the ECOE process were conducted by the field service representatives. Technical assistance was provided to the Districts through meetings with the ECOE steering committees, assistance in analyzing perceptual surveys, and by providing samples of school improvement plans, Gold File catalogs, and web site addresses to schools visited. Additional technical assistance was provided to the Districts through discussions with the ECOE committees and chairs about the process. In November 1997, technical reviews of the ECOE process were conducted by the field service representatives in conjunction with the announced monitoring visits. Workshops on brainstorming and consensus building and asking strategic questions were held in January and February 1998. In March 1998, the field service representatives conducted ECOE team visits and prepared materials for the NCA workshop. Technical assistance was provided in workshops on the ECOE process and team visits. In April 1998, technical assistance was provided on the ECOE process and academically distressed schools. In May 1998, technical assistance was provided on the ECOE process, and team visits were conducted. 38 VI. REMEDIATION (Continued) A. Through the Extended COE process, the needs for technical assistance by District, by School, and by desegregation compensatory education programs will be identified. (Continued) 2. Actual as of June 30, 2003 (Continued) In June 1998, the Extended COE Team Visit Reports were completed. A School Improvement Conference was held in Hot Springs on July 13-15, 1998. Major conference topics included information on the process of continuous school improvement, curriculum alignment, \"Smart Start,\" Distance Learning, using data to improve academic performance, educational technology, and multicultural education. All school districts in Arkansas were invited and representatives from Pulaski County attended. In September 1998, requests for technical assistance were received, visitation schedules were established, and assistance teams began visiting the Districts. Assistance was provided by telephone and on-site visits. The ADE provided inservice training on \"Using Data to Sharpen the Focus on Student Achievement\" at Gibbs Magnet Elementary school on October 5, 1998 at their request. The staff was taught how to increase test scores through data disaggregation, analysis, alignment, longitudinal achievement review, and use of individualized test data by student, teacher, class and content area. Information was also provided regarding the \"Smart Start\" and the \"Academic Distress\" initiatives. On October 20, 1998, ECOE technical assistance was provided to Southwest Jr. High School. B. Identify available resources for providing technical assistance for the specific condition, or circumstances of need, considering resources within ADE and the Districts, and also resources available from outside sources and experts. 1. Projected Ending Date Ongoing 2. Actual as of June 30, 2003 The information for this item is detailed under Section VI.F. of this report. C. Through the ERIC system, conduct a literature search for research evaluating compensatory education programs. 1. Projected Ending Date Ongoing 39 VI. REMEDIATION (Continued) C. Through the ERIC system, conduct a literature search for research evaluating compensatory education programs. (Continued) 2. Actual as of June 30, 2003 An updated ERIC Search was conducted on May 15, 1995 to locate research on evaluating compensatory education programs. The ADE received the updated ERIC disc that covered material through March 1995. An ERIC search was conducted in September 30, 1996 to identify current research dealing with the evaluation of compensatory education programs, and the articles were reviewed. An ERIC search was conducted in April 1997 to identify current research on compensatory education programs and sent to the Cycle 1 principals and the field service specialists for their use. An Eric search was conducted in October 1998 on the topic of Compensatory Education and related descriptors. The search included articles with publication dates from 1997 through July 1998. D. Identify and research technical resources available to ADE and the Districts through programs and organizations such as the Desegregation Assistance Center in San Antonio, Texas. 1. Projected Ending Date Summer 1994 2. Actual as of June 30, 2003 The information for this item is detailed under Section VI.F. of this report. E. Solicit, obtain, and use available resources for technical assistance. 1. Projected Ending Date Ongoing 2. Actual as of June 30, 2003 The information for this item is detailed under Section VI.F. of this report. 40 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. 1. Projected Ending Date Ongoing 2. Actual as of June 30, 2003 From March 1995 through July 1995, technical assistance and resources were obtained from the following sources: the Southwest Regional Cooperative\nUALR regarding training for monitors\nODM on a project management software\nADHE regarding data review and display\nand Phi Delta Kappa, the Desegregation Assistance Center and the Dawson Cooperative regarding perceptual surveys. Technical assistance was received on the Microsoft Project software in November 1995, and a draft of the PMT report using the new software package was presented to the ADE administrative team for review. In December 1995, a data manager was hired permanently to provide technical assistance with computer software and hardware. In October 1996, the field service specialists conducted workshops in the Districts to address their technical assistance needs and provided assistance for upcoming team visits. In November and December 1996, the field service specialists addressed technical assistance needs of the schools in the Districts as they were identified and continued to provide technical assistance for the upcoming team visits. In January 1997, a draft of the February 1997 Semiannual Monitoring Report was presented to the State Board of Education, the Desegregation Litigation Oversight Subcommittee, and the parties. The ECOE monitoring section of the report included information that identified technical assistance needs and resources available to the Cycle 1 schools. Technical assistance was provided during the January 29-31, 1997 Title I MidWinter Conference. The conference emphasized creating a learning community by building capacity schools to better serve all children and empowering parents to acquire additional skills and knowledge to better support the education of their children. In February 1997, three ADE employees attended the Southeast Regional Conference on Educating Black Children. Participants received training from national experts who outlined specific steps that promote and improve the education of black children. 41 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of June 30, 2003 (Continued) On March 6-9, 1997, three members of the ADE's Technical Assistance Section attended the National Committee for School Desegregation Conference. The participants received training in strategies for Excellence and Equity: Empowerment and Training for the Future. Specific information was received regarding the current status of court-ordered desegregation, unitary status, and resegregation and distributed to the Districts and ADE personnel. The field service specialists attended workshops in March on ACT testing and school improvement to identify technical assistance resources available to the Districts and the ADE that will facilitate desegregation efforts. ADE personnel attended the Eighth Annual Conference on Middle Level Education in Arkansas presented by the Arkansas Association of Middle Level Education on April 6-8, 1997. The theme of the conference was Sailing Toward New Horizons. In May 1997, the field service specialists attended the NCA annual conference and an inservice session with Mutiu Fagbayi. An Implementation Oversight Committee member participated in the Consolidated COE Plan inservice training. In June and July 1997, field service staff attended an SAT-9 testing workshop and participated in the three-day School Improvement Conference held in Hot Springs. The conference provided the Districts with information on the COE school improvement process, technical assistance on monitoring and assessing achievement, availability of technology for the classroom teacher, and teaching strategies for successful student achievement. In August 1997, field service personnel attended the ASCD Statewide Conference and the AAEA Administrators Conference. On August 18, 1997, the bi-monthly Team V meeting was held and presentations were made on the Early Literacy Learning in Arkansas (ELLA) program and the Schools of the 21st Century program. In September 1997, technical assistance was provided to the Cycle 2 principals on data collection for onsite and offsite monitoring. ADE personnel attended the Region VI Desegregation Conference in October 1997. Current desegregation and educational equity cases and unitary status issues were the primary focus of the conference. On October 14, 1997, the bi-monthly Team V meeting was held in Paragould to enable members to observe a 21st Century school and a school that incorporates traditional and multi-age classes in its curriculum. 42 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of June 30, 2003 (Continued) In November 1997, the field service representatives attended the Governor's Partnership Workshop to discuss how to tie the committee's activities with the ECOE process. In March 1998, the field service representatives attended a school improvement conference and conducted workshops on team building and ECOE team visits. Staff development seminars on Using Data to Sharpen the Focus on Student Achievement are scheduled for March 23, 1998 and March 27, 1998 for the Districts. In April 1998, the Districts participated in an ADE seminar to aid them in evaluating and improving student achievement. In August 1998, the Field Service Staff attended inservice to provide further assistance to schools, i.e., Title I Summer Planning Session, ADE session on Smart Start, and the School Improvement Workshops. All schools and districts in Pulaski County were invited to attend the \"Smart Start\" Summit November 9, 10, and 11 to learn more about strategies to increase student performance. \"Smart Start\" is a standards-driven educational initiative which emphasizes the articulation of clear standards for student achievement and accurate measures of progress against those standards through assessments, staff development and individual school accountability. The Smart Start Initiative focused on improving reading and mathematics achievement for all students in Grades K-4. Representatives from all three districts attended. On January 21 , 1998, the ADE provided staff development for the staff at Oak Grove Elementary School designed to assist them with their efforts to improve student achievement. Using achievement data from Oak Grove, educators reviewed trends in achievement data, identified areas of greatest need, and reviewed seven steps for improving student performance. On February 24, 1999, the ADE provided staff development for the administrative staff at Clinton Elementary School regarding analysis of achievement data. On February 15, 1999, staff development was rescheduled for Lawson Elementary School. The staff development program was designed to assist them with their efforts to improve student achievement using achievement data from Lawson, educators reviewed the components of the Arkansas Smart Initiative, trends in achievement data, identified areas of greatest need, and reviewed seven steps for improving student performance. Student Achievement Workshops were rescheduled for Southwest Jr. High in the Little Rock School District, and the Oak Grove Elementary School in the Pulaski County School District. 43 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of June 30, 2003 (Continued) On April 30, 1999, a Student Achievement Workshop was conducted for Oak Grove Elementary School in PCSSD. The Student Achievement Workshop for Southwest Jr. High in LRSD has been rescheduled. On June 8, 1999, a workshop was presented to representatives from each of the Arkansas Education Service Cooperatives and representatives from each of the three districts in Pulaski County. The workshop detailed the Arkansas Comprehensive Testing, Assessment and Accountability Program (ACTAAP). On June 18, 1999, a workshop was presented to administrators of the NLRSD. The workshop detailed the Arkansas Comprehensive Testing, Assessment and Accountability Program (ACTAAP) . On August 16, 1999, professional development on ways to increase student achievement and the components of the new ACT AAP program was presented during the preschool staff development activities for teaching assistant in the LRSD. On August 20, 1999, professional development on ways to increase student achievement and the components of the new ACTAAP program was presented during the preschool staff development activities for the Accelerated Learning Center in the LRSD. On September 13, 1999, professional development on ways to increase student achievement and the components of the new ACT AAP program were presented to the staff at Booker T. Washington Magnet Elementary School. On September 27, 1999, professional development on ways to increase student achievement was presented to the Middle and High School staffs of the NLRSD. The workshop also covered the components of the new ACTAAP program, and ACT 999 of 1999. On October 26, 1999, professional development on ways to increase student achievement was presented to LRSD personnel through a staff development training class. The workshop also covered the components of the new ACT AAP program, and ACT 999 of 1999. On December 7, 1999, professional development on ways to increase student achievement was scheduled for Southwest Middle School in the LRSD. The workshop was also set to cover the components of the new ACT AAP program, and ACT 999 of 1999. However, Southwest Middle School administrators had a need to reschedule, therefore the workshop will be rescheduled. 44 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of June 30, 2003 (Continued) On January 10, 2000, professional development on ways to increase student achievement was conducted for both Dr. Martin Luther King Magnet Elementary School \u0026amp; Little Rock Central High School. The workshops also covered the components of the new ACTAAP program, and ACT 999 of 1999. On March 1, 2000, professional development on ways to increase student achievement was conducted for all principals and district level administrators in the PCSSD. The workshop also covered the components of the new ACT AAP program, and ACT 999 of 1999. On April 12, 2000, professional development on ways to increase student achievement was conducted for the LRSD. The workshop also covered the components of the new ACTAAP program, and ACT 999 of 1999. Targeted staffs from the middle and junior high schools in the three districts in Pulaski County attended the Smart Step Summit on May 1 and May 2. Training was provided regarding the overview of the \"Smart Step\" initiative, \"Standard and Accountability in Action,\" and \"Creating Learning Environments Through Leadership Teams.\" The ADE provided training on the development of alternative assessment September 12-13, 2000. Information was provided regarding the assessment of Special Education and LEP students. Representatives from each district were provided the opportunity to select a team of educators from each school within the district to participate in professional development regarding Integrating Curriculum and Assessment K-12. The professional development activity was directed by the national consultant, Dr. Heidi Hays Jacobs, on September 14 and 15, 2000. The ADE provided professional development workshops from October 2 through October 13, 2000 regarding, \"The Write Stuff: Curriculum Frameworks, Content Standards and -Item Development.\" Experts from the Data Recognition Corporation provided the training. Representatives from each district were provided the opportunity to select a team of educators from each school within the district to participate. The ADE provided training on Alternative Assessment Portfolio Systems by video conference for Special Education and LEP Teachers on November 17, 2000. Also, Alternative Assessment Portfolio System Training was provided for testing coordinators through teleconference broadcast on November 27, 2000. 45 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of June 30, 2003 (Continued) On December 12, 2000, the ADE provided training for Test Coordinators on end of course assessments in Geometry and Algebra I Pilot examination. Experts from the Data Recognition Corporation conducted the professional development at the Arkansas Teacher Retirement Building. The ADE presented a one-day training session with Dr. Cecil Reynolds on the Behavior Assessment for Children (BASC). This took place on December 7, 2000 at the NLRSD Administrative Annex. Dr. Reynolds is a practicing clinical psychologist. He is also a professor at Texas A \u0026amp; M University and a nationally known author. In the training, Dr. Reynolds addressed the following: 1) how to use and interpret information obtained on the direct observation form, 2) how to use this information for programming, 3) when to use the BASC, 4) when to refer for more or additional testing or evaluation, 5) who should complete the forms and when, (i.e., parents, teachers, students), 6) how to correctly interpret scores. This training was intended to especially benefit School Psychology Specialists, psychologists, psychological examiners, educational examiners and counselors. During January 22-26, 2001 the ADE presented the ACTAAP Intermediate (Grade 6) Benchmark Professional Development Workshop on Item Writing. Experts from the Data Recognition Corporation provided the training. Representatives from each district were invited to attend. On January 12, 2001 the ADE presented test administrators training for mid-year End of Course (Pilot) Algebra I and Geometry exams. This was provided for schools with block scheduling. On January 13, 2001 the ADE presented SmartScience Lessons and worked with teachers to produce curriculum. This was shared with eight Master Teachers. The SmartScience Lessons were developed by the Arkansas Science Teachers Association in conjunction with the Wilbur Mills Educational Cooperative under an Eisenhower grant provided by the ADE. The purpose of SmartScience is to provide K-6 teachers with activity-oriented science lessons that incorporate reading, writing, and mathematics skills. The following training has been provided for educators in the three districts in Pulaski County by the Division of Special Education at the ADE since January 2000: On January 6, 2000, training was conducted for the Shannon Hills Pre-school Program, entitled \"Things you can do at home to support your child's learning.\" This was presented by Don Boyd - ASERC and Shelley Weir. The school's director and seven parents attended. 46 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of June 30, 2003 (Continued) On March 8, 2000, training was conducted for the Southwest Middle School in Little Rock, on ADD. Six people attended the training. There was follow-up training on Learning and Reading Styles on March 26. This was presented by Don Boyd - ASERC and Shelley Weir. On September 7, 2000, Autism and Classroom Accommodations for the LRSD at Chicot Elementary School was presented. Bryan Ayres and Shelley Weir were presenters. The participants were: Karen Sabo, Kindergarten Teacher\nMelissa Gleason, Paraprofessional\nCurtis Mayfield, P.E. Teacher\nLisa Poteet, Speech Language Pathologist\nJane Harkey, Principal\nKathy Penn-Norman, Special Education Coordinator\nAlice Phillips, Occupational Therapist. On September 15, 2000, the Governor's Developmental Disability Coalition Conference presented Assistive Technology Devices \u0026amp; Services. This was held at the Arlington Hotel in Hot Springs. Bryan Ayres was the presenter. On September 19, 2000, Autism and Classroom Accommodations for the LRSD at Jefferson Elementary School was presented. Bryan Ayres and Shelley Weir were presenters. The participants were: Melissa Chaney, Special Education Teacher\nBarbara Barnes, Special Education Coordinator\na Principal, a Counselor, a Librarian, and a Paraprofessional. On October 6, 2000, Integrating Assistive Technology Into Curriculum was presented at a conference in the Hot Springs Convention Center. Presenters were: Bryan Ayers and Aleecia Starkey. Speech Language Pathologists from LRSD and NLRSD attended. On October 24, 2000, Consideration and Assessment of Assistive Technology was presented through Compressed Video-Teleconference at the ADE facility in West Little Rock. Bryan Ayres was the presenter. On October 25 and 26, 2000, Alternate Assessment for Students with Severe Disabilities for the LRSD at J. A. Fair High School was presented. Bryan Ayres was the presenter. The participants were: Susan Chapman, Special Education Coordinator\nMary Steele, Special Education Teacher\nDenise Nesbit, Speech Language Pathologist\nand three Paraprofessionals. On November 14, 2000, Consideration and Assessment of Assistive Technology was presented through Compressed Video-Teleconference at the ADE facility in West Little Rock. Bryan Ayres was the presenter. On November 17, 2000, training was conducted on Autism for the LRSD at the Instructional Resource Center. Bryan Ayres and Shelley Weir were presenters. 47 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of June 30, 2003 (Continued) On December 5, 2000, Access to the Curriculum Via the use of Assistive Technology Computer Lab was presented. Bryan Ayres was the presenter of this teleconference. The participants were: Tim Fisk, Speech Language Pathologist from Arch Ford Education Service Cooperative at Plumerville and Patsy Lewis, Special Education Teacher from Mabelvale Middle School in the LRSD. On January 9, 2001, Consideration and Assessment of Assistive Technology was presented through Compressed Video-Teleconference at the ADE facility in West Little Rock. Bryan Ayres was the presenter. Kathy Brown, a vision consultant from the LRSD, was a participant. On January 23, 2001, Autism and Classroom Modifications for the LRSD at Brady Elementary School was presented. Bryan Ayres and Shelley Weir were presenters. The participants were: Beverly Cook, Special Education Teacher\nAmy Littrell, Speech Language Pathologist\nJan Feurig, Occupational Therapist\nCarolyn James, Paraprofessional\nCindy Kackly, Paraprofessional\nand Rita Deloney, Paraprofessional. The ADE provided training on Alternative Assessment Portfolio Systems for Special Education and Limited English Proficient students through teleconference broadcast on February 5, 2001. Presenters were: Charlotte Marvel, ADE\nDr. Gayle Potter, ADE\nMarcia Harding, ADE\nLynn Springfield, ASERC\nMary Steele, J. A. Fair High School, LRSD\nBryan Ayres, Easter Seals Outreach. This was provided for Special Education teachers and supervisors in the morning, and Limited English Proficient teachers and supervisors in the afternoon. The Special Education session was attended by 29 teachers/administrators and provided answers to specific questions about the alternate assessment portfolio system and the scoring rubric and points on the rubric to be used to score the portfolios. The LEP session was attended by 16 teachers/administrators and disseminated the common tasks to be included in the portfolios: one each in mathematics, writing and reading. On February 12-23, 2001, the ADE and Data Recognition Corporation personnel trained Test Coordinators in the administration of the spring Criterion-Referenced Test. This was provided in 20 sessions at 10 regional sites. Testing protocol, released items, and other testing materials were presented and discussed. The sessions provided training for Primary, Intermediate, and Middle Level Benchmark Exams as well as End of Course Literacy, Algebra and Geometry Pilot Tests. The LRSD had 2 in attendance for the End of Course session and 2 for the Benchmark session. The NLRSD had 1 in attendance for the End of Course session and 1 for the Benchmark session. The PCSSD had 1 in attendance for the End of Course session and 1 for the Benchmark session. 48 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of June 30, 2003 (Continued) On March 15, 2001, there was a meeting at the ADE to plan professional development for staff who work with Limited English Proficiency (LEP) students. A $30,000 grant has been created to provide LEP training at Chicot Elementary for a year, starting in April 2001. A $40,000 grant was created to provide a Summer English as Second Language (ESL) Academy for the LRSD from June 18 through 29, 2001. Andre Guerrero from the ADE Accountability section met with Karen Broadnax, ESL Coordinator at LRSD, Pat Price, Early Childhood Curriculum Supervisor at LRSD, and Jane Harkey, Principal of Chicot Elementary. On March 1-2 and 8-29, 2001, ADE staff performed the following activities: processed registration for April 2 and 3 Alternate Portfolio Assessment video conference quarterly meeting\nanswered questions about Individualized Educational Plan (IEP) and LEP Alternate Portfolio Assessment by phone from schools and Education Service Cooperatives\nand signed up students for alternate portfolio assessment from school districts. On March 6, 2001, ADE staff attended a Smart Step Technology Leadership Conference at the State House Convention Center. On March 7, 2001, ADE staff attended a National Assessment of Educational Progress (NAEP) Regional Math Framework Meeting about the Consensus Project 2004. On March 8, 2001, there was a one-on-one conference with Carole Villarreal from Pulaski County at the ADE about the LEP students with portfolios. She was given pertinent data, including all the materials that have been given out at the video conferences. The conference lasted for at least an hour. On March 14, 2001 , a Test Administrator's Training Session was presented specifically to LRSD Test Coordinators and Principals. About 60 LRSD personnel attended. The following meetings have been conducted with educators in the three districts in Pulaski County since July 2000. On July 10-13, 2000 the ADE provided Smart Step training. The sessions covered Standards-based classroom practices. 49 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of June 30, 2003 (Continued) On July 19-21, 2000 the ADE held the Math/Science Leadership Conference at UCA. This provided services for Arkansas math and science teachers to support systemic reform in math/science and training for 8th grade Benchmark. There were 200 teachers from across the state in attendance. On August 14-31, 2000 the ADE presented Science Smart Start Lessons and worked with teachers to produce curriculum. This will provide K-6 teachers with activity-oriented science lessons that incorporate reading, writing, and mathematics skills. On September 5, 2000 the ADE held an Eisenhower Informational meeting with Teacher Center Coordinators. The purpose of the Eisenhower Professional Development Program is to prepare teachers, school staff, and administrators to help all students meet challenging standards in the core academic subjects. A summary of the program was presented at the meeting. On November 2-3, 2000 the ADE held the Arkansas Conference on Teaching. This presented curriculum and activity workshops. More than 1200 attended the conference. On November 6, 2000 there was a review of Science Benchmarks and sample model curriculum. A committee of 6 reviewed and revised a drafted document. The committee was made up of ADE and K-8 teachers. On November 7-10, 2000 the ADE held a meeting of the Benchmark and End of Course Mathematics Content Area Committee. Classroom teachers reviewed items for grades 4, 6, 8 and EOC mathematics assessment. There were 60 participants. On December 4-8, 2000 the ADE conducted grades 4 and 8 Benchmark Scoring for Writing Assessment. This professional development was attended by approximately 750 teachers. On December 8, 2000 the ADE conducted Rubric development for Special Education Portfolio scoring. This was a meeting with special education supervisors to revise rubric and plan for scoring in June. On December 8, 2000 the ADE presented the Transition Mathematics Pilot Training Workshop. This provided follow-up training and activities for fourth-year mathematics professional development. On December 12, 2000 the ADE presented test administrators training for midyear End of Course (Pilot) Algebra I and Geometry exams. This was provided for schools with block scheduling. 50 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of June 30, 2003 (Continued) The ADE provided training on Alternative Assessment Portfolio Systems for Special Education and Limited English Proficient students through teleconference broadcasts on April 2-3, 2001 . Administration of the Primary, Intermediate, and Middle Level Benchmark Exams as well as End of Course Literacy took place on April 23-27, 2001 . Administration of the End of Course Algebra and Geometry Exams took place on May 2-3, 2001 . Over 1,100 Arkansas educators attended the Smart Step Growing Smarter Conference on July 10 and 11 , 2001, at the Little Rock Statehouse Convention Center. Smart Step focuses on improving student achievement for Grades 5-8. The Smart Step effort seeks to provide intense professional development for teachers and administrators at the middle school level, as well as additional materials and assistance to the state's middle school teachers. The event began with opening remarks by Ray Simon, Director of the ADE. Carl Boyd, a longtime educator and staff consultant for Learning 24-7, presented the first keynote address on \"The Character-Centered Teacher\". Debra Pickering, an education consultant from Denver, Colorado, presented the second keynote address on \"Characteristics of Middle Level Education\". Throughout the Smart Step conference, educators attended breakout sessions that were grade-specific and curriculum area-specific. Pat Davenport, an education consultant from Houston, Texas, delivered two addresses. She spoke on \"A Blueprint for Raising Student Achievement\". Representatives from all three districts in Pulaski County attended. Over 1,200 Arkansas teachers and administrators attended the Smart Start Conference on July 12, 2001, at the Little Rock Statehouse Convention Center. Smart Start is a standards-driven educational initiative which emphasizes the articulation of clear standards for student achievement and accurate measures of progress against those standards through assessments, staff development and individual school accountability. The Smart Start Initiative focused on improving reading and mathematics achievement for all students in Grades K-4. The event began with opening remarks by Ray Simon, Director of the ADE. Carl Boyd, a longtime educator and staff consultant for Leaming 24-7, presented the keynote address. The day featured a series of 15 breakout sessions on best classroom practices. Representatives from all three districts in Pulaski County attended. On July 18-20, 2001 , the ADE held the Math/Science Leadership Conference at UCA. This provided services for Arkansas math and science teachers to support systemic reform in math/science and training for 8th grade Benchmark. There were approximately 300 teachers from across the state in attendance. 51 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of June 30, 2003 (Continued) The ADE and Harcourt Educational Measurement conducted Stanford 9 test administrator training from August 1-9, 2001. The training was held at Little Rock, Jonesboro, Fort Smith, Forrest City, Springdale, Mountain Home, Prescott, and Monticello. Another session was held at the ADE on August 30, for those who were unable to attend August 1-9. The ADE conducted the Smart Start quarterly meeting by video conference at the Education Service Cooperatives and at the ADE from 9:00 a.m. until 11 :30 a.m. on September 5, 2001. The ADE released the performance of all schools on the Primary and Middle Level Benchmark Exams on September 5, 2001. The ADE conducted Transition Core Teacher In-Service training for Central in the LRSD on September 6, 2001 . The ADE conducted Transition Checklist training for Hall in the LRSD on September 7, 2001. The ADE conducted Transition Checklist training for McClellan in the LRSD on September 13, 2001. The ADE conducted Basic Co-teaching training for the LRSD on October 9, 2001 . The ADE conducted training on autism spectrum disorder for the PCSSD on October 15, 2001 . Professional Development workshops (1 day in length) in scoring End of Course assessments in algebra, geometry and reading were provided for all districts in the state. Each school was invited to send three representatives (one for each of the sessions). LRSD, NLRSD, and PCSSD participated. Information and training materials pertaining to the Alternate Portfolio Assessment were provided to all districts in the state and were supplied as requested to LRSD, PCSSD and David 0. Dodd Elementary. On November 1-2, 2001 the ADE held the Arkansas Conference on Teaching at the Excelsior Hotel \u0026amp; Statehouse Convention Center. This presented sessions, workshops and short courses to promote exceptional teaching and learning. Educators could become involved in integrated math, science, English \u0026amp; language arts and social studies learning. The ADE received from the schools selected to participate in the National Assessment of Educational Progress (NAEP), a list of students who will take the test. 52 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of June 30, 2003 (Continued) On December 3-7, 2001 the ADE conducted grade 6 Benchmark scoring training for reading and math. Each school district was invited to send a math and a reading specialist. The training was held at the Holiday Inn Airport in Little Rock. On December 4 and 6, 2001 the ADE conducted Mid-Year Test Administrator Training for Algebra and Geometry. This was held at the Arkansas Activities Association's conference room in North Little Rock. On January 24, 2002, the ADE conducted the Smart Start quarterly meeting by ADE compressed video with Fred Jones presenting. On January 31, 2002, the ADE conducted the Smart Step quarterly meeting by NSCI satellite with Fred Jones presenting. On February 7, 2002, the ADE Smart Step co-sponsored the AR Association of Middle Level Principal's/ADE curriculum, assessment and instruction workshop with Bena Kallick presenting. On February 11-21, 2002, the ADE provided training for Test Administrators on the Primary, Intermediate, and Middle Level Benchmark Exams as well as End of Course Literacy, Algebra and Geometry Exams. The sessions took place at Forrest City, Jonesboro, Mountain Home, Springdale, Fort Smith, Monticello, Prescott, Arkadelphia and Little Rock. A make-up training broadcast was given at 15 Educational Cooperative Video sites on February 22. During February 2002, the LRSD had two attendees for the Benchmark Exam training and one attendee for the End of Course Exam training. The NLRSD and PCSSD each had one attendee at the Benchmark Exam training and one attendee for the End of Course Exam training. The ADE conducted the Smart Start quarterly meeting by compressed interactive video at the South Central Education Service Cooperative from 9:30 a.m. until 11 :30 a.m. on May 2, 2002. Telecast topics included creating a standards-based classroom and a seven-step implementation plan. The principal's role in the process was explained. The ADE conducted the Smart Step quarterly meeting by compressed interactive video at the South Central Education Service Cooperative from 9:30 a.m. until 11 :30 a.m. on May 9, 2002. Telecast topics included creating a standards-based classroom and a seven-step implementation plan. The principal's role in the process was explained. 53 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of June 30, 2003 (Continued) The Twenty-First Annual Curriculum and Instruction Conference, cosponsored by the Arkansas Association for Supervision and Curriculum Development and the Arkansas Department of Education, will be held June 24-26, 2002, at the Arlington Hotel in Hot Springs, Arkansas. \"Ignite Your Enthusiasm for Learning\" is the theme for this year's conference, which will feature educational consultant, Dr. Debbie Silver, as well as other very knowledgeable presenters. Additionally, there will be small group sessions on Curriculum Alignment, North Central Accreditation, Section 504, Building Level Assessment, Administrator Standards, Data Disaggregation, and National Board. The Educational Accountability Unit of the ADE hosted a workshop entitled \"Strategies for Increasing Achievement on the ACT AAP Benchmark Examination\" on June 13-14, 2002 at the Agora Center in Conway. The workshop was presented for schools in which 100% of students scored below the proficient level on one or more parts of the most recent Benchmark Examination. The agenda included presentations on \"The Plan-Do-Check-Act Instructional Cycle\" by the nationally known speaker Pat Davenport. ADE personnel provided an explanation of the MPH point program. Presentations were made by Math and Literacy Specialists. Dr. Charity Smith, Assistant Director for Accountability, gave a presentation about ACTAAP. Break out sessions were held, in which school districts with high scores on the MPH point program offered strategies and insights into increasing student achievement. The NLRSD, LRSD, and PCSSD were invited to attend. The NLRSD attended the workshop. The Smart Start Summer Conference took place on July 8-9, 2002, at the Little Rock Statehouse Convention Center and Peabody Hotel. The Smart Start Initiative focuses on improving reading and mathematics achievement for all students in Grades K-4. The event included remarks by Ray Simon, Director of the ADE. After comments by the Director, Bena Kallick presented the keynote address \"Beyond Mapping: Essential Questions, Assessment, Higher Order Thinking\". This was followed by a series of breakout sessions on best classroom practices. On the second day, Vivian Moore gave the keynote address \"Overcoming Obstacles: Avenues for Student Success\". Krista Underwood gave the presentation \"Put Reading First in Arkansas\". This was followed by a series of breakout sessions on best classroom practices. 54 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of June 30, 2003 (Continued) The Smart Step Summer Conference took place on July 10-11, 2002, at the Little Rock Statehouse Convention Center and Peabody Hotel. Smart Step focuses on improving student achievement for Grades 5-8. The event included remarks by Ray Simon, Director of the ADE. After comments by the Director, Vivian Moore presented the keynote address \"Overcoming Obstacles: Avenues for Student Success\". This was followed by a series of breakout sessions on best classroom practices. On the second day, Bena Kallick presented \"Beyond Mapping: Essential Questions, Assessment, Higher Order Thinking\". Ken Stamatis presented \"Smart Steps to Creating a School Culture That Supports Adolescent Comprehension\". This was followed by a series of breakout sessions on best classroom practices. On August 8, 2002, Steven Weber held a workshop at Booker T. Washington Elementary on \"Best Practices in Social Studies\". It was presented to the 4th grade teachers in the Little Rock School District. The workshop focused around the five themes of geography and the social studies (fourth grade) framework/standards. Several Internet web sites were shared with the teachers, and the teachers were shown methods for incorporating writing into fourth grade social studies. One of the topics was using primary source photos and technology to stimulate the students to write about diverse regions. A theme of the workshop included identifying web sites which apply to fourth grade social studies teachers and interactive web sites for fourth grade students. This was a Back-to-School In-service workshop. The teachers were actively involved in the workshop. On August 13 Steven Weber conducted a workshop at Parkview High School in the LRSD. Topics of the workshop included: 1. Incorporating Writing in the Social Studies Classroom 2. Document Based (open-ended) Questioning Techniques 3. How to practice writing on a weekly basis without assigning a lengthy research report 4. Developing Higher Level Thinking Skills in order to produce active citizens, rather than passive, uninformed citizens 5. Using the Social Studies Framework 6. Identifying state and national Web Sites which contain Primary Sources for use in the classroom The 8:30 - 11 :30 session was for the 6 - 8 grade social studies teachers. The 12:30 - 3:00 session was for the 9 - 12 grade social studies teachers. Several handouts were used, also PowerPoint, primary source photos and documents, and Internet web sites (i.e., Library of Congress, Butler Center for Arkansas Studies, National Archives, etc.). This was a Back-to-School In-service workshop. The teachers were actively involved in the workshop. Marie McNeal is the Social Studies Specialist for the Little Rock School District. She invited Steven Weber to present at the workshop, and was in attendance. 55 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of June 30, 2003 (Continued) On September 30 through October 11, 2002, the ADE provided Professional Development for Test Administrators on the End of Course Literacy, Algebra and Geometry Exams. The training was held at the Holiday Inn Airport. All three districts in Pulaski County sent representatives to the training. On October 3, 2002, Charlotte Marvel provided in-service training for LEP teachers in the Little Rock School District. On December 6, 2002, the Community and Parent Empowerment Summit was held for parents of children attending the LRSD. It took place at the Saint Mark Baptist Church in Little Rock. Dr. Charity Smith, Assistant Director for Accountability, presented information on No Child Left Behind, Supplemental Services, after school tutoring, how parents can help, and the Refrigerator Curriculum. Mr. Reginald Wilson, Senior Coordinator for Accountability, presented information on ACTAAP, including how to find information on the AS-IS Website and what is included in the school report cards. Donna Elam spoke on the topic \"From the School House to the Jail House\". On December 10 - 12, 2002, the Math Workshop \"Investigations in Number, Data and Space\" was held at the Clinton Elementary Magnet School in Sherwood. Training for Kindergarten and First Grade Teachers was held on December 10, and included Making Shapes and Building Blocks, Quilts, Squares and Block Towns. Training for Second and Third Grade Teachers was held on December 11, and included Shapes, Halves, Symmetry and Turtle Paths. Training for Fourth and Fifth Grade Teachers was held on December 12. Fourth grade covered Seeing Solids and Silhouettes. Fifth Grade was about Containers and Cubes. The sessions provided quality time for teachers to discuss the curriculum, reflect on implications, provide mutual support, and continue planning. The ADE provided professional development for all school districts on Alternative Assessment Portfolio Systems on January 7-9, 2003 at the Holiday Inn Airport. The LRSD had two in attendance, NLRSD had one in attendance, and the PCSSD had two in attendance. The ADE conducted the Smart Start Statewide Professional Staff Development Video Conference at the ADE/AETN Studio and at participating Education Service Cooperatives from 9:30 a.m. until 11 :30 a.m. on February 12, 2003. The ADE conducted the Smart Step Statewide Professional Staff Development Video Conference at the ADE/AETN Studio and at participating Education Service Cooperatives from 9:30 a.m. until 11 :30 a.m. on February 13, 2003. 56 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of June 30, 2003 (Continued) Test Coordinator training was provided throughout the state during the weeks starting February 10 and February 17, 2003. The training in Little Rock was February 20, 2003. The Little Rock School District had two attendees for the Benchmark, End of Course, and Stanford 9 training. The North Little Rock School District had one attendee at the Benchmark, End of Course, and Stanford 9 training. The Pulaski County Special School District had one attendee at the Benchmark, End of Course, and Stanford 9 training. Two sixth grade teachers from each district attended the Professional Development for Benchmark assessments during the week of February 17, 2003 at the Holiday Inn Airport. Two fourth and two eighth grade teachers from each district attended the Professional Development for Benchmark assessments during the week of March 3, 2003 at the Holiday Inn Airport. The ADE announces the opportunity for schools to participate in the Arkansas Literacy Coaching Model and to train a school employee to serve as a full-time literacy coach. Training will be held at the Early Literacy Training Center at UALR. A literacy coach is a site-based employee who works full time with the school staff providing professional development, technical assistance, and support to teachers. They demonstrate exemplary classroom literacy practices, observe and coach teachers, provide sustained mentoring to classroom teachers, plan and conduct professional literacy team meetings, provide workshops on the literacy framework, and maintain data on student performance. Depending on the number of qualifying school districts who agree to participate, training expenses will be funded by the ADE through the Early Literacy Training Center at UALR. Grant funds will provide graduate level training, lodging and travel expenses, and materials to establish a model classroom. 57 VII. TEST VALIDATION A. B. Using a collaborative approach, the ADE will select and contract with an independent bias review service or expert to evaluate the Stanford 8, or other monitoring instruments used to measure disparities in academic achievement between black students and white students. 1. Projected Ending Date March, 1995 2. Actual as of June 30, 2003 On March 29, 1995, letters were sent to four national experts about conducting a test bias validation of the Stanford Achievement Test, Eighth Edition, Form K (SAT-8). Dr. Paul Williams, Deputy Director of Educational Testing Service (ETS), contacted the ADE in April of 1995 concerning the proposal for validating the SAT-8 test. The ADE requested that Dr. Williams conduct a valid ity study of test items used in the SAT-8. Dr. Williams submitted a final proposal for his services. The ADE Bias Review Test Committee met Friday, July 7, 1995, and approved Dr. William's contract proposal. The final contract was forwarded to Dr. Williams for his signature. The contract was signed in August 1995, thereby, completing this goal. By April 1994, establish a bias review committee to oversee the bias review process, and invite representatives of the Districts and parties to meet with the bias review committee. 1. Projected Ending Date Ongoing 2. Actual as of June 30, 2003 Complete. ADE established a Bias Review Committee in April 1994. In accordance with the Implementation Plan, representatives from the Districts and the parties were invited to attend and participate in this and all meetings of the Bias Review Committee. C. Upon completion of test validation procedures by the bias review service or expert, the ADE will adopt and use a validated test as a monitoring instrument. 1. Projected Ending Date March 1995 and ongoing 58 VII. TEST VALIDATION (Continued) C. Upon completion of test validation procedures by the bias review service or expert, the ADE will adopt and use a validated test as a monitoring instrument. (Continued) 2. Actual as of June 30, 2003 Dr. Paul Williams met with the staff of the Psychological Corporation to review their methods and procedures. In August 1995, he met with the staff at Georgia State University to review the statistical methods that would be used in the analysis. Dr. Williams reported difficulty with the bias-review study in receiving the names of the bias panel and the complete SAT-8 data set from the Psychological Corporation. Dr. Williams submitted an invoice totaling $8,961 for Task I activities of the SAT-8 validity study for partial fulfillment of the test validation study. On December 6, 1995, a contract extension for Dr. Williams was reviewed by the Legislative Council. In January 1996, he indicated that he was in the final stages of the test validation, and the ADE was presented a draft report in March 1996. In May 1996, Dr. Williams stated that the wrong data sets were sent to him by the Psychological Corporation resulting in Task 3 having to be redone. A new draft of the final report was received by the ADE in July 1996. In August 1996, copies of the test validation report were provided to the State Board of Education and the ADE administrative team for their review. On September 10, 1996, the LRSD notified the ADE that they had reviewed the test validation report and would like to meet with the ADE to discuss the report. The ADE Director indicated that he would schedule a meeting with the LRSD to discuss the report. In October 1996, historical files and data were provided t\nThis project was supported in part by a Digitizing Hidden Special Collections and Archives project grant from The Andrew W. Mellon Foundation and Council on Library and Information Resoources.\n   \n\n   \n\n  \n\n\n   \n\n  \n\n \n\n\n   \n\n   \n\n \n\n\n   \n\n  \n\n \n\n\u003cdcterms_creator\u003eArkansas. Department of Education\u003c/dcterms_creator\u003e\n   \n\n \n\n  \n\n\n   \n\n \n\n  \n\n\n\n   \n\n  \n\n  \n\n\n\n\n   \n\n   \n\n  \n\n \n\n \n\n\n   \n\n  \n\n \n\n\n\n\n\n\n\n\n   \n\n \n\n\n\n  \n\n\n   \n\n\n\n  \n\n\n\n "},{"id":"bcas_bcmss0837_28","title":"Arkansas Department of Education's (ADE's) Project Management Tool","collection_id":"bcas_bcmss0837","collection_title":"Office of Desegregation Management","dcterms_contributor":null,"dcterms_spatial":["United States, 39.76, -98.5","United States, Arkansas, 34.75037, -92.50044","United States, Arkansas, Pulaski County, 34.76993, -92.3118"],"dcterms_creator":["Arkansas. Department of Education"],"dc_date":["2003-04/2003-05"],"dcterms_description":null,"dc_format":["application/pdf"],"dcterms_identifier":null,"dcterms_language":["eng"],"dcterms_publisher":["Little Rock, Ark. : Butler Center for Arkansas Studies. Central Arkansas Library System"],"dc_relation":null,"dc_right":["http://rightsstatements.org/vocab/InC-EDU/1.0/"],"dcterms_is_part_of":["Office of Desegregation Monitoring records (BC.MSS.08.37)","History of Segregation and Integration of Arkansas's Educational System"],"dcterms_subject":["Education--Arkansas","Office of Desegregation Monitoring (Little Rock, Ark.)","School integration--Arkansas","Arkansas. Department of Education","Project management"],"dcterms_title":["Arkansas Department of Education's (ADE's) Project Management Tool"],"dcterms_type":["Text"],"dcterms_provenance":["Butler Center for Arkansas Studies"],"edm_is_shown_by":null,"edm_is_shown_at":["http://arstudies.contentdm.oclc.org/cdm/ref/collection/bcmss0837/id/28"],"dcterms_temporal":null,"dcterms_rights_holder":null,"dcterms_bibliographic_citation":null,"dlg_local_right":["Available for use in research, teaching, and private study. Any other use requires permission from the Butler Center."],"dcterms_medium":["documents (object genre)"],"dcterms_extent":["222 pages"],"dlg_subject_personal":null,"dcterms_subject_fast":null,"fulltext":"\n \n\n\n\n\n\n\n\n  \n\n\n   \n\n   \n\n\n   \n\n\n   \n\n\n\n\n   \n\n\n\n\n   \n\n\n\n\n\n\n\n\n   \n\n   \n\n \n\n\n   \n\n   \n\n  \n\n\n   \n\n  \n\n \n\n\n   \n\n  \n\n \n\n\n   \n\n  \n\n  \n\nLittle Rock School District, plaintiff vs. Pulaski County Special School District, defendant.\nRECEIVED THE ATTORNEY GENERAL STATE OF ARKANSAS MIKE BEEBE APR 2 5 2003 OFFICE OF DESEGREGATION MONITORING Mark A. Hagemeier Assistant Attorney General Mr.M. SamuelJones, ill Wright, Lindsey \u0026amp; Jennings 200 W. Capitol, Suite 2000 Little Rock, AR 72201 Mr. John W. Walker John Walker, P.A. 1 723 Broadway Little Rock, AR 72201 Mr. Richard Roachell Plaza West Building 415 N. Mcl\u0026lt;\"inley, Suite 465 Little Rock, AR 72205 April 24, 2003 Direct dial: (501 ) 682-3643 E-mail: mark.hagemeier@ag.state.us Mr. Christopher Heller Friday, Eldredge \u0026amp; Clark 400 W. Capitol, Suite 2000 Little Rock, AR 72201-3493 Mr. Stephen W. Jones Jack, Lyon \u0026amp; Jones 425 W. Capitol, Suite 3400 Little Rock, AR 72201 Ms. Ann Marshall One Union National Plaza 124 West Capitol, Suite 1895 Little Rock, AR 72201 RE: Little Rock Sch. Dist. v. Pulaski County Special Sch. Dist. et al. U.S. Dist. Ct. No. 4:82-CV-866 Dear Gentlemen and Ms. Marshall: Enclosed please find a copy of Separate Defendant Arkansas Department of Education's Motion to Withdraw as Counsel and for Substitution of Counsel, Notice of Filing and ADE's Project Management Tool sent for filing in the above-referenced matter. MAH/jle Very truly yours, ~:){ . MARK A. HAG~ R Assistant Attorn~:ral 323 Center Street Suite 200  Little Rock, Arkansas 72201 (501) 682-2007  FAX (501) 682-2591 Internet Website http://www.ag.state.ar.us/ Cc: Mr. Ray Simon D. Scott Smith Mr. Louis Ferren Ms. Charity Smith CERTIFICATE OF SERVICE I, Mark A. Hagemeier, certify that on April 24, 2003, I caused the foregoing document to be served by depositing a copy in the United States mail, postage prepaid, addressed to each of the following: Mr.M. SamuelJones,ill Wright, Lindsey \u0026amp; Jennings 200 W. Capitol, Suite 2000 Little Rock, AR 72201 Mr. John W. Walker John Walker, P.A. 1723 Broadway Little Rock, AR 72201 Mr. Richard Roachell Plaza West Building 415 N. McKinley, Suite 465 Little Rock, AR 72205 Mr. Christopher Heller Friday, Eldredge \u0026amp; Clark 400 W. Capitol, Suite 2000 Little Rock, AR 72201-3493 Mr. Stephen W. Jones Jack, Lyon \u0026amp; Jones 425 W. Capitol, Suite 3400 Little Rock, AR 72201 Ms. Ann Marshall One Union National Plaza 124 West Capitol, Suite 1895 Little Rock, AR 72201 Mark A. Hage~ 2 IN THE UNITED STATES DISTRICT COURT EASTERN DISTRICT OF ARKANSAS WESTERN DIVISION LITTLE ROCK SCHOOL DISTRICT, ET AL PLAINTIFFS V. NO. LR-C-82-866 PULASKI COUNTY SPECIAL SCHOOL DISTRICT, ET AL DEFENDANTS MRS. LORENE JOSHUA, ET AL INTERVENORS KATHERINE W. KNIGHT, ET AL INTERVENORS ADE'S PROJECT MANAGEMENT TOOL In compliance with the Court's Order of December 10, 1993, the Arkansas Department of Education (ADE) submits the following Project Management Tool to the parties and the Court. This document describes the progress the ADE has made since March 15, 1994, in complying with provisions of the Implementation Plan and itemizes the ADE's progress against timelines presented in the Plan. - IMPLEMENTATION PHASE ACTIVITY I. FINANCIAL OBLIGATIONS A. Use the previous year's three quarter average daily membership to calculate MFPA (State Equalization) for the current school year. 1. Projected Ending Date Last day of each month, August - June. 2. Actual as of April 30, 2003 !!titi~l!~~-l~fW!1i~:,tt~lfi~!~iii~~Ji~'-cui.il~tj:m~ B. Include all Magnet students in the resident District's average daily membership for calculation. 1. Projected Ending Date Last day of each month, August - June. I. FINANCIAL OBLIGATIONS (Continued) B. Include all Magnet students in the resident District's average daily membership for calculation. (Continued) 2. Actual as of April 30, 2003 ~!hii::::::':c~-:,:,,~,--::Hli,\\l~\\lii\\WiEGfi::~f::zito~.Jili{Atie.'fa!941~1~g}qi\n'.EX C. Process and distribute State MFPA. 1. Projected Ending Date Last day of each month, August - June. 2. Actual as of April 30, 2003 ~~1ax1r1t~QQjdj~p,9.fJ9ni:'gf\n~t~ E\nqualizij~pn -~ij-nding\"lor:t.)' OZZQ3.~ii.fi The aitotmenis\"\"cit ~i1tEguaiizationpundfng calculated tor FY 02103 at March 3 t, 4Q0~ .,,$ 1.Jbj~Gttcfp~_riof!l ~dj.$tm~nts\nw.er~.-~s foH9ws: LR~D.t ~5, 1~2.~3i:... .., NLRSD'l :$29877 8.21\n=.-:.- t:- .\n__ r .:-:.:=:=-:!: PCSSO\n- $55, 116,~] D. Determine the number of Magnet students residing in each District and attending a Magnet School. 1. Projected Ending Date Last day of each month, August - June. 2. Actual as of April 30, 2003 Based oil th~ intorm.~tion ~yhllabre: the ADE cattiatecf~ March it, 2003 tor FY o.v:~\n.,~le.Gtlo pe.q9qi~.JwJuS1file~-  E. Desegregation Staff Attorney reports the Magnet Operational Charge to the Fiscal Services Office. 1. Projected Ending Date Ongoing, as ordered by the Court. 2 I. FINANCIAL OBLIGATIONS (Continued) E. Desegregation Staff Attorney reports the Magnet Operational Charge to the Fiscal Services Office. (Continued) 2. Actual as of April 30, 2003 Bif' -, eca1'tofat~li(af Maf.cfl)l:3l{m2qOg'tdf:Jt \u0026amp;2-X It should be noted that currently the Magnet Review Committee is reporting this information instead of the staff attorney as indicated in the Implementation Plan. F. Calculate state aid due the LRSD based upon the Magnet Operational Charge. 1. Projected Ending Date Last day of each month, August - June. 2. Actual as of April 30, 2003 .1,:-----'-:,:i~iil~r- 6'~1!1111!~,:,1 G. Process and distribute state aid for Magnet Operational Charge. 1. Projected Ending Date Last day of each month, August - June. 2. Actual as of April 30, 2003 ltiilfi,~l~lf.fl~i.ili\u0026amp;tliilBlill'Ji\nllir!~\\ll1tfmiinl H. Calculate the amount of M-to-M incentive money to which each school district is entitled. 1. Projected Ending Date Last day of each month, August - June. 2. Actual as of April 30, 2003 0\n19J.1i1.~a fg.r-Jr60?~Zs1g~ iif P~oq4iattJGiimto1ijJ I. Process and distribute M-to-M incentive checks. 1. Projected Ending Date Last day of each month, September - June. 3 I. FINANCIAL OBLIGATIONS (Continued) I. Process and distribute M-to-M incentive checks. (Continued) 2. Actual as of April 30, 2003 misltllifiJ1b1\nisitttiE1:,Pltotirat'.M~c~#fa=ao\u0026amp;a::W-re.1 J. Districts submit an estimated Magnet and M-to-M transportation budget to ADE. 1. Projected Ending Date 2. Ongoing, December of each year. Actual as of April 30, 2003 In September 2002, the Magnet and M-to-M transportation budgets for FY 02/03 were submitted to the ADE by the Districts. K. The Coordinator of School Transportation notifies General Finance to pay districts for the Districts' proposed budget. 1. Projected Ending Date Ongoing, annually. 2. Actual as of April 30, 2003 In January 2003, General Finance was notified to pay the second one-third payment for FY 02/03 to the Districts. It should be noted that the Transportation Coordinator is currently performing this function instead of Reginald Wilson as indicated in the Implementation Plan. L. ADE pays districts three equal installments of their proposed budget. 1. Projected Ending Date Ongoing, annually. 4 I. FINANCIAL OBLIGATIONS (Continued) L. ADE pays districts three equal installments of their proposed budget. (Continued) 2. Actual as of April 30, 2003 In January 2003, General Finance made the second one-third payment to the Districts for their FY 02/03 transportation budget. The budget is now paid out in three equal installments. At January 31 , 2003, the following had been paid for FY 02/03: LRSD - $2,453,084.00 NLRSD - $469,000.00 PCSSD - $1,305,848.96 M. ADE verifies actual expenditures submitted by Districts and reviews each bill with each District's transportation coordinator. 1. Projected Ending Date Ongoing, annually. 2. Actual as of April 30, 2003 In August 1997, the ADE transportation coordinator reviewed each district's Magnet and M-to-M transportation costs for FY 96/97. In July 1998, each district was asked to submit an estimated budget for the 98/99 school year. In September 1998, paperwork was generated for the first payment in the 98/99 school year for the Magnet and M-to-M transportation program. School districts should receive payment by October 1, 1998 In July 1999, each district submitted an estimated budget for the 99/00 school year. In September 1999, paperwork was generated for the first payment in the 99/00 school year for the Magnet and M-to-M transportation program. In September 2000, paperwork was generated for the first payment in the 00/01 school year for the Magnet and M-to-M transportation program. In September 2001, paperwork was generated for the first payment in the 01/02 school year for the Magnet and M-to-M transportation program. In September 2002, paperwork was generated for the first payment in the 02/03 school year for the Magnet and M-to-M transportation program. 5 I. FINANCIAL OBLIGATIONS (Continued) N. Purchase buses for the Districts to replace existing Magnet and M-to-M fleets and to provide a larger fleet for the Districts' Magnet and M-to-M Transportation needs. 1. Projected Ending Date Ongoing, as stated in Exhibit A of the Implementation Plan. 2. Actual as of April 30, 2003 In FY 94/95, the State purchased 52 buses at a cost of $1 ,799,431 which were added to or replaced existing Magnet and M-to-M buses in the Districts. The buses were distributed to the Districts as follows: LRSD - 32\nNLRSD - 6\nand PCSSD-14. The ADE purchased 64 Magnet and M-to-M buses at a cost of $2,334,800 in FY 95/96. The buses were distributed accordingly: LRSD - 45\nNLRSD - 7\nand PCSSD - 12. In May 1997, the ADE purchased 16 Magnet and M-to-M buses at a cost of $646,400. In July 1997, the ADE purchased 16 Magnet and M-to-M buses at a cost of $624,879. In July 1998, the ADE purchased 16 new Magnet and M-to-M buses at a cost of $695,235. The buses were distributed accordingly: LRSD - 8\nNLRSD - 2\nand PCSSD- 6. Specifications for 16 school buses have been forwarded to state purchasing for bidding in January, 1999 for delivery in July, 1999. The ADE accepted a bid on 16 buses for the Magnet and M/M transportation program. The buses will be delivered after July 1, 1999 and before August 1, 1999. The buses will be distributed accordingly: LRSD - 8\nNLRSD - 2\nPCSSD - 6. In July 1999, the ADE purchased 16 new Magnet and M-to-M buses at a cost of $718,355. The buses were distributed accordingly: LRSD - 8\nNLRSD - 2\nand PCSSD- 6. In July 2000, the ADE purchased 16 new Magnet and M-to-M buses at a cost of $724,165. The buses were distributed accordingly: LRSD - 8\nNLRSD - 2\nand PCSSD - 6. 6 I. FINANCIAL OBLIGATIONS (Continued) N. Purchase buses for the Districts to replace existing Magnet and M-to-M fleets and to provide a larger fleet for the Districts' Magnet and M-to-M Transportation needs. (Continued) 2. Actual as of April 30, 2003 (Continued) The bid for 16 new Magnet and M-to-M buses was let by State Purchasing on February 22, 2001 . The contract was awarded to Ward Transportation Services, Inc. The buses to be purchased include two type C 47 passenger buses and fourteen type C 65 passenger buses. Prices on these units are $43,426.00 each on the 47 passenger buses, and $44,289.00 each on the 65 passenger buses. The buses will be distributed accordingly: LRSD - 8 of the 65 passenger\nNLRSD - 2 of the 65 passenger\nPCSSD - 2 of the 47 passenger and 4 of the 65 passenger buses. On August 2, 2001 , the ADE took possession of 16 new Magnet and M-to-M buses. The total amount paid was $706,898. In June 2002, a bid for 16 new Magnet and M-to-M buses was awarded to Ward Transportation Services, Inc. The buses to be purchased include five 47 passenger buses for $42,155.00 each, ten 65 passenger buses for $43,850.00 each, and one 47 passenger bus with a wheelchair lift for $46,952.00. The total amount was $696,227. In August of 2002, the ADE purchased 16 new Magnet and M-to-M buses. The total amount paid was $696,227. 0 . Process and distribute compensatory education payments to LRSD as required by page 23 of the Settlement Agreement. 1. Projected Ending Date July 1 and January 1, of each school year through January 1, 1999. 2. Actual as of April 30, 2003 Obligation fulfilled in FY 96/97. P. Process and distribute additional payments in lieu of formula to LRSD as required by page 24 of the Settlement Agreement. 1. Projected Ending Date 2. Payment due date and ending July 1, 1995. Actual as of April 30, 2003 (Continued) Obligation fulfilled in FY 95/96. 7 I. FINANCIAL OBLIGATIONS (Continued) Q . Process and distribute payments to PCSSD as required by Page 28 of the Settlement Agreement. 1. Projected Ending Date Payment due date and ending July 1, 1994. 2. Actual as of April 30, 2003 Final payment was distributed July 1994. R. Upon loan request by LRSD accompanied by a promissory note, the ADE makes loans to LRSD. S. 1. Projected Ending Date Ongoing through July 1, 1999. See Settlement Agreement page 24. 2. Actual as of April 30, 2003 The LRSD received $3,000,000 on September 10, 1998. As of this reporting date, the LRSD has received $20,000,000 in loan proceeds. Process and distribute payments in lieu of formula to PCSSD required by page 29 of the Settlement Agreement. 1. Projected Ending Date Payment due date and ending July 1, 1995. 2. Actual as of April 30, 2003 Obligation fulfilled in FY 95/96. T. Process and distribute compensatory education payments to NLRSD as required by page 31 of the Settlement Agreement. 1. Projected Ending Date July 1 of each school year through June 30, 1996. 2. Actual as of April 30, 2003 Obligation fulfilled in FY 95/96. 8 I. FINANCIAL OBLIGATIONS (Continued) U. V. Process and distribute check to Magnet Review Committee. 1. Projected Ending Date Payment due date and ending July 1, 1995. 2. Actual as of April 30, 2003 Distribution in July 1997 for FY 97/98 was $75,000. This was the total amount due to the Magnet Review Committee for FY 97/98. Distribution in July 1998 for FY 98/99 was $75,000. This was the total amount due to the Magnet Review Committee for FY 98/99. Distribution in July 1999 for FY 99/00 was $92,500. This was the total amount due to the Magnet Review Committee for FY 99/00. Distribution in July 2000 for FY 00/01 was $92,500. This was the total amount due to the Magnet Review Committee for FY 00/01 . Distribution in August2001 for FY 01/02 was $92,500. This was the total amount due to the Magnet Review Committee for FY 01/02. Distribution in July 2002 for FY 02/03 was $92,500. This was the total amount due to the Magnet Review Committee for FY 02/03. Process and distribute payments for Office of Desegregation Monitoring. 1. Projected Ending Date Not applicable. 2. Actual as of April 30, 2003 Distribution in July 1997 for FY 97/98 was $200,000. This was the total amount due to the ODM for FY 97/98. Distribution in July 1998 for FY 98/99 was $200,000. This was the total amount due to the ODM for FY 98/99. Distribution in July 1999 for FY 99/00 was $200,000. This was the total amount due to the ODM for FY 99/00. Distribution in July 2000 for FY 00/01 was $200,000. This was the total amount due to the ODM for FY 00/01 . Distribution in August 2001 for FY 01 /02 was $200,000. This was the total amount due to the ODM for FY 01/02. 9 I. FINANCIAL OBLIGATIONS (Continued) V. Process and distribute payments for Office of Desegregation Monitoring. (Continued) 2. Actual as of April 30, 2003 (Continued) Distribution in July 2002 for FY 02/03 was $200,000. This was the total amount due to the ODM for FY 02/03. 10 II. MONITORING COMPENSATORY EDUCATION A. Begin testing and evaluating the monitoring instrument and monitoring system to assure that data is appropriate and useful in monitoring the impacts of compensatory education programs on disparities in academic achievement for black students and white students. 1. Projected Ending Date January 15, 1995 2. Actual as of April 30, 2003 In May 1995, monitors completed the unannounced visits of schools in Pulaski County. The monitoring process involved a qualitative process of document reviews, interviews, and observations. The monitoring focused on progress made since the announced monitoring visits. In June 1995, monitoring data from unannounced visits was included in the July Semiannual Report. Twenty-five per cent of all classrooms were visited, and all of the schools in Pulaski County were monitored. All principals were interviewed to determine any additional progress since the announced visits. The July 1995 Monitoring Report was reviewed by the ADE administrative team, the Arkansas State Board of Education, and the Districts and filed with the Court. The report was formatted in accordance with the Allen Letter. In October 1995, a common terminology was developed by principals from the Districts and the Lead Planning and Desegregation staff to facilitate the monitoring process. The announced monitoring visits began on November 14, 1995 and were completed on January 26, 1996. Copies of the preliminary Semiannual Monitoring Report and its executive summary were provided to the ADE administrative team and the State Board of Education in January 1996. A report on the current status of the Cycle 5 schools in the ECOE process and their school improvement plans was filed with the Court on February 1, 1996. The unannounced monitoring visits began in February 1996 and ended on May 10, 1996. In June 1996, all announced and unannounced monitoring visits were completed, and the data was analyzed using descriptive statistics. The Districts provided data on enrollment in compensatory education programs. The Districts and the ADE Desegregation Monitoring staff developed a definition for instructional programs. 11 II. MONITORING COMPENSATORY EDUCATION (Continued) A. Begin testing and evaluating the monitoring instrument and monitoring system to assure that data is appropriate and useful in monitoring the impacts of compensatory education programs on disparities in academic achievement for black students and white students. (Continued) 2. Actual as of April 30, 2003 (Continued) The Semiannual Monitoring Report was completed and filed with the Court on July 15, 1996 with copies distributed to the parties. Announced monitoring visits of the Cycle 1 schools began on October 28, 1996 and concluded in December 1996. In January 1997, presentations were made to the State Board of Education, the Desegregation Litigation Oversight Subcommittee, and the parties to review the draft Semiannual Monitoring Report. The monitoring instrument and process were evaluated for their usefulness in monitoring the impacts of compensatory education programs on achievement disparities. In February 1997, the Semiannual Monitoring Report was filed. Unannounced monitoring visits began on February 3, 1997 and concluded in May 1997. In March 1997, letters were sent to the Districts regarding data requirements for the July 1997 Semiannual Monitoring Report and the additional discipline data element that was requested by the Desegregation Litigation Oversight Subcommittee. Desegregation data collection workshops were conducted in the Districts from March 28, 1997 to April 7, 1997. A meeting was conducted on April 3, 1997 to finalize plans for the July 15, 1997 Semiannual Monitoring Report. Onsite visits were made to Cycle 1 schools who did not submit accurate and timely data on discipline, M-to-M transfers, and policy. The July 15, 1997 Semiannual Monitoring Report and its executive summary were finalized in June 1997. In July 1997, the Semiannual Monitoring Report and its executive summary were filed with the court, and the ADE sponsored a School Improvement Conference. On July 10, 1997, copies of the Semiannual Monitoring Report and its executive summary were made available to the Districts for their review prior to filing it with the Court. In August 1997, procedures and schedules were organized for the monitoring of the Cycle 2 schools in FY 97/98. 12 II. MONITORING COMPENSATORY EDUCATION (Continued) A. Begin testing and evaluating the monitoring instrument and monitoring system to assure that data is appropriate and useful in monitoring the impacts of compensatory education programs on disparities in academic achievement for black students and white students. (Continued) 2. Actual as of April 30, 2003 (Continued) A Desegregation Monitoring and School Improvement Workshop for the Districts was held on September 10, 1997 to discuss monitoring expectations, instruments, data collection and school improvement visits. On October 9, 1997, a planning meeting was held with the desegregation monitoring staff to discuss deadlines, responsibilities, and strategic planning issues regarding the Semiannual Monitoring Report. Reminder letters were sent to the Cycle 2 principals outlining the data collection deadlines and availability of technical assistance. In October and November 1997, technical assistance visits were conducted, and announced monitoring visits of the Cycle 2 schools were completed. In December 1997 and January 1998, technical assistance visits were conducted regarding team visits, technical review recommendations, and consensus building. Copies of the infusion document and perceptual surveys were provided to schools in the ECOE process. The February 1998 Semiannual Monitoring Report was submitted for review and approval to the State Board of Education, the Director, the Administrative Team, the Attorney General's Office, and the Desegregation Litigation Oversight Subcommittee. Unannounced monitoring visits began in February 1998, and technical assistance was provided on the school improvement process, external team visits and finalizing school improvement plans. On February 18, 1998, the representatives of all parties met to discuss possible revisions to the ADE's monitoring plan and monitoring reports. Additional meetings will be scheduled. Unannounced monitoring visits were conducted in March 1998, and technical assistance was provided on the school improvement process and external team visits. In April 1998, unannounced monitoring visits were conducted, and technical assistance was provided on the school improvement process. 13 II. MONITORING COMPENSATORY EDUCATION (Continued) A. Begin testing and evaluating the monitoring instrument and monitoring system to assure that data is appropriate and useful in monitoring the impacts of compensatory education programs on disparities in academic achievement for black students and white students. (Continued) 2. Actual as of April 30, 2003 (Continued) In May 1998, unannounced monitoring visits were completed, and technical assistance was provided on the school improvement process. On May 18, 1998, the Court granted the ADE relief from its obligation to file the July 1998 Semiannual Monitoring Report to develop proposed modifications to ADE's monitoring and reporting obligations. In June 1998, monitoring information previously submitted by the districts in the Spring of 1998 was reviewed and prepared for historical files and presentation to the Arkansas State Board. Also, in June the following occurred: a) The Extended COE Team Visit Reports were completed, b) the Semiannual Monitoring COE Data Report was completed, c) progress reports were submitted from previous cycles, and d.) staff development on assessment (SAT-9) and curriculum alignment was conducted with three supervisors. In July, the Lead Planner provided the Desegregation Litigation Oversight Committee with (1) a review of the court Order relieving ADE of its obligation to file a July Semiannual Monitoring Report, and (2) an update of ADE's progress toward work with the parties and ODM to develop proposed revisions to ADE's monitoring and reporting obligations. The Committee encouraged ODM, the parties and the ADE to continue to work toward revision of the monitoring and reporting process. In August 1998, the ADE Implementation Phase Working group met to review the Implementation Phase activities for the previous quarter. The Assistant Attorney General, the Assistant Director for Accountability and the Education Lead Planner updated the group on all relevant desegregation legal issues and proposed revisions to monitoring and reporting activities during the quarter. In September 1998, tentative monitoring dates were established and they will be finalized once proposed revisions to the Desegregation Monitoring Plan are finalized and approved. In September/October 1998, progress was being made on the proposed revisions to the monitoring process by committee representatives of all the Parties in the Pulaski County Settlement Agreement. While the revised monitoring plan is finalized and approved, the ADE monitoring staff will continue to provide technical assistance to schools upon request. 14 II. MONITORING COMPENSATORY EDUCATION (Continued) A. Begin testing and evaluating the monitoring instrument and monitoring system to assure that data is appropriate and useful in monitoring the impacts of compensatory education programs on disparities in academic achievement for black students and white students. (Continued) 2. Actual as of April 30, 2003 (Continued) In December 1998, requests were received from schools in PCSSD regarding test score analysis and staff Development. Oak Grove is scheduled for January 21, 1999 and Lawson Elementary is also tentatively scheduled in January. Staff development regarding test score analysis for Oak Grove and Lawson Elementary in the PCSSD has been rescheduled for April 2000. Staff development regarding test score analysis for Oak Grove and Lawson Elementary in the PCSSD was conducted on May 5, 2000 and May 9, 2000 respectively. Staff development regarding classroom management was provided to the Franklin Ele.mentary School in LRSD on November 8, 2000. Staff development regarding ways to improve academic achievement was presented to College Station Elementary in PCSSD on November 22, 2000. On November 1, 2000, the ADE Implementation Phase Working group met to review the Implementation Phase activities for the previous quarter. The Assistant Director for Accountability updated the group on all relevant desegregation legal issues and discussed revisions to monitoring and reporting activities during the quarter. The next Implementation Phase Working Group Meeting is scheduled for February 27, 2001 in room 201-A at the ADE. The Implementation Phase Working Group meeting that was scheduled for February 27 had to be postponed. It will be rescheduled as soon as possible. The quarterly Implementation Phase Working Group meeting is scheduled for June 27, 2001 . The quarterly Implementation Phase Working Group meeting was rescheduled from June 27. It will take place on July 26, 2001 in room 201-A at 1 :30 p.m. at the ADE. 15 II. MONITORING COMPENSATORY EDUCATION (Continued) A. Begin testing and evaluating the monitoring instrument and monitoring system to assure that data is appropriate and useful in monitoring the impacts of compensatory education programs on disparities in academic achievement for black students and white students. (Continued) 2. Actual as of April 30, 2003 (Continued) On July 26, 2001 , the ADE Implementation Phase Working group met to review the Implementation Phase activities for the previous quarter. Mr. Willie Morris, ADE Lead Planner for Desegregation, updated the group on all relevant desegregation issues. Mr. Mark Hagemeier, Assistant Attorney General, and Mr. Scott Smith, ADE Staff Attorney, discussed the court case involving the LRSD seeking unitary status. The next Implementation Phase Working Group Meeting is scheduled for October 11 , 2001 in room 201 -A at the ADE. On October 11 , 2001 , the ADE Implementation Phase Working group met to review the Implementation Phase activities for the previous quarter. Mr. Willie Morris, ADE Lead Planner for Desegregation, updated the group on all relevant desegregation issues. Mr. Scott Smith, ADE Staff Attorney, discussed the ADE's intent to take a proactive role in Desegregation Monitoring. The next Implementation Phase Working Group Meeting is scheduled for January 10, 2002 in room 201-A at the ADE. The Implementation Phase Working Group Meeting that was scheduled for January 10 was postponed. It has been rescheduled for February 14, 2002 in room 201-A at the ADE. On February 12, 2002, the ADE Implementation Phase Working group met to review the Implementation Phase activities for the previous quarter. Mr. Willie Morris, ADE Lead Planner for Desegregation, updated the group on all relevant desegregation issues. Mr. Mark Hagemeier, Assistant Attorney General, discussed the court case involving the LRSD seeking unitary status. The next Implementation Phase Working Group Meeting is scheduled for April 11, 2002 in room 201-A at the ADE. On April 11 , 2002, the ADE Implementation Phase Working group met to review the Implementation Phase activities for the previous quarter. Mr. Willie Morris, ADE Lead Planner for Desegregation, updated the group on all relevant desegregation issues. Mr. Mark Hagemeier, Assistant Attorney General, discussed the court case involving the LRSD seeking unitary status. The next Implementation Phase Working Group Meeting is scheduled for July 11, 2002 in room 201-A at the ADE. 16 II. MONITORING COMPENSATORY EDUCATION (Continued) A. Begin testing and evaluating the monitoring instrument and monitoring system to assure that data is appropriate and useful in monitoring the impacts of compensatory education programs on disparities in academic achievement for black students and white students. (Continued) 2. Actual as of April 30, 2003 (Continued) On July 18, 2002, the ADE Implementation Phase Working group met to review the Implementation Phase activities for the previous quarter. Mr. Willie Morris, ADE Lead Planner for Desegregation, updated the group on all relevant desegregation issues. Dr. Charity Smith, Assistant Director for Accountability, talked about section XV in the Project Management Tool (PMT) on Standardized Test Selection to Determine Loan Forgiveness. She said that the goal has been completed, and no additional reporting is required for section XV. Mr. Morris discussed the court case involving the LRSD seeking unitary status. He handed out a Court Order from May 9, 2002, which contained comments from U.S. District Judge Bill Wilson Jr., about hearings on the LRSD request for unitary status. Mr. Morris also handed out a document from the Secretary of Education about the No Child Left Behind Act. There was discussion about how this could have an affect on Desegregation issues. The next Implementation Phase Working Group Meeting is scheduled for October 10, 2002 at 1:30 p.m. in room 201-A at the ADE. The quarterly Implementation Phase Working Group meeting was rescheduled from October 10. It will take place on October 29, 2002 in room 201-A at 1:30 p.m. at the ADE. On October 29, 2002, the ADE Implementation Phase Working Group met to review the Implementation Phase activities for the previous quarter. Mr. Willie Morris, ADE Lead Planner for Desegregation, updated the group on all relevant desegregation issues. Meetings with the parties to discuss possible revisions to the ADE's monitoring plan will be postponed by request of the school districts in Pulaski County. Additional meetings could be scheduled after the Desegregation ruling is finalized. The next Implementation Phase Working Group Meeting is scheduled for January 9, 2003 at 1 :30 p.m. in room 201-A at the ADE. On January 9, 2003, the ADE Implementation Phase Working Group met to review the Implementation Phase activities for the previous quarter. Mr. Willie Morris, ADE Lead Planner for Desegregation, updated the group on all relevant desegregation issues. No Child Left Behind and the Desegregation ruling on unitary status for LRSD were discussed. The next Implementation Phase Working Group Meeting is scheduled for April 10, 2003 at 1 :30 p.m. in room 201- A at the ADE. ~ne ~~.rt~rly 'meiimii:!!c3tion P,9-ii~ ::!:Y9.r!\u0026lt;in!\n] Gf9YP.Teting jas resc~e\u0026lt;1,~J~d frofn fprjl 1-0. !tw11!J!:!R~ pla~~_ofi:Al?tiL?:4, 2003 ln:room 201::t\\ at 1~3Q p.mt .at theAD~'. 17 Ill. A PETITION FOR ELECTION FOR LRSD WILL BE SUPPORTED SHOULD A MILLAGE BE REQUIRED A. Monitor court pleadings to determine if LRSD has petitioned the Court for a special election. 1. Projected Ending Date Ongoing. 2. Actual as of April 30, 2003 Ongoing. All Court pleadings are monitored monthly. B. Draft and file appropriate pleadings if LRSD petitions the Court for a special election. 1. Projected Ending Date Ongoing 2. Actual as of April 30, 2003 To date, no action has been taken by the LRSD. 18 IV. REPEAL STATUTES AND REGULATIONS THAT IMPEDE DESEGREGATION A. Using a collaborative approach, immediately identify those laws and regulations that appear to impede desegregation. 1. Projected Ending Date December, 1994 2. Actual as of April 30, 2003 The information for this item is detailed under Section IV.E. of this report. B. Conduct a review within ADE of existing legislation and regulations that appear to impede desegregation. C. 1. Projected Ending Date November, 1994 2. Actual as of April 30, 2003 The information for this item is detailed under Section IV.E. of this report. Request of the other parties to the Settlement Agreement that they identify laws and regulations that appear to impede desegregation. 1. Projected Ending Date November, 1994 2. Actual as of April 30, 2003 The information for this item is detailed under Section IV. E. of this report. D. Submit proposals to the State Board of Education for repeal of those regulations that are confirmed to be impediments to desegregation. 1. Projected Ending Date Ongoing 2. Actual as of April 30, 2003 The information for this item is detailed under Section IV. E. of this report. 19 IV. REPEAL STATUTES AND REGULATIONS THAT IMPEDE DESEGREGATION (Continued) E. Submit proposals to the Legislature for repeal of those laws that appear to be impediments to desegregation. 2. Actual as of April 30, 2003 A committee within the ADE was formed in May 1995 to review and collect data on existing legislation and regulations identified by the parties as impediments to desegregation. The committee researched the Districts' concerns to determine if any of the rules, regulations, or legislation cited impede desegregation. The legislation cited by the Districts regarding loss funding and worker's compensation were not reviewed because they had already been litigated. In September 1995, the committee reviewed the following statutes, acts, and regulations: Act 113 of 1993\nADE Director's Communication 93-205\nAct 145 of 1989\nADE Director's Memo 91-67\nADE Program Standards Eligibility Criteria for Special Education\nArkansas Codes 6-18-206, 6-20-307, 6-20-319, and 6-17- 1506. In October 1995, the individual reports prepared by committee members in their areas of expertise and the data used to support their conclusions were submitted to the ADE administrative team for their review. A report was prepared and submitted to the State Board of Education in July 1996. The report concluded that none of the items reviewed impeded desegregation. As of February 3, 1997, no laws or regulations have been determined to impede desegregation efforts. Any new education laws enacted during the Arkansas 81 st Legislative Session will be reviewed at the close of the legislative session to ensure that they do not impede desegregation. In April 1997, copies of all laws passed during the 1997 Regular Session of the 81 st General Assembly were requested from the office of the ADE Liaison to the Legislature for distribution to the Districts for their input and review of possible impediments to their desegregation efforts. In August 1997, a meeting to review the statutes passed in the prior legislative session was scheduled for September 9, 1997. 20 IV. REPEAL STATUTES AND REGULATIONS THAT IMPEDE DESEGREGATION (Continued) E. Submit proposals to the Legislature for repeal of those laws that appear to be impediments to desegregation. (Continued) 2. Actual as of April 30, 2003 (Continued) On September 9, 1997, a meeting was held to discuss the review of the statutes passed in the prior legislative session and new ADE regulations. The Districts will be contacted in writing for their input regarding any new laws or regulations that they feel may impede desegregation. Additionally, the Districts will be asked to review their regulations to ensure that they do not impede their desegregation efforts. The committee will convene on December 1, 1997 to review their findings and finalize their report to the Administrative Team and the State Board of Education. In October 1997, the Districts were asked to review new regulations and statutes for impediments to their desegregation efforts, and advise the ADE, in writing, if they feel a regulation or statute may impede their desegregation efforts. In October 1997, the Districts were requested to advise the ADE, in writing, no later than November 1, 1997 of any new law that might impede their desegregation efforts. As of November 12, 1997, no written responses were received from the Districts. The ADE concludes that the Districts do not feel that any new law negatively impacts their desegregation efforts. The committee met on December 1, 1997 to discuss their findings regarding statutes and regulations that may impede the desegregation efforts of the Districts. The committee concluded that there were no laws or regulations that impede the desegregation efforts of the Districts. It was decided that the committee chair would prepare a report of the committee's findings for the Administrative Team and the State Board of Education. The committee to review statutes and regulations that impede desegregation is now reviewing proposed bills and regulations, as well as laws that are being signed in, for the current 1999 legislative session. They will continue to do so until the session is over. The committee to review statutes and regulations that impede desegregation will meet on April 26, 1999 at the ADE. The committee met on April 26, 1999 at the ADE. The purpose of the meeting was to identify rules and regulations that might impede desegregation, and review within the existing legislation any regulations that might result in an impediment to desegregation. This is a standing committee that is ongoing and a report will be submitted to the State Board of Education once the process is completed. 21 IV. REPEAL STATUTES AND REGULATIONS THAT IMPEDE DESEGREGATION (Continued) E. Submit proposals to the Legislature for repeal of those laws that appear to be impediments to desegregation. (Continued) 2. Actual as of April 30, 2003 (Continued) The committee met on May 24, 1999 at the ADE. The committee was asked to review within the existing legislation any regulations that might result in an impediment to desegregation. The committee determined that Mr. Ray Lumpkin would contact the Pulaski County districts to request written response to any rules, regulations or laws that might impede desegregation. The committee would also collect information and data to prepare a report for the State Board. This will be a standing committee. This data gathering will be ongoing until the final report is given to the State Board. On July 26, 1999, the committee met at the ADE. The committee did not report any laws or regulations that they currently thought would impede desegregation, and are still waiting for a response from the three districts in Pulaski County. The committee met on August 30, 1999 at the ADE to review rules and regulations that might impede desegregation. At that time, there were no laws under review that appeared to impede desegregation. In November, the three districts sent letters to the ADE stating that they have reviewed the laws passed by the 82nd legislative session as well as current rules \u0026amp; regulations and district policies to ensure that they have no ill effect on desegregation efforts. There was some concern from PCSSD concerning a charter school proposal in the Maumelle area. The work of the committee is on-going each month depending on the information that comes before the committee. Any rules, laws or regulations that would impede desegregation will be discussed and reported to the State Board of Education. On October 4, 2000, the ADE presented staff development for assistant superintendents in LRSD, NLRSD and PCSSD regarding school laws of Arkansas. The ADE is in the process of forming a committee to review all Rules and Regulations from the ADE and State Laws that might impede desegregation. The ADE Committee on Statutes and Regulations will review all new laws that might impede desegregation once the 83rd General Assembly has completed this session. The ADE Committee on Statutes and Regulations will meet for the first time on June 11 , 2001 at 9:00 a.m. in room 204-A at the ADE. The committee will review all new laws that might impede desegregation that were passed during the 2001 Legislative Session. 22 IV. REPEAL STATUTES AND REGULATIONS THAT IMPEDE DESEGREGATION (Continued) E. Submit proposals to the Legislature for repeal of those laws that appear to be impediments to desegregation. (Continued) 2. Actual as of April 30, 2003 (Continued) The ADE Committee on Statutes and Regulations rescheduled the meeting that was planned for June 11 , in order to review new regulations proposed to the State Board of Education. The meeting will take place on July 16, 2001 at 9:00 a.m. at the ADE. The ADE Committee to Repeal Statutes and Regulations that Impede Desegregation met on July 16, 2001 at the ADE. The following Items were discussed: (1) Review of 2001 state laws which appear to impede desegregation. (2) Review of existing ADE regulations which appear to impede desegregation. (3) Report any laws or regulations found to impede desegregation to the Arkansas State Legislature, the ADE and the Pulaski County school districts. The next meeting will take place on August 27, 2001 at 9:00 a.m. at the ADE. The ADE Committee to Repeal Statutes and Regulations that Impede Desegregation met on August 27, 2001 at the ADE. The Committee is reviewing all relevant laws or regulations produced by the Arkansas State Legislature, the ADE and the Pulaski County school districts in FY 2000/2001 to determine if they may impede desegregation. The next meeting will take place on September 10, 2001 in Conference Room 204-B at 2:00 p.m. at the ADE. The ADE Committee to Repeal Statutes and Regulations that Impede Desegregation met on September 10, 2001 at the ADE. The Committee is reviewing all relevant laws or regulations produced by the Arkansas State Legislature, the ADE and the Pulaski County school districts in FY 2000/2001 to determine if they may impede desegregation. The next meeting will take place on October 24, 2001 in Conference Room 204-B at 2:00 p.m. at the ADE. The ADE Committee to Repeal Statutes and Regulations that Impede Desegregation met on October 24, 2001 at the ADE. The Committee is reviewing all relevant laws or regulations produced by the Arkansas State Legislature, the ADE and the Pulaski County school districts in FY 2000/2001 to determine if they may impede desegregation. On December 17, 2001 , the ADE Committee to Repeal Statutes and Regulations that Impede Desegregation composed letters that will be sent to the school districts in Pulaski County. The letters ask for input regarding any new laws or regulations that may impede desegregation. Laws to review include those of the 83rd General Assembly, ADE regulations, and regulations of the Districts. 23 IV. REPEAL STATUTES AND REGULATIONS THAT IMPEDE DESEGREGATION (Continued) E. Submit proposals to the Legislature for repeal of those laws that appear to be impediments to desegregation. (Continued) 2. Actual as of April 30, 2003 (Continued) On January 10, 2002, the ADE Committee to Repeal Statutes and Regulations that Impede Desegregation sent letters to the school districts in Pulaski County. The letters ask for input regarding any new laws or regulations that may impede desegregation. The districts were asked to respond by March 8, 2002. On March 5, 2002, A letter was sent from the LRSD which mentioned Act 17 48 and Act 1667 passed during the 83rd Legislative Session which may impede desegregation. These laws will be researched to determine if changes need to be made. A letter was sent from the NLRSD on March 19, noting that the district did not find any laws which impede desegregation. On April 26, 2002, A letter was sent for the PCSSD to the ADE, noting that the district did not find any laws which impede desegregation except the \"deannexation\" legislation which the District opposed before the Senate committee. 24 V. COMMITMENT TO PRINCIPLES A. Through a preamble to the Implementation Plan, the Board of Education will reaffirm its commitment to the principles of the Settlement Agreement and outcomes of programs intended to apply those principles. 1. Projected Ending Date Ongoing 2. Actual as of April 30, 2003 The preamble was contained in the Implementation Plan filed with the Court on March 15, 1994. B. Through execution of the Implementation Plan, the Board of Education will continue to reaffirm its commitment to the principles of the Settlement Agreement and outcomes of programs intended to apply those principles. 1. Projected Ending Date Ongoing 2. Actual as of April 30, 2003 Ongoing C. Through execution of the Implementation Plan, the Board of Education will continue to reaffirm its commitment to the principles of the Settlement Agreement by actions taken by ADE in response to monitoring results. 1. Projected Ending Date Ongoing 2. Actual as of April 30, 2003 Ongoing D. Through regular oversight of the Implementation Phase's Project Management Tool, and scrutiny of results of ADE's actions, the Board of Education will act on its commitment to the principles of the Settlement Agreement. 1. Projected Ending Date Ongoing 25 V. COMMITMENT TO PRINCIPLES (Continued) D. Through regular oversight of the Implementation Phase's Project Management Tool, and scrutiny of results of ADE's actions, the Board of Education will act on its commitment to the principles of the Settlement Agreement. (Continued) 2. Actual as of April 30, 2003 At each regular monthly meeting of the State Board of Education, the Board is provided copies of the most recent Project Management Tool (PMT) and an executive summary of the PMT for their review and approval. Only activities that are in addition to the Board's monthly review of the PMT are detailed below. In May 1995, the State Board of Education was informed of the total number of schools visited during the monitoring phase and the data collection process. Suggestions were presented to the State Board of Education on how recommendations could be presented in the monitoring reports. In June 1995, an update on the status of the pending Semiannual Monitoring Report was provided to the State Board of Education. In July 1995, the July Semiannual Monitoring Report was reviewed by the State Board of Education. On August 14, 1995, the State Board of Education was informed of the need to increase minority participation in the teacher scholarship program and provided tentative monitoring dates to facilitate reporting requests by the ADE administrative team and the Desegregation Litigation Oversight Subcommittee. In September 1995, the State Board of Education was advised of a change in the PMT from a table format to a narrative format. The Board was also briefed about a meeting with the Office of Desegregation Monitoring regarding the PMT. In October 1995, the State Board of Education was updated on monitoring timelines. The Board was also informed of a meeting with the parties regarding a review of the Semiannual Monitoring Report and the monitoring process, and the progress of the test validation study. In November 1995, a report was made to the State Board of Education regarding the monitoring schedule and a meeting with the parties concerning the development of a common terminology for monitoring purposes. In December 1995, the State Board of Education was updated regarding announced monitoring visits. In January 1996, copies of the draft February Semiannual Monitoring Report and its executive summary were provided to the State Board of Education. 26 V. COMMITMENT TO PRINCIPLES (Continued) D. Through regular oversight of the Implementation Phase's Project Management Tool, and scrutiny of results of ADE's actions, the Board of Education will act on its commitment to the principles of the Settlement Agreement. (Continued) 2. Actual as of April 30, 2003 (Continued) During the months of February 1996 through May 1996, the PMT report was the only item on the agenda regarding the status of the implementation of the Monitoring Plan. In June 1996, the State Board of Education was updated on the status of the bias review study. In July 1996, the Semiannual Monitoring Report was provided to the Court, the parties, ODM, the State Board of Education, and the Desegregation Litigation Oversight Subcommittee. In August 1996, the State Board of Education and the ADE administrative team were provided with copies of the test validation study prepared by Dr. Paul Williams. During the months of September 1996 through December 1996, the PMT was the only item on the agenda regarding the status of the implementation of the Monitoring Plan. On January 13, 1997, a presentation was made to the State Board of Education regarding the February 1997 Semiannual Monitoring Report, and copies of the report and its executive summary were distributed to all Board members. The Project Management Tool and its executive summary were addressed at the February 10, 1997 State Board of Education meeting regarding the ADE's progress in fulfilling their obligations as set forth in the Implementation Plan. In March 1997, the State Board of Education was notified that historical information in the PMT had been summarized at the direction of the Assistant Attorney General in order to reduce the size and increase the clarity of the report. The Board was updated on the Pulaski County Desegregation Case and reviewed the Memorandum Opinion and Order issued by the Court on February 18, 1997 in response to the Districts' motion for summary judgment on the issue of state funding for teacher retirement matching contributions. During the months of April 1997 through June 1997, the PMT was the only item on the agenda regarding the status of the implementation of the Monitoring Plan. The State Board of Education received copies of the July 15, 1997 Semiannual Monitoring Report and executive summary at the July Board meeting. 27 V. COMMITMENT TO PRINCIPLES (Continued) D. Through regular oversight of the Implementation Phase's Project Management Tool, and scrutiny of results of ADE's actions, the Board of Education will act on its commitment to the principles of the Settlement Agreement. (Continued) 2. Actual as of April 30, 2003 (Continued) The Implementation Phase Working Group held its quarterly meeting on August 4, 1997 to discuss the progress made in attaining the goals set forth in the Implementation Plan and the critical areas for the current quarter. A special report regarding a historical review of the Pulaski County Settlement Agreement and the ADE's role and monitoring obligations were presented to the State Board of Education on September 8, 1997. Additionally, the July 15, 1997 Semiannual Monitoring Report was presented to the Board for their review. In October 1997, a special draft report regarding disparity in achievement was submitted to the State Board Chairman and the Desegregation Litigation Oversight Subcommittee. In November 1997, the State Board of Education was provided copies of the monthly PMT and its executive summary. The Implementation Phase Working Group held its quarterly meeting on November 3, 1997 to discuss the progress made in attaining the goals set forth in the Implementation Plan and the critical areas for the current quarter. In December 1997, the State Board of Education was provided copies of the monthly PMT and its executive summary. In January 1998, the State Board of Education reviewed and discussed ODM's report on the ADE's monitoring activities and instructed the Director to meet with the parties to discuss revisions to the ADE's monitoring plan and monitoring reports. In February 1998, the State Board of Education reviewed and approved the PMT and discussed the February 1998 Semiannual Monitoring Report. In March 1998, the State Board of Education reviewed and approved the PMT and its executive summary and was provided an update regarding proposed revisions to the monitoring process. In April 1998, the State Board of Education reviewed and approved the PMT and its executive summary. In May 1998, the State Board of Education reviewed and approved the PMT and its executive summary. 28 V. COMMITMENT TO PRINCIPLES (Continued) D. Through regular oversight of the Implementation Phase's Project Management Tool, and scrutiny of results of ADE's actions, the Board of Education will act on its commitment to the principles of the Settlement Agreement. (Continued) 2. Actual as of April 30, 2003 (Continued) In June 1998, the State Board of Education reviewed and approved the PMT and its executive summary. The State Board of Education also reviewed how the ADE would report progress in the PMT concerning revisions in ADE's Monitoring Plan. In July 1998, the State Board of Education reviewed and approved the PMT and its executive summary. The State Board of Education also received an update on Test Validation, the Desegregation Litigation Oversight Committee Meeting, and revisions in ADE's Monitoring Plan. In August 1998, the State Board of Education reviewed and approved the PMT and its executive summary. The Board also received an update on the five discussion points regarding the proposed revisions to the monitoring and reporting process. The Board also reviewed the basic goal of the Minority Recruitment Committee. In September 1998, the State Board of Education reviewed the proposed modifications to the Monitoring plans by reviewing the common core of written response received from the districts. The primary commonalities were (1) Staff Development, (2) Achievement Disparity and (3) Disciplinary Disparity. A meeting of the parties is scheduled to be conducted on Thursday, September 17, 1998. The Board encouraged the Department to identify a deadline for Standardized Test Validation and Test Selection. In October 1998, the Board received the progress report on Proposed Revisions to the Desegregation Monitoring and Reporting Process (see XVIII). The Board also reviewed and approved the PMT and its executive summary. In November, the Arkansas State Board of Education reviewed the PMT and its executive summary. The Board also received an update on the proposed revisions in the Desegregation monitoring Process and the update on Test validation and Test Selection provisions of the Settlement Agreement. The Board was also notified that the Implementation Plan Working Committee held its quarterly meeting to review progress and identify quarterly priorities. In December, the State Board of Education reviewed the PMT and its executive summary. The Board also received an update on the joint motion by the ADE, the LRSD, NLRSD, and the PCSSD, to relieve the Department of its obligation to file a February Semiannual Monitoring Report. The Board was also notified that the Joshua lntervenors filed a motion opposing the joint motion. The Board was informed that the ADE was waiting on a response from Court. 29 V. COMMITMENT TO PRINCIPLES (Continued) D. Through regular oversight of the Implementation Phase's ProjectManagementTool, and scrutiny of results of ADE's actions, the Board of Education will act on its commitment to the principles of the Settlement Agreement. (Continued) 2. Actual as of April 30, 2003 (Continued) In January, the Arkansas State Board of Education reviewed the PMT and its executive summary. The Board also received an update on the joint motion of the ADE, LRSD, PCSSD, and NLRSD for an order relieving the ADE of filing a February 1999 Monitoring Report. The motion was granted subject to the following three conditions: (1) notify the Joshua intervenors of all meetings between the parties to discuss proposed changes, (2) file with the Court on or before February 1, 1999, a report detailing the progress made in developing proposed changes and (3) identify ways in which ADE might assist districts in their efforts to improve academic achievement. In February, the Arkansas State Board of Education reviewed the PMT and its executive summary. The Board was informed that the three conditions: (1) notify the Joshuc\n1 lntervenors of all meetings between the parties to discuss proposed changes, (2) file with the Court on or before February 1, 1999, a report detailing the progress made in developing proposed changes and (3) identify ways in which ADE might assist districts in their efforts to improve academic achievement had been satisfied. The Joshua lntervenors were invited again to attend the meeting of the parties and they attended on January 13, and January 28, 1999. They are also scheduled to attend on February 17, 1998. The report of progress, a collaborative effort from all parties was presented to court on February 1, 1999. The Board was also informed that additional items were received for inclusion in the revised report, after the deadline for the submission of the progress report and the ADE would: (1) check them for feasibility, and fiscal impact if any, and (2) include the items in future drafts of the report. In March, the Arkansas State Board of Education reviewed the PMT and its executive summary. The Board also received and reviewed the Desegregation Monitoring and Assistance Progress Report submitted to Court on February 1, 1999. On April 12, and May 10, 1999, the Arkansas State Board of Education reviewed the PMT and its executive summary. The Board also was notified that once the financial section of the proposed plan was completed, the revised plan would be submitted to the board for approval. On June 14, 1999, the Arkansas State Board of Education reviewed the PMT and its executive summary. The Board also was notified that once the financial section of the proposed plan was completed, the revised plan would be submitted to the board for approval. 30 V. COMMITMENT TO PRINCIPLES (Continued) D. Through regular oversight of the Implementation Phase's Project Management Tool, and scrutiny of results of ADE's actions, the Board of Education will act on its commitment to the principles of the Settlement Agreement. (Continued) 2. Actual as of April 30, 2003 (Continued) On July 12, 1999, the Arkansas State Board of Education reviewed the PMT and its executive summary. The Board also was notified that once the financial section of the proposed plan was completed, the revised plan would be submitted to the board for approval. On August 9, 1999, the Arkansas State Board of Education reviewed the PMT and its executive summary. The Board was also notified that the new Desegregation Monitoring and Assistance Plan would be ready to submit to the Board for their review \u0026amp; approval as soon as plans were finalized. On September 13, 1999, the Arkansas State Board of Education reviewed the PMT and its executive summary. The Board was also notified that the new Desegregation Monitoring and Assistance Plan would be ready to submit to the Board for their review \u0026amp; approval as soon as plans were finalized. On October 12, 1999, the Arkansas State Board of Education reviewed the PMT and its executive summary. The Board was notified that on September 21, 1999 that the Office of Education Lead Planning and Desegregation Monitoring meet before the Desegregation Litigation Oversight Subcommittee and presented them with the draft version of the new Desegregation Monitoring and Assistance Plan. The State Board was notified that the plan would be submitted for Board review and approval when finalized. On November 8, 1999, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of October. On December 13, 1999, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of November. On January 10, 2000, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of December. On February 14, 2000, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of January. On March 13, 2000, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of February. On April 10, 2000, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of March. 31 V. COMMITMENT TO PRINCIPLES (Continued) D. Through regular oversight of the Implementation Phase's ProjectManagementTool, and scrutiny of results of ADE's actions, the Board of Education will act on its commitment to the principles of the Settlement Agreement. (Continued) 2. Actual as of April 30, 2003 (Continued) On May 8, 2000, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of April. On June 12, 2000, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of May. On July 10, 2000, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of June. On August 14, 2000, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of July. On September 11 , 2000, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of August. On October 9, 2000, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of September. On November 13, 2000, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of October. On December 11 , 2000, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of November. On January 8, 2001 , the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of December. On February 12, 2001, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of January. On March 12, 2001, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of February. On April 9, 2001 , the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of March. On May 14, 2001, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of April. On June 11, 2001 , the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of May. 32 V. COMMITMENT TO PRINCIPLES (Continued) D. Through regular oversight of the Implementation Phase's Project Management Tool, and scrutiny of results of ADE's actions, the Board of Education will act on its commitment to the principles of the Settlement Agreement. (Continued) 2. Actual as of April 30, 2003 (Continued) On July 9, 2001 , the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of June. On August 13, 2001, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of July. On September 10, 2001, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of August. On October 8, 2001, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of September. On November 19, 2001, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of October. On December 10, 2001 , the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of November. On January 14, 2002, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of December. On February 11 , 2002, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of January. On March 11 , 2002, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of February. On April 8, 2002, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of March. On May 13, 2002, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of April. On June 10, 2002, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of May. On July 8, 2002, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of June. On August 12, 2002, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of July. 33 V. COMMITMENT TO PRINCIPLES (Continued) D. Through regularoversightofthe Implementation Phase's ProjectManagementTool, and scrutiny of results of ADE's actions, the Board of Education will act on its commitment to the principles of the Settlement Agreement. (Continued) 2. Actual as of April 30, 2003 (Continued) On September 9, 2002, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of August. On October 14, 2002, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of September. On November 18, 2002, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of October. On December 9, 2002, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of November. On January 13, 2003, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of December. On February 10, 2003, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of January. On March 10, 2003, the Arkansas State Board of Education reviewed and approved the PMT and its executive summary for the month of February. 3 4 VI. REMEDIATION A. Through the Extended COE process, the needs for technical assistance by District, by School, and by desegregation compensatory education programs will be identified. 1. Projected Ending Date Ongoing 2. Actual as of April 30, 2003 During May 1995, team visits to Cycle 4 schools were conducted, and plans were developed for reviewing the Cycle 5 schools. In June 1995, the current Extended COE packet was reviewed, and enhancements to the Extended COE packet were prepared. In July 1995, year end reports were finalized by the Pulaski County field service specialists, and plans were finalized for reviewing the draft improvement plans of the Cycle 5 schools. In August 1995, Phase I - Cycle 5 school improvement plans were reviewed. Plans were developed for meeting with the Districts to discuss plans for Phase 11 - Cycle 1 schools of Extended COE, and a school improvement conference was conducted in Hot Springs. The technical review visits for the FY 95/96 year and the documentation process were also discussed. In October 1995, two computer programs, the Effective Schools Planner and the Effective Schools Research Assistant, were ordered for review, and the first draft of a monitoring checklist for Extended COE was developed. Through the Extended COE process, the field service representatives provided technical assistance based on the needs identified within the Districts from the data gathered. In November 1995, ADE personnel discussed and planned for the FY 95/96 monitoring, and onsite visits were conducted to prepare schools for the FY 95/96 team visits. Technical review visits continued in the Districts. In December 1995, announced monitoring and technical assistance visits were conducted in the Districts. At December 31 , 1995, approximately 59% of the schools in the Districts had been monitored. Technical review visits were conducted during January 1996. In February 1996, announced monitoring visits and midyear monitoring reports were completed, and the field service specialists prepared for the spring NCA/COE peer team visits. 35 VI. REMEDIATION (Continued) A. Through the Extended COE process, the needs for technical assistance by District, by School, and by desegregation compensatory education programs will be identified. (Continued) 2. Actual as of April 30, 2003 (Continued) In March 1996, unannounced monitoring visits of Cycle 5 schools commenced, and two-day peer team visits of Cycle 5 schools were conducted. Two-day team visit materials, team lists and reports were prepared. Technical assistance was provided to schools in final preparation for team visits and to schools needing any school improvement information. In April and May 1996, the unannounced monitoring visits were completed. The unannounced monitoring forms were reviewed and included in the July monitoring report. The two-day peer team visits were completed, and annual COE monitoring reports were prepared. In June 1996, all announced and unannounced monitoring visits of the Cycle 5 schools were completed, and the data was analyzed. The Districts identified enrollment in compensatory education programs. The Semiannual Monitoring Report was completed and filed with the Court on July 15, 1996, and copies were distributed to the parties. During August 1996, meetings were held with the Districts to discuss the monitoring requirements. Technical assistance meetings with Cycle 1 schools were planned for 96/97. The Districts were requested to record discipline data in accordance with the Allen Letter. In September 1996, recommendations regarding the ADE monitoring schedule for Cycle 1 schools and content layouts of the semiannual report were submitted to the ADE administrative team for their review. Training materials were developed and schedules outlined for Cycle 1 schools. In October 1996, technical assistance needs were identified and addressed to prepare each school for their team visits. Announced monitoring visits of the Cycle 1 schools began on October 28, 1996. In December 1996, the announced monitoring visits of the Cycle 1 schools were completed, and technical assistance needs were identified from school site visits. In January 1997, the ECOE monitoring section identified technical assistance needs of the Cycle 1 schools, and the data was reviewed when the draft February Semiannual Monitoring Report was presented to the Desegregation Litigation Oversight Subcommittee, the State Board of Education, and the parties. 36 VI. REMEDIATION (Continued) A. Through the Extended COE process, the needs for technical assistance by District, by School, and by desegregation compensatory education programs will be identified. (Continued) 2. Actual as of April 30, 2003 (Continued) In February 1997, field service specialists prepared for the peer team visits of the Cycle 1 schools. NCA accreditation reports were presented to the NCA Committee, and NCA reports were prepared for presentation at the April NCA meeting in Chicago. From March to May 1997, 111 visits were made to schools or central offices to work with principals, ECOE steering committees, and designated district personnel concerning school improvement planning. A workshop was conducted on Learning Styles for Geyer Springs Elementary School. A School Improvement Conference was held in Hot Springs on July 15-17, 1997. The conference included information on the process of continuous school improvement, results of the first five years of COE, connecting the mission with the school improvement plan, and improving academic performance. Technical assistance needs were evaluated for the FY 97/98 school year in August 1997. From October 1997 to February 1998, technical reviews of the ECOE process were conducted by the field service representatives. Technical assistance was provided to the Districts through meetings with the ECOE steering committees, assistance in analyzing perceptual surveys, and by providing samples of school improvement plans, Gold File catalogs, and web site addresses to schools visited. Additional technical assistance was provided to the Districts through discussions with the ECOE committees and chairs about the process. In November 1997, technical reviews of the ECOE process were conducted by the field service representatives in conjunction with the announced monitoring visits. Workshops on brainstorming and consensus building and asking strategic questions were held in January and February 1998. In March 1998, the field service representatives conducted ECOE team visits and prepared materials for the NCA workshop. Technical assistance was provided in workshops on the ECOE process and team visits. In April 1998, technical assistance was provided on the ECOE process and academically distressed schools. In May 1998, technical assistance was provided on the ECOE process, and team visits were conducted. 37 VI. REMEDIATION (Continued) A. Through the Extended COE process, the needs for technical assistance by District, by School, and by desegregation compensatory education programs will be identified. (Continued) 2. Actual as of April 30, 2003 (Continued) In June 1998, the Extended COE Team Visit Reports were completed. A School Improvement Conference was held in Hot Springs on July 13-15, 1998. Major conference topics included information on the process of continuous school improvement, curriculum alignment, \"Smart Start,\" Distance Learning, using data to improve academic performance, educational technology, and multicultural education. All school districts in Arkansas were invited and representatives from Pulaski County attended. In September 1998, requests for technical assistance were received, visitation schedules were established, and assistance teams began visiting the Districts. Assistance was provided by telephone and on-site visits. The ADE provided inservice training on \"Using Data to Sharpen the Focus on Student Achievement\" at Gibbs Magnet Elementary school on October 5, 1998 at their request. The staff was taught how to increase test scores through data disaggregation, analysis, alignment, longitudinal achievement review, and use of individualized test data by student, teacher, class and content area. Information was also provided regarding the \"Smart Start\" and the \"Academic Distress\" initiatives. On October 20, 1998, ECOE technical assistance was provided to Southwest Jr. High School. 8. Identify available resources for providing technical assistance for the specific condition, or circumstances of need, considering resources within ADE and the Districts, and also resources available from outside sources and experts. 1. Projected Ending Date Ongoing 2. Actual as of April 30, 2003 The information for this item is detailed under Section VI.F. of this report. C. Through the ERIC system, conduct a literature search for research evaluating compensatory education programs. 1. Projected Ending Date Ongoing 38 VI. REMEDIATION (Continued) C. D. Through the ERIC system, conduct a literature search for research evaluating compensatory education programs. (Continued) 2. Actual as of April 30, 2003 An updated ERIC Search was conducted on May 15, 1995 to locate research on evaluating compensatory education programs. The ADE received the updated ERIC disc that covered material through March 1995. An ERIC search was conducted in September 30, 1996 to identify current research dealing with the evaluation of compensatory education programs, and the articles were reviewed. An ERIC search was conducted in April 1997 to identify current research on compensatory education programs and sent to the Cycle 1 principals and the field service specialists for their use. An Eric search was conducted in October 1998 on the topic of Compensatory Education and related descriptors. The search included articles with publication dates from 1997 through July 1998. Identify and research technical resources available to ADE and the Districts through programs and organizations such as the Desegregation Assistance Center in San Antonio, Texas. 1. Projected Ending Date Summer 1994 2. Actual as of April 30, 2003 The information for this item is detailed under Section VI.F. of this report. E. Solicit, obtain, and use available resources for technical assistance. 1. Projected Ending Date Ongoing 2. Actual as of April 30, 2003 The information for this item is detailed under Section VI.F. of this report. 39 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. 1. Projected Ending Date Ongoing 2. Actual as of April 30, 2003 From March 1995 through July 1995, technical assistance and resources were obtained from the following sources: the Southwest Regional Cooperative\nUALR regarding training for monitors\nODM on a project management software\nADHE regarding data review and display\nand Phi Delta Kappa, the Desegregation Assistance Center and the Dawson Cooperative regarding perceptual surveys. Technical assistance was received on the Microsoft Project software in November 1995, and a draft of the PMT report using the new software package was presented to the ADE administrative team for review. In December 1995, a data manager was hired permanently to provide technical assistance with computer software and hardware.  In October 1996, the field service specialists conducted workshops in the Districts to address their technical assistance needs and provided assistance for upcoming team visits. In November and December 1996, the field service specialists addressed technical assistance needs of the schools in the Districts as they were identified and continued to provide technical assistance for the upcoming team visits. In January 1997, a draft of the February 1997 Semiannual Monitoring Report was presented to the State Board of Education, the Desegregation Litigation Oversight Subcommittee, and the parties. The ECOE monitoring section of the report included information that identified technical assistance needs and resources available to the Cycle 1 schools. Technical assistance was provided during the January 29-31 , 1997 Title I MidWinter Conference. The conference emphasized creating a learning community by building capacity schools to better serve all children and empowering parents to acquire additional skills and knowledge to better support the education of their children. In February 1997, three ADE employees attended the Southeast Regional Conference on Educating Black Children. Participants received training from national experts who outlined specific steps that promote and improve the education of black children. 40 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of April 30, 2003 (Continued) On March 6-9, 1997, three members of the ADE's Technical Assistance Section attended the National Committee for School Desegregation Conference. The participants received training in strategies for Excellence and Equity: Empowerment and Training for the Future. Specific information was received regarding the current status of court-ordered desegregation, unitary status, and resegregation and distributed to the Districts and ADE personnel. The field service specialists attended workshops in March on ACT testing and school improvement to identify technical assistance resources available to the Districts and the ADE that will facilitate desegregation efforts. ADE personnel attended the Eighth Annual Conference on Middle Level Education in Arkansas presented by the Arkansas Association of Middle Level Education on April 6-8, 1997. The theme of the conference was Sailing Toward New Horizons. In May 1997, the field service specialists attended the NCA annual conference and an inservice session with Mutiu Fagbayi. An Implementation Oversight Committee member participated in the Consolidated COE Plan inservice training. In June and July 1997, field service staff attended an SAT-9 testing workshop and participated in the three-day School Improvement Conference held in Hot Springs. The conference provided the Districts with information on the COE school improvement process, technical assistance on monitoring and assessing achievement, availability of technology for the classroom teacher, and teaching strategies for successful student achievement. In August 1997, field service personnel attended the ASCD Statewide Conference and the AAEA Administrators Conference. On August 18, 1997, the bi-monthly Team V meeting was held and presentations were made on the Early Literacy Learning in Arkansas (ELLA) program and the Schools of the 21st Century program. In September 1997, technical assistance was provided to the Cycle 2 principals on data collection for onsite and offsite monitoring. ADE personnel attended the Region VI Desegregation Conference in October 1997. Current desegregation and educational equity cases and unitary status issues were the primary focus of the conference. On October 14, 1997, the bi-monthly Team V meeting was held in Paragould to enable members to observe a 21st Century school and a school that incorporates traditional and multi-age classes in its curriculum. 41 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of April 30, 2003 (Continued) In November 1997, the field service representatives attended the Governor's Partnership Workshop to discuss how to tie the committee's activities with the ECOE process. In March 1998, the field service representatives attended a school improvement conference and conducted workshops on team building and ECOE team visits. Staff development seminars on Using Data to Sharpen the Focus on Student Achievement are scheduled for March 23, 1998 and March 27, 1998 for the Districts. In April 1998, the Districts participated in an ADE seminar to aid them in evaluating and improving student achievement. In August 1998, the Field Service Staff attended inservice to provide further assistance to schools, i.e., Title I Summer Planning Session, ADE session on Smart Start, and the School Improvement Workshops. All schools and districts in Pulaski County were invited to attend the \"Smart Start\" Summit November 9, 10, and 11 to learn more about strategies to increase student performance. \"Smart Start\" is a standards-driven educational initiative which emphasizes the articulation of clear standards for student achievement and accurate measures of progress against those standards through assessments, staff development and individual school accountability. The Smart Start Initiative focused on improving reading and mathematics achievement for all students in Grades K-4. Representatives from all three districts attended. On January 21 , 1998, the ADE provided staff development for the staff at Oak Grove Elementary School designed to assist them with their efforts to improve student achievement. Using achievement data from Oak Grove, educators reviewed trends in achievement data, identified areas of greatest need, and reviewed seven steps for improving student performance. On February 24, 1999, the ADE provided staff development for the administrative staff at Clinton Elementary School regarding analysis of achievement data. On February 15, 1999, staff development was rescheduled for Lawson Elementary School. The staff development program was designed to assist them with their efforts to improve student achievement using achievement data from Lawson, educators reviewed the components of the Arkansas Smart Initiative, trends in achievement data, identified areas of greatest need, and reviewed seven steps for improving student performance. Student Achievement Workshops were rescheduled for Southwest Jr. High in the Little Rock School District, and the Oak Grove Elementary School in the Pulaski County School District. 42 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of April 30, 2003 (Continued) On April 30, 1999, a Student Achievement Workshop was conducted for Oak Grove Elementary School in PCSSD. The Student Achievement Workshop for Southwest Jr. High in LRSD has been rescheduled. On June 8, 1999, a workshop was presented to representatives from each of the Arkansas Education Service Cooperatives and representatives from each of the three districts in Pulaski County. The workshop detailed the Arkansas Comprehensive Testing, Assessment and Accountability Program (ACTAAP). On June 18, 1999, a workshop was presented to administrators of the NLRSD. The workshop detailed the Arkansas Comprehensive Testing, Assessment and Accountability Program (ACTAAP). On August 16, 1999, professional development on ways to increase student achievement and the components of the new ACTAAP program was presented during the preschool staff development activities for teaching assistant in the LRSD. On August 20, 1999, professional development on ways to increase student achievement and the components of the new ACT AAP program was presented during the preschool staff development activities for the Accelerated Learning Center in the LRSD. On September 13, 1999, professional development on ways to increase student achievement and the components of the new ACT AAP program were presented to the staff at Booker T. Washington Magnet Elementary School. On September 27, 1999, professional development on ways to increase student achievement was presented to the Middle and High School staffs of the NLRSD. The workshop also covered the components of the new ACTAAP program, and ACT 999 of 1999. On October 26, 1999, professional development on ways to increase student achievement was presented to LRSD personnel through a staff development training class. The workshop also covered the components of the new ACTAAP program, and ACT 999 of 1999. On December 7, 1999, professional development on ways to increase student achievement was scheduled for Southwest Middle School in the LRSD. The workshop was also set to cover the components of the new ACTAAP program, and ACT 999 of 1999. However, Southwest Middle School administrators had a need to reschedule, therefore the workshop will be rescheduled. 4 3 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of April 30, 2003 (Continued) On January 10, 2000, professional development on ways to increase student achievement was conducted for both Dr. Martin Luther King Magnet Elementary School \u0026amp; Little Rock Central High School. The workshops also covered the components of the new ACT AAP program, and ACT 999 of 1999. On March 1, 2000, professional development on ways to increase student achievement was conducted for all principals and district level administrators in the PCSSD. The workshop also covered the components of the new ACTAAP program, and ACT 999 of 1999. On April 12, 2000, professional development on ways to increase student achievement was conducted for the LRSD. The workshop also covered the components of the new ACTAAP program, and ACT 999 of 1999. Targeted staffs from the middle and junior high schools in the three districts in Pulaski County attended the Smart Step Summit on May 1 and May 2. Training was provided regarding the overview of the \"Smart Step\" initiative, \"Standard and Accountability in Action,\" and \"Creating Learning Environments Through Leadership Teams.\" The ADE provided training on the development of alternative assessment September 12-13, 2000. Information was provided regarding the assessment of Special Education and LEP students. Representatives from each district were provided the opportunity to select a team of educators from each school within the district to participate in professional development regarding Integrating Curriculum and Assessment K-12. The professional development activity was directed by the national consultant, Dr. Heidi Hays Jacobs, on September 14 and 15, 2000. The ADE provided professional development workshops from October 2 through October 13, 2000 regarding, \"The Write Stuff: Curriculum Frameworks, Content Standards and Item Development.\" Experts from the Data Recognition Corporation provided the training. Representatives from each district were provided the opportunity to select a team of educators from each school within the district to participate. The ADE provided training on Alternative Assessment Portfolio Systems by video conference for Special Education and LEP Teachers on November 17, 2000. Also, Alternative Assessment Portfolio System Training was provided for testing coordinators through teleconference broadcast on November 27, 2000. 44 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of April 30, 2003 (Continued) On December 12, 2000, the ADE provided training for Test Coordinators on end of course assessments in Geometry and Algebra I Pilot examination. Experts from the Data Recognition Corporation conducted the professional development at the Arkansas Teacher Retirement Building. The ADE presented a one-day training session with Dr. Cecil Reynolds on the Behavior Assessment for Children (BASC). This took place on December 7, 2000 at the NLRSD Administrative Annex. Dr. Reynolds is a practicing clinical psychologist. He is also a professor at Texas A \u0026amp; M University and a nationally known author. In the training, Dr. Reynolds addressed the following: 1) how to use and interpret information obtained on the direct observation form, 2) how to use this information for programming, 3) when to use the BASC, 4) when to refer for more or additional testing or evaluation, 5) who should complete the forms and when, (i.e., parents, teachers, students), 6) how to correctly interpret scores. This training was intended to especially benefit School Psychology Specialists, psychologists, psychological examiners, educational examiners and counselors. During January 22-26, 2001 the ADE presented the ACTAAP Intermediate (Grade 6) Benchmark Professional Development Workshop on Item Writing. Experts from the Data Recognition Corporation provided the training. Representatives from each district were invited to attend. On January 12, 2001 the ADE presented test administrators training for mid-year End of Course (Pilot) Algebra I and Geometry exams. This was provided for schools with block scheduling. On January 13, 2001 the ADE presented SmartScience Lessons and worked with teachers to produce curriculum. This was shared with eight Master Teachers. The SmartScience Lessons were developed by the Arkansas Science Teachers Association in conjunction with the Wilbur Mills Educational Cooperative under an Eisenhower grant provided by the ADE. The purpose of SmartScience is to provide K-6 teachers with activity-oriented science lessons that incorporate reading, writing, and mathematics skills. The following training has been provided for educators in the three districts in Pulaski County by the Division of Special Education at the ADE since January 2000: On January 6, 2000, training was conducted for the Shannon Hills Pre-school Program, entitled \"Things you can do at home to support your child's learning.\" This was presented by Don Boyd - ASERC and Shelley Weir. The school's director and seven parents attended. 45 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of April 30, 2003 (Continued) On March 8, 2000, training was conducted for the Southwest Middle School in Little Rock, on ADD. Six people attended the training. There was follow-up training on Learning and Reading Styles on March 26. This was presented by Don Boyd - ASERC and Shelley Weir. On September 7, 2000, Autism and Classroom Accommodations for the LRSD at Chicot Elementary School was presented. Bryan Ayres and Shelley Weir were presenters. The participants were: Karen Sabo, Kindergarten Teacher\nMelissa Gleason, Paraprofessional\nCurtis Mayfield, P.E. Teacher\nLisa Poteet, Speech Language Pathologist\nJane Harkey, Principal\nKathy Penn-Norman, Special Education Coordinator\nAlice Phillips, Occupational Therapist. On September 15, 2000, the Governor's Developmental Disability Coalition Conference presented Assistive Technology Devices \u0026amp; Services. This was held at the Arlington Hotel in Hot Springs. Bryan Ayres was the presenter. On September 19, 2000, Autism and Classroom Accommodations for the LRSD at Jefferson Elementary School was presented. Bryan Ayres and Shelley Weir were presenters. The participants were: Melissa Chaney, Special Education Teacher\nBarbara Barnes, Special Education Coordinator\na Principal, a Counselor, a Librarian, and a Paraprofessional. On October 6, 2000, Integrating Assistive Technology Into Curriculum was presented at a conference in the Hot Springs Convention Center. Presenters were: Bryan Ayers and Aleecia Starkey. Speech Language Pathologists from LRSD and NLRSD attended. On October 24, 2000, Consideration and Assessment of Assistive Technology was presented through Compressed Video-Teleconference at the ADE facility in West Little Rock. Bryan Ayres was the presenter. On October 25 and 26, 2000, Alternate Assessment for Students with Severe Disabilities for the LRSD at J. A. Fair High School was presented. Bryan Ayres was the presenter. The participants were: Susan Chapman, Special Education Coordinator\nMary Steele, Special Education Teacher\nDenise Nesbit, Speech Language Pathologist\nand three Paraprofessionals. On November 14, 2000, Consideration and Assessment of Assistive Technology was presented through Compressed Video-Teleconference at the ADE facility in West Little Rock. Bryan Ayres was the presenter. On November 17, 2000, training was conducted on Autism for the LRSD at the Instructional Resource Center. Bryan Ayres and Shelley Weir were presenters. 46 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of April 30, 2003 (Continued) On December 5, 2000, Access to the Curriculum Via the use of Assistive Technology Computer Lab was presented. Bryan Ayres was the presenter of this teleconference. The participants were: Tim Fisk, Speech Language Pathologist from Arch Ford Education Service Cooperative at Plumerville and Patsy Lewis, Special Education Teacher from Mabelvale Middle School in the LRSD. On January 9, 2001 , Consideration and Assessment of Assistive Technology was presented through Compressed Video-Teleconference at the ADE facility in West Little Rock. Bryan Ayres was the presenter. Kathy Brown, a vision consultant from the LRSD, was a participant. On January 23, 2001, Autism and Classroom Modifications for the LRSD at Brady Elementary School was presented. Bryan Ayres and Shelley Weir were presenters. The participants were: Beverly Cook, Special Education Teacher\nAmy Littrell, Speech Language Pathologist\nJan Feurig, Occupational Therapist\nCarolyn James, Paraprofessional\nCindy Kackly, Paraprofessional\nand Rita Deloney, Paraprofessional. The ADE provided training on Alternative Assessment Portfolio Systems for Special Education and Limited English Proficient students through teleconference broadcast on February 5, 2001. Presenters were: Charlotte Marvel, ADE\nDr. Gayle Potter, ADE\nMarcia Harding, ADE\nLynn Springfield, ASERC\nMary Steele, J. A. Fair High School, LRSD\nBryan Ayres, Easter Seals Outreach. This was provided for Special Education teachers and supervisors in the morning, and Limited English Proficient teachers and supervisors in the afternoon. The Special Education session was attended by 29 teachers/administrators and provided answers to specific questions about the alternate assessment portfolio system and the scoring rubric and points on the rubric to be used to score the portfolios. The LEP session was attended by 16 teachers/administrators and disseminated the common tasks to be included in the portfolios: one each in mathematics, writing and reading. On February 12-23, 2001, the ADE and Data Recognition Corporation personnel trained Test Coordinators in the administration of the spring Criterion-Referenced Test. This was provided in 20 sessions at 10 regional sites. Testing protocol, released items, and other testing materials were presented and discussed. The sessions provided training for Primary, Intermediate, and Middle Level Benchmark Exams as well as End of Course Literacy, Algebra and Geometry Pilot Tests. The LRSD had 2 in attendance for the End of Course session and 2 for the Benchmark session. The NLRSD had 1 in attendance for the End of Course session and 1 for the Benchmark session. The PCSSD had 1 in attendance for the End of Course session and 1 for the Benchmark session. 47 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of April 30, 2003 (Continued) On March 15, 2001 , there was a meeting at the ADE to plan professional development for staff who work with Limited English Proficiency (LEP) students. A $30,000 grant has been created to provide LEP training at Chicot Elementary for a year, starting in April 2001. A $40,000 grant was created to provide a Summer English as Second Language (ESL) Academy for the LRSD from June 18 through 29, 2001. Andre Guerrero from the ADE Accountability section met with Karen Broadnax, ESL Coordinator at LRSD, Pat Price, Early Childhood Curriculum Supervisor at LRSD, and Jane Harkey, Principal of Chicot Elementary. On March 1-2 and 8-29, 2001 , ADE staff performed the following activities: processed registration for April 2 and 3 Alternate Portfolio Assessment video conference quarterly meeting\nanswered questions about Individualized Educational Plan (IEP) and LEP Alternate Portfolio Assessment by phone from schools and Education Service Cooperatives\nand signed up students for alternate portfolio assessment from school districts. On March 6, 2001 , ADE staff attended a Smart Step Technology Leadership Conference at the State House Convention Center. On March 7, 2001, ADE staff attended a National Assessment of Educational Progress (NAEP) Regional Math Framework Meeting about the Consensus Project 2004. On March 8, 2001 , there was a one-on-one conference with Carole Villarreal from Pulaski County at the ADE about the LEP students with portfolios. She was given pertinent data, including all the materials that have been given out at the video conferences. The conference lasted for at least an hour. On March 14, 2001, a Test Administrator's Training Session was presented specifically to LRSD Test Coordinators and Principals. About 60 LRSD personnel attended. The following meetings have been conducted with educators in the three districts in Pulaski County since July 2000. On July 10-13, 2000 the ADE provided Smart Step training. The sessions covered Standards-based classroom practices. 48 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of April 30, 2003 (Continued) On July 19-21 , 2000 the ADE held the Math/Science Leadership Conference at UCA. This provided services for Arkansas math and science teachers to support systemic reform in math/science and training for 8th grade Benchmark. There were 200 teachers from across the state in attendance. On August 14-31, 2000 the ADE presented Science Smart Start Lessons and worked with teachers to produce curriculum. This will provide K-6 teachers with activity-oriented science lessons that incorporate reading, writing, and mathematics skills. On September 5, 2000 the ADE held an Eisenhower Informational meeting with Teacher Center Coordinators. The purpose of the Eisenhower Professional Development Program is to prepare teachers, school staff, and administrators to help all students meet challenging standards in the core academic subjects. A summary of the program was presented at the meeting. On November 2-3, 2000 the ADE held the Arkansas Conference on Teaching. This presented curriculum and activity workshops. More than 1200 attended the conference. On November 6, 2000 there was a review of Science Benchmarks and sample model curriculum. A committee of 6 reviewed and revised a drafted document. The committee was made up of ADE and K-8 teachers. On November 7-10, 2000 the ADE held a meeting of the Benchmark and End of Course Mathematics Content Area Committee. Classroom teachers reviewed items for grades 4, 6, 8 and EOC mathematics assessment. There were 60 participants. On December 4-8, 2000 the ADE conducted grades 4 and 8 Benchmark Scoring for Writing Assessment. This professional development was attended by approximately 750 teachers. On December 8, 2000 the ADE conducted Rubric development for Special Education Portfolio scoring. This was a meeting with special education supervisors to revise rubric and plan for scoring in June. On December 8, 2000 the ADE presented the Transition Mathematics Pilot Training Workshop. This provided follow-up training and activities for fourth-year mathematics professional development. On December 12, 2000 the ADE presented test administrators training for midyear End of Course (Pilot) Algebra I and Geometry exams. This was provided for schools with block scheduling. 49 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of April 30, 2003 (Continued) The ADE provided training on Alternative Assessment Portfolio Systems for Special Education and Limited English Proficient students through teleconference broadcasts on April 2-3, 2001 . Administration of the Primary, Intermediate, and Middle Level Benchmark Exams as well as End of Course Literacy took place on April 23-27, 2001 . Administration of the End of Course Algebra and Geometry Exams took place on May 2-3, 2001. Over 1,100 Arkansas educators attended the Smart Step Growing Smarter Conference on July 10 and 11, 2001, at the Little Rock Statehouse Convention Center. Smart Step focuses on improving student achievement for Grades 5-8. The Smart Step effort seeks to provide intense professional development for teachers and administrators at the middle school level, as well as additional materials and assistance to the state's middle school teachers. The event began with opening remarks by Ray Simon, Director of the ADE. Carl Boyd, a longtime educator and staff consultant for Learning 24-7, presented the first keynote address on \"The Character-Centered Teacher\". Debra Pickering, an education consultant from Denver, Colorado, presented the second keynote address on \"Characteristics of Middle Level Education\". Throughout the Smart Step conference, educators attended breakout sessions that were grade-specific and curriculum area-specific. Pat Davenport, an education consultant from Houston, Texas, delivered two addresses. She spoke on \"A Blueprint for Raising Student Achievement\". Representatives from all three districts in Pulaski County attended. Over 1,200 Arkansas teachers and administrators attended the Smart Start Conference on July 12, 2001 , at the Little Rock Statehouse Convention Center. Smart Start is a standards-driven educational initiative which emphasizes the articulation of clear standards for student achievement and accurate measures of progress against those standards through assessments, staff development and individual school accountability. The Smart Start Initiative focused on improving reading and mathematics achievement for all students in Grades K-4. The event began with opening remarks by Ray Simon, Director of the ADE. Carl Boyd, a longtime educator and staff consultant for Learning 24-7, presented the keynote address. The day featured a series of 15 breakout sessions on best classroom practices. Representatives from all three districts in Pulaski County attended. On July 18-20, 2001 , the ADE held the Math/Science Leadership Conference at UCA. This provided services for Arkansas math and science teachers to support systemic reform in math/science and training for 8th grade Benchmark. There were approximately 300 teachers from across the state in attendance. 50 l VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of April 30, 2003 (Continued) The ADE and Harcourt Educational Measurement conducted Stanford 9 test administrator training from August 1-9, 2001 . The training was held at Little Rock, Jonesboro, Fort Smith, Forrest City, Springdale, Mountain Home, Prescott, and Monticello. Another session was held at the ADE on August 30, for those who were unable to attend August 1-9. The ADE conducted the Smart Start quarterly meeting by video conference at the Education Service Cooperatives and at the ADE from 9:00 a.m. until 11 :30 a.m. on September 5, 2001 . The ADE released the performance of all schools on the Primary and Middle Level Benchmark Exams on September 5, 2001 . The ADE conducted Transition Core Teacher In-Service training for Central in the LRSD on September 6, 2001 . The ADE conducted Transition Checklist training for Hall in the LRSD on September 7, 2001 . The ADE conducted Transition Checklist training for McClellan in the LRSD on September 13, 2001 . The ADE conducted Basic Co-teaching training for the LRSD on October 9, 2001 . The ADE conducted training on autism spectrum disorder for the PCSSD on October 15, 2001 . Professional Development workshops (1 day in length) in scoring End of Course assessments in algebra, geometry and reading were provided for all districts in the state. Each school was invited to send three representatives (one for each of the sessions). LRSD, NLRSD, and PCSSD participated. Information and training materials pertaining to the Alternate Portfolio Assessment were provided to all districts in the state and were supplied as requested to LRSD, PCSSD and David 0. Dodd Elementary. On November 1-2, 2001 the ADE held the Arkansas Conference on Teaching at the Excelsior Hotel \u0026amp; Statehouse Convention Center. This presented sessions, workshops and short courses to promote exceptional teaching and learning. Educators could become involved in integrated math, science, English \u0026amp; language arts and social studies learning. The ADE received from the schools selected to participate in the National Assessment of Educational Progress (NAEP), a list of students who will take the test. 51 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of April 30, 2003 (Continued) On December 3-7, 2001 the ADE conducted grade 6 Benchmark scoring training for reading and math. Each school district was invited to send a math and a reading specialist. The training was held at the Holiday Inn Airport in Little Rock. On December 4 and 6, 2001 the ADE conducted Mid-Year Test Administrator Training for Algebra and Geometry. This was held at the Arkansas Activities Association's conference room in North Little Rock. On January 24, 2002, the ADE conducted the Smart Start quarterly meeting by ADE compressed video with Fred Jones presenting. On January 31, 2002, the ADE conducted the Smart Step quarterly meeting by NSCI satellite with Fred Jones presenting. On February 7, 2002, the ADE Smart Step co-sponsored the AR Association of Middle Level Principal's/ADE curriculum, assessment and instruction workshop with Bena Kallick presenting. On February 11-21 , 2002, the ADE provided training for Test Administrators on the Primary, Intermediate, and Middle Level Benchmark Exams as well as End of Course Literacy, Algebra and Geometry Exams. The sessions took place at Forrest City, Jonesboro, Mountain Home, Springdale, Fort Smith, Monticello, Prescott, Arkadelphia and Little Rock. A make-up training broadcast was given at 15 Educational Cooperative Video sites on February 22. During February 2002, the LRSD had two attendees for the Benchmark Exam training and one attendee for the End of Course Exam training. The NLRSD and PCSSD each had one attendee at the Benchmark Exam training and one attendee for the End of Course Exam training. The ADE conducted the Smart Start quarterly meeting by compressed interactive video at the South Central Education Service Cooperative from 9:30 a.m. until 11 :30 a.m. on May 2, 2002. Telecast topics included creating a standards-based classroom and a seven-step implementation plan. The principal's role in the process was explained. The ADE conducted the Smart Step quarterly meeting by compressed interactive video at the South Central Education Service Cooperative from 9:30 a.m. until 11 :30 a.m. on May 9, 2002. Telecast topics included creating a standards-based classroom and a seven-step implementation plan. The principal's role in the process was explained. 52 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of April 30, 2003 (Continued) The Twenty-First Annual Curriculum and Instruction Conference, cosponsored by the Arkansas Association for Supervision and Curriculum Development and the Arkansas Department of Education, will be held June 24-26, 2002, at the Arlington Hotel in Hot Springs, Arkansas. \"Ignite Your Enthusiasm for Learning\" is the theme for this year's conference, which will feature educational consultant, Dr. Debbie Silver, as well as other very knowledgeable presenters. Additionally, there will be small group sessions on Curriculum Alignment, North Central Accreditation, Section 504, Building Level Assessment, Administrator Standards, Data Disaggregation, and National Board. The Educational Accountability Unit of the ADE hosted a workshop entitled \"Strategies for Increasing Achievement on the ACT AAP Benchmark Examination\" on June 13-14, 2002 at the Agora Center in Conway. The workshop was present_ed for schools in which 100% of students scored below the proficient. level on one or more parts of the most recent Benchmark Examination. The agenda included presentations on \"The Plan-Do-Check-Act Instructional Cycle\" by the nationally known speaker Pat Davenport. ADE personnel provided an explanation of the MPH point program. Presentations were made by Math and Literacy Specialists. Dr. Charity Smith, Assistant Director for Accountability, gave a presentation about ACTAAP. Break out sessions were held, in which school districts with high scores on the MPH point program offered strategies and insights into increasing student achievement. The NLRSD, LRSD, and PCSSD were invited to attend. The NLRSD attended the workshop. The Smart Start Summer Conference took place on July 8-9, 2002, at the Little Rock Statehouse Convention Center and Peabody Hotel. The Smart Start Initiative focuses on improving reading and mathematics achievement for all students in Grades K-4. The event included remarks by Ray Simon, Director of the ADE. After comments by the Director, Bena Kallick presented the keynote address \"Beyond Mapping: Essential Questions, Assessment, Higher Order Thinking\". This was followed by a series of breakout sessions on best classroom practices. On the second day, Vivian Moore gave the keynote address \"Overcoming Obstacles: Avenues for Student Success\". Krista Underwood gave the presentation \"Put Reading First in Arkansas\". This was followed by a series of breakout sessions on best classroom practices. 53 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of April 30, 2003 (Continued) The Smart Step Summer Conference took place on July 10-11, 2002, at the Little Rock Statehouse Convention Center and Peabody Hotel. Smart Step focuses on improving student achievement for Grades 5-8. The event included remarks by Ray Simon, Director of the ADE. After comments by the Director, Vivian Moore presented the keynote address \"Overcoming Obstacles: Avenues for Student Success\". This was followed by a series of breakout sessions on best classroom practices. On the second day, Bena Kallick presented \"Beyond Mapping: Essential Questions, Assessment, Higher Order Thinking\". Ken Stamatis presented \"Smart Steps to Creating a School Culture That Supports Adolescent Comprehension\". This was followed by a series of breakout sessions on best classroom practices. On August 8, 2002, Steven Weber held a workshop at Booker T. Washington Elementary on \"Best Practices in Social Studies\". It was presented to the 4th grade teachers in the Little Rock School District. . The workshop focused around the five themes of geography and the social studies (fourth grade) framework/standards. Several Internet web sites were shared with the teachers, and the teachers were shown methods for incorporating writing into fourth grade social studies. One of the topics was using primary source photos and technology to stimulate the students to write about diverse regions. A theme of the workshop included identifying web sites which apply to fourth grade social studies teachers and interactive web sites for fourth grade students. This was a Back-to-School In-service workshop. The teachers were actively involved in the workshop. On August 13 Steven Weber conducted a workshop at Parkview High School in the LRSD. Topics of the workshop included: 1. Incorporating Writing in the Social Studies Classroom 2. Document Based (open-ended) Questioning Techniques 3. How to practice writing on a weekly basis without assigning a lengthy research report 4. Developing Higher Level Thinking Skills in order to produce active citizens, rather than passive, uninformed citizens 5. Using the Social Studies Framework 6. Identifying state and national Web Sites which contain Primary Sources for use in the classroom The 8:30 - 11 :30 session was for the 6 - 8 grade social studies teachers. The 12:30 - 3:00 session was for the 9 - 12 grade social studies teachers. Several handouts were used, also PowerPoint, primary source photos and documents, and Internet web sites (i.e., Library of Congress, Butler Center for Arkansas Studies, National Archives, etc.). This was a Back-to-School In-service workshop. The teachers were actively involved in the workshop. Marie McNeal is the Social Studies Specialist for the Little Rock School District. She invited Steven Weber to present at the workshop, and was in attendance. 54 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of April 30, 2003 (Continued) On September 30 through October 11 , 2002, the ADE provided Professional Development for Test Administrators on the End of Course Literacy, Algebra and Geometry Exams. The training was held at the Holiday Inn Airport. All three districts in Pulaski County sent representatives to the training. On October 3, 2002, Charlotte Marvel provided in-service training for LEP teachers in the Little Rock School District. On December 6, 2002, the Community and Parent Empowerment Summit was held for parents of children attending the LRSD. It took place at the Saint Mark Baptist Church in Little Rock. Dr. Charity Smith, Assistant Director for Accountability, presented information on No Child Left Behind, Supplemental Services, after school tutoring, how parents can help, and the Refrigerator Curriculum. Mr. Reginald Wilson, Senior Coordinator for Accountability, presented information on ACTAAP, including how to find information on the AS-IS Website and what is included in the school report cards. Donna Elam spoke on the topic \"From the School House to the Jail House\". On December 10 - 12, 2002, the Math Workshop \"Investigations in Number, Data and Space\" was held at the Clinton Elementary Magnet School in Sherwood. Training for Kindergarten and First Grade Teachers was held on December 10, and included Making Shapes and Building Blocks, Quilts, Squares and Block Towns. Training for Second and Third Grade Teachers was held on December 11, and included Shapes, Halves, Symmetry and Turtle Paths. Training for Fourth and Fifth Grade Teachers was held on December 12. Fourth grade covered Seeing Solids and Silhouettes. Fifth Grade was about Containers and Cubes. The sessions provided quality time for teachers to discuss the curriculum, reflect on implications, provide mutual support, and continue planning. The ADE provided professional development for all school districts on Alternative Assessment Portfolio Systems on January 7-9, 2003 at the Holiday Inn Airport. The LRSD had two in attendance, NLRSD had one in attendance, and the PCSSD had two in attendance. The ADE conducted the Smart Start Statewide Professional Staff Development Video Conference at the ADE/AETN Studio and at participating Education Service Cooperatives from 9:30 a.m. until 11 :30 a.m. on February 12, 2003. The ADE conducted the Smart Step Statewide Professional Staff Development Video Conference at the ADE/AETN Studio and at participating Education Service Cooperatives from 9:30 a.m. until 11 :30 a.m. on February 13, 2003. 55 VI. REMEDIATION (Continued) F. Evaluate the impact of the use of resources for technical assistance. (Continued) 2. Actual as of April 30, 2003 (Continued) Test Coordinator training was provided throughout the state during the weeks starting February 10 and February 17, 2003. The training in Little Rock was February 20, 2003. The Little Rock School District had two attendees for the Benchmark, End of Course, and Stanford 9 training. The North Little Rock School District had one attendee at the Benchmark, End of Course, and Stanford 9 training. The Pulaski County Special School District had one attendee at the Benchmark, End of Course, and Stanford 9 training. Two sixth grade teachers from each district attended the Professional Development for Benchmark assessments during the week of February 17, 2003 at the Holiday Inn Airport. 56 VII. TEST VALIDATION A. B. Using a collaborative approach, the ADE will select and contract with an independent bias review service or expert to evaluate the Stanford 8, or other monitoring instruments used to measure disparities in academic achievement between black students and white students. 1. Projected Ending Date March, 1995 2. Actual as of April 30, 2003 On March 29, 1995, letters were sent to four national experts about conducting a test bias validation of the Stanford Achievement Test, Eighth Edition, Form K (SAT-8). Dr. Paul Williams, Deputy Director of Educational Testing Service (ETS), contacted the ADE in April of 1995 concerning the proposal for validating the SAT-8 test. The ADE requested that Dr. Williams conduct a validity study of test items used in the SAT-8. Dr. Williams submitted a final proposal for his services. The ADE Bias Review Test Committee met Friday, July 7, 1995, and approved Dr. William's contract proposal. The final contract was forwarded to Dr. Williams for his signature. The contract was signed in August 1995, thereby, completing this goal. By April 1994, establish a bias review committee to oversee the bias review process, and invite representatives of the Districts and parties to meet with the bias review committee. 1. Projected Ending Date Ongoing 2. Actual as of April 30, 2003 Complete. ADE established a Bias Review Committee in April 1994. In accordance with the Implementation Plan, representatives from the Districts and the parties were invited to attend and participate in this and all meetings of the Bias Review Committee. C. Upon completion of test validation procedures by the bias review service or expert, the ADE will adopt and use a validated test as a monitoring instrument. 1. Projected Ending Date March 1995 and ongoing 57 VII. TEST VALIDATION (Continued) C. Upon completion of test validation procedures by the bias review service or expert, the ADE will adopt and use a validated test as a monitoring instrument. (Continued) 2. Actual as of April 30, 2003 Dr. Paul Williams met with the staff of the Psychological Corporation to review their methods and procedures. In August 1995, he met with the staff at Georgia State University to review the statistical methods that would be used in the analysis. Dr. Williams reported difficulty with the bias-review study in receiving the names of the bias panel and the complete SAT-8 data set from the Psychological Corporation. Dr. Williams submitted an invoice totaling $8,961 for Task I activities of the SAT-8 validity study for partial fulfillment of the test validation study. On December 6, 1995, a contract extension for Dr. Williams was reviewed by the Legislative Council. In January 1996, he indicated that he was in the final stages of the test validation, and the ADE was presented a draft report in March 1996. In May 1996, Dr. Williams stated that the wrong data sets were sent to him by the Psychological Corporation resulting in Task 3 having to be redone. A new draft of the final report was received by the ADE in July 1996. In August 1996, copies of the test validation report were provided to the State Board of Education and the ADE administrative team for their review. On September 10, 1996, the LRSD notified the ADE that they had reviewed the test validation report and would like to meet with the ADE to discuss the report. The ADE Director indicated that he would schedule a meeting with the LRSD to discuss the report. In October 1996, historical files and data were provided to the ADE Director, the ADE Assistant Director for Technical Services, and the ADE Assistant Director for Planning and Curriculum for their review in preparation for a meeting with the LRSD regarding the validity study. Test validation procedures by the expert have been completed. A recommendation was drafted proposing the use of the SA T-8 by the ADE as the validated test for monitoring. The ADE is presently working to arrange a meeting with the Administration of the LRSD to discuss the test validation study. Effective September 22, 1997, the State Board of Education hired a new Director of the General Education Division, which should allow the ADE to move forward in this matter. 58 VII. TEST VALIDATION (Continued) C. Upon completion of test validation procedures by the bias review service or expert, the ADE will adopt and use a validated test as a monitoring instrument. (Continued) 2. Actual as of April 30, 2003 (Continued) In October 1997, the GED Director was updated on the history of the test validation process to provide the Director with background information in preparation for a meeting with the LRSD. In February 1998, ADE staff met with senior staff members to discuss the test validation and appropriate test scores for consideration by the LRSD. The ADE Director met with the Superintendent of the LRSD to discuss test validation issues. In June 1998, the ADE Director directed the Assistant Director for Accountability to recommend staff to discuss how the ADE would measure LRSD's progress toward meeting the loan forgiveness thresholds of the Settlement Agreement. Plans were made to meet with the staff Tuesday, June 30, 1998. The Test Validation Committee met on June 30, 1998, and discussed the following: 1. The appropriateness of the use of scaled scores on the SAT-8 test as the metric for assessing LRSD compliance with the loan forgiveness provisions of the Settlement Agreement\nand 2. The need for an independent analysis of LRSD students' test scores to determine compliance or noncompliance with loan forgiveness standard, and who would bear the cost of such an independent analysis. The Test Validation Committee met on September 10, 1998, to review recent correspondence from LRSD and to further discuss issues related to the loan forgiveness provisions of the Settlement Agreement. A follow-up administrative meeting was held on October 13, 1998, to discuss issues related to the test validation process. Participants included Tim Gauger, Assistant Attorney General, Dr. Charity Smith, Lead Planner for Desegregation, and Frank Anthony, Assistant Director for Accountability. A meeting was scheduled with Dr. Les Carnine, LRSD Superintendent and Mr. Ray Simon, ADE Director, regarding Test Validation and loan forgiveness provisions of the Settlement Agreement on May 12, 1999. 59 VII. TEST VALIDATION (Continued) C. Upon completion of test validation procedures by the bias review service or expert, the ADE will adopt and use a validated test as a monitoring instrument. (Continued) 2. Actual as of April 30, 2003 (Continued) On June 14, 1999, the State Board of Education was briefed on the status of LRSD's refusal to make principal and interest payments into escrow as required by the loan provisions of the Settlement Agreement and related documents. The Board requested that a draft motion to enforce the Settlement Agreement be prepared and submitted to the Board for review and\nThis project was supported in part by a Digitizing Hidden Special Collections and Archives project grant from The Andrew W. Mellon Foundation and Council on Library and Information Resoources.\n   \n\n   \n\n  \n\n\n   \n\n  \n\n \n\n\n   \n\n   \n\n \n\n\n   \n\n  \n\n \n\n\u003cdcterms_creator\u003eArkansas. Department of Education\u003c/dcterms_creator\u003e\n   \n\n \n\n  \n\n\n   \n\n \n\n  \n\n\n\n   \n\n  \n\n  \n\n\n\n   \n\n   \n\n  \n\n \n\n \n\n\n   \n\n  \n\n \n\n\n\n\n\n\n\n\n   \n\n \n\n\n\n  \n\n\n   \n\n\n\n  \n\n\n\n "},{"id":"bcas_bcmss0837_1754","title":"Joshua intervenor's comments regarding page 148 \"evaluations\", motion to withdrawal and substitution of counsel, and Arkansas Department of Education (ADE) project management tools.","collection_id":"bcas_bcmss0837","collection_title":"Office of Desegregation Management","dcterms_contributor":null,"dcterms_spatial":["United States, 39.76, -98.5","United States, Arkansas, 34.75037, -92.50044","United States, Arkansas, Pulaski County, 34.76993, -92.3118","United States, Arkansas, Pulaski County, Little Rock, 34.74648, -92.28959"],"dcterms_creator":["United States. District Court (Arkansas: Eastern District)"],"dc_date":["2003-04/2003-06"],"dcterms_description":null,"dc_format":["application/pdf"],"dcterms_identifier":null,"dcterms_language":["eng"],"dcterms_publisher":["Little Rock, Ark. : Butler Center for Arkansas Studies. Central Arkansas Library System"],"dc_relation":null,"dc_right":["http://rightsstatements.org/vocab/InC-EDU/1.0/"],"dcterms_is_part_of":["Office of Desegregation Monitoring records (BC.MSS.08.37)","History of Segregation and Integration of Arkansas's Educational System"],"dcterms_subject":["Little Rock (Ark.)--History--21st Century","Education--Arkansas","Pulaski County Special School District","Little Rock School District","Arkansas. Department of Education","Project management","School districts","School integration","African Americans--Education","Charter schools","Educational planning","Students","Education--Evaluation"],"dcterms_title":["Joshua intervenor's comments regarding page 148 \"evaluations\", motion to withdrawal and substitution of counsel, and Arkansas Department of Education (ADE) project management tools."],"dcterms_type":["Text"],"dcterms_provenance":["Butler Center for Arkansas Studies"],"edm_is_shown_by":null,"edm_is_shown_at":["http://arstudies.contentdm.oclc.org/cdm/ref/collection/bcmss0837/id/1754"],"dcterms_temporal":null,"dcterms_rights_holder":null,"dcterms_bibliographic_citation":null,"dlg_local_right":["Available for use in research, teaching, and private study. Any other use requires permission from the Butler Center."],"dcterms_medium":["filing"],"dcterms_extent":["44 pages"],"dlg_subject_personal":null,"dcterms_subject_fast":null,"fulltext":"\u003c?xml version=\"1.0\" encoding=\"utf-8\"?\u003e\n\u003citems type=\"array\"\u003e  \u003citem\u003e   \n\n   \n\n   \n\n\n   \n\n   \n\n\n   \n\n\n   \n\n   \n\n\n   \n\n   \n\n\n   \n\n   \n\n\n\n\n\n\n\n\n\n\n\n\n\n\n   \n\n \n\n \n\n \n\n\n   \n\n   \n\n   \n\n\n   \n\n  \n\n   \n\n\n   \n\n  \n\n   \n\n\n   \n\n \n\n\u003cdcterms_description type=\"array\"\u003e   \n\n\u003cdcterms_description\u003eDistrict Court, the Joshua intervenors' comments on the submission of page 148 ''evaluations''; District Court, motion to withdraw as counsel and for substitution of counsel; District Court, notices of filing, Arkansas Department of Education (ADE) project management tools; Court of Appeals, brief of appellee; District Court, notice of filing, Arkansas Department of Education (ADE) project management tool    This transcript was create using Optical Character Recognition (OCR) and may contain some errors.     . ,:;-:- - b.BD ED -=-  u.f sM'rn1c;co,1,mr =-- !;/\\'fERN tHTRIQT ARN:\\1\\l~S IN THE UNITED STATES DISTRICT COURT EASTERN DISTRICT oF ARKANSAS APR 1 4 :og, WESTERN DIVISION LITTLE ROCK SCHOOL DISTRICT v. LR-:C-82-866 PULASKI COUNTY SPECIAL SCHOOL DISTRICT NO . 1, ET AL. RECEIVED DEFENDANTS MRS. LORENE JOSHUA, ET AL . KATHERINE KNIGHT, ET AL . APR 1 ~ 2003 OFFICE OF DESEGREGATION MONITORING The Joshua Intervenors' Comments on the Submission of Page 14s \"Evaluations\" INTERVENORS INT ERVEN ORS The Joshua Intervenors comment as follows on the \"[LRSD] Notice of Fil i ng Program Evaluations Required by Paragraph c of the Court's Compliance Remedy\" and the accompanying \"evaluations.\" This court held that the LRSD did not substantially comply with sec. 2.7.1 of the Revised Plan, addressing \"Program Assessment/Program Evaluation [at 150).\" [At 168] The court noted the importance of this commitment. I find that the purpose of Sec. 2.7.1 was to make sure that the programs promised under Sec. 2. 7 actually worked to improve the academic achievement of African-American students. I further find that LRSD's substantial compliance with Sec. 2.7.1 was crucial to its commitment to improve the academic achievement of African-American students~ for, without performing a rigorous annual assessment of each of the many dozens of programs implemented under Sec. 2.7, it would be impossible to determine which programs were working and should be continued and which programs were not working and should be discontinued, modified, or replaced ~1th new programs. [At 150) The court's \"Compliance Remedy\" for the Sec. 2.7.1 violation 1 addressed in part \"program evaluations on each of the programs identified in page 148 of the Final Compliance Report.\" [At 170, 171) The court discussed the completion of these evaluations and their submission to the court and the parties, by March 15, 2003, after their approval by the LRSD school board. [At 171-72] The court also required, in effect, additional evaluations of \"each of the programs implemented under Section 2.7 to improve the academic achievement of African-American students.\" [ At 170] These materials are to be submitted on or before March 15, 2004. [At 172] This court also discussed the criteria to govern the LRSD's exiting court supervision. Because LRSD failed to substantially comply with the crucially important obligations contained in Sec. 2.7.1, .it. must remain under court supervision with regard to that section of the Revised Plan until it: Cal demonstrates that a program assessment procedure is in place that can accurately measure the effectiveness of each program implemented under sec. 2.1 in improving the academic achievement of AfricanAmerican students; ... \" [At 110) The LRSD \"Notice of Filing\" describes the LRSD' s plan to prepare \"comprehensive program evaluation[s]\" as follows: The District will prepare the following new, comprehensive evaluations: (a) Elementary Literacy, (b) Middle and High School Literacy and (c) K-12 Mathematics and Science. Each evaluation will be prepared in accordance with proposed Regulation IL-Rl and will incorporate all available student assessment data relevant to the program being evaluated. These evaluations will be submitted to the District Court on or before March 15, 2004. [Exhibit A at SJ Joshua Intervenors have raised an issue about the scope of this plan pursuant to Section 8 of the Revised Plan. The page 148 \"evaluations\" were, as noted, submitted on March 14, 2003. A review of these materials and other relevant documents 2 show that if LRSD is to \"[demonstrate} that a program assessment procedure is in place that can accurately measure the effectiveness of each program implemented under Sec. 2. 7 in improving the academic achievement of African-American students\" -- it will have to be by a future submission. In general, the documents submitted were either not evaluations, or very deficient evaluations. Joshua Intervenors offer the following examples of deficiencies identified in the page 154 \"evaluations.\" Early Literacy (Vol. 1-2] 1 Dr. Ross described the report as \"one of the best written reports from LRSD I've read.\" [At 2] He also discussed \"a number of weaknesses .... \" [l.s;l.] Dr. Ross' critique includes the following content: \"Of greatest concern overall is the writer's obvious efforts to 'prove' gap reduction even where the data support is weak or spurious.\" (At 3] \"Statistically, a very serious weakness is the lack of validity of the 'Percent Improvement' (PI) index.\" [At 3 J \"Another major statistical weakness is emphasizing the comparison of growth ratios (GR) between Band NB students .. The reason is the obvious ceiling effects on most of the measures.\" [At 4J \"Not surprisingly, on the two literacy tests that do .Il.Q.t. have low ceilings -- Writing Vocabulary and ORA -- the Growth Ratios are much less supportive of gap reduction (e.g., seep. 54, bullet 4), and could even be used by critics as showing extensions of the gap in a number of places. 11 [At 5) \"The present data are 1 This segment is based upon a critique by Dr. Ross, titled \"Review of Year 2 Evaluations.\" It was submitted to counsel _ang Mrs , Marsha 11 of ODM, by counsel for the LRSD, on October 2 s , 2 o o 2 . 3 I I I I I I I I I I II suggestive of definite early progress made by LRSD in improving - All students' literacy performance. There are also indicators of some progress in gap reduction in certain skills. However, given that we are dealing with teacher-administered tests having very low ceiling levels, the overall evidence is weaker than this report conveys. There is no reason to reduce the credibility of the findings by presenting them with such an obvious positive bias.\" [At 7] \"Conduct more studies that examine implementation quality and impacts on the school and the classroom.\" [At 8] charter school [Vol. 1-2] \"Performance data for the program evaluation were not disaggregated by race. The student body, however, was 87 percent African American.\" [Vol. 1-2 at l; Dr. Lesley) Southwest Middle School's SEDL Program [Vol. 1-2) - The \"evaluation\" documents produced by the Southwest Educational Development Lab contain neither a detailed description of the program implemented at Southwest Middle School, nor student achievement data. [Vol. 1-2 at 243-63] Collaborative Action Plan [Vol. 1-2] \"Although the 249-page study produced by SEDL that evaluated the project included student achievement data, those data were not disaggregated by race, and LRSD' s short-term ( one year) participation in the project would not predict that the involvement of this relatively small group of parents and community volunteers would result in improved student performance.\" [Vol. 1-2 at 528; Dr. Lesley) 4 ..... Extended Year schools [Vol. vol. 4J \"Unfortunately, the present evaluation design does not seem sufficiently sensitive to detect effects that might be attributable to EYE. specifically, usage of whole-school data compared descriptively to district norms gives only a very surface examination of the schools' progress, with susceptibility to contamination by student mobility, differences in SES, etc.\" (Exh. Bat S: Dr. Ross] \"The external evaluator's conclusion was that 'Unfortunately, the limited nature of the original design and existing data do not afford us an opportunity to answer in a rigorous manner the key evaluation question of_ the extent of impact of the initiative on black student performance.'\" [Vol. 4 at 1732; Dr. Lesley: see also Vol. 4 at 1813 (Youth Policy Research Group, Inc.] Middle School Implementation [Vol. 4] \"The study conducted by the external evaluator did not attempt to draw any conclusions related to this research question [impact on African-American achievement] since the student performance data available for the study were 'baseline', and there are serious questions about the appropriateness of the achievement measures and about the validity of some of the other performance outcome measures.\" [Vol. 4 at 1870; Dr. Lesley] \"The data presented in the original report does not support the interpretation of program effects on student performance. It provides a baseline for examining future effects, but needs to be extended and verified.\" [Vol. 4 at 1911; Youth Policy Research 5 I \\ . Group, Inc. ) ~lementary _summer school [Vol. 3] There is a lack of II implementation data to describe the  program strategies and the degree to which they were actually used by teachers.\" There is not \"an adequate control group or norms to which the achievement scores of the summer school students could be compared.\" (Eh.Bat 3; Dr. Ross] \"Unfortunately, there are no additional details in the evaluation that describe the precise treatment afforded the students in the program. Missing is any indication of precisely how much of the curriculum was delivered, how and when it was del i vered, and neither by whom, nor its relationship to the previously identified objectives.\" [Vol. control group or norms \" [Vol. Education and Management Associates, Inc.] HIPPY [Vol. 3 J at--] \"No adequate at -- ] [ By Quality \"A limitation of the study, wh i ch unfortunately cannot be remedied retroactively, is the lack of implementation data to describe the fidelity with which HIPPY program components were actually used.\" [Eh . Bat 4; Dr. Ross] \"Conclusions are difficult due to limitations of the study.\" [Vol. 3. at 1554; Dr. Lesley] \"A third weakness is the gap between the HIPPY experience and the achievement scores analyzed .... By that time, several years had elapsed subsequent to the HIPPY interventions.\" [Vol. J at 1567; Dr. Ross] 6 campus Leadership Teams [Vol. 3] \" However, the 'evaluation data' collected to date consist of only results from two district-wide surveys that assessed team members' reactions to various activities. No information exists to verify the representatives of the samples, the validity of the data collection in general, or the implementation of the CLTs at the various schools.\" [Eh. Bat 5; Dr. Ross) \"These surveys were not intended to be a program evaluation., although they were mistakenly characterized as such in the District's compliance report to the court. No student performance data were collected, and, therefore, no conclusions could be drawn as to whether the Campus Leadership Teams' work has resulted in improved academic achievement for any students, nor specifically for African American students.\" [Vol. 3 at 1256; Dr. Lesley] \"There was no formal evaluation of CLT by the LRSD.\" [Vol. 3 at 1259; Dr.. RossJ Lyceum scholars Program [Vol. 4) \"Approximately one-half of the students participating in this small program ( 8 to 10 students total) were African American. Because the numbers were so small, neither performance data nor survey data were disaggregated by race. Neither the staff study nor that of the external evaluator could determine whether this program had any positive benefit on the academic performance of African American students.\" [Vol.4 at 1607; Dr. Lesley; see also at 1635 (inadequate description of treatment provided students in program; 7 Dr. Ross)] onward to Excellence (Vol. 3) The program \"was never fornally achievement data reports sent by the evaluated, except for principal to ADE.\" As \"implementation data are lacking,\" \"if positive or negative results were found, it would be impossible to determine whether OTE or numerous other factors were the main cause.\" [Eh.Bat 4; Dr. Ross) \"In view of these factors, there is no basis for evaluating the 'study,' since none existed.\" [Vol. 3 at 1217; Dr. Ross] Vital Link [Vol. 3] \"Further, the evaluation study conducted was so limited (a brief post-test only, closed-ended survey) that the policy implications of the results are minimal and even potentially misleading if derived.\" [Eh.Bat Jr Dr. Ross] There is \"(i]nsufficient description of the program and its implementation.\" There is a \"[l)ack of pre-program (pretest) data for judging change following program completion.\" \"No examination of results for different subgroups (e.g., by ethnicity) . 11 [Vol.3 at 1542: Dr. Ross) 8 conclusion The need for high quality evaluations, if the LRSD is to exit court supervision, is clear. Robert Pressman 22 Locust Avenue Lexington, MA 02421 781-862-1955 Mass. 405900 Attorney at Law J n John P.A. 1723 Broadway Little Rock, AR 72206 501-374-3758 Ark. 64046 1100 North University, Suite 240 Little Rock, AR 72207 501.-663-9900 9 CERTIFICATE OF SERVICE I hereby certify that a copy of the foregoing pleadilf.: been mailed, postage pre-paid, to all the counsel of record this .-~ (i._ day of ,t, , fJ , ?oc:S,  ~ ~ ?fa ~~~ ohnw.Wall\u0026lt;er .1 UNITED STATES DISTRICT COURT EASTERN DISTRICT OF ARKANSAS WESTERN DIVISION LITTLE ROCK SCHOOL DISTRICT v. No. LR-C-82-866 PULASKI COUNTY SPECIAL SCHOOL DISTRICT NO. 1, et al. MOTION TO WITHDRAW AS COUNSEL AND FOR SUBSTITUTION OF COUNSEL RECEIVED APR 2 5 2003 OFFICE OF DESEGREGATION MONITORING PLAINTIFF DEFENDANTS Separate Defendant Arkansas Department of Education, by and through their attorneys, Attorney General Mike Beebe and Assistant Attorney Mark A. Hagemeier, for their Motion to Withdraw as Counsel and for Substitution of Counsel, state: 1. Assistant Attorney General Colette D. Honorable left state employment effective April 10, 2003. 2. This matter has been reassigned to Assistant Attorney General Mark A. Hagemeier, who now represents Defendants and should be substituted as counsel of record. 3. Defendant requests that the Court and parties direct all future services and correspondence to Mark A. Hagemeier. WHEREFORE, premises considered, Defendants respectfully request that the Court grant the Motion to Withdraw as Counsel and for Substitution of Counsel and that Mark A. Hagemeier be substituted as their counsel of record . .l By: Respectfully Submitted, MIKE BEEBE Attorney General Assistant Attorney eral 323 Center Street, Suite 200 Little Rock, AR 72201-2610 (501) 682-3643 CERTIFICATE OF SERVICE I, Mark A. Hagemeier, certify that on April 24, 2003, I caused the foregoing document to be served by depositing a copy in the United States mail, postage prepaid, addressed to each of the following: Mr. M. Samuel Jones, III Wright, Lindsey \u0026amp; Jennings 200 W. Capitol, Suite 2000 Little Rock, AR 72201 Mr. John W. Walker John Walker, P.A. 1723 Broadway Little Rock, AR 72201 Mr. Richard Roachell Plaza West Building 415 N. McKinley, Suite 465 Little Rock, AR 72205 Mr. Christopher Heller Friday, Eldredge \u0026amp; Clark 400 W. Capitol, Suite 2000 Little Rock, AR 72201-3493 Mr. Stephen W. Jones Jack, Lyon \u0026amp; Jones 425 W. Capitol, Suite 3400 Little Rock, AR 72201 Ms. Ann Marshall One Union National Plaza 124 West Capitol, Suite 1895 Little Rock, AR 72201 Mark A. Hagemeier 2 --- ..... . .)_ RECEIVED THE ATTORNEY GENERAL STATE OF ARKANSAS MIKE BEEBE APR 2 5 2003 OFFICE OF DESEGREGATION MONITORlNG Mark A. Hagemeier Assistant Attorney General Mr. M. SamuelJones,m Wright, Lindsey \u0026amp; Jennings 200 W. Capitol, Suite 2000 Little Rock, AR 72201 Mr. John W. Walker John Walker, P.A. 1 723 Broadway Little Rock, AR 72201 Mr. Richard Roachell Plaza West Building 415 N. Mc.inley, Suite 465 Little Rock, AR 72205 April 24, 2003 Direct dial: (501) 682-3643 E-mail: mark.hagemeier@ag.state.us Mr. Christopher Heller Friday, Eldredge \u0026amp; Clark 400 W. Capitol, Suite 2000 Little Rock, AR 72201-3493 Mr. Stephen W. Jones Jack, Lyon \u0026amp; Jones 425 W. Capitol, Suite 3400 Little Rock, AR 72201 Ms. Ann Marshall One Union National Plaza 124 West Capitol, Suite 1895 Little Rock, AR 72201 RE: Little Rock Sch. Dist. v. Pulaski County Special Sch. Dist. et al. U.S. Dist. Ct. No. 4:82-CV-866 Dear Gentlemen and Ms. Marshall: Enclosed please find a copy of Separate Defendant Arkansas Department of Education's Motion to Withdraw as Counsel and for Substitution of Counsel, Notice of Filing and ADE's Project Management Tool sent for filing in the above-referenced matter. MAH/jle Very truly yours, ~.){ . MARK A. HAG~R Assistant Attom~::ral 323 Center Street  Suite 200  Little Rock, Arkansas 72201 (501) 682-2007  FAX (501) 682-2591 Internet Website http://www.ag.state.ar.us/ Cc: Mr. Ray Simon D. Scott Smith Mr. Louis Ferren Ms. Charity Smith .l UNITED STATES DISTRICT COURT EASTERN DISTRICT OF ARKANSAS WESTERN DIVISION RECEIVED APR Z 5 1003 OFFICE OF DESEGREG\"i\\OM MOMliORlMG LITTLE ROCK SCHOOL DISTRICT PLAINTIFF v. No. LR-C-82-866 PULASKI COUNTY SPECIAL SCHOOL DISTRICT NO. 1, et al. DEFENDANTS NOTICE OF FILING In accordance with the Court's Order of December 10, 1993, the Arkansas Department of Education hereby gives notice of the filing of ADE's Project Management Tool for March 2003. Respectfully Submitted, MIKE BEEBE Attorney General Assistant Attorney eneral 323 Center Street, Suite 1100 Little Rock, Arkansas 72201 (501) 682-3643 Attorney for Arkansas Department of Education #94127 .l CERTIFICATE OF SERVICE I, Mark A. Hagemeier, certify that on April 24, 2003, I caused the foregoing document to be served by depositing a copy in the United States mail, postage prepaid, addressed to each of the following: Mr. M. Samuel Jones, ID Wright, Lindsey \u0026amp; Jennings 200 W. Capitol, Suite 2000 Little Rock, AR 72201 Mr. John W. Walker John Walker, P.A. 1723 Broadway Little Rock, AR 72201 Mr. Richard Roachell Plaza West Building 415 N. McKinley, Suite 465 Little Rock, AR 72205 Mr. Christopher Heller Friday, Eldredge \u0026amp; Clark 400 W. Capitol, Suite 2000 Little Rock, AR 72201-3493 Mr. Stephen W. Jones Jack, Lyon \u0026amp; Jones 425 W. Capitol, Suite 3400 Little Rock, AR 72201 Ms. Ann Marshall One Union National Plaza 124 West Capitol, Suite 1895 Little Rock, AR 72201 Mark A. Hagerne'e 2 .l IN THE UNITED STATES DISTRICT COURT EASTERN DISTRICT OF ARKANSAS WESTERN DIVISION LITTLE ROCK SCHOOL DISTRICT, ET AL PLAINTIFFS V. NO. LR-C-82-866 PULASKI COUNTY SPECIAL SCHOOL DISTRICT, ET AL DEFENDANTS MRS. LORENE JOSHUA, ET AL INTERVENORS KA THERINE W. KNIGHT, ET AL INTERVENORS ADE'S PROJECT MANAGEMENT TOOL In compliance with the Court's Order of December 10, 1993, the Arkansas Department of Education (ADE) submits the following Project Management Tool to the parties and the Court. This document describes the progress the ADE has made since March 15, 1994, in complying with provisions of the Implementation Plan and itemizes the ADE's progress against timelines presented in the Plan. IMPLEMENTATION PHASE ACTIVITY I. FINANCIAL OBLIGATIONS A. Use the previous year's three quarter average daily membership to calculate MFPA (State Equalization) for the current school year. 1. Projected Ending Date Last day of each month, August - June. 2. Actual as of April 30, 2003 B. Include all Magnet students in the resident District's average daily membership for calculation. 1 . Projected Ending Date Last day of each month, August - June. Raymond Simon Director s: ate Board of -Education Shelby Hillman, Chair Carlisle JoNell Caldwell, Vice Chair Uttfe Rock Luke Gordy Van Buren Robert Hackler Mountain Home Peggy Jeffries Fort Smith Calvin King Marianna - ane Rebick Uttfe Rock Lewis Thompson, Jr. Texarkana Jeanna Westmoreland Arkadelphia Arkansas Department of Education #4 Capilol Mall, Liltle Rock, AR 72201-1071 501-682-4475 May 30, 2003 MAY 3 1 2003 Mr. M. Samuel Jones, III Wright, Lindsey \u0026amp; Jennings 200 West Capitol, Suite 2000 Little Rock, AR 72201 Mr. Christopher Heller Friday, Eldredge \u0026amp; Clark OFFICE OF DESEGREGATION MONITORING Mr. John W. Walker John Walker, P.A. 1723 Broadway Little Rock, AR 72201 Mr. Richard Roachell Plaza West Building 415 N. McKinley, Suite 465 Little Rock, AR 72205 400 West Capitol, Suite 2000 Little Rock, AR 72201-3493 Mr. Stephen W. Jones Jack, Lyon \u0026amp; Jones 425 West Capitol, Suite 3400 Little Rock, AR 72201 Ms. Ann Marshall One Union National Plaza 124 West Capitol, Suite 1895 Little Rock, AR 72201 RE: Little Rock School District v. Pulaski County Special School District, et al. U.S. District Court No. 4:82-CV-866 Dear Gentlemen and Ms. Marshall: Per an agreement with the Attorney General's Office, I am filing the Arkansas Department of Education's Project Management Tool for the month of April 2003 in the above-referenced case. If you have any questions, please feel free to contact me at your convenience. General Counsel Arkansas Department of Education SS:law cc: Mark Hagemeier UNITED STATES DISTRICT COURT EASTERN DISTRICT OF ARKANSAS WESTERN DNISION LITTLE ROCK SCHOOL DISTRICT .PLAINTIFF V. No. LR-C-82-866 PULASKI COUNTY SPECIAL SCHOOL DISTRICT NO. 1, et al DEFENDANTS- NOTICE OF FILING In accordance with the Court's Order of December 10, 1993, the Arkansas Department of Education hereby gives notice of the filing of the ADE's Project Management Tool for April 2003. Respectfully Submitted, j~1t~~ Scott Smith, 251 Attorney, Arkansas Department of Education #4 Capitol Mall, Room 404-A Little Rock, AR 72201 501-682-4227 CERTIFICATE OF SERVICE I, Scott Smith, certify that on May 30, 2003, I caused the foregoing document to be served by depositing a copy in the United States mail, postage prepaid, addressed to each of the following: Mr.M. SamuelJones,III Wright, Lindsey \u0026amp; Jennings 200 West Capitol, Suite 2000 Little Rock, AR 72201 Mr. John W. Walker John Walker, P.A. 1723 Broadway Little Rock, AR 72201 Mr. Richard Roachell Plaza West Building 415 N. McKinley, Suite 465 Little Rock, AR 72205 Mr. Christopher Heller Friday, Eldredge \u0026amp; Clark 400 West Capitol, Suite 2000 Little Rock, AR 72201-3493 Mr. Stephen W. Jones Jack, Lyon \u0026amp; Jones 425 West Capitol, Suite 3400 Little Rock, AR 72201 Ms. Ann Marshall One Union National Plaza 124 West Capitol, Suite 1895 Little Rock, AR 72201 Scott Smith IN THE UNITED STATES DISTRICT COURT EASTERN DISTRICT OF ARKANSAS WESTERN DIVISION LITTLE ROCK SCHOOL DISTRICT, ET AL PLAINTIFFS V. NO. LR-C-82-866 PULASKI COUNTY SPECIAL SCHOOL DISTRICT, ET AL DEFENDANTS MRS. LORENE JOSHUA, ET AL INTERVENORS KATHERINE W. KNIGHT, ET AL INTERVENORS ADE'S PROJECT MANAGEMENT TOOL In compliance with the Court's Order of December 10, 1993, the Arkansas Department of Education (ADE) submits the following Project Management Tool to the parties and the Court. This document describes the progress the ADE has made since March 15, 1994, in complying with provisions of the Implementation Plan and itemizes the ADE's progress against timelines presented in the Plan. - IMPLEMENTATION PHASE ACTIVITY I. FINANCIAL OBLIGATIONS A. Use the previous year's three quarter average daily membership to calculate MFPA (State Equalization) for the current school year. 1 . Projected Ending Date Last day of each month, August - June. 2. Actual as of May 31, 2003 !ii!ii~h.tii\\ii~,i~miiii%~iliti!!1f.1,a11gy1~t;~r'i\u0026amp;~ B. Include all Magnet students in the resident District's average daily membership for calculation. 1. Projected Ending Date Last day of each month, August - June. IN THE UNITED STATES COURT OF APPEALS FOR THE EIGHTH CIRCUIT NOS. 02-3867 AND 03-1147 RECEIVED - '/ /rJ d - (} It 'v?:h d, JUN0 1 8 2003 - ., tJZ l l'VI OFFICE OF DESEGREGATION MONITORING MRS. LORENE JOSHUA, et al. !JNIUO!INOW N0l!V93H93S3a :10 3~1:1:10 Appellants EOOZ 8 1 Nnr v. 03Al3~3H LITTLE ROCK SCHOOL DISTRICT Appellee Appeal from the United States District Court for the Eastern District of Arkansas Honorable William R. Wilson, Jr., District Judge BRlEF OF APPELLEE CHRISTOPHER HELLER JOHN C. FENDLEY, JR. FRlDA Y, ELDREDGE \u0026amp; CLARK 400 West Capitol Avenue, Suite 2000 Little Rock, Arkansas 7220 l (501) 376-2011 Attorneys for Appellee SUMMARY AND REQUEST FOR ORAL ARGUMENT This appeal arises out of the interdistrict desegregation case filed in 1982 by the Little Rock School District (\"LRSD\") against the Pulaski County Special School District (\"PCSSD\"), the North Little Rock School District (''NLRSD\") and the State of Arkansas. Mrs. Lorene Joshua, et al., (\"Joshua\") intervened during the remedy phase after a liability finding in favor of the LRSD against all of the defendants. In 1998, the LRSD and Joshua agreed to anew desegregation plan for the LRSD, lmown as the \"Revised Plan.\" The Revised Plan entitled the LRSD to a declaration of unitary status if it substantially complied with the plan and no party objected. The - Revised Plan provided that any party objecting would bear the burden of proof. Joshua objected to the LRSD being granted unitary status. Hearings were held on Joshua's objections. The district court found that the LRSD had substantially complied with all but one section of the Revised Plan and granted the LRSD partial unitary status. Joshua then moved to disqualify the Honorable William R. Wilson, Jr. based on 28 U.S.C.  455(b)(2). That motion was denied. Joshua appeals the district court's grant of partial unitary status and denial of the motion to disqualify. The LRSD respectfully requests at least thirty minutes of oral argument due to length and complexity of the proceedings below and the substantial public interest in this case. Raymond Simon Director s: ate Board of Education Shelby Hillman, Chair Carlisle JoNell Caldwell, Vice Chair Little Rock Luke Gordy Van Buren Robert Hackler Mountain Home Peggy Jeffries Fort Smith Calvin King Mananna  eRebick ock Lewis Thompson, Jr. Texarkana Jeanna Westmoreland Arkadelphia Arkansas Department of Education #4 CapiJol Mall, LiJtle Rock, AR 72201-1071 501-682-4475 http:/ larkedu.state.ar.us RECEIVED June 30, 2003 JUL 1- 2003 Mr. M. Samuel Jones, III Wright, Lindsey \u0026amp; Jennings 200 West Capitol, Suite 2000 Little Rock, AR 72201 Mr. Christopher Heller OFFICE OF Friday, Eldredge \u0026amp; Clark DESEGREGATION MONITORING Mr. John W. Walker John Walker, P.A. 1723 Broadway Little Rock, AR 72201 Mr. Richard Roachell Plaza West Building 415 N. McKinley, Suite 465 Little Rock, AR 72205 400 West Capitol, Suite 2000 Little Rock, AR 72201-3493 Mr. Stephen W. Jones Jack, Lyon \u0026amp; Jones 425 West Capitol, Suite 3400 Little Rock, AR 72201 Ms. Ann Marshall One Union National Plaza 124 West Capitol, Suite 1895 Little Rock, AR 72201 RE: Little Rock School District v. Pulaski County Special School District, et al. U.S. District Court No. 4:82-CV-866 Dear Gentlemen and Ms. Marshall: Per an agreement with the Attorney General's Office, I am filing the Arkansas Department of Education's Project Management Tool for the month of June 2003 in the above-referenced case. If you have any questions, please feel free to contact me at your convenience. Sincerely, (} r} lJL~ ~~L Scott Smith General Counsel Arkansas Department of Education SS:law cc: Mark Hagemeier UNITED STATES DISTRICT COURT EASTERN DISTRICT OF ARKANSAS WESTERN DNISION RECEIVED JUL 1 - 2003 OFFICE OF DESEGREGATION MONITORING LITTLE ROCK SCHOOL DISTRICT PLAINTIFF V. No. LR-C-82-866 PULASKI COUNTY SPECIAL SCHOOL DISTRICT NO. 1, et al DEFENDANTS NOTICE OF FILING In accordance with the Court's Order of December 10, 1993, the Arkansas Department of Education hereby gives notice of the filing of the ADE's Project Management Tool for June 2003. Respectfully Submitted, 9-\u0026gt;~vtc LtiA b f v,) Scott Smith, #92251 7 Attorney, Arkansas Department of Education #4 Capitol Mall, Room 404-A Little Rock, AR 72201 501-682-4227 CERTIFICATE OF SERVICE - I, Scott Smith, certify that on June 30, 2003, I caused the foregoing document to be served by depo~iting a copy in the United States mail, postage prepaid, ad~~~ ;VED each of the followmg: tiC\\., Cl Mr. M. Samuel Jones, III Wright, Lindsey \u0026amp; Jennings 200 West Capitol, Suite 2000 Little Rock, AR 72201 Mr. John W. Walker John Walker, P.A. 1 723 Broadway Little Rock, AR 72201 Mr. Richard Roachell Plaza West Building 415 N. McKinley, Suite 465 Little Rock, AR 72205 Mr. Christopher Heller Friday, Eldredge \u0026amp; Clark 400 West Capitol, Suite 2000 Little Rock, AR 72201-3493 Mr. Stephen W. Jones Jack, Lyon \u0026amp; Jones 425 West Capitol, Suite 3400 Little Rock, AR 72201 Ms. Ann Marshall One Union National Plaza 124 West Capitol, Suite 1895 Little Rock, AR 72201 JUL 1 - 2003 OFFICE OF DESEGREGATION MONITORING RECEIVED IN THE UNITED STATES DISTRICT COURT JUL 1 - 2003 EASTERN DISTRICT OF ARKANSAS WESTERN DIVISION OFFICE OF DESEGREGATION MONITORING LITTLE ROCK SCHOOL DISTRICT, ET AL PLAINTIFFS V. NO. LR-C-82-866 PULASKI COUNTY SPECIAL SCHOOL DISTRICT, ET AL DEFENDANTS MRS. LORENE JOSHUA, ET AL INTERVENORS KATHERINE W. KNIGHT, ET AL INTERVENORS ADE'S PROJECT MANAGEMENT TOOL In compliance with the Court's Order of December 10, 1993, the Arkansas Department of Education (ADE) submits the following Project Management Tool to the parties and the Court. This document describes the progress the ADE has made since March 15, 1994, in complying with provisions of the Implementation Plan and itemizes the AD E's progress against timelines presented in the Plan. - IMPLEMENTATION PHASE ACTIVITY I. FINANCIAL OBLIGATIONS A. Use the previous year's three quarter average daily membership to calculate MFPA (State Equalization) for the current school year. 1. Projected Ending Date Last day of each month, August - June. 2. Actual as of June 30, 2003 l!i.iii~ll~1111.~ili!lliil~lf~ili!iii!lrs.itiwct:.lli~ B. Include all Magnet students in the resident District's average daily membership for calculation. 1. Projected Ending Date Last day of each month, August - June.    This project was supported in part by a Digitizing Hidden Special Collections and Archives project grant from The Andrew W. Mellon Foundation and Council on Library and Information Resources.\u003c/dcterms_description\u003e\n   \n\n\u003c/dcterms_description\u003e   \n\n  \n\n\n   \n\n   \n\n   \n\n\n   \n\n   \n\n   \n\n\n   \n\n  \n\n \n\n\n   \n\n   \n\n   \n\n\n   \n\n   \n\n   \n\n\n\n   \n\n   \n\n   \n\n\n   \n\n   \n\n  \n\n  \n\n   \n\n\n   \n\n   \n\n   \n\n\n   \n\n   \n\n   \n\n   \n\n   \n\n   \n\n\n\n\n\n   \n\n   \n\n   \n\n   \n\n\n   \n\n   \n\n   \n\n\n   \n\n   \n\n   \n\n   \n\n\u003c/item\u003e\n\u003c/items\u003e"}],"pages":{"current_page":12,"next_page":13,"prev_page":11,"total_pages":16,"limit_value":12,"offset_value":132,"total_count":182,"first_page?":false,"last_page?":false},"facets":[{"name":"type_facet","items":[{"value":"Text","hits":182}],"options":{"sort":"count","limit":16,"offset":0,"prefix":null}},{"name":"creator_facet","items":[{"value":"Arkansas. Department of Education","hits":127},{"value":"United States. District Court (Arkansas: Eastern District)","hits":46},{"value":"United States Court of Appeals for the Eighth Circuit","hits":5}],"options":{"sort":"count","limit":11,"offset":0,"prefix":null}},{"name":"subject_facet","items":[{"value":"Project management","hits":182},{"value":"Arkansas. Department of Education","hits":176},{"value":"Education--Arkansas","hits":157},{"value":"Office of Desegregation Monitoring (Little Rock, Ark.)","hits":150},{"value":"School integration--Arkansas","hits":96},{"value":"School integration","hits":63},{"value":"School districts","hits":46},{"value":"Little Rock School District","hits":44},{"value":"Little Rock (Ark.)--History--21st Century","hits":37},{"value":"Pulaski County Special School District","hits":35},{"value":"Education--Evaluation","hits":27}],"options":{"sort":"count","limit":11,"offset":0,"prefix":null}},{"name":"location_facet","items":[{"value":"United States, 39.76, -98.5","hits":182},{"value":"United States, Arkansas, 34.75037, -92.50044","hits":182},{"value":"United States, Arkansas, Pulaski County, 34.76993, -92.3118","hits":182},{"value":"United States, Arkansas, Pulaski County, Little Rock, 34.74648, -92.28959","hits":54},{"value":"United States, Arkansas, Pulaski County, Maumelle, 34.86676, -92.40432","hits":3},{"value":"United States, Arkansas, Pulaski County, North Little Rock, 34.76954, -92.26709","hits":1}],"options":{"sort":"count","limit":11,"offset":0,"prefix":null}},{"name":"us_states_facet","items":[{"value":"Arkansas","hits":182}],"options":{"sort":"count","limit":11,"offset":0,"prefix":null}},{"name":"year_facet","items":[{"value":"2005","hits":18},{"value":"2006","hits":18},{"value":"2007","hits":18},{"value":"2004","hits":15},{"value":"2003","hits":14},{"value":"2008","hits":12},{"value":"2009","hits":12},{"value":"2010","hits":12},{"value":"2011","hits":12},{"value":"2012","hits":11},{"value":"2002","hits":9},{"value":"1994","hits":6},{"value":"2013","hits":6},{"value":"1998","hits":3},{"value":"1999","hits":3},{"value":"2001","hits":3},{"value":"1993","hits":2},{"value":"1995","hits":2},{"value":"1996","hits":2},{"value":"1997","hits":2},{"value":"2000","hits":2}],"options":{"sort":"count","limit":100,"offset":0,"prefix":null},"min":"1993","max":"2013","count":182,"missing":0},{"name":"medium_facet","items":[{"value":"documents (object genre)","hits":69},{"value":"projects (object groupings)","hits":60},{"value":"filing","hits":48},{"value":"planning","hits":5}],"options":{"sort":"count","limit":11,"offset":0,"prefix":null}},{"name":"rights_facet","items":[{"value":"http://rightsstatements.org/vocab/InC-EDU/1.0/","hits":182}],"options":{"sort":"count","limit":11,"offset":0,"prefix":null}},{"name":"collection_titles_sms","items":[{"value":"Office of Desegregation Management","hits":182}],"options":{"sort":"count","limit":11,"offset":0,"prefix":null}},{"name":"provenance_facet","items":[{"value":"Butler Center for Arkansas Studies","hits":182}],"options":{"sort":"count","limit":11,"offset":0,"prefix":null}},{"name":"class_name","items":[{"value":"Item","hits":182}],"options":{"sort":"count","limit":100,"offset":0,"prefix":null}},{"name":"educator_resource_b","items":[{"value":"false","hits":182}],"options":{"sort":"count","limit":100,"offset":0,"prefix":null}}]}}